1 General

Purpose
This Pre-Installation Guide will aid you and any required personnel in site preparation prior to installation
of the system.
Read these instructions carefully and thoroughly to prepare for installation of the system. Proper site
planning will ensure optimum efficiency, maintenance access, proper instrument performance, and
avoidance of unnecessary delays during installation.

Responsibility
The customer is responsible for making certain that the basic site requirements for the system are
fulfilled.
These instructions are to be followed by the customer and by customer-contracted personnel, except
where otherwise noted.

Disclaimer
All configurations and specifications are subject to change without notice.

DOC-M86-EXX179 V1 - 03.2019 Page: 1 / 10


● D8 VENTURE
with Dual IµS Microfocus Source
Pre-Installation Guide

2 Radiation Safety
Radiation safety can be separated into two categories:
• Instrument: Bruker AXS is authorized to provide installation, service, and preventive maintenance of
all Bruker analytical X-ray systems. Bruker AXS is also authorized to provide training and
consultation on these systems' operation and safety features.
• State, Province, and/or Commonwealth: Bruker AXS is NOT authorized - and is strictly forbidden -
to provide consultation services regarding your local state, province, and/or commonwealth
regulatory requirements.
You, as the customer, are required to contact the agency in your state or province that regulates the
X-ray instrument's registration, receipt, and/or use (i.e., your local state or province may or may not
require you to have a Radiation Safety Officer on-site, use standard operating procedures, use
dosimetry badges, conduct an annual radiation check, etc.).
lf you have any questions, please do not hesitate to contact Bruker AXS.

Page: 2 / 10 DOC-M86-EXX179 V1 - 03.2019


● D8 VENTURE
with Dual IµS Microfocus Source
Pre-Installation Guide

3 Dimensions and Weight

X-ray Enclosure Dimensions


The system is equipped with integrated casters for easier transportation inside the laboratory. Side, rear,
and front panels can be removed for moving the system through doors. The upper enclosure may be
detached from the base cabinet for transport. The enclosure and base cabinet are connected
mechanically (i.e., with screws} and electrically. Electrical and mechanical connections must be
separated before attempting to detach the upper enclosure and base cabinet.

Height Width Depth


Cabinet and enclosure 204.0 cm (80.3") 1676 cm (66.0") 128.4 cm (50.6")
ready for operation
Transport size on 204.0 cm (80.3") 139.5 cm (54.9") 85.3 cm (33.6")
casters
Space inside enclosure 106.0 cm (41.8") 139.5 cm (54.9") 114.8 cm (45.2")
Table 3.1: X-ray enclosure dimensions

System Weight
When used in a dual-source configuration with two lµS sources, the DB VENTURE's total system weight
is approx. 909 kg (2004 lbs}.

DOC-M86-EXX179 V1 - 03.2019 Page: 3 / 10


● D8 VENTURE
with Dual IµS Microfocus Source
Pre-Installation Guide

4 Installation Site and Operating Conditions

Installation site and operating conditions


Installation site Provide sufficient floor space, see schematic below.
Also include adequate space for the PC.
Clearance around the instrument 70.0 cm (27.6") recommended. Although the
instrument has wheels, it should be accessible from all
sides for proper servicing and airflow.
Room operation-range temperature Maximum: 15.0 °C - 30.0 °C (59.0 °F - 86.0 °F)
Recommended: 20.0 °C - 25.0 °C (68.0 °F - 77.0 °F)
Avoid direct sunlight.
Maximum temperature gradient 1.0 °C (1.8 °F) per hour
Relative humidity 20 ‑ 80 %, non-condensing
Heat Dissipation (maximum) Dissipated heat must be removed by a ventilation or
air-cooling system. Cooling air should flow around the
instrument without restriction. lf possible, locate the air
conditioning and heating ducts so that their airflow is
not aimed directly at the instrument.
We recommend a clean, dust-free environment.
Static electricity elimination (to avoid Any carpeting in the area should be conductive. lf the
adverse effects on instrument electronics) area is carpeted with non-conductive carpet, we
recommend that you place anti-static mats over the
conventional carpeting in the area around the
instrument.
Fuse protection on the installation site See figure Figure 51 [} 7]
Operating altitude 0 – 2000 m (6500 feet) at atmospheric pressure

