INTERVIEW BURNING,MAXIMUM TEMP IN THE E/R IS 49

DEG C
PERKENALAN DIRI
1.NAME : SYAMSUDDIN THIRTH ENGINEER(3RD
SOLLE
PLACE/DATE OF BIRD : KATINTING,18-
ENGINEER)
JANUARY 1981
PRESENT ADDRESS : JLN.WALANG BARU 1 5. JOB IS ASSIST TO THE CHIEF ENGINEER EXHAUST GAS TEMPERATURE
NO.1C.KELURAHAN TUGU UTARA.KECAMATAN AND 2ND ENGINEER HIGHT OF MAIN ENGINE
KOJA, -RESPONSIBILITY TO THE AUXALARY -CAUSES OF GAS TEMP OF MAIN ENGINE
JAKARTA ENGINE AND ANOTHER AUXALARY HIGT IS
UTARA,INDONESIA
MACHINARY,LIKE GENERATOR,ALL -WATER JACKET MAYBE NOT FUNCTIONING
STATUS : MARRIED ( 3 CHILDREN 2
SON AND 1 DAUGHTER) PUMPS,AIR COMPRESSOR AND ATC PROPERLY AND NEED TO BE EXAMINED
LAST LICENSE : I HOLD COC -RESPONSIBLE FOR ELECTRICAL,LUB -CHECK AIR INTERCOOLER MAY NOT
CLASS II OF MERCHANT MARINE POLITEHNIC OIL,BILGE,AND OILY WATER SEPARATOR FUNCTION PROPERLY COOL THE AIR RINSE
MAKASSAR SYSTEM -INJECTOR NOZZLE MAYBE CLOGGED DUE
-FOLLOW ORDER FROM 2ND ENGR AND TO BURNING HOT CRUST
2.LAST EXPERIENCE : FROM ASD TUG TYPE CHIEF ENGR -MAYBE PROBABLY DUE TO ENGINE
TUGBOAT,AS C/E,VESSEL NAME IS KEJORA
-UPDATE SPARE PART LIST AND ASSIST 2ND OPERATION FOR A LONG TIME SO THAT THE
ENAM,GRT 290/
HP 3600,KW 2882. MARK ENGR AND CHIEF ENGR TO VALVE SETTING CHANGED CAUSING
THE ENGINE IS NIIGATA,TRADING AREA MAINTENANCE IN ENG/ROOM COMBUSTION TIMING IS NOT RIGHT
TANJUNG PELEPAS -MAKE AND UPDATE PMS(PLANE -CHECK THE VALVE MAYBE HAVE ALREADY
PORT OF MALAYSIA MAINTENANCE SYSTEM) WEAK
-DUTY TIME IS 0600-1200 AM AND 1600-
CHIEF ENGINEER 2400 PM
IF TROUBLE / PROBLEM IN
3.: DUTY & RESPONSIBILITY AS E/R MAIN ENGINE
C/E..RESPONSIBILITY TO THE -INFORM TO THE BRIDGE THAT ANY
MASTER,RESPONSIBILITY TO THE ALL
MACHINARY IN ENGINE ROOM AND
MAIN ENGINE TROUBLE / PROBLEM IN ENGINE ROOM
-DECREASE OF MAIN ENGINE RPM
EQUIPMENT ON THE VESSEL,ALSO
RESPONSIBILITY FOR RECORD OF SAVE
PROCEDUR FOR START MAIN ENGINE -TO BE CHECK ONE BY ONE OF THE
OPERATION AND MAINTENANCE AND REPAIR
-CHECK LO LEVEL IN SUMP TANK OPERATION MACHINERY
-CHECK LO IN GEAR BOX
IN THE LOG BOOK . RESPONSIBLE TO MANAGE -CHECK OIL IN TURBO CHARGE
-TO BE CHECK LO AND FO PRESS OF
THE ENGINE ROOM AND RESPONSIBLE FOR -CHECK OIL IN GOVERNOR MAIN ENGINE
THE POWER AND SAVE PROPULSION OF THE -START SW PUMP AND LO PUMP -TO BE CHECK EXHAUST AND COOLING
VESSEL . AND RESPONSIBLE FOR THE SMOOTH -CHECH FUEL OIL LEVEL SYSTEM TEMPERATURE
OPERATION OF THE MACHINE AND THE DUTY -OPEN INDICATOR VALVE
-PUMPING CYLINDER OIL -TO BE CHECK PRESS OF COOLING
TO REPORT ALL ACTIVIES OF THE CREW IN
-TURNING THE FLY WHEEL
THE ENGINE ROOM TO WORK IN THE -START AIR COMPRESSOR
COMPANY. -CLOSE INDICATOR VALVE OVERHAUL MAIN ENGINE
CHIEF ENGINEER -AIR BLOW
-START FUEL PUMP AND FW PUMP (PREPARE AND REASON)
The Chief Engineer is responsible to the all -START MAIN ENGINE -PLANNING A GOOD JOB FOR
machinery in the vessel and the operation and OVERHAUL
organizational and repair of all machinery. He is MAIN ENGINE BREAK DOWN -SPECIFY THE TIME OF
also responsible for the requisitioning and (PENYEBABNYA) IMPLEMENTATION AND INFORM ALL
storage of an adequate stock of tools, spare -SHORTAGES OF FUEL SUPPLY,CHECK THE WORKER ON THE OVERHAUL PLAN
parts, and materials necessary for safe machinery
FUEL SYSTEM TO THE ENGINE -CHECK THE SPARE PART IF NOT
-EXCESSIVE HEAT ENAUGH ORDER AGAIN
operation and maintenance. He maintains ENGINE(OVERHEATING),CHECK THE -TO KNOW WELL THE STATE OF THE
records of spare parts showing the quality and COOLING SYTEM AND
MACHINE THAT WILL BE IN OVERHAUL
storage allocation. He prepares and submits work LUBRICATION(PUMPS,LO COOLER,FW
-PREPARE TOOLS THAT WILL BE USED
orders and specifications for repairs which must COOLER)AND CHECK THE TAP-TAP OF
be made up as soon as possible. He is responsible
WORK BOTH When to General Overhoul the
-THE ACCURRRENCE OF JAM EVEN BROKEN
for the records of all operations, maintenance ON THE PISTON RING SUCTION OR
main engine ?
