CRCC-CREC-CCCC Design, Construction, Supply, Installation, Completion, Testing, Commissioning

CONSORTIUM and Maintenance of Electrified Double Track from Gemas to Johor Bahru
SDN. BHD.
Doc No. SIPY-TRANSMIT-267619 Rev: A Date: 02/04/2024 Page :

Document Title:
SYSTEM BUILDING TYPE B2 (Segamat & Layang-Layang Station) (DD Rev.A)
Submission Record

Revision Date Revision Information


0 22/08/2023 New submission
A 02/04/2024 New submission

CCCCSB /DDC

Architecture Consultant
Prepared by Ihsan Rahim
BIM Manager (NRY)
Signature Date 02/04/2024

Infrastructure, Structure
Prepared by Gan Chin Bong & MEP Consultant BIM Signature Date
Manager (SSP)
Traction Power Supply
(Infrastructure,
Prepared by Mohd Faizal Ibrahim Architecture, Structure & Signature Date
MEP) and Electrification
System Manager
Signaling
Prepared by Syed Azman Contractor’s BIM Signature Date 02/04/2024
Coordinator (ASTS)
Communication
Muhammad Nazzem
Prepared by Contractor’s BIM Signature Date
Jamal
Coordinator (WMSB)

Reviewed by Peter Wyss System BIM Coordinator Signature Date

Arvinthran Raja Senior Trackwork


Reviewed by Signature Date
Kumaran Design Engineer

Reviewed by Amir Yusri Site Engineer (Telco) Signature Date

Dorairajan Contractor’s BIM


Reviewed by Signature Date
Umashankar Manager

Contractor’s Design
Verified by Lee Hang Meng Signature Date
Manager
Contractor’s
Approved by Yeoh Keong Yuan Project Director’s Signature Date
Representative
ICC

APPROVED APPROVED WITH COMMENTS REJECTED,


Proceed with the Proceed with the works and to comply (pls specify) REVISE AND
works RESUBMIT

Reviewed by Signature Date

Verified by Signature Date


(Please tick the appropriate box)

Page a