Taking machine room layout as standard one, mount control box. -.Utilize corners on top part of the control box to fix lower part of the control box.
1.2. Machine room’s pipeline laying
Determine laying route and distance of pipes and cut off pipes to process pipe fittings (pipe duct and hose). Pipe duct made of construction metal materials for wire-hole from control box to hoistway, insert the cable into hose.
Hose (Φ42) → used for power line and rotary encoder.