and repairs in the log book. He does not keep EXHAUST VALVE - When the engine working hours reach
watch while the ship is under way -CRANKSHAFT BEARING JAMMED AND 16000-24000 hours
PISTON JAMMED - When the engine lubricating oil leak on
-OVERLOAD,CHECK THE PROPELLER shell 0 / 0 ring are damaged
SECOND ENGEER (2ND/ENGINEER) POSSIBILITY OF OBJECTS THAT STUCK SO - If there is damage to the crankshaft
BURDENSOME FOR ENGINE - The existence of damage to the metal seat
4. IS RESPONSIBLE TO THE CHIEF ENGINEER
( cushion) as it affects the alignment of the
-ACTING AS CHIEF C/E ASSISTENT
-2ND ENGINEER MUST BE FAMILIAR WITH ALL OVER HEATING MAIN crankshaft . When the spin will experience
MACINARY,STEERING GEAR,PUMP AND MAIN the thrill
ENGINE MAINTENANCE
ENGINE - When the engine is having a powerful
-FIRST STEP IF MAIN ENGINE OVER
-HE WILL ASSIST IN THE SUPERVISION OF E/R vibration which requires measurement of
HEATING IS CHECK COOLING SYSTEM
RATING AND GIVEN THEM DAILY WORK several components
MAYBE COOLING PUMP NOT WORKING
SCEDULE
PROPERLY
-DOING JOB IN E/R WITH FOLLOW THE PMS
SYSTEM (PLANE MAINTENANCE SYSTEM)
-CHECK HEAT EXCHANGER MAYBE CRUST PREPARING TO START MAIN
ARISING ON THE SURFACE OF THE PIPE
-DUTY OF MIDNIGHT 2400-0006 AM AND 1200-
WHICH MAKES IT LOST THE OBILITY TO ENGINGE BY AIR
1800 PM -CHECK THE FUEL TANK , FW
DELIVER HOT
-CHECK AIR CIRCULATING SYSTEM,AIR EXPANSION TANK , ADDED IF LESS
CIRCULATING IN E/R TO ENSURE -CHECK PRESSURE OF AIR BOTTLO 30
ADEQUACY OF THE AIR FOR ENGINE FOR KG
-CHECK THE AMOUNT OF LUBRICATINGpada setiap pangkat batang engkol Oil out of the cooler temperature is
OIL CONDITIONS IN THE LO SUMP TANK automatically controlled at a constant
-START LO PRIMING PUMP,FUEL OIL bergerak mencebur ke dalam mangkok
PUMP,SW PUMP tersebut dan memercikkan minyak level that is determined to obtain a
-START TURNING GEAR ABOUT 30 pelumas dari dalam mangkok suitable viscosity with desirable at the
MENITS inlet of the main diesel engine. Then
CLOSE INDICATOR VALVE membasahi bagian-bagian yang harus
lub . oil supplied to the main engine
START MAI ENGINE dilumasi. bearings and also fed back to the lub .
PENGARUH TEKANAN (EFFECT) oil sump tank .
LUB OIL TO MAIN ENGINE
-MAIN ENGINE HEAT lubrication system
-THE VOICE OF MAIN ENGINE SOUNDS NOISY /
NUDE In general, the lubrication system is often ( Lubrication System)
-THE POWER OF MAIN ENGINE DECREASES used on the machine is divided into two Lubricating oil at a machining
parts: system is funcion to minimize
MAIN ENGINE / DIESEL ENGINE a. Dry lubrication system
DIFFICULT (SUSAH) DI START
friction on the surface of the
Dry lubrication system Lubricating oil
-AIR PRESSURE IN THE BOTLO IS TOO LOW is accommodated and nowhere else is the components that move and intersect
-LEAK IN THE AIR STARTING VALVE LINE
sump tank . On board lubrication system . Besides lubricating oil also serves
-AIR STARTING VALVE JUMMED DUE TO
CORROSION used is the lubrication system the dry as a cooling fluid on multiple
-COMPRESSION IN THE COMBUSTION CHAMBER lubrication system full pressure that the oil motors
IS TOO LOW originated from a shelter ( sump tank ) is
-ANY LEAK IN FUEL SYSTEM
circulated by a pump with a certain
-SPRAYING IN FUEL INSIDE THE CYLINDER LATE LUB OIL PRESSURE DROP
AND DEFICIENT pressure gets engine parts that require
-FUEL CONTAINING THE WATER lubrication and then the oil back into the
(DECREASE / TURUN)
-SLOW FUEL FLOW CAUSED BY THE VISICOSITY holding tank ( sump tank ) . PENYEBABNYA
OF FUEL -SUMP TANK SHORTAGE OF LUB OIL (NO
-PROPELLER STUCK WITH A HARD OBJEC THAT b . Wet lubrication system ENAUGH TO SUCTION)
FLOOTS In wet lubrication system lubricating -STRAINER OF FILTER CLOGGED
-VISCOSITY OF LUB OIL IS TOO HIGHT
oil pump to pump lubricating oil from -VISCOSITY OF LUB OIL IS REDUCED
MAIN ENGINE (ABNORMAL) the lubricating oil bath lubrication oil -THE AIR SUCKED THROUGH THE PIPE
