FIRST FLOOR KEY PLAN

P5 P6 P7 P8 P8b P9 P10 P11 P11a P11b


144000 23000
14400 14400 14400 14400 14400 14400 11700 11300
6030 8370 3000 8700
P6a
STAIRCASE 08
R.C.STAIRCASE TO ENGR'S DETAIL
150MM(H) x 200MM (W) R=1777.78, T=275+N=25(45 Nos) C/W
4125 3000 510 1700 1250 1435 300 KICKER KERB 1850
STAINLESS HANDRAIL AT 1200mm HEIGHT
pipe-90 pipe-89 pipe-88 pipe-87 pipe-86 pipe-85
BRICKWALL INFILL UNDER RAMP WITH
FINISHED WALL AT ONE SIDE
TEL 3505 1145 5180 4220

2745
PITCH
SYS - PP 1200mm HIGH RAILING WITH 48MM OD
HR/ - PP 150MM(H) x 300MM (W)
1340
PITCH
100mm THK BRICKWALL WITH LW5A LW9 LW8 STAINLESS STEEL HANDRAILS IN SATIN
20mm THK CEMENT PLASTER RWDP-91 CR - CW CR - KICKER KERB RWDP-
FL2A FL12 83a&83b FINISH TYPE 316 TO DETAIL

1110
ON BOTHSIDE RWDP-92&FL10 FL10

6975
130 150MM(H) x 200MM (W)

200
92a
960

UP DN 50DP 50DP DPftHR DN. JANI. 4 8 1 KICKER KERB PITCH


RC STEP TO ENGR'S DETAIL
STAIRCASE 03 R=175, T=260+25n C/W M.S.

4230
R.C.STAIRCASE TO ENGR'S DETAIL 50DP DP (N/V) PP/ UP
23 11 10
3000

3000
PITCH SCP CTb 2075 150(w)x50(d) RAILING AT 1200mm HEIGHT
2491

R=179.85, T=255+N=25(67 Nos) C/W M.S. ELECT FD1 FD1 D2 3000 2000 6000 2000 5000 2000 5000 2000 5000 4000
HT2 - SCUPPER DRAIN
HANDRAIL ATLW3A
900mm HEIGHT LW3A DN. tap ft UP 5125
LW3 LW3 LW3 LW3 LW3

445 175
50DP FD1A pipe-84
445

HR

400

211
25DP D2B DP ft HOT DIPPED GALVANISE FENCING AT

789
HR ft ft FL6H ft ft ft /REW ft
FL6H FL6H DP HR 1830 HEIGHT C/W HOT DIPPED
1865

450x450mm PCUD15 RWDP-81 RWDP-82 RWDP-83

LAID TO FALL
RWDP-80a STAIRCASE 02 RWDP-83a GALVANISE GRILLE DOOR TO DETAIL
2975

2989
RWDP-83&83c
RWDP UP 75
R.C.STAIRCASE TO ENGR'S DETAIL AL PP AL PP

1:200
150MM(H) x 300MM (W)

LAID TO FALL
LAID TO FALL

R=176.09, T=275+N=25(23 Nos) C/W KICKER KERB HT1/HT3 HT1a HT1/HT3 HT1a 2000 6 1

1200
6000

1:200
5600
/HT4/TT /HT4/TT
1:200

RETAINING WALL BELOW STAINLESS HANDRAIL AT 1200mm HEIGHT UP 'U'-DRAIN UNDER


SCUPPER DRAIN C/W LINEAR RC COPING AT TOP WINDOW RAMP 8 TRACKSIDE DRAINAGE
PLATFORM TO ENGR'S DETAIL 300x300mm PCUD14

1721
SILL RAMP UP RAMP UP RAMP UP FFL 27.885 RAMP UP

2000
2825 1340 1620 1500 1775 3000 COVER TO DETAIL B4 FFL 28.385 FFL 28.135 FFL 27.635
FFL 28.685

3560
300x300mm PCUD14 GRADIENT 1 : 20 GRADIENT 1 : 20 GRADIENT 1 : 20 GRADIENT 1 : 20
KNOCK OUT PANEL FFL 28.685

450
1510

220 220
3020

780
1510
HOSE REEL PIPELINE RC COPING AT TOP WINDOW
RUNNING ABOVE CEILING

2822
LAID TO FALL
SILL
AT 4800mm HT RC STEP TO ENGR'S DETAIL
LAID TO FALL

LAID TO FALL
1265 3460 4385 150MM DIA. UPVC. RWDP.

