You are on page 1of 1

MATERIAL RECEIPT

MR # TWM-MR-001-Rev.00
Contractor El-Nesr Package # TWM-Fence-01
Package Title The Water MarQ (Fence) Date 2/2/2023

Description of material for inspection:


‫استالم الحديد بالموقع‬
‫مرفق الكميات التي تم تسليمها لشركة النسر‬

Date of material delivery

Comments

Contractor's Signature Date: 2/2/2023

Inspection comments (Contractor)

Signature of Contractor

Comments

Signature of Contractor Name: Position Date :

Signature of Consultant Name: Position: Date :

Distribution : Client, PM (1), Contractor (1)

You might also like