FACTORY SET UP FOR GELMART STYLES

STORE
1. ALL THE FABRIC MUST BE SEPARATED BY COLOR AND LOT WISE
2. ALL THE ACCESSORIES MUST LABELED AS STYLE WISE AND PO WISE
3. MUST HANGING APPROVED COLOR CARD IN STORE WITH MER: SIGNATURE
4. FABRIC INVENTORY REPORT MUST BE UPDATED AND NEED TO BE CLEAR
5. FABRIC INSPECTION REPORT MUST BE MAINTAINED WITH
GSM/SHRINKAGE /VISUAL DIFFECT RPORT
6. ACCESSORIES INSPECTION /TRIM INSPECTION REPORT MUST BE
MAINTAINE

CUTTING SECTION
1. FABRIC MUST USE LOT WISE FOR LAYERING
2. FABRIC MUST BE RELEXED MINIMMUM 48 HOURES WITH REPORT
3. LAYER HEIGHT MAXIMUM 2. 1/2"
4. APPROVED PATTERN MUST BE VISIBLE @ CUTTING WITH SIGNATRE
5. NEED 100% CUT PANAL CHECKING IN CUTTING WITH REPORT?
6. CUT PANAL SHOULD KEEP PO WISE /COLOR WISE WITH TAG
8. ALL THE CUT PANAL MUST BE KEPT IN POLY BAG (LIGHT COLORS)
9. BUNDLE CHECKING WITH 3 POINT MUST BE MAINTAIN WITH REPORT
(TOP PANAL/MID PANAL/BOTTOM PAAL)
10. REPLACEMENT REPORT MUST MAINTAIN (FOR REJECT CUT PANAL)

SEWING FLOR
1. SIZE SET APPROVED & CORRECTION REPORT MUST BE IN FILLED
2. PILOT RUN INSPECTION REPORT MUST BE IN FILLED
3. PP MEETING REPORT MUST BE FILLED
4. MUST KEEP SPI MOCK UP @ ALL THE MACHINE
5. MUST NEED OPERATION MOCK UP AT ALL THE OPERATIONS QCS TABELS
6. ALL THE OVER LOCK MACHINE SHOULD BE WITH SEAM ALLOWANCE
GAUGE TO AVOID USING EXTRA SEAM ELLOWANCE
7. MUST HAVE MEASUREMENT SHEET AND GAUGES AT ALL THE PROCESS
QCS AND END LINE QCS

8. PP SAMPLE WITH COMMENT MUST HANGING END OF LINE


9. ALL THE QUALITY INTERNAL REPORT MUST MAINTAIN PROPERLY AND
CLEARLY (IN LINE/PROCESS/END LINE/HEAT TRANSFER/WASH
TEST/REJECTION/MEASUERMENT/)
10. TECHNICAL FILE MUST KEEP WITH SUBJECT QCS WITH COMPLETE
DETAILS
11. COLOR CARD MUST HANG ON FRONT OF LINE

PACKING SECTION
1. PCKING APPROVAL MUST HANG ON PACKING
2. RATIO DETAILS MUST HANG ON PACKING
3. CTN /COLOR ASSORTMENT /FOLDING /TRIMS APPROVAL MUST HANG
IN ACKING WITH QAM SIGNATURE
4. FOLDING GMT KEEPING HEIGHT, CANT EXCEED MOR THAN HALF
METER IN PACKING TABEL .( MAXIMUM 10 TO 20 PCS ARE ALLOWED )
5. MUST MEASURED ALL @THE KEY POINT THE GMT IN PACKING AS CHEST
/LENGTH
6. FOLDING MEASUREMENT MUST BE MARKED ON TABEL
7. ALL THE INTERNAL REPORT MUST BE MAINTAIN (IN LINE/PRE
FINAL/FINAL)
8. MUST KEEP NINE POINT CHECK REPORT PROPERLY.WITH USING NEEDLE
DEDECTOR MACHINE

**********THANKS FOR YOUR KIND CO OPERATION ********