TRADE PROJECT

THIKA TECHNICAL TRAINING INSTITUTE (BUILDING AND CIVIL

ENGINEERING DEPARTMENT)

PROJECT TITLE : TRADE PROJECT FOR THE DESIGNING OF DIRECT

COLD AND HOT WATER SUPPLY SYSTEM AND

TO THE MANHOLE IN GENTS WASHROOM

SUBMITTED TO : KENYA NATIONAL EXAMINATION COUNCIL (KNEC)

COURSE NAME : CRAFT CERTIFICATE IN PLUMBING

STUDENT NAME : MUIRURI BETH NYAMBURA

INDEX NUMBER : 2071011105

COURSE CODE : 1305/316

SUPERVISOR : MR. GACHAU

EXAM SERIES : NOVEMBER 2023

1
Table of Contents
DECLARATION........................................................................................................................................i
DEDICATION...........................................................................................................................................ii
ACKNOWLEDGEMENT........................................................................................................................iii
FORWARD...............................................................................................................................................iv
ACRONYMS..............................................................................................................................................v
ISOMETRIC..............................................................................................................................................1
PLAN..........................................................................................................................................................2
ELEVATION.............................................................................................................................................3
ESTIMATION AND MATERIAL COST...............................................................................................4
WORKING PROGRAM..........................................................................................................................6
NOTES.......................................................................................................................................................6
CONCLUSION..........................................................................................................................................8

2
DECLARATION
I Beth Nyambura declares that this project in craft certificate in plumbing is my own work and
has not been presented by anyone

Name: Muiruri Beth Nyambura

Signature: ……………………..

Date: 23/10/2023

Supervisor: Mr. Gachau

Signature…………………..

Date: ………………………….

i
DEDICATION
I dedicate this project to my class tutor for helping me to obtain plumbing skills making me a
better person. I appreciate my parents for the financial and moral support. I also appreciate my
course mates for their endless effort in the discussion group about this the same.

ii
ACKNOWLEDGEMENT
I owe my heart gratitude’s to my classes tutor and the workshop technician for preparing me for
the project. I thank my parents for their financial support. Mostly I acknowledge our almighty
God for life opportunity and strength.

iii
FORWARD
The project consist of a complete cold and hot water supply feeding all the appliance in gent’s
washrooms and a manhole where all the appliances drains first. Hot water is to be supplied from
the hot water cylinder while the cold water will be from the storage cistern appliances will be
supplied with both hot and cold water they include; kitchen sink, bath tub and wash hand basin
while other appliances like bowl urinal and low level closet only cold water with supplied, cold
water at the right hand side while hot water is at the left . all pipe dimensions is in mm scale of
1:20 to be used.

iv
ACRONYMS
W.H.B – Wash Hand Basin

H.W.C – Hot Water Cylinder

L.L.W.C – Low Level Water Closet

B-tub- Bath Tub

B. Urinal – Bowl Urinal

F.C – Flushing Cistern

K.S – Kitchen Sink

CWSC- Cold Water Storage Cistern.

v
ISOMETRIC

1
PLAN

2
ELEVATION

3
ESTIMATION AND MATERIAL COST
No Item & design Unit Quantit Unit cost ksh Total cost
y (ksh)
Appliances 1
1 Kitchen sink 1 7500 7500
2 Bath tub 1 10000 10000
3 Wash hand basin 1 21000 21000
4 Bowl urinal 1 2500 2500
5 Flushing cistern 2 1500 3000
6 Water closet 1 7500 7500
7 Hot water cylinder 1 8000 8000
8 Storage cistern 1 20000 20000
9 Man hole cover 12 by 18 1 1500 1500
Total Ksh 62,100
Pipes
Ppr pipes 13mm 6 250.00 1500
Ppr pipes 19mm 4 350.00 1400
Ppr pipes 25mm 3 400.00 12000
61 pipes 19mm 3 130.00 390
61 pipes 13mm 3 110.00 330
PVC waste pipes 11/2 2 600.000 1200
inches
PVC waste pipes 4 inches 1 1500.00 1500
Total 18320

No. Item & design Unit Quantit Unit cost ksh Total cost
y ksh
1 PPR (m) socket ¾” 2 30 60
2 PPR (f) adapters ¾” 5 50 250

4
3 PPR plain socket ¾” 3 30 90
4 PPR plain tee ¾” 3 40 80
5 PPR plain elbows ½” , 9 20 180
¾” 9 30 270
1” 9 40 360
6 PVC waste tee 1” 2 150 300
7 1+2” 3 150 450
4” 3 200 600
PVC waste elbows 4” 2 200 400
½” 4 150 600
1” 4 150 600
Flexible tube 6 70 420
Taps 3 180 540
Totals Ksh 5200

Cost of labour

30/1000 x ( 62100+ 18320 +5200)

=ksh 25,686

5
WORKING PROGRAM
No. Activity Working hours
1 Identification of the site 2 hrs
Measuring 2 hrs
Outlining 2hrs
Cutting 3hrs
ppr fusion 5 hrs
2. Fixing water cistern and hot 3 hrs
water cylinder
Fixing cold and hot water 6 hrs
pipes 8 hrs
Digging and fixing the
drainage pipes.
3. building a manhole 7 hrs
Testing ,of leakages 2 hrs
Clearing the site 40 min
Handing over the project 30 min

NOTES
The hot and water storage cistern should be fixed firmly. The hot water should be dust proof with
water capacity of 200 liters while the storage cistern should be of 3000 liters water capacity.

Both outlets pipes and inlets pipes should be at the opposite ends.

Hot water cylinder should supply water to the kitchen sink bath tub and wash hand basin while
cold water should be supplied to all appliances with cold water on the right hand side and the hot
one on the left hand side.

For the hot water supply pipes bends will be used instead of the use of many elbows.

All pipes must be tested and clipped on the wall allowed for a free space for expansion.

6
All appliances should be mounted

Bath tub, kitchen sink and wash hand basin should have taps security fixed on each of them of
baht hot and cold water supply.

An angle valve and a flexible tubing should be used on the appliances

All the appliances should have a pleasing appearances

Both tub should be fixed on the wall with wood batten

Cold and hot water supply pipes should be reduced from them to 13 mm

Ball valve should be inserted in the storage for cistern to prevent back flow or overflow

All pipes dimension should be in millimeters

7
CONCLUSION
I hereby concluded that though this practice project and discussion have gained a lot of skills and
knowledge aiding to be a qualified hardworking good plumber.