OWNER - CHỦ ĐẦU TƯ

WORKING PLAN FOR CHECKING AC-L1-01-02 - 1FL LOBBY THANH VAN HOTEL DEVELOPMENT INVESTMENT JSc
CÔNG TY CP ĐT PHÁT TRIỂN KHÁCH SẠN THÀNH VÂN

26.Dec.2022
1 2 3 4 5 1 2 3 4 5
19650 19650 DESIGN CONSULTANT - THIẾT KẾ:
4650 7600 6200 1200 4650 7600 6200 1200
CÔNG TY TƯ VẤN ĐẦU TƯ
Ranh đất S2 S2
Land boundary line
-- -- -- -- & XÂY DỰNG QUỐC TẾ
Lan can tường cao 1200mm
RC WALL GL+1200mm INTERNATIONAL CONSTRUCTION &
Thông gió tầng hầm INVESTMENT CONSULTANCY COMPANY
Dàn nóng vrf
Foundation for audor unit Basement ventilation
Vrf condenser units
2400x1000x200
Chỉ giới xây dựng B1F-400 Chỉ giới xây dựng
Setback line Setback line
Lan can tường cao 1200mm ICIC Co.,LTD
P. rác RC WALL GL+1200mm
Garbage
11.67 m² i=6% Traffic paint(white) Head Office.
B1F-400 13% 32-34 Street 13, An Phu Ward, District 2
SL=FFL-3.200 Kho chứa đồ vải Curved Ramp Ho Chi Minh City, Vietnam
Linen store FFL-1490 Tel No : (08) 37446611 / 22
6.72 m² Fax No : (08) 37446600
B1F-400 Email : icic@icic.com.vn
SL=FFL-3.200 Traffic paint(white) Website : www.icic.com.vn
10%
Straight Ramp
D P. đệm 2 D D Ranh giới khu đất without Roof Lan can tường cao 1200mm D GENERAL
Vestibule 2 Line boundaryline RC WALL GL+1200mm DIRECTOR
2.36 m² KS. TRẦN LÊ CHƯƠNG
B1F+150=FFL-2.650 EPS Up
TæNG
gi¸m ®èc
SL=FFL-2.650
Lối nhân viên xuống hầm Thông gió tầng hầm 1FL-50~-70
4450

4450

4450

4450
Staff entrance to basement Basement ventilation ST-4 PRESIDED
FFL-1950 Dock FFL-50 KTS. LÝ THÀNH ĐẠT
CHñ TR×
B1F+100=FFL-2.700 Kho 10%

Tăng áp Ds
Tăng áp Ds
Kỹ thuật điện Up Dn Storage Kỹ thuật điện Straight Ramp
Eps Eps without Roof
Nước 1.29 m2 DESIGN
C C C PS C KTS. NGUYỄN ANH TÚ
P. đệm 1 Sảnh thang THIÕT KÕ
Bump
Vestibule 1 nhân viên FFL+250
3.44 m² B1F+150=FFL-2.650 P, giữ đồ Thang máy 3
Văn phòng Cloak Staff Elv.lobby
SL=FFL-2.650 Office Lift - 3 Lối xuống hầm 1 CHECK
14.47 m2 4.79 m2

5000

5000
ST-1 21.48 m2 Entrance to KTS. NGUYỄN TRẦN ĐIỀN TÂM
ST-1 1FL=FFL+1.000 KIÓM
Phòng máy phát 1FL=FFL+1.000 SL=FFL+1.000 Down basement
5000

5000
Generator room SL=FFL+900
23.52 m² B1F+150=FFL-2.650
Thang thép
Phòng đệm thang Dn Baby Bed
Thang máy 2 MANAGER
Steel staircase KTS. LÝ THÀNH ĐẠT
Fire lift lobby S1 Lift - 2 S1

Pccc
12.85 m² Up CHñ NHIÖM
-- -- Doghouse Sảnh thang máy -- --
B1F+150=FFL-2.650 i=1.5%
Lễ tân Lift Lobby
18850

18850

18850

18850
SL=FFL-2.700 Reception Quầy đăng kư 9.45 m2

Pccc
B B B B

Pccc
5.7m2 Check-in kiot 1FL=FFL+1.000
1FL=FFL+1.000 Thang máy 1
SL=FFL+900 Lift - 1 MAIN CONTRACTOR - NHÀ THẦU CHÍNH
Cây xanh
ST-2 Green area HEAD OFFICE:
57 m2 Sảnh