APABILA MENDENGAR SUARA into the bowl at any rank piston rod -SUCTION PIPE OF THE PUMP CLOGGED
YANG TIDAK NORMAL PADA moves splashing into the bowl and
VOLTAGE OF PUMP LOW
MAIN ENGINE sprinkle lubricating oil in a bowl of wet LUB OIL SYSTEM
-INFORM TO CHIEF ENGINEER ,AND IMMEDIATLY
CHECK ONE BY ONE WHICH PART ARE NO OTHER parts should be lubricated . TEMPERATURE HIGHT
SOUNDS AND ANALIZE THE CAUSES OF THESE Th -THE OF NORMALLY HEAT ABSOPTION
SOUNDS AND WHERE THE ORIGIN OF THE CAUSED BY THE LO COOLER
SOUNDS,AND IF IT WIL RESULT IN SERIUS THEN purpose of lubrication are : -PIPE TUBE CLOGGED OR DIRTY
THE MACHINE IS STOPPED OR AT A NEW STOP 1. Restrictions on friction and wear of -SW COOLING CAPASITY USED IS REDUSED
ON THE MAKE MAINTENANCE OR REPAIR -THE TEMPERATURE OF COOLANT SW TO
friction .2. Distributors frictional heat .
ENTERING LO COOLER IS HIGHT
3. Protecting the surface against corrosion .
LUB OIL 4. Flushing impurities . SEA WATER PRESSURE OF MAIN
5. Silencers . ENGINE ABNORMAL CAUSES
SISTEM PELUMASAN 6. Serves as the closing meeting -PRESSURE OF PUMP DECREASE
Pada umumnya sistem pelumasan yang sering Tujuan dari pelumasan adalah : -ANY LEAK OF THE PIPE SO MAYBE WILL BE
digunakan pada mesin dibagi atas dua bagian SUCTION AIR INTO THE SYSTEM AND
1. Pembatasan gesekan dan keausan COOLANT OF SW WILL BE REDUCE OR DOWN
yaitu : gesekan.
a. Sistem pelumasan kering
Sistem pelumasan kering yaitu minyak
2. Penyalur panas gesekan. LUB OIL BERWARNA
lumas ditampung ditempat yang lain yaitu 3. Pelindung permukaan terhadap
sump tank. Di kapal sistem pelumasan yang korosi. PUTIH SUSU
digunakan adalah sistem pelumasan kering 4. Pembilasan bahan pengotor. This is due to the mixing of
yaitu sistem pelumasan tekanan penuh yaitu oil with water . The cause
5. Peredam suara.
minyak berasal dari tempat penampungan could be from a leak packing
(sump tank) yang disirkulasikan dengan pompa 6. Berfungsi sebagai penutup rapat. head , oil cooler or oil
dengan tekanan tertentu kebagian-bagian filter holder . Thus, water
mesin yang memerlukan pelumasan kemudian can get into the engine and
minyak kembali ke tangki penampungan (sump LUB OIL Work mixed with lubricant . If you
tank).
b. Sistem pelumasan basah principle have this device replace the
oil cooler and filter with a
Lubricating oil sucked from lub . oil
Pada sistem pelumasan basah pompa sump tank by a screw or centrifugal -
new one .
minyak lumas memompa minyak type pump through a suction filter and
lumas dari bak minyak pelumas fed to the main diesel engine through
kedalam mangkok minyak pelumas the second filter and lub . oil cooler .
TUGAS-TUGAS YANG -INCREASE RPM OF THE ENGINE UNTIL  Position the MCB in the generator towards
VOLTAGE 380 VOLT,GENERATOR READY TO ON
DILAKUKAN SELAMA JAGA DI GIVE LOAD
 Raise rev the engine by pulling the handle of
KAMAR MESIN -DURING OPERATES NOTES CONTINUES TO
the gas towards the left and set up the voltage
-MEMONITOR MESIN-MESIN YANG SEDANG CHECK OF THE MACHIINE AND THE MAIN
OPERASI VOLTAGE on the panel to the left and set up the voltage on
the panel at 380V figure, machines are ready to
-MONITORING THE OPERATION OF
MACHINERY
Safety device Protection be loaded
-MELAKUKAN SUATU TINDAKAN BILA (A/E)  During the operation note the continued state
DALAM PENGAWASAN DI TEMUKAN SUATU of the machine and the mains voltage
KONDISI YG TDK SESUAI DENGAN YG DI - Safety valve (katup keamanan)
-Over speed Trip  After completion of the primary pump is used
HARAPKAN
switch off the button, return the position switch
-PERFORM AND ACTION WHEN THE -Shut down
MONITORING WAS DISCOVERED A panel in position
-Slow down The main, return position switch panel in its
CONDITION THAT IS NOT CONSISTENT WITH
WHAT WE EXPECTED -Quick stop valve,Quick closing original position, the MCB Genset On OFF
calve,emergency shut off valve. position and
-Inter lock(turning gear. Genset already switches off slowly
-Inter lock(lub oil low presure)  Clean the engine and generator room.
GENERATOR -Inter lock (indicator zero pitch) GENERATOR
-Mist oil detektor(crank shaft) Generator is electric power source
-Relief valve(katup pelepasan) machinefor supply electric
WHAT IS THE AUXILIARY ENGINE
-THE AUXILIARY ENGINE IS ALL consumption, normally on board ship
MACHINES ON BOARD SHIP,THEY PENGOPERASIAN GENERATOR have 3 ge-
HAVE SUPPORT MAIN ENGINE  Periksa secara umum keadaan mesin: nerator, 2 running and 1 stand by
WORKING Baut-baut ,Belting dan Baterai
some time during cargo
 Periksa Oli , Solar dan Air, Pastikan operating we used 3 generator running because
10 Situasi ketika generator kapaldalam keadaan cukup anticipa –
 Atur handle gas pada posisi start tion for overload electric consumption is
harus dimatikan  Hidupkan mesin dengan kunci starter responsible on 3 generator performance and
1. Tidak Normal/ Suara Aneh atau dengan menggunakan engkol maintenance on the periodi cal follow the
2. Berasap  Biarkan mesin hidup pada putaran maintenance instruction manual book,3rd
3. Parameter minyak pelumas yang tidak rendah ± 2 Menit engineer do to check or replace some part in
biasa  Posisikan switch Voltase dan Ampere side generator for make sure the machine
4.Tekanan Differential pada panel listrik kearah kiri (manual) ready to use on emergency situation.
5. Kecepatan yang berlebihan  Posisikan MCB pada genset kearah ON
6. Air Pendingin  Naikan putaran mesin dengan menarik Prosedur Pengoperasian
7. Kebocoran dari pipa pipa handle gas kearah kiri dan atur sampai Generator
8. Terdapat bagian yang longgar voltase pada panel pada kearah kiri dan Procedure pengoperasian generator
9. Terdapat air di oli atur sampai voltase pada panel pada angka
harus mengikuti SOP (standard
10 situation when the generator vessel 380V, mesin genset siap untuk diberi operation prosedure) yang ada sebagai
beban
to be turned off petunjuk(standard operation prosedure)
1. Not Normal / Sounds Weird  Selama beroperasi perhatikan terus
keadaan mesin dan tegangan listriknya yang ada sebagai petunjuk operator
2. Fuming
3. Parameters unusual lubricating oil  Setelah selesai digunakan matikan dalam mengoperasikan suatu unit
Differential 4.Tekanan tombol pompa utama, kembalikan posisi pembangkit. Prosedur pengoperasian
5. Excessive speed switch panel pada posisi dalam suatu sistem pembangkit secara
6. Air Cooling utama, kembalikan posisi switch panel umum dibagi menjadi empat tahapan,
7. Leakage from pipe pada posisi semula , MCB pada Genset
8. There are loose parts
yaitu :
Pada Posisi OFF dan Tahap persiapan
9. There is water in the oil
Genset sudah dapat dimatikan secara Tahap menjalankan generator
perlahan lahan Tahap pembebanan
PREPARE TO START  Bersihkan mesin dan ruangan
GENERATOR Tahap menghentikan generator
-GENERAL CHECK CONDITION OF
genset. Operating Procedure Generator
BOLT,BELTING AND BATTERY OPERATION GENERATOR Operating Procedure generator should
-CHECK LUB OIL,FUEL,FRESH WATER,MAKE  Check the general state of the machine: bolts, follow the SOP (standard operation
SURE ALL ENAUGHT Belting and Batteries
-SET THE HANDLE TO START POSITION procedure) existing as a guide (standard
 Check the Oil, Solar and Water, in a state
-START THE ENGINE WITH STARTER KEY OR operation procedure) existing as operator
sure enough
BY USED THE AIR STARTING
 Set the handle of the gas in the start position
instructions to operate a generating unit.
-LET THE ENGINE RUN AT LOW RPM ABOUT 2
 Turn the engine with the ignition key or by The operating procedures in a plant system
MINIT
-POSITION SWITCH VOLTAGE AND using a crank are generally divided into four stages,
AMPERAGE ON THE ELECTRICAL PANEL TO  Let engine at low rpm ± 2 Minutes namely:
THE LEFT(MANUAL) - Preparation phase
 Position switches Voltage and Ampere on the
-POSITION MCB IN THE GENERATOR
DIRECTION ON electrical panel to the left (manual) - Stage run generators
- stage loading
- Phase stopping generator a normal state. After checking the unit under lebih tinggi dari sistem.
normal conditions and then the machine is ready
Tahap persiapan to do loading
6. Gunakan Synchroscope pada incoming
generator dan set frekwensi incoming
Sebelum mengoperasikan generator set generator berputar perlahan – lahan di
perlu dilakukan prosedur pemeriksaan Tahap pembebanan daerah “Fast” mendekati 0.
secara keseluruhan. Pemeriksaan sebelum Setelah generator berputar pada kecepatan 7. Tutup breaker incoming generator saat
pengoperasianpemeriksaan secara normal dan dalam kondisi baik, maka siap 1 sampai 2 derajat pada synchroscope
dilakukan pembebanan pada sistem operasi. sebelum posisi 0. Dengan asumsi breaker
keseluruhan. Pemeriksaan sebelum mepunyai massa lembam dengan demikian
Pembebanan pada generator dapat bersifat
pengoperasian resisitif, induktif maupun kapasitif tergantung penutupan breaker tepat pada angka 0 pada
akan menjamin kinerja generator dari jenis beban yang diterima oleh generator synchroscope.
berfungsi dengan baik. Hal-hal yang perlu stage loading 8. Matikan synchroscope
diperhatikan sebelum mengoperasikan Once the generator is rotating at normal speed 9. Dengan governor control, buat
and in good condition, then it is ready to do perpindahan beban ke incoming generator
generator set, yaitu : loading the operating system. Imposition of the secara perlahan – lahan.
1) Sistem start generator can be resisitif, inductive or 10. Jika power faktor yang terbaca antara 2
capacitive depending on the type of load generator atau lebih yangdiparalel tidak
2) Sistem pelumasan
accepted by the generator
3) Sistem pendingin sama maka, set AVR masing – masing
generator sampai power faktor setiap
4) Sistem bahan bakar
Tahap menghentikan generator generator mendekati sama.
5) Sistem kontrol Jangan langsung mematikan mesin secara tiba-
6) Sistem proteksi6) Sistem proteksi tiba. Lepaskan atau turunkan bebannya
7) Sistem interlock terlebih dahulu secara perlahan-lahan,
kemudian biarkan mesin bekerja tanpa beban
8) Sistem governor
untuk memberikan kesempatan pada mesin
menyesuaikan temperatur kerja seiring dengan
penurunan pemakaian bahan bakar. Bila
Synchronizing procedure
sedang diparalel generator harus dilepaskan Once the engine starts running properly,
GENERATOR dahulu dari hubungan paralel. synchronization is carried out.
Setelah generator berhenti lakukan 1. In the Engine control room,
Preparation phase pemeriksaan untukSetelah generator berhenti, Check the pressure gauges.
Before operating the generator sets need to do lakukan pemeriksaan untuk menjamin 2. On the generator control panel,
the inspection procedure as a whole.
keandalan mesin bila generator beroperasi check if all the ground lights are working
Examination before pengoperasianpemeriksaan
overall. Inspection before operation kembali properly with adequate brightness.
will guarantee the performance of the generator Phase stopping generator 3.  Also check the synchronizing relays
is functioning properly. Things that need to be Do not immediately turn off the engine for open position. Bring the running or
considered before operating the generator set, suddenly. Remove or lower the load first the lead generator to the desired
namely: slowly, then let the machine work without the optimum parameters: 380 volts and 60
1) System start burden to provide opportunities for adjusting hertz
2) lubrication system the machine working temperature due to lower
3) The cooling system 4.  Bring the generator that is to be
fuel consumption. When you're diparalel
4) The fuel system generator should be released in advance of a synchronized(0n-coming) to the desired
5) Control system parallel connection. parameters. Now turn on the
6) proteksi6 System) protection system After the generator stopped doing checks synchronizing relay and keep a close
7) Interlock System untukSetelah generator stops, perform checks to look at the needle.
8) System governor ensure the reliability of the engine when the 5.  The needle in the synchroscope will
generator operating again move at a varying speed initially.
Tahap menjalankan generator Adjust the speed of the generator by
Tahap ini merupakan langkah menjalankan SYNCRONIZASY (PARALLEL) obtaining a steady slow motion of the
mesin generator dengan putaran rendah GENERATOR needle in the clock wise direction.
kemudian putaran dinaikkan sampai ke putaran Prosedur sinkronisasi generator: 6.  Once the needle is moving at a
nominal. Setelah kecepatan putar mesin 1. Pastikan bahwa breaker dari generator steady speed, depress the breaker close
mencapai putaran nominal, perlu dilakukan yang akan diparalel (incoming generator) dalam button when the needle has traveled
pengecekan terhadap parameter yang ada keadaan terbuka, atau dengan kata lain three-fourth of its way. Energize the
pada unit tersebut agar berada dalam keadaan incoming generator terisolasi dengan sistem. breakers when the needle reaches a
normal. Setelah pengecekan unit dalam kondisi 2. Pastikan AVR (Automatic Voltage Regulator) position similar to the 11' o clock
normal kemudian mesin siap untuk dilakukan dalam keadaan“Automatic”, bukan manual. position of a clock.
pembebanan 3. Start Prime mover sampai pada spesifikasi 7.  After doing this, check the
Stage run generators putaran tanpa beban.
parameters of the on-coming generator.
This stage is a step running the generator engine 4. Gunakan governor control untuk mengeset
with the low round of the round then lifted up to frekwensi Incoming Generator lebih tinggi 1/10 They should be same as those of the
par round. Once the engine speed reaches the dari frekwensi sistem. leading generator. i.e 380 Volts and 60
nominal rotation, need to be checked against the 5. Gunakan AVR untuk mengeset hertz
existing parameters in the unit in order to be in Tegangan Incoming Generator sama atau
CARA MENAMBAH FREON AIR _ Faucet suction cap ( large pipe ) ,
CONDITIONER/AC while compressor is turned on ( fakum
1. buka tutup pentil pipa besar body ) , let it run out of wind
PENYEBAB TURUNNYA 2. pasang manifuld/ analizer _ After the wind finished , close the
KINERJA AUXILIARY 3. tutup kran manifuld faucet small / small pipe
4.pasangkan slsng ke tabung freon,jangan 3. how to fill :
GENERATOR
CAUSES OF THE DROP ENGINE
terlalu kencang dulu untuk membuang > Post large pipe that leads to the in
PERFORMANCE AUXILIARY udara door , and put manifuld / analyzer to
GENERATOR 5. buka kran manifuld ( setelah udara directly to the freon tubes
-THE FUEL PRESSURE IS TOO LOW hilang,/fakum udara ) faucet pipe has been installed , open
-TYPE OF FUEL NO SUITIBLE WITH THE 6. siapkan tang amper untung cek ampere the faucet slowly manifuld , to encourage
ENGINE TYPE
-FILTER CLOGGED
untuk AC split windows rata tekanan freon wind in pipaserta directly attach a small
-THE FUEL TEMPERATURE 70-80, pipe , (in the off condition ) , _ fakum with
-LEAK FUEL PUMP How to Charge THE FREON AIR freon
-ANY COMBUSTION PRESSURE DIFFERENCE CONDITIONER / AC > Open faucet expansion by using key L
SETTING TAPPET CLEARENCE
-EXHAUST VALVE DAMAGE 1. unscrew the large pipe nipple , slowly slowly , to look at the full pointer
-HIGHT EXHAUST GAS IS BACK THE 2. pairs manifuld / analyzer analyzer .
