AMENDMENT/SUPPLEMENTAL BID BULLETIN NO.

August 30, 2022

AMENDMENT/SBB No. 1 TO THE BIDDING DOCUMENTS (DATED JUNE 15, 2022) FOR THE
PROCUREMENT OF 820 UNITS MOTORCYCLES (SPLIT-REF-057-PBD-22-05)

This Supplemental Bid Bulletin No. 1 is issued to amend certain provisions of the Invitation to Bid
and Bid Data Sheet, Special Conditions of Contract, Schedule of Requirements, and Technical
Specifications relative to the above-mentioned procurement.

AS ISSUED on June 15, 2022 IN THE PHIL.


SECTIONS/ CLAUSES BIDDING DOCUMENTS REVISED TO READ
AFFECTED (SPLIT-REF-057-PBD-22-05)
A. Section I. Invitation
to Bid

• Item 4 Interested bidders may obtain further Interested bidders may obtain further
information from Atty. Mary Mae M. information from Mr. Dennis Joseph A.
Gadon, OIC-Chief of Procurement Division Cruz, OIC-Chief of Procurement Division
Office and Head of BAC Secretariat…xxx Office and Head of BAC Secretariat…xxx

• Item 6 Bids must be duly received by the BAC Bids must be duly received by the BAC
Secretariat at the address below on or Secretariat at the address below on or
before July 26, 2022 at 9:00 a.m….xxx before September 6, 2022 at 9:00
a.m….xxx
Bid opening shall be conducted face-to-
face on July 26, 2022 at 9:30 a.m. at the Bid opening shall be conducted face-to-
FAPsO Conference Room… xxx face on September 6, 2022 at 9:30 a.m. at
the FAPsO Conference Room… xxx
• Item 8 For further information, please refer to: For further information, please refer to:

ATTY. MARY MAE M. GADON MR. DENNIS JOSEPH A. CRUZ


BAC Secretariat for SPLIT … xxx BAC Secretariat for SPLIT … xxx
B. Section II. Bid Data
Sheet

• ITB Clause 3.1 Refer to WB Guidelines on Anti- The bank requires compliance with the
Corruption (Annex A) Bank’s Anti-Corruption Guidelines and its
prevailing sanctions, policies and
procedures as set forth in the WBG’s
Sanctions Framework as set forth in
“Annex A – Fraud and Corruption” (pages
42-43 of the bidding documents)

• ITB Clause 5.4 The Bidder must have completed … a The Bidder must have completed … a single
single contract that is similar to this contract that is similar to this Project … xxx
Project … xxx
For this purpose, similar projects should
be referring to the supply and delivery of
motorcycles.

• ITB Clause 10.1 The Procuring Entity’s address for the The Procuring Entity’s address for the
submission of written request … submission of written request …

Atty. Mary Mae M. Gadon Mr. Dennis Joseph A. Cruz


OIC-Chief, Procurement Division OIC-Chief, Procurement Division
Head, BAC Secretariat …xxx Head, BAC Secretariat …xxx

• ITB Clause 12.1 The first envelope shall contain the The first envelope shall contain the
following eligibility and technical following eligibility and technical
documents: documents:

a. Eligibility Requirements a. Eligibility Requirements

i. Registration Certification of the i. Registration Certification of the


Company; Company;
ii. List of relevant contracts that comply to ii. List of relevant contracts that comply to
experience requirement as specified in ITB experience requirement as specified in ITB
Clause 5.4; Clause 5.4 (Refer to the attached forms –
iii. Audited financial statement for the ANNEX “B”)
past 2 years;…xxx iii. Audited financial statement for the past
2 years;…xxx

• ITB Clause 13.2 Estimated cost does not apply as a ceiling ABC and estimated cost do not apply as a
for bid prices. ceiling for bid prices.

• ITB Clause 17.1 Bids will be valid for 90 days from the date Bids will be valid for 90 days from the date
of opening of bids, i.e. until October 24, of opening of bids, i.e. until December 05,
2022 2022
• ITB Clause 18.2 The bid security shall be valid until The bid security shall be valid until January
November 24, 2022 04, 2023
• ITB Clause 21 The address for submission of bids is: The address for submission of bids is:

…. xxx …. xxx

Atty. Mary Mae M. Gadon Mr. Dennis Joseph A. Cruz


OIC-Chief, Procurement Division … xxx OIC-Chief, Procurement Division … xxx

The deadline for submission of bids is July The deadline for submission of bids is
26, 2022 at 9:00 a.m. September 06, 2022 at 9:00 a.m.