1:200

3300
- PP DISCHARGE TO INFRA FFL 28.685 FFL 28.685 R=175, T=260+25n C/W M.S.
2450
1:200

1:200
DRAIN
1500 2960 1425 CR - 4975 2040 2660 4900 3530 4550 1480
RAILING AT 1200mm HEIGHT
FL6J FL6J FL6J
450x300mm PCUD6 FD1A D2B 450x300mm PCUD10 450x300mm PCUD10
RWDP-66 UP

1200
2500
ELEC
1775
1325

1150 1150

RWDP-70
JANI. 3 HR 10 1 HR RWDP-64 RWDP-62 HR RWDP-60
ft
RWDP-58 6 1
ft ft RWDP-68 UP 75 50DP ft ft ft ft AL PP ft ft AL PP ft 'U'-DRAIN UNDER
2800

3100

8000

3200
DP (N/V) RWDP-65b
HR 25DP DP RAMP 6

599
UP DP HT1/HT3 HT1a HT1/HT3 HT1a B4 RAMP UP RAMP UP RAMP UP RAMP UP TRACKSIDE DRAINAGE

2000
1325

ELV wcd RWDP-66a ft tap FFL 28.385 GRADIENT 1 : 20 FFL 28.135 GRADIENT 1 : 20 FFL 27.885 GRADIENT 1 : 20
1325

RWDP-67 RWDP-65a /HT4/TT /HT4/TT GRADIENT 1 : 20

1000
RWDP-69 50DP RWDP-63 RWDP-61 RWDP-59 /REW RWDP-57
LAID TO FALL

LAID TO FALL
FL6J FFL 27.635
450x300mm PCUD7 FD1 STAIRCASE 07 450x300mm PCUD11 450x300mm PCUD11

1060
FL6J FL6J
1:200

1:200
DP HR R.C.STAIRCASE TO ENGR'S DETAIL 150MM(H) x 300MM (W) HOT DIPPED GALVANISE FENCING AT
2450

- PP FFL 28.685 1830 HEIGHT C/W HOT DIPPED

3300
R=177.78, T=275+N=25(45 Nos) C/W KICKER KERB AT BOTHSIDES
CR - STAINLESS HANDRAIL AT 1200mm HEIGHT OF STAIRCASE FFL 28.685 GALVANISE GRILLE DOOR TO DETAIL

2557
1510

220 220
780
DOTTED LINE INDICATED 1200mm HIGH M.S.

41120
4200

2980
7220
PEDESTRAIN BRIDGE ABOVE HANDRIAL TO DETAIL

220 220
780
1510
RC COPING AT TOP WINDOW

2823
SILL
1265 3460 4385 STAIRCASE 06

LAID TO FALL

3300
FFL 28.685 FFL 28.685
LAID TO FALL

- PP
R.C.STAIRCASE TO ENGR'S DETAIL
2450

150MM DIA. UPVC. RWDP.

1:200
1500 2960 1425 CR -
1:200

DISCHARGE TO INFRA
R=177.78, T=275+N=25(45 Nos) C/W FL6J 4550 1480
FL6J DRAIN

FD1A RWDP-47a STAINLESS HANDRAIL AT 1200mm HEIGHT


450x300mm PCUD8 450x300mm PCUD12 450x300mm PCUD12
1150

2500
ELEC D2B RAMP UP RAMP UP RAMP UP RAMP UP RAMP 4
1325 1325

1775

2000
1150

RWDP-43
ft HR RWDP-48b 10 1 HR DP RWDP-52 RWDP-54 RWDP-56 FFL 28.385
ft ft RWDP-45 50DP ft JANI. 2 ft RWDP-50 ft AL PP ft ft AL PP ft ft B4 GRADIENT 1 : 20 GRADIENT 1 : 20 FFL 28.135 GRADIENT 1 : 20 FFL 27.885 GRADIENT 1 : 20 FFL 27.635 'U'-DRAIN UNDER
2800

8000

3200
DP ft UP 75
HR 25DP (N/V) UP HT1/HT3 HT1a HT1/HT3 HT1a TRACKSIDE DRAINAGE
ELV wcd ft tap DP
1325

RWDP-48a HR 6 1

1200
RWDP-44 /HT4/TT /HT4/TT
RWDP-42 50DP RWDP-49 RWDP-51 RWDP-53 /REW RWDP-55 UP
LAID TO FALL

450x300mm PCUD9 FD1 RWDP-47 FL6J FL6J FL6J


450x300mm PCUD13 450x300mm PCUD13
1:200

DP HR 4975 2040 2650 4910 3530 150MM(H) x 300MM (W)