PRESSURE 3. close the faucet manifuld and open a small faucet after making sure
4.install to freon tubes , not too tight first to there is no leaking pipes ,.
throw the air > Ready compressor is turned on , while
5. manifuld open faucet ( after air is lost , / looking freon pressure and amperage .
AIR CONDITION SYSTEMfakum air)
1.KOMPRESSOR 6. prepare driver amperage ampere profit
AIR COND BEKERJA MELALUI
KOMPRESSOR YAITUH MENEKAN GAS YG
checks Sistem Interlock
BERTEKANAN TINGGI KEMUDIAN DI TERUSKAN for a split air conditioner freon pressure Sistem interlock adalah suatu cara untuk
MENUJU KONDENSOR Average windows 70-80 , mengamankan jalannya proses serta
2.KONDENSOR pengamanan perlatan dari unit yang paling
DIGUNAKAN UNTUK MENGUBAH /
MENDINGINKAN GAS YG BERTEKANAN TINGGI
CARA MENGISI FREON AIR kecil sampai keseleuruhan sistem. Dimana
BERUBAH MENJADI CAIRAN YG BERTEKANAN CONDITIONER / AC alat pengaman tersebut terkait satu dengan
TINGGI DAN DI ALIRKAN KE ORIFICE TUBE.. 1.compresor benar benar fakum,/ yang lainnya, sehingga membentuk satu
3.ORIFICE TUBE kesatuan yang akan bekerja secara serentak
CAIRAN YG BERTEKANAN TINGGI bebas dari udara dan kotoran
DITURUNKAN TEKANAN DAN SUHUNYA 2. cara fakum : apabila kondisi proses atau alat mengalami
MENJADI CAIRAN DINGIN BERTEKANAN gangguan
_ tutup kran isap(pipa besar),
RENDAH,SELAIN MEMASANG ORIFICE Sistem interlock ada dua macam, yaitu
TUBE,DIPASANG JUGA KATUP EXPANSI sambil compresor dihidupkan ( fakum sistem OR dan sistem AND
4.KATUP EXPANSI body), biarkan sampai angin habis Ada dua tahapan sistem pengamanan,
INI DI RANCANG UNTUK
MENGONTROL ALIRAN CAIRAN PENDINGIN
_ setelah angin habis, tutup kran yaitu :
MELALUI KATUP ORIFICE YG BERUBAH WUJUD kecil/pipa kecil 1. Alarm (peringatan tanda bahaya)
CAIRAN MENJADI UAP KETIKA ZAT PENDINGIN 3. cara mengisi : Alarm atau peringatan tanda bahaya dapat
MENINGGALKAN KATUP PEMUAIAN DAN
MEMASUKI EVAPURATOR / PENDINGIN > pasang pipa besar yang menuju ke berupa lampu, bel, horn dan tanda-tanda lain
5.EVAPURATOR in door,lalu pasang manifuld/analizer yang menyatakan bahwa proses atau alat
REFRIGERANT MENYERAP PANAS ke tabung freon langsung ke dalam keadaan bahaya (ada gangguan) dan
DALAM RUANGAN MELALUI KUMPARAN
PENDINGIN DAN KIPAS EVAPURATOR kran pipa yang telah terpasang, hal ini bila tidak diadakan koreksi maka
MENIUPKAN UDARA DINGIN KE DALAM buka pelan pelan kran manifuld, untuk kondisi akan berkembang menjadi situasi
RUANGAN
mendorong angin yang di pipaserta yang krisis dan bahkan pabrik akan berhenti
AIR CONDITION langsung di pasang pipa kecil, ( dalam (shut down)
1.AIR COND WORKING THROUGHT THE 2. Shut Down atau Trip
COMPRESSOR WHICH SURPRESS THE HIGHT kondisi off), _ fakum dengan freon Suatu kondisi proses yang sudah mencapai
PRESSURE GAS IS FORWARDED TO THE > buka kran expansi dengan batas bahaya yang tertinggi atau adanya
CONDENSOR
2.IN THE CONDENSOR CHANGE OR COOL THE menggunakan kunci L,secara pelan kerusakan pada peralatan sehingga
HIGHT PRESSURE GAS INTO A LIQUID HIGHT pelan, sampai terlihat penunjuk full di menyebabkan pabrik mati sebagian atau
PRESSURE AND PIPE TO THE ORIFICE TUBE analizer. keseluruhan. Peralatan yang terkait dalam
3.THE ORIFICE TUBE HIGHT PRESSURE FLUID
AND THE PRESSURE LOWERED ITS lalu buka kran kecil setelah yakin tidak sistem interlock ini adalah sakelar tekanan
TEMPERATURE LOW PRESSURE COOL LIQUIDS,IN ada kebocoran pipa,. (pressure switch), katup solenoida (solenoid
ADDITION TO INSTALLING ORIFICE valve), level switch dan relay
TUBE,EXPANTION V/V ALSO INSTALLED
> compressor siap
4.EXPANSION V/V ARE DESIGNED TO CONTROL dihidupkan,sambil melihat tekanan Interlock system
THE FLOW OF COOLING FLUID THROUGHT THE freon dan ampere. The interlock system is a way to secure the
V/V ORIFICE THAT CHANGE SHAPE WHEN A
LIQUID TO A VAPOR REFRIGERANT LEAVING
HOW TO FILL FREON AIR process and securing equipment from the
THE EXPANTION V/V AND ENTERS EVAPURATOR CONDITIONER / AC smallest unit to keseleuruhan system.
