Professional Documents
Culture Documents
NON-CHLORIDE ACCELERATOR
0.5% (9° to 12°) $16.00 1% (5° to 8°) $23.00
1.5% (2° to 4°) $30.00 2% (-1° to 1°) $35.00
2.5% (-2° to -4°) $42.00 3% (-5° to -8°) $48.00
Ambient temperature refers to 12 hours after it has been poured
CALCIUM CHLORIDE
0.5% @ $5.00 1% @ $8.00
1.5% @ $9.00 2% @ $11.00
SPECIAL PRODUCTS
Polypropylene Fibers $18.00 Concrete Blocks $100.00
Tuf-Strand Structural Fibers $40.00/per 1.8kg Bag Retarder Type Rx - 6HR $12.00
Superplasticizers (HRWR) $20.00 Retarder Type Rx - 2HR $9.00
Mid-Range (MRWR) $16.00 Early Strength Products On Request
Integral Colour Colour Washout $90.00/load
1% Colour $50.00 3% Colour $120.00
2% Colour $80.00 4% Colour $160.00
No outside colour will be added to our trucks
MINIMUM LOAD CHARGES
3 cubic meters or less (this minimum charge also applies to partial balance loads) $225.00/load
When highway traffic act restrictions are in effect, a Load Restriction Charge will apply $300.00/load
Request of specific truck size may result in a Truck Substitution Charge $200.00/load
Failure to notify dispatch of load restrictions will result in load being returned at customers full expense.
DEMURRAGE
Allowed 60 minutes per load for unloading, additional time to be charged $5.00/min
EQUIPMENT CHARGE
Conveyor Discharge 40' Conveyor $250.00/load
50' Conveyor $300.00/load
ADDITIONAL CHARGES
Environmental Charge $5.00
Winter Handling November 1, 2021 to April 30, 2022 $20.00
Fuel Surcharge $3.00
Carbon Tax Recovery $2.00
ALL PRICES ARE SUBJECT TO HST
CONCRETE ORDERS: DUNNVILLE PLANT (905) 774-6253
**Prices listed are per cubic meter, unless stated otherwise**
All prices in effect until December 31, 2021