• ITB Clause 24.1 The BAC shall open the bids in public on The BAC shall open the bids in public on
July 26, 2022 at 9:30 a.m. at … xxx September 06, 2022 at 9:30 a.m. at … xxx

• ITB Clause 24.2 During Bid opening, if the first envelope During Bid opening, if the first envelope
lacks the documents listed in World lacks the documents listed in World
Bank BDS 12.1, the bid shall be declared Bank BDS 12.1, the bid shall not be
non-responsive but the documents shall declared non-responsive.
be kept by the Procuring Entity.
Section V. Special The inspections and tests that will be The inspections and tests that will be
Conditions of conducted shall be as follows: conducted shall be as follows:
Contract
The motorcycles shall be inspected based Preliminary inspection and testing of at
• SCC Clause 16.1 on the description of its physical features least 10% of the total quantity of the
indicated in the technical specifications. goods awarded shall be undertaken at the
supplier’s warehouse prior to deployment
Engine performance and other technical of the goods to the final destination.
specifications of the offered vehicle shall
be checked at the nearest Philippine The motorcycles shall be inspected based
Motor Vehicle Inspection Center on the description of its physical features
(PMVIC) accredited by the Land indicated in the technical specifications as
Transportation Office (LTO) from the well as the engine performance.
warehouse/point of origin, to determine
compliance of the same vis-à-vis the The final inspection and acceptance of the
prescribed technical specifications goods will be done at the final
indicated in the PBD. The cost of destinations in Section VI – Schedule of
inspection and testing of at least ten Requirements by the purchaser’s
percent (10%) of the total quantity authorized Inspectorate Team based on
delivered shall be to the account of the the technical specifications and brochures
Supplier. submitted by the Supplier.

Inspection and test shall be conducted in


collaboration with the authorized
Inspectorate Team created by the DAR,
the Supplier’s authorized representative
and the authorized End-user’s
representatives.

• GCC Clause 17.3 Warranty required: three (3) years after Warranty required: 12 months or
acceptance by the Procuring Entity of the 12,000km whichever comes first.
delivered Goods. Warranty security either
in the form of retention money or a
special bank guarantee in the amount
specified in the GCC clause shall only be
effective for a period of one (1) year.
C. Section VI. Refer to the attached Annex “C” which
Schedule of replaces the previously issued Section VI.
Requirements Schedule of Requirements.

D. Section VII Refer to the attached Annex “D” which


Technical replaces the previously issued Section VII.
Specification Technical Specifications.

The foregoing shall form an integral part of the Bid Documents and supersede previous issuances relative to the
subject procurement.

APPROVED BY:
(For the BAC-Primary)

MARIA CELESTINA M. TAM


Assistant Secretary, Legal Affairs Office and
Chairperson, Bids and Awards Committee-Primary
CO
Annex “B”

Statement of Single Largest / Completed Contracts Similar to the Contract to be Bid

This is to certify that ______(Company)___ ____has the following completed contract/s for the period CY2018-2022.

Date of the Contracting Amount of Date


Name of Contract Nature/Scope Date Awarded
Contract Party Contract Completed

________________________________________________________ ______________________________
Name and Signature of Date
Authorized Representative

Instructions:
a) Cut-off date as of:
(i) Up to the day before the deadline of submission of bids.
i. b) In the column under “Dates”, indicate the dates of Delivery/End-user’s Acceptance and Official Receipt.
ii. c) “Name of Contract”. Indicate here the Nature/Scope of the Contract for the Procuring Entity to determine the relevance of the entry with the
Procurement at hand. Example: “Supply and Delivery of Motorcycle”
L ANNEX “C”
Section VI. Schedule of Requirements
The delivery schedule expressed as weeks/months stipulates hereafter a delivery date
which is the date of delivery to the project site.

(This replaces the Schedule of Requirements that was issued with the Philippine
Bidding Documents on June 15 , 2022.)