OR COOLING 1.compresor really fakum , / free of air and Where safety devices are associated with
5.EVAPURATOR IS REFRIGERANT ABSORBS HEAT dirt each other, thus forming a unity that will
IN THE ROO THROUBHT THE COOLING COILS
AND EVAPURATOR FAN BLOWINGCOOL AIR
2. fakum ways : work simultaneously when the process
INTO THE ROOM conditions or disorders tool
Interlock systems are of two kinds, namely - Test running - Periksa instalasi listriknya
systems and systems OR AND - Saat menjalankan dan menghentikan mesin
There are two phases of the security Jelaskan perawatan dan perbaikan “top harus sesuai prosedur
system, namely: overhaul” pada mesin induk 4 tak dan
1. Alarm (the warning) sebutkan secara rinci semua Installation onboard engine
Alarm or the warning may be light, bell, komponen/bagian” yg dibuka, coolant is necessary routine
horn and other signs stating that the dibersihkan, diperiksa dan diukur? treatment or care which order
processes or tools in danger (no Top overhaul: perawatan dan perbaikan groceries awake quality. Explain
interference) and that these matters are not untuk pembersihan, pemeriksaan,
pengukuran, penganalisaan, penggantian treatment "which made the
held correction, then the condition will
develop into a situation of crisis and even baru pada bagian atas material mesin yg installation of cooling machine ?
dioverhoul. - Ball bering of the compressor motor should be
the factory will stop (shut down)
Komponen-komponen: lubricated
2. Shut Down or Trip - V - Belt tension is checked
A condition that the process has reached - Kepala
silinder - katup - Evaporator didefros when a lot of frost
the limit of the highest hazard or damage to buang lengkap - Condenser must be cleaned frequently
the equipment causing part or the wholePenekan katup lengkap - celah - Check the lubricating oil in the charter , if less
plant dies. Equipment involved in these added
interlock system is a pressure switch Batang pendorong rocker arm - pegas - Clean the filter in the solenoid valve
(pressure switch), the solenoid valve - Replacing silica gell in the dryer when it is
Penekan katup masuk dan buang - diameter time
(solenoid valve), level switches and relays - If there is air in the system must be in drain
Explain the maintenance and repair - At the time of installation operation,
"top overhaul " the main engine 4 stroke and temperature and pressure must be considered
Jelaskan langkah-langkah apaspecify
saja in detail all the components / parts , - Nipple - nipple and cover faucet grease
yg anda lakukan ketika akan "which opened , cleaned , inspected and - Filters expansion valve and a pressure
melaksanakan overhaul mulai dari regulator kept clean
measured? - Do not start the engine is always at the switch
persiapan hingga pengetesan!
- Mempersiapkan team work engine controller
- Membuat perencanaan kerja
Top overhaul : maintenance and repair - Check the electrical installation
- Menentukan waktu pelaksanaan for the cleaning , inspection ,
- Mempersiapkan peralatan dan perlengkapan measurement , analysis , new
suku cadang replacement at the top of the engine Sebelum kapal tiba dishipyard
- Membuka dan memperhatikan urutan material which dioverhoul . untuk melaksanakan perbaikan,
pembongkaran Components : sebutkan persiapan” yg
- Membersihkan bagian-bagian yg dibongkar - Cylinder head
- Melakukan pengukuran bagian-bagian yg
dilaksanakan baik dikapal maupun
- complete exhaust valve
penting - Pressure Valve complete digalangan?
- Melakukan pemasangan kembali bagian- - slit gap Pihak Kapal Pihak Dock
bagian yg masih memadai dan mengganti - Trunk driving rocker arm
bagian-bagian mesin yg sudah rusak
1. Persiapan surat- 1. Siapkan locking
- spring valve
- Diadakan pengetesan kompresi, tekanan - Pressure intake valve and exhaust
menyurat space
injector dan pengukuran gap klep masuk dan - the diameter of each valve 2. Disiapkan drawing 2. Siapkan ikut ten
keluar 3. List barang” kapal 3. Siapkan organisa
- Setelah selesai, isi oli Instalasi mesin pendingin dikapal 4. Hitung muatan 4. Siapkan peralata
- Buang udara dalam system aliran bahan sangatlah perlu penanganan atau
bakar sampai di docking yg diperlukan
perawatan yg rutin agar bahan
- Pengisian system air pendingin mesin 5. Disiapkan buku 5. Siapkan fasilitas
makanan terjaga kualitasnya. Jelaskan
- Test running
perawatan” yg dilakukan terhadap harian dock
Explain any steps that you do when instalasi mesin pendingin? 6. Persiapan ABK 6. Siapkan suku
you carry out overhauls ranging - Ball bering dari motor kompresor harus Selama docking cadang
from preparation to the test ! dilumasi 7. Disiapkan docking
- Preparing the team work engine - V-Belt diperiksa tegangannya list dan repair list
- Make a work plan - Evaporator didefros bila banyak bunga es
- Define the time of execution - Condenser harus sering dibersihkan Before the ship arrived
- Preparing equipment and supplies spare parts - Periksa minyak lumas dalam carter, bila dishipyard to implement
- Opening and pay attention to the order of kurang ditambahkan improvements , mentioned
demolition - Bersihkan filter di solenoid valve
- Clean the parts that dismantled - Mengganti silica gell di dryer bila tiba preparation "which apply to both
- To measure the parts mouthful saatnya vessel and digalangan ?
