The document provides a budget breakdown for renovating room 233 at the Hotel Horison Ultima Ratu Serang. It lists 17 items needed for the renovation including granit tiles, bathroom tiles, wood panels, sand, sealants, shower fixtures, faucets, phones, pipe stops, and a mirror. The total cost for all materials is estimated to be Rp 11,610,000.
The document provides a budget breakdown for renovating room 233 at the Hotel Horison Ultima Ratu Serang. It lists 17 items needed for the renovation including granit tiles, bathroom tiles, wood panels, sand, sealants, shower fixtures, faucets, phones, pipe stops, and a mirror. The total cost for all materials is estimated to be Rp 11,610,000.
The document provides a budget breakdown for renovating room 233 at the Hotel Horison Ultima Ratu Serang. It lists 17 items needed for the renovation including granit tiles, bathroom tiles, wood panels, sand, sealants, shower fixtures, faucets, phones, pipe stops, and a mirror. The total cost for all materials is estimated to be Rp 11,610,000.
1 GRANIT 60 x 60 17 DUS Rp 375.000 Rp 6.375.000 2 KERAMIK KAMAR MANDI 30 x 30 5 DUS Rp 95.000 Rp 475.000 3 HPL INTERIOR 9 LEMBAR Rp 202.000 Rp 1.818.000 4 PASIR 1 COLT Rp 200.000 Rp 200.000 5 LEM AIBON 1KG 5 PCS Rp 75.000 Rp 375.000 6 Sealant clear 1 pcs Rp 37.000 Rp 37.000 7 Sealant putih 2 pcs Rp 37.000 Rp 74.000 8 jet shower 1 set Rp 126.000 Rp 126.000 9 Head shower plus selang 1 set Rp 185.000 Rp 185.000 10 Keran wastafel (1set plus selang) 1 set Rp 558.000 Rp 558.000 11 Keran shower 1 set Rp 572.000 Rp 572.000 12 Telepon bed room 1 pcs Rp 143.000 Rp 143.000 13 Telpon kamar mandi 1 pcs Rp 143.000 Rp 143.000 14 Stop keran 0.5 inc 3 pcs Rp 80.000 Rp 240.000 15 Stop kontak dinding isi 2 1 pcs Rp 27.000 Rp 27.000 16 Stop kontak dinding isi 1 2 pcs Rp 16.000 Rp 32.000 17 Handle pintu kamar mandi solid 1 pcs Rp 110.000 Rp 110.000 18 Kaca meja 1 pcs Rp 120.000 Rp 120.000 TOTAL Rp 11.610.000