You are on page 1of 1

DETAILED TECHNICAL SPECIFICATIONS (DTS) FOR ELECTRICAL WORKS AND DG

SETS....................................................................................................... 186
SCOPE OF WORK: ................................................................ 186
DC System: ........................................................................... 189
Diesel Generators with AMF & Synchronising Panel. ........ 189
PROJECT INFORMATION: ..................................................... 190
Design Criteria for Electrical Equipment / System............. 190
1.1.1 EARTHING & LIGHTNING PROTECTION SYSTEM: ................. 196
1.1.2 Drawings / Documents for Reference ............................... 197
GENERAL TECHNICAL & PARTICULAR REQUIREMENTS FOR ELECTRICAL
EQUIPMENT/ SYSTEMS: ........................................................................ 199
415V METAL ENCLOSED SWITCH BOARDS: ......................... 199
LOCAL PUSH BUTTON STATIONS .......................................... 225
APFC PANEL WITH CAPACITOR BANKS .............................. 226
CABLES & CABLING SYSTEM ................................................ 230
Applicable Standards: ........................................................ 230
EARTHING & LIGHTNING PROTECTION SYSTEM .................. 239
LIGHTING & VENTILATION SYSTEM ....................................... 246
DC SYSTEM ........................................................................... 272
1.1.3 Drawings/ Documents Required: ....................................... 279
SAFETY EQUIPMENTS/ REQUIREMENTS AND MISCELLANEOUS ITEMS: 281
FIRE SAFETY ........................................................................... 281
DEGREE OF PROTECTION .................................................... 281
ELECTRICAL EQUIPMENT FOR HAZARDOUS AREAS ............ 281
INSTALLATION, TESTING & COMMISSIONING – ELECTRICAL
EQUIPMENT:......................................................................................... 283
GENERAL: ............................................................................. 283
POWER/ DISTRIBUTION TRANSFORMERS.............................. 284
HV/ LV SWITCHGEAR CONTROL PANELS ............................ 284
EARTHING AND LIGHTNING PROTECTION SYSTEM ............. 285
INSTALLATION OF CABLE RACKS AND CABLE TRAYS ......... 288
CABLE INSTALLATION ........................................................... 290
LIGHTING SYSTEM INSTALLATION ......................................... 302
PRE COMMISSONING TESTS ON ELECTRICAL EQUIPMENT/ SYSTEMS
TO BE CARRIED OUT AFTER INSTALLATION: ........................................ 309
GENERAL: ............................................................................. 309

TABLE OF CONTENTS X

You might also like