Rc volume for ventilation


289 KHUAT DUY TIEN ROAD
Lobby Nước PS TRUNG HOA, CAU GIAY, HA NOI
Dịch vụ dọn phòng

Thông gió tầng hầm


B1F=FFL-2.800 79.10 m2 TEL: (84-24) 3553 3839 FAX: (84-24) 3553 3788
House keeping 1FL=FFL+1.000=EL+6.230
SL=FFL-2.800 8.00 m² BRANCH OFFICE:
FFL ±0.000=EL+5.230 Up
B1F=FFL-2.800 SL=FFL+950 Trực Pccc 7TH FLOOR-VIETNAM CHAMBER OF COMMERCE AND INDUSTRY
Parking SL=FFL-2.800
Vách kính
Fire control
7.20 m2
ST-2 VINATA HO CHI MINH CITY BRANCH BUILDING
171 VO THI SAU STREET, WARD VO THI SAU,
Bãi đậu xe
Glass curtain wall 1FL=FFL+1.000 DISTRICT 3, HO CHI MINH CITY
9400

9400

9400

9400
370.66 m² P. Thay đồ nam Tường rào gạch Bolck
B1F=FFL-2.800 Locker room (M) bê tông H=1500mm SL=FFL+900 TEL: (84-28) 3932 1766 FAX: (84-28) 3932 1764
SL=FFL-2.800 2.04 m² P. Thay đồ nữ Brick wall mortar + paint
Locker room (F) T220mm, H=1500mm APPROVER:
PH£ DUYÖT
trÇn nam trung
METERING 1.98 m² Lan can kính H=900
ST-3
MVSG room/ Phòng trung thế CHECKER 2:
QM
IM

IM

MVSG room
10 12 14 16 18

Lối vào Glass handrail H=900 NG¦êI KIÓM 2


trÇn lª anh th¸i
Vách kính
Phòng trung thế 10.65 m²
Glass curtain wall Entrance
Ram dốc tàn tật
CHECKER 1:
nguyªn hïng
B1F=FFL-2.800 Thang thép 1FL±0.00~-50 NG¦êI KIÓM 1
SL=FFL-2.800 Steel staircase
9 7 5 3 1

Up SL=FFL+900
Lan can kính H=900
Glass handrail H=900
i=1.5%

A A A Up A
Lan can inox
SUS handrail 900mm
Up Up M.KATO K.MAKI
Phòng biến áp
Ốp đá granite Ốp đá granite
C

Transfomer
13.34 m² Granite Stone(Dry) Granite Stone(Dry) SUBCONTRACTOR - NHÀ THẦU PHỤ
B

B1F=FFL-2.800 Tường rào gạch Bolck


A

SL=FFL-2.800 Biên mái sảnh bê tông H=1500mm


n

Canopy boundary Brick wall mortar + paint


T220mm, H=1500mm

P. bơm chữa cháy Water meter box


Fire pump room 2280x485x950
27.45 m² 1696 5000 12128 3100 1828

FIRE
B1F=FFL-2.800
SL=FFL-2.800
Cây xanh
Green area
15 m2

Ra / Out Vào / In

4650 7600 6200 1200 4650 7600 6200 1200


19650 19650

1 2 3 4 5 1 2 3 4 5
VỈA HÈ
PAVEMENT
PROJECT NAME - TÊN DỰ ÁN
MẶT BẰNG HẦM 1 TL: 1/100
SOTETSU HCMC HOTEL
BASEMENT 1 FLOOR PLAN SC : 1/100
KHÁCH SẠN SOTETSU HCM
NO8, LY TU TRONG STREET, No.1DISTRICT, HO CHI MINH CITY
LY TU TRONG STREET SỐ 8, LÝ TỰ TRỌNG, P BẾN NGHÉ, QUẬN 1, TP HỒ CHÍ MINH
ĐƯỜNG LÝ TỰ TRỌNG
FFL=EL+5.230=GL DRAWING TILE - TÊN BẢN VẼ

MẶT BẰNG TẦNG HẦM 1


BASEMENT 1 FLOOR PLAN
MẶT BẰNG TẦNG TRỆT
GROUND FLOOR PLAN
STAGE AS BUILT DRAWING
MẶT BẰNG TẦNG TRỆT TL: 1/100 GIAI ĐOẠN BẢN VẼ HOÀN CÔNG

GROUND FLOOR PLAN SC : 1/100 COMPLETION

Working area/ NGÀY HOÀN THÀNH

SCALE
8/2022

REVISION : 00
Khu vực làm việc TỶ LỆ
DRAWING NO
1/100(A1)
SỐ HIỆU BẢN VẼ A-03-01
THE PROCEDURE FOR CHECKING AND REPAIR
AC STRANGE NOISE
Step 1: Use PVC canvas cover all floor & furniture of working area.

Figure 1: PVC canvas use to cover floor


Step 2: Use wooden plank to protection Foor for the position of scaffolding installation

Figure 2: Use wooden plank for scaffolding installation


Step 3: Install scaffolding reach to Ceiling heigh 4300mm following method below:

Figure 3: Method to install scaffolding

Step 4: Checking the reason & repair the AC strange noise (AC-L1-01-02 at 1FL lobby): Checking air
grill damper; cheking air duct; checking volume damper; checking AC fan…
Step 5: After AC system run normally, we will cleaning and checking after works.