You are on page 1of 4

22 Nov 2023 09:15:00 - MPAD_Min_Opportunity Lost.

sm

MULTIPURPOSE AMPHIBIOUS DREDGE

Given:
6
Purchasing_Cost 30 10
ia 6.25 % (interest rate from Bangko Sentral)

n 25 yr (lifespan of equipment)

6
DDR_Cost 4 10 (estimate)

ddr 2.5 yr (frequency of DDR)

3
PM_Cost 90 10

pm 1 yr (frequency of PM)

3
CM_Cost 500 10

cm 1 yr (frequency of CM)

p (percent multiplied to purchasing cost to obtain salvage value)


5%
6
Salvage_value p Purchasing_Cost 1.5 10

L
Volume_of_fuel_per_day 15
day

hr
Operation_time_per_day 6
day

75
Unit_Cost_Fuel
L

Volume_of_fuel_per_day 22 day 12 month Operation_time_per_day Unit_Cost_Fuel


Fuel_Cost
yr
Fuel_Cost 6187.5 (per year)

Idling_days 2842 1651 165 4658

6
Operational_Cost 1 10

opp 1 yr (frequency of operation)

3
1748.36 22 day 12 month 10
DMII_Salary 461.57
day month yr yr
#DM 2

1/4
22 Nov 2023 09:15:00 - MPAD_Min_Opportunity Lost.sm

3
795.68 22 day 12 month 10
DF_Salary 210.06
day month yr yr
#DF 1

3
705.63 22 day 12 month 10
ME_Salary 186.29
day month yr yr
#ME 1

3
12000 12 month 10
Laborer_Salary 144
month yr yr

#Laborer 2

Labor_Cost DMII_Salary #DM DF_Salary #DF ME_Salary #ME Laborer_Salary #Laborer yr


6
Labor_Cost 1.6075 10

Required: What is the dredging operational value that we are losing due to idling?

2/4
22 Nov 2023 09:15:00 - MPAD_Min_Opportunity Lost.sm

Using floor function to round down values:

f x if round x , 0 x
round x , 0
else
round x , 0 1

Getting Present Values of DDR, PM, CM, and Fuel Costs:

n
f ddr
ddr i
yr 6
PVDDR DDR_Cost 1 ia 19.07 10
i 1

n
f pm
pm i
yr 6
PVPM PM_Cost 1 ia 1.12 10
i 1

n
f cm
cm i
yr 6
PVCM CM_Cost 1 ia 6.24 10
i 1

n
yr
i 3
PVFuel_Cost Fuel_Cost 1 ia 77.25 10
i 1

Every year, fuel is being consumed.


n
f opp
opp i
yr 6
PVOperational_Cost Operational_Cost 1 ia 12.49 10
i 1

n
yr
i 6
PVLabor_Cost Labor_Cost 1 ia 20.07 10
i 1

Present Value of Operation nd Maintenance Expenses:


6
O_M_Cost PVDDR PVPM PVCM PVOperational_Cost PVFuel_Cost PVLabor_Cost 59.07 10

3/4
22 Nov 2023 09:15:00 - MPAD_Min_Opportunity Lost.sm

Total of Present Value:

6
PVtotal Purchasing_Cost O_M_Cost 89.07 10

Obtaining the operational value of dredging per year.


n
1 1 ia n
PVtotal Operation_Value Salvage_value 1 ia
ia

n
yr
PVtotal Salvage_value 1 ia 6
10
Operation_Value 7.11 (per year)
n yr
yr
1 1 ia
yr
ia

3
1 yr 1 month 10 (per day)
Operation_Value_per_day Operation_Value 26.92
12 month 22 day day

6
Opportunity_Lost Operation_Value_per_day Idling_days day 125.41 10