IRAQ BASRAH REFINERY UPGRADING PROJECT

SAFETY INSPECTION REPORT


Reference Number : SIR-01
Date Action Taken by Contractor
Area Observation-Findings Recommendations Contractor / Subcontractor Due Date
Time Construction Supervision

Meeting with the staff and creating a work plan for the
25/01/2022 Al Yamama inmediately
transfer of concrete blocks

Observed By: Zaid Ihsan Mohammed Action taken By: Ali Mohan

Signature: Signature:

Designation: HSE Designation:

Date: 27-01-2022 Date: