LIGHTING CALCULATION
Document no:
SLS – 40 – ELE – CAL – 001
PT. DEPRIWANGGA
NO part of this document may be reproduced, in any form or by any means, except as permitted by
the Author
Jasa Konsultansi Perancangan
& Feasibility Study
Jalur Pipa Transmisi Gas Arun - Belawan
REVISION SHEET
COMMENT SHEET
COMPANY
BY
POSITION
DATE
Jasa Konsultansi Perancangan
& Feasibility Study
Jalur Pipa Transmisi Gas Arun - Belawan
TABLE OF CONTENTS
REVISION SHEET......................................................................................................................1
COMMENT SHEET....................................................................................................................2
TABLE OF CONTENTS..............................................................................................................3
1. Introduction..........................................................................................................................4
1.1 Background..................................................................................................................4
1.2 Objectives.....................................................................................................................4
1.3 Scope...........................................................................................................................4
1.4 Associated Document..................................................................................................4
2. Glossary of Terms...............................................................................................................5
2.1 Definitions.....................................................................................................................5
2.2 Abbreviations................................................................................................................5
3. Principal Design Consideration...........................................................................................5
4. Basis and Assumptions.......................................................................................................5
4.1 Design Basis................................................................................................................5
4.2 Assumptions.................................................................................................................6
4.3 Formulae......................................................................................................................6
5. Indoor Lighting Calculation..................................................................................................9
5.1 Model of Lighting..........................................................................................................9
5.2 Calculation....................................................................................................................9
6. Outdoor Lighting Calculation.............................................................................................10
6.1 Model of Lighting........................................................................................................10
6.2 Result.........................................................................................................................10
Jasa Konsultansi Perancangan
& Feasibility Study
Jalur Pipa Transmisi Gas Arun - Belawan
1. Introduction
1.1 Background
This document covers Control Valve Calculation for FEED 75 KM pipeline project from point B
Arun to SLS A Development. The Control valve to be installed on Area 19, Arun before Metering
SKID. Located in lhokseumawe, Aceh and operated by PERTAMINA GAS., hereinafter is referred
to as COMPANY.
This document is preliminary calculation only. It is VENDOR’S responsibility to verify this
calculation to meet COMPANY requirement to run facilities operable and safely. The VENDOR
shall be required to update this document, once specific information has been defined. Should
there be discrepancies or anomalies between documents, VENDOR shall clarify and responsible
for the revision the document and consequences thereof.
1.2 Objectives
This document provides calculations to determine illumination level calculation of Electrical Room
and Control Room to be installed on the Electrical Room and Control Room FEED 75 KM pipeline
project from point B Arun to SLS A Development.
The purpose of this calculation is to confirm the number of fixtures required and illmunation levels
meet the requirement for Electrical Room and Control Room.
This report consist of indoor and outdoor lighting calculation outputs. The calculations are
attached to this report. Outdoor lighting calculation is performed using Chalmlite Lighting
Software version 4.05
1.3 Scope
This assessment of electrical calculation is for FEED 75 KM pipeline project from point B Arun to
SLS A Development of PERTAMINA GAS.
International Standards used in this report of Lighting Calculation but not limited as follows:
- IESNA Lighting Handbook Illuminating Engineering Society of North America
- ASHRAE/IESNA Standard 90.1 American Society of Heating, Refrigerating and Air-
Jasa Konsultansi Perancangan
& Feasibility Study
Jalur Pipa Transmisi Gas Arun - Belawan
2. Glossary of Terms
2.1 Definitions
COMPANY PT Pertamina Gas
CONTRACTOR The party that carries out all or part of the design, engineering, procurement,
construction, commissioning or management of a project. The COMPANY
may undertake all or part of the duties of the CONTRACTOR
VENDOR The party that manufactures or supplies equipment and services to perform
the duties specified by the CONTRACTOR
2.2 Abbreviations
LLF Loss Light Factor
MF Maintenance Factor
UF Utility Factor
IEC International Electro-technical Commission
IEEE Institute of Electrical and Electronic Engineers
4.2 Assumptions
Generally, this lighting calculation is based on several assumptions data as below:
4.2.1 Light Loss Factor (LLF) or Maintenance Factor (MF) for lighting calculation as follow:
- For process area, the maintenance factor is 0.8 in indoor and outdoor
- For non-process area, the maintenace factor is 0.85 for indoor and 0.8 for outdoor
4.2.2 Lighting system is designed to provide a level of illumination 0.75 m above the floor. The
mounting height will be 2.25 m. For outdoor area the mounting height will be 9 m.
- Ceiling : 0.7
- Wall : 0.5
- Floor : 0.3
4.3 Formulae
4.3.1 Zonal Cavity Method (Lumen Method)
In rectangular room or building, zonal cavity method can be used to quickly calculate average
illuminance levels, number of luminaires, and lighting layout.
n x N x F x UF x MF
E= (1)
A
Where
N = number of luminaire
MF = maintenance factor (sometimes also called light loss factor LLF), to account for the
reduction in light output from a lighting system due to ageing of the lamps and
accumulation of dirt/dust on the light fittings and room surfaces
Jasa Konsultansi Perancangan
& Feasibility Study
Jalur Pipa Transmisi Gas Arun - Belawan
Utilisation factor (UF) measures the efficiency of the lighting scheme to deliver the light to the
working plane relative to the room geometry. This incorporates the proportion of flux reaching
the working plane from both the direct and reflected off other surfaces encasing the
room/environment.
length L
width W
c
e
Ceiling
hm
plane
Workin
fl g plane
o
The utilisation factor can be obtained from Utilisation Factor Table provided by the luminaire
manufacturer based on the surface reflectance along with the room index (K), which can be
derived as:
LxW
K= (2)
( L + W ) hm
Where
Maintenance factor (MF) is a value designed to account for the reduction in light output from a
lighting system due to:
(3)
I x cosӨ
E= x MF x AL (7)
d2
Where
Ө = angle between the light ray coming from the source to the point, and a line
that is perpendicular (normal) to the plane or surface on which the illuminance is
being measured or calculated
MF = maintenance factor
Ө d
O P
If the target plane is illuminated by multiple light source, the calculations can be preformed
individually per light source. The final result can be obtained by summing all calculated
illuminance levels.
5. Indoor Lighting Calculation
5.1 Model of Lighting
Model of flourescent lighting fixture selected in the calculation are taken from Philips Lighting
Handbook. It will revised per actual VENDOR.
The lighting fixtures used in the calculation are based on the following main parameters,
Lamp type : Flourescent Lamp T8 2x36 W per fixtures
Lamp lumens : 2x3350 lumens
Light loss factor : 0.8
Catalgoue : Philips
5.2 Calculation
First we define the room index based on the room physical dimension from equation (2)
LxW
K=
( L + W ) hm
11 x 8
=
( 11+ 8 ) 2.25
= 2.06
So the Room index: 2.06
Jasa Konsultansi Perancangan
& Feasibility Study
Jalur Pipa Transmisi Gas Arun - Belawan
To find the LLF or UF, see the Coefficient Utilization Table in Attachment 1
For the assumption reflection factor and the room index above, UF is set to be 0.75
500×88
N=
2×3350×0 . 75×0 . 8
N = 11.73
The number of fixtures required is set to be 16 fixtures
The average intensity of illumination for each Electrical and Control Room will be
n×N×UF ×MF×F
E=
A
E= 682.18 lux
Model of high pressured sodium outdoor lighting selected in the calculation are taken from
Chalmit Photometric Data provided by Chalmlite Software. It will revised per actual VENDOR.
The lighting fixtures used in the calculation are based on the following main parameters,
Lamp type : Maxinex 2x250W per fixtures
Lamp lumens : 2x28000 lumens
Light loss factor : 0.8
Catalgoue : Chalmit
6.2 Result
From the calculation report, the minimum illumination levels is 12 lux. This has suffice the
minimum requirement illumination level for outdoor area.
Jasa Konsultansi Perancangan
& Feasibility Study
Jalur Pipa Transmisi Gas Arun - Belawan
Appendix 3
Outdoor Lighting Calculation Report