Typical Floor Plan

Figure 4.1: Typical floor plan arrangement (with Dual lµS Microfocus Source Configuration)

Page: 4 / 10 DOC-M86-EXX179 V1 - 03.2019


● D8 VENTURE
with Dual IµS Microfocus Source
Pre-Installation Guide

Heat dissipation

Component Heat dissipation to air


Enclosure controller and goniomete r control Max . 800 W (2730 btu/hr)
electronics
lµS X- ray generator Max. 160 W (546 btu/hr)
PHOTON detector unit and power supply chassis 240 – 700 W (820 btu/hr)
Low-temperature device (optional) Heat dissipation may vary. Refer to the
documentation included with your particular low-
temperature device.
Computer Max. 165 W (563 btu/hr)
Table 4.1: Heat dissipation to air by component

For 110 VAC 1-phase configurations, the supplied step-up transformer's heat dissipation is
negligible.

lµS Optics and Vacuum


Because the lµS optics are not field-serviceable or cleanable, the optics housing is evacuated to a few
millibars to avoid contamination. The lµS generator contains a vacuum gauge that prevents the shutter
from being opened when the shutter housing is not evacuated (to avoid oxidation of the optics in the
presence of X-rays).

DOC-M86-EXX179 V1 - 03.2019 Page: 5 / 10


● D8 VENTURE
with Dual IµS Microfocus Source
Pre-Installation Guide

5 Electrical Requirements
• Use the supplied power cable to connect the instrument. See the following table for power
requirements (including the computer and peripherals).

lf the power line voltage at your site fluctuates outside the values in the table below, a compatible
line voltage conditioner or regulator may be necessary. Check with your site's electrical coordinator.

• On the wall behind the instrument, connect power from the building mains to a labeled direct-wired
circuit breaker/disconnect box so that power to the instrument can be interrupted if necessary.
• Wire the room air conditioner and any external pumps to a different electrical circuit than that used
for the instrument. High starting currents from their motors may adversely affect line voltage stability.
• To limit electrical noise in the system, connect the system chassis ground to an external grounding
terminal. Note that only the instrument can use this ground, and the ground resistance must not
exceed 0.5 Ohm. For optimum performance, make this connection within 3.7 m (12') of the rear of
the instrument.
• lf the supply neutral is grounded, it should have the same potential as the earth point on the
instrument.

Service Required Component(s) Voltage Frequency Phases Current Draw


Using the Service [VAC] [Hz] [A]
Dedicated service (for lµS Micro sources 100 – 240 50/60 1-phase 1
svstem’s ONLY,
Enclosure controller 208 – 240 50/60 1-phase 3
components plug into
and goniometer
system's intemal
control electronics
distribution unit)1 2 3
208 - 240 VAG, 60 Hz, PHOTON 100 – 240 50/60 1-phase 3
1-phase, (2) detector power supply
15 A fuses/breakers
or
110 VAC, 60 Hz, 1-
phase (2), 20 A fuses/
breakers
110 VAC, 60 Hz, 1- Control computer 110 – 220 50/60 1-phase 15
phase, 15 A fuse/
breaker3
Service for low- Specifications may vary;
temperature device (if please refer to the documentation included with your particular low-temperature
ordered) device.
1
If fuses are used, use slow-blow fuses.
2
Additional accessories will require additional power.
3
Customer to supply plug or shut-off box.

Page: 6 / 10 DOC-M86-EXX179 V1 - 03.2019


● D8 VENTURE
with Dual IµS Microfocus Source
Pre-Installation Guide

Figure 5.1: Recommended electrical connections

Figure 5.2: 208 VAC single-phase electrical connections (schematic)

The 110 VAC single-phase configuration is the same as that for 220 VAC single-phase, with the
addition of a Bruker-supplied step-up transformer.

DOC-M86-EXX179 V1 - 03.2019 Page: 7 / 10


● D8 VENTURE
with Dual IµS Microfocus Source
Pre-Installation Guide

Figure 5.3: 110 VAC single-phase electrical connections (schematic)

NOTICE
lf the mains power is incorrectly connected, damage to the instrument WILL occur!

5.1 Low-Temperature Device Requirements


The optional low-temperature device requires a source of dry air or nitrogen as a shield gas, meeting the
requirements in the following table.