2450

- PP FFL 28.685 RC STEP TO ENGR'S DETAIL

3300
HOSE REEL PIPELINE KICKER KERB AT BOTHSIDES R=175, T=260+25n C/W M.S.
CR - OF STAIRCASE FFL 28.685
RUNNING ABOVE CEILING RAILING AT 1200mm HEIGHT

2550
AT 4800mm HT

1510

2100 220 220


3020

780
1510
2000 1275 1200mm HIGH RAILING WITH 48MM OD

450
STAIRCASE 01 FFL 28.685 STAIRCASE 05 STAINLESS STEEL HANDRAILS IN SATIN
FFL 28.685 UP

1000 1000 1200

1200
R.C.STAIRCASE TO ENGR'S DETAIL R.C.STAIRCASE TO ENGR'S DETAIL FINISH TYPE 316 TO DETAIL
6 1 FFL 27.635
R=176.09, T=275+N=25(23 Nos) C/W R=1777.78, T=275+N=25(45 Nos) C/W
LAID TO FALL

LAID TO FALL
STAINLESS HANDRAIL AT 1200mm HEIGHT STAINLESS HANDRAIL AT 1200mm HEIGHT

2450
B4 RAMP UP RAMP UP RAMP UP RAMP UP

2000
RC COPING AT TOP WINDOW 5600 FFL 28.385
AL PP GRADIENT 1 : 20 FFL 28.135 GRADIENT 1 : 20 FFL 27.885 GRADIENT 1 : 20 RAMP 2
6000
1:200

1:200
SCUPPER DRAIN C/W LINEAR 110mm THK BRICKWALL AT 2300mm GRADIENT 1 : 20
SILL HT1/HT3 HT1a
HEIGHT WITH 20mm THK CEMENT

3451
COVER TO DETAIL /HT4/TT
AL PP PLASTER ON BOTHSIDE WITH OPENINGS DISCHARGE TO
1620 1500 1750 6035 495 7200 1105 4535 HOT DIPPED GALVANISED FENCING AT 1830

2001
SUMP AT GRD RETAINING WALL BELOW TO
future railing RWDP-29&29a HT1/HT3 HT1a 1170 RWDP-27 HEIGHT C/W HOT DIPPED GALVANISED
HR DP ft RWDP-31a ft RWDP-30a ft /HT4/TT ft ft HR DP LEVEL ft /REW RWDP-26 ENGR'S DETAIL
LW3 LW3A ft RWDP-30 location RWDP-28 LW3A LW3 LW3
LW3 ft GRILLE DOOR TO DETAIL
400
300

300

175 2095 300


598

2500
750 DP
750
8602 HR RWDP-28a
2395

RWDP-31 RWDP-15a RWDP 405 1530 pipe-18


clear provisional FL6G 630 1560 FL6G RWDP-19
-28b&28c
2800

UP 75 escalator area (allow for floor hacking) 50DP D2B 1200mm HEIGHT PARAPET
300

130 WALL TO DETAIL VOID


FFL 28.685
5375

FL6G JANI. 1
STAIRCASE 04 FFL 28.685 (N/V) PP/ RC Flat roof FFL 27.835
3000
3030

R.C.STAIRCASE TO ENGR'S DETAIL SCP CTb with waterproofing


50DP
R=179.85, T=255+N=25(67 Nos) C/W M.S. 150MM(H) x 300MM (W) HT2 - pipe-18c(2) pipe-18d(1)
FD1 FD1 D2 150MM(H) x 300MM (W) FFL 28.635 pipe-17
pipe-18b(2)
HANDRAIL AT 900mm HEIGHT FD1A KICKER KERB AT BOTHSIDES 3305 ft tap RWDP-19a fall fall FFL 27.835 RWDP-15 RWDP-16
105

KICKER KERB AT BOTHSIDES


75

ELECT DP OF STAIRCASE
960 679

50DP 495 2600 2400 4535 1560 1530 OF STAIRCASE pipe-18c pipe-18d

RWDP-25 50DP 50DP DPftHR FL10 FL9 FL9 FL9 335 FL10 FL11 FL2A FL2A FL11 RC Flat roof pipe-18c(1) VOID
with waterproofing
VOID
960

