Professional Documents
Culture Documents
( 11.07.2022 – 05.08.2022 )
RONI SARKAR
hoteL AIRDROP
Summer Internship
Project
A study on employee job satisfaction
At
Hotel airdrop
Date – 05/07/2022
KAMALGHAT, west Tripura signature of the student
Name – Roni sarkar
Id – 20IUT0150199
BBA (FMC)
THE ICFAI UNIVERSITY TRIPURA
ACKNOWLEDGEMENT –
Date – 05/08/2022
Kamalghat, west Tripura yours obediently,
Roni sarkar
Signature ; ……………………………………….
ID 20IUT0150199
BBA (FNC) , ICFAI UNIVERCITY TRIPURA
List of tables and illustration’s -
Abbreviations –
1. Cp – Continental plan
2. Ap – American plane
3. Ep – European plan
4. MAP – Modified American plan
Abstract –
TOTAL ROOMS – 42 (14 rooms each floor , 8 king size bad room , 6
twin bad room )
Expenses –
Grocery ; RS – 6000 (as per requirement )
Vegetables (Weekly) . Do.
SERVER –
WINHMS
1. Housekeeping- To improve efficiency and productivity to
maintain safety and cleanliness to maintain good control over
the processes to maintain the good product quality.
Mitry the fold or hospitality fold
King size room
Hotel industry room temperature- 20 degree.
Do not disturb-Clean up my room card.
Tumbler glass for gurgling in the bathroom.
Smoking detection room.
King size bed- 4pillow, 2cushion, 1T.V, Writing table, table lamp,
Luggage rack.
When we have to enter in a room first of all we have to ring the bell
and wait for 5sec. if there is no response from the guest then again
ring the bell and wait for 5sec. again if there is no response from the
guest then knock the door. Smoking detection room.
King size bed- 4pillow, 2cushion, 1T.V, Writing table, table lamp,
Luggage rack.
When we have to enter in a room first of all we have to ring the bell
and wait for 5sec. if there is no response from the guest then again
ring the bell and wait for 5sec. again if there is no response from the
guest then knock the door.
5S-
Seiri- sorting/segregating
Seiton- self arrangement/arranging.
Seiso- Spic and Span(Neat and clean)
Seiketsu- Standardization.
Shitsuke- Self discipline.
Lost and Found Book-
Laundry book-
Staff uniform register-
Lock book-
Chemicals-
R1- bathroom Cleaner.
B2or R2- All purpose area(Public area, floor)
R3- Glass cleaner.(Light blue)
R4- Wooden polish(White)
R5- Room freshner
R6- WC Cleaning(harpic)
R7/D7- Steal Polish.
R8- x(tea cattle)
R9- Bathroom Stain red clr
R10/H10- Handwash.
Front Office-
Greetings the guest
Explaining about the plans
After selecting a plan, guest id proof are registered in the WINHMS
server.
All the guest queries and requirement will be deal by the front office
or the receptionist.
2. FRONT OFFICE –
In this department
some Technik are there HOW to no customer name spelling
A – ALPHA
B – BRAVO
C – CHARLI
D – DELTA
E – ECHO
F – FOX TRON
G – GOLF
H – HOTEL
I – INDIA
J – JULIYACT
K – KILO
L – LIMA
M – MIKE
N – NOVEMBER
O – OSKAR
P – PAPA
Q – QUEN
R – ROSE
S – SIERRA
T – TANGO
U – UNIFROM
V – VICTORY
W – WISKY
X – XRAY
Y – YANKEE
Z – ZULU
3. IT/HR -
In this case 2 department in there
This case following some rules and regulation
4. Store room –
In this case mainly follow LIFO and FIFO method
LIFO – 1st in 1st out
FIFO – last in 1st out
Important of the study –
PRIMARY OBJECTIVE -
To find out employee job satisfaction at HOTEL AIRDROP
SECONDARY OBJECTIVE –
• Sample size – 52
• How to conduct an employee satisfaction survey –
Step 1 – understand employee satisfaction survey
requirement.
Step 2 – create a questionnaire
Step 3 – collet Data
Step 4 – Analyse Results
Step 5 – Act on the result, and make necessary charts