You are on page 1of 3

IRIS1 NV

OTIS - SIGMA Date : 2011. 04. 10


FIELD ENGINEERING Page : 0 - 1 / 3

Machine Room WiringWire


FIM 2
Connecting

2.1. Power line wiring/connecting

3 Inspect power line length of main power supply of phase, and implement wiring/wire connecting.
Wiring point Home position Destination
3-phase power line
Lower part at right side of
Power supply for Distributing box of building
distributing box
lighting

Wiring point Home position Destination


L1,L2,L3, PE One side of the second OCB[L1,L2,L3,PE]
L1, N building distributing box FSK1[L1, N]

FSK1
Note) please refer to drawing 003-Invter OCB

2.2. Motor wiring/wire connecting


Conduct wiring/wire connecting between control box and motor.
Wiring point Home position Destination
Motor power line Motor on traction machine side
ENC(Encoder) ENC on traction machine side
Control box
Brake terminal on traction
Brake
machine side

Home position Destination


T1,T2,T3,PE Motor [U1,V1,W1,PE]
Controller

Motor

Unpublished Work Copyright © OTIS Elevator Company


IRIS1 NV
OTIS - SIGMA Date : 2011. 04. 10
FIELD ENGINEERING Page : 0 - 2 / 3

Machine Room WiringWire


FIM 2
Connecting

2.3. ENC (Rotary Encoder) wiring/wire connecting


PG Card [justify] Motor [ENC]

Controller

M/C

Note) ENC: utilize binding band to fasten.

2.4. Brake wiring/wire connecting

Traction machine [Brake


Brake Field panel[MB]
terminal]
Controller

M/C

Note) Please determine traction machine type after connecting


wire of Brake.
-.less than 15 passengers: New Bomco1
-.more than 17 passengers: Wanyuan

Unpublished Work Copyright © OTIS Elevator Company


IRIS1 NV
OTIS - SIGMA Date : 2011. 04. 10
FIELD ENGINEERING Page : 0 - 3 / 3

Machine Room WiringWire


FIM 2
Connecting

2.5. Governor wiring/wire connecting

Gov. Field panel[Gov] Governor

Controller

Unpublished Work Copyright © OTIS Elevator Company

You might also like