RWDP-23a FFL 28.185 SPOUT PIPE


LW5A
PITCH

RWDP pipe-21a
526 2100 900 2100 890 2100 pipe-22a pipe-18b(1) 600mm HEIGHT RC PARAPET WALL
VOID VOID VOID VOID VOID 380 SPOUT PIPE
pipe-1 pipe-2 pipe-3
200
2100

- PP HR/ - PP pipe-18b
NOTE:
VOID
CR - CW CR -
SLAB TO BE WATERPROOFED AND FFL 28.335 1. FLOOR TRAP COVER SHALL BE STAINLESS STEEL
400

400 1800 400

SYS TEL 600MM x 600MM SLAB SCREEDED TO FALL


1775 1700 1250 1435 300 pipe-4 VOID OPENING TO DETAIL VOID VOID
AND 100MM DIA. IN SIZE. THE SETTING OUT SHALL
VOID
PITCH VOID 13500 VOID
fall fall SPOUT PIPE BE REFERRED TO FLOOR FINISH DETAILED
ft DRAWING
BASE METAL THICKNESS (BMT) OF 0.48mm THK. 150MM (W) X 50MM (D) SCUPPER DRAIN
115

pipe-18a 2. REFER TO SYSTEMS AND M&E DRAWINGS FOR


600

@ZINCALUME STEEL(COLOURED RIB (43MM VOID VOID


1200

pipe-22a FFL 28.185 pipe-21b Extension of RC flat roof and framings pipe-14

pipe-22
DETAILS OF CABLE ROUTING AND MANHOLES
COMPLETE WITH 1 LAYER OF 50MM 150 3. RC COLUMNS SHALL BE ADJUSTED FOR PLASTER
PITCH

PITCH

PITCH

FORMALDEHYDE FREE FIBRE GLASS16KG/M3 RWDP-23 RWDP-21 fall FFL 28.335 RWDP-20 fall
LW7
fall

THICKNESS AND CHAMFERING


fall

INSULATION COMPLY TO U VALUE: 0.35/R 600mm HEIGHT RC PARAPET WALL


pipe-8
200

230
pipe-5 pipe-6 pipe-7 pipe-9 pipe-10 pipe-11
VALUE: 2.73 TO BOMBA CLASS '0' C/W DOUBLE 4. WALL IS 100MM THK BRICK WALL WITH 20MM THK.
448

fall
298
750

fall
fall

SIDED WOVEN INSULATION SUPPORTED BY 1


LAYER OF BRC3315 WIREMESH OR EQUIVALENT CEMENT PLASTER ON BOTH SIDES.
1200

A/C LEDGE LOUVRES TO ARCH'S DETAIL FFL 27.785 pipe-12 pipe-13


TO ARCH'S APPROVAL ON STEEL ROOFING FULL HEIGHT BRICKWALL ALL AROUND AC LEDGE 5. ALL ROLLER SHUTTER ARE AUTOMATED
STRUCTURE TO SPECIALIST DETAIL WITH RC STIFFENER AT 3M INTERVAL WITH CEMENT 6. TACTILE & TILES TO REFER TO FLOOR FINISHES
BOARD ON TOP TO CLOSE GAP AND TO BE LAYOUT
PLASTERED BOTHSIDES TO REFER TO DETAIL
New RC cantilever slab
600MM x 600MM SLAB
OPENING TO DETAIL
DWG TITLE: KULAI STATION - TYPE B:
1265 1735 12665 5905 8495 1530 12870 630 5000 8770 - ENLARGED FIRST FLOOR PLAN
14400 14400 14400 14400 (PLATFORM) (02/02)
- FIRST FLOOR KEY PLAN

DWG NUM : GJBEDTP/CRJGR/DD/SIPY-NRY/


S4.3/BS-AR/KU/1012 (REV DB.10)
P5a P6 P6a P7 P7a P8 P8a P9 P9a P9b P10 P11a P11b FOR CONSTRUCTION STI NUM : CRJGR-NRYA-STI-GEN-
B.10)
DESIGN COORD DATE: 24 JAN 2022

1 ENLARGED FIRST FLOOR PLAN (PLATFORM) (02/02) CONSTRUCTION DATE


S4.SKU-ARC-ALL-00071
: JANUARY 2022
1012 SCALE = 1 : 200