Requirements
Filtration 2 micron particle size, average maximum
Dryness Dew point < -60 °C (-76 °F)
Supply pressure range 2.07 - 6.89 bar (30-100 psi), internally regulated
to 1.38 bar (20 psi)
Table 5.1: Low-temperature device shield gas requirements

The customer must supply a fitting to attach the supplied 8-mm (5/16-inch) input hose to the shield
gas source.

Allow at least 76.2 cm (30.0") behind the instrument for the low-temperature device's dewar and for
service access to it. The dewar is fed from an industry-standard 160-liter tank (not supplied). Allow
adequate space for transporting the tank to within 1.5 m (5.0') of the dewar. Securely mount the
cylinders to a wall or table.

Page: 8 / 10 DOC-M86-EXX179 V1 - 03.2019


● D8 VENTURE
with Dual IµS Microfocus Source
Pre-Installation Guide

6 Communication Requirements

Connections (recommended) Purpose


The system is equipped with a LAN connection for remote hardware and software diagnosis. To use
this option you’ll need the following:
Network connection via RJ-45 (Ethernet) Remote diagnosis over the internet
Telephone line via RJ-11 Voice connection near instrument

Note
Bruker’s Remote Diagnostic Service is now available over the internet (i.e., WebEx). Check with
your IT administrator to find out how this may affect your IT policy.

7 Changing the System’s Location


With each permanent location change, the following points must be considered:
• Before permanently changing the location of the system, please consult your local Bruker AXS
Service Representative.
• All mechanical vibrations are to be avoided during system transport. Otherwise, sensitive physical
components may be damaged.
• The mains connection at the new location must meet the requirements given in this Pre-Installation
Guide.
• At the new location, make sure that all operation permits are strictly observed.
• All documentation (e.g., manuals and other safety certificates) must be moved together with the
instrument.

8 Final Check
You, the customer, are the system operator and responsible for meeting all applicable building and
safety codes. Once the pre-installation utilities are connected, get certification from an approved
authority that the installation meets all applicable building and safety codes.
When all pre-installation work is finished, contact the Bruker AXS Service Department by telephone or
email to confirm that your site is ready for installation.
Upon receiving confirmation that your site is ready, Bruker AXS personnel or local Bruker AXS
representative will schedule the instrument installation.

DOC-M86-EXX179 V1 - 03.2019 Page: 9 / 10


● D8 VENTURE
with Dual IµS Microfocus Source
Pre-Installation Guide

9 When the System Arrives


• When the system arrives, check it for damage with the delivery driver. Contact the carrier’s office and
Bruker immediately if you find any damage. Check the tilt and shock indicators (if present).
• Compare the packing list (i.e., the number of boxes received) with your order invoice, and contact
Bruker if you find any discrepancies.
• Move boxes or crates to the installation site (if possible) to facilitate timely installation. Wait until a
Bruker authorized Field Service Engineer opens the boxes to check their contents against your
invoice. Do not open or uncrate any boxes.
• If uncrating is required, call Bruker for authorization. If you are authorized to uncrate the shipment,
save all packing material until the Bruker Field Service Engineer completes the installation.
• Installation must be performed by a Bruker authorized Field Service Engineer.
• Save all of the system’s packing materials until the Bruker Field Service Engineer has completed the
installation.

10 Contact
For service support please contact your local Bruker Office which you can find on www.bruker.com/
baxs-offices:

Or contact our international Hotline:

Bruker AXS GmbH Bruker AXS Inc.


Address Oestliche Rheinbrueckenstrasse 49 5465 East Cheryl Parkway
D-76187 Karlsruhe Madison, WI 53711-5373
Germany USA
Phone +49 (721) 50997-0 +1 (800) 234-XRAY (9729)
Fax +49 (721) 50997-5222 +1 (608) 276-3015
E-Mail info.baxs@bruker.com customer.service@bruker.com
Web www.bruker.com
Customer Support
Bruker AXS Karlsruhe Service Center Bruker AXS Madison Service Center
Hotline +49 (721) 50997-5200 +1 (608) 276-3087
E-Mail service.axs@bruker.com customer.service@bruker.com
Table 10.1: Contact to Bruker AXS

Page: 10 / 10 DOC-M86-EXX179 V1 - 03.2019

You might also like