LOT 1 – MOTORCYCLES FOR LUZON

DELIVERY PERIOD PER BATCH


Central/Regional No. of Batch 1 Batch 2 Batch 3
Distribution Units within 30 within 60 within 90 calendar
calendar days calendar days days from receipt of
from receipt of from receipt of Notice to Proceed
Notice to Notice to
Proceed Proceed
DARCO 2 2
DARRO CAR 25 25
DARRO I 27 27
DARRO II 52 52
DARRO III 20 20
DARRO IV-A 17 17
DARRO IV-B 22 22
DARRO V 60 60
Total/batch 54 89 82
TOTAL 225

LOT 2 – MOTORCYCLES FOR VISAYAS

DELIVERY PERIOD PER BATCH


Regional No. of Batch 1 Batch 2 Batch 3
Distribution Units within 30 within 60 within 90 calendar
calendar days calendar days days from receipt of
from receipt of from receipt of Notice to Proceed
Notice to Proceed Notice to Proceed
DARRO VI 108 108
DARRO VII 30 30
DARRO VIII 123 123
30 108 123
Total/batch
TOTAL 261
LOT 3 – MOTORCYCLES FOR MINDANAO

DELIVERY PERIOD PER BATCH


Regional No. Batch 1 Batch 2 Batch 3
Distribution of within 60 within 90 within 120
Units calendar days calendar days calendar days
from receipt of from receipt of from receipt of
Notice to Proceed Notice to Proceed Notice to Proceed
DARRO IX 65 65
DARRO X 60 60
DARRO XI 59 59
DARRO XII 88 88
DARRO CARAGA 62 62

Total/batch 65 122 147


TOTAL 334

I hereby commit to comply and deliver all the above requirements in accordance with
the above-stated schedule.

Name of Company: ________________________________________

Signature over Printed Name of Authorized Representative:

________________________________________________________

Date: _______________________
Board Member
ANNEX “D”

Section VII. Technical Specifications


(This replaces the Schedule of Requirements that was issued with the Philippine
Bidding Documents on June 15 , 2022.)

Item Description Statement of Compliance


Bidders must state here either “Comply”or
“Not Comply” against each of the
individual parameters of eachSpecification
stating the corresponding performance
parameter of the equipment offered.
Statements of “Comply” or “NotComply”
must be supported by evidencein a Bidders
Bid and cross-referenced to that evidence.
Evidence shall be in the form of
manufacturer’s un-amended sales
literature, unconditional statements of
specification and compliance issued by the
manufacturer, samples, independent test
data etc., as appropriate.A statement that is
not supported by evidence or is
subsequently found to be contradicted by
the evidence presented will render the Bid
under evaluation liable for rejection. A
statement either inthe Bidders statement of
compliance or the supporting evidence that
is found to be false either during Bid
evaluation, post-qualification or the
execution of theContract may be regarded
as fraudulent and render the Bidder or
supplier liable for prosecution subject to
the provisions of ITB Clause 3.1(a)(ii)
and/or GCC Clause 2.1(a)(ii).

Item Purchaser’s Technical Bidder’s Statement of Compliance


Description Specifications
(Minimum)

Motorcycles 1.Brand new, latest model

2.Type: Off-road

3. Engine Type: Air-cooled,


four stroke, OHC
4. Displacement: 140 cc.

5. Starting system: electric and


kick

6. Bore and stroke: at least 57 x


57 mm

7. Transmission type: 5-speed


manual

8. Front suspension: telescopic


fork

9. Rear suspension: mono


shock

10. Front tire: 70/90-17

11. Rear tire: 90/80-17

12. Front brake: disc

13. Rear brake: drum

14. With headlight and tail


light

15. Seat height: at least 800mm

16. Wheel base: 1340 mm

17. Ground clearance: 234 mm

18. Fuel tank capacity: at least 7


liters

19. Complete with all standard


Other tools, manual, accessories
Requirements
20. Free one-year
comprehensive insurance with
Acts of Nature (AON) coverage

21. Free one (1) year LTO


registration

22. On-site Technical Support


within 72 hours from the time
of notification

23. Twelve months warranty or


12,000 kms. whichever comes
first

24. After-sales service: spare


parts and service centers (list of
which should be submitted with
the bid) are available in key
major cities (nationwide) in the
areas where the DAR Regional
Offices are located.

I hereby certify that the statement of compliance to the foregoing technical specifications are true
and correct, otherwise, if found to be false either during bid evaluation or post-qualification, the
same shall give rise to automatic disqualification of our bid.

___________________________________
Name of Company/Bidder

___________________________________ ______________
Signature over Printed Name of Date
Authorized Representative