WATCH KEEPING (BRIDGE)

Planned passage properly carried out


1

Efficient look out is maintained


2

The helmsman or the auto pilot is steering the correct course


3

V.H.F watch is maintained


4

Standard magnetic compass error is established


5

Standard magnetic and gyro compasses compared


6

Manual (hand) steering is tested at least once during the watch


7

Navigation and signal light are functioning properly


8

Navigational equipment are functioning properly including Bridge Navigational Watch


9 Alarm System (BNWAS)

Ship's position is plotted on the chart at regular interval


10

Speed and course made good are reasonable


11

Latest weather report observed


12

Collision regulations are observed by own and other ships in vicinity


13

14 Time of Safety and fire round on completion, recorded every watch.

Created by: Checked by: Instructed by:

Fariborz Kia Fariborz Kia Fariborz Kia

Date: 2015‐08‐17 Date: 2015‐08‐17 Date: 2015‐08‐17


Check list file
HSEQMS Documentation PAGE : 2 of 2
Watch keeping (bridge) ‐ 109
Document may not be disclosed to Document: Revision:
any third party without the prior CHL-Watch keeping (bridge) ‐ 109 2
approval of the management

Signature of officer(s) in charge of key operation:

Date:

Place:

Created by: Checked by: Instructed by:

Fariborz Kia Fariborz Kia Fariborz Kia

Date: 2015‐08‐17 Date: 2015‐08‐17 Date: 2015‐08‐17

You might also like