- Doing reassembling the parts that are still - Bila ada udara didalam system harus di cerat The Party Boat Dock
adequate and replace engine parts that have - Pada waktu instalasi beroperasi, suhu dan
tekanan harus diperhatikan
Pihak Kapal
been damaged
1. Preparation of correspondence
- Held compression testing , pressure valve - Nipple-nipple dan kran-kran penutup diberi
2. Prepared drawing
injectors and metering gap in and out grease
3. List the goods " ship
- When finished , fill the oil - Saringan-saringan klep ekspansi & pengatur
4. Calculate the charge until at docking
- Remove the flow of air in the fuel system tekanan dijaga bersih
5. Prepared diary
- Completion of engine cooling water system - Menstart motor jangan selalu pada switch
6. Preparation ABK During the docking
pengontrol
7. Prepared docking and repair mailing list - If you working into the enclosed space
Pihak Dock
Keuntungan-keuntungan
the checking list must be done too.
1. Prepare the locking space perawatan terencana? - Working at the high position or climbing
2. Prepare to bid - Memperpanjang waktu kerja unit should be wear safety belt.
3. Prepare the organization
4. Prepare the necessary equipment
pesawat/mesin dan mempertahankan e. Explain how the procedure overhaule
5. Prepare a dock facility nilai penyusutan pada kapal main engine while the ship alongside at
6. Prepare Parts - Kondisi material pada harbour :
pesawat/mesin dapat dipantau setiap - Permission to the master regarding the
saat hanya dengan melihat pelaporan regulation every port is not the same.
Jelaskan penerapan fungsi - Calculation how long the overhaule take
managemen “planning” dalam administrasi perawatan
the time refer to the ship while alongside.
tugas dikamar mesin? - Dengan adanya sukucadang yg - If all everything are possible for working
- Menjamin pelaksanaan perawatan sesuai cukup, perawatan akan tepat waktu so why not to overhaule I.
dengan perencanaan - Operasi kapal lancer dengan
- Terlaksananya pengawasan yg ketat memberikan rasa aman dan tenang
Tell about the bunkering process
terhadap pengendalian dan pelaksanaan - Biaya perawatan dapat
perawatan dan perbaikan diperhitungkan sesuai anggaran alone on your board ship :
- Bunker meeting
- Perawatan dilakukan sesuai dengan perawatan
- Signing on the check list form of bunker
standard yg ditetapkan The advantages of the meeting.
Explain the application of the
management function " planning " maintain plan? - Prepare the communication equipment
- Extend the working time of aircraft / on the bunker station.
in the task dikamar machine ? - Prepare the sopep equipment nearly the
- Ensure the implementation of care according to plan engine and maintain the value of
depreciation on ships bunker station.
- Implementation of strict supervision which the
control and implementation of maintenance and - The condition of the material on aircraft / - Prepare portable fire extinguizer beside
repair engine can be monitored at any time just the bunker station.
- Care provided in accordance with the by looking at the administrative reporting - Plugging to all of scupper.
standards specified treatment - Secure the mooring when the bunker
- With the elbow parts , maintenance will berge has alongside.
be on time - Ensure to arranging of bunker
- Operating the boat smoothly by providing connection hose.
Sebutkan tujuan perawatan a sense of security and calm - Sounding check to the bunker barge.
terencana? - Maintenance costs can be calculated in - Check and make sure to the concern
accordance care budget valves of filling line.
- Mengoptimumkan daya dan hasil guna
- Every personel in charge standby in each
material sesuai fungsi dan manfaatnya.
own position.
- Mencegah terjadinya kerusakan berat Perawatan periodic adalah
secara mendadak, serta mencegah
menurunya efisiensi perawatan yg dilakukan secara . Tell the cooperation
- Mengurangi kerusakan mendadak atau periodic berdasarkan waktu between the deck department
pengangguran waktu kalender atau jam kerja dengan
- Mengurangi jumlah perbaikan & waktu and the engine department :
perbaikan ketika kapal melaksanakan dok
mengacu kepada manual - Cooperation done while the ship process to
tahunan instruction book yaitu perawatan alongside or to departure.
- Menammbah pengetahuan awak kapal secara harian, mingguan, bulanan, - When prepare for bunker supply operation.
dan mendidik untuk memiliki rasa - Specially at the emergencies case the
tiga bulanan, tahunan, lima cooperation must be done well.
tanggung-jawab serta disiplin kerja.
tahunan - In every emergency drill the cooperation
State the purpose of planned
maintenance ? Periodic maintenance is has done.
maintenance that is done periodically c. Explain the use of lubricating oil and how
- Optimizes the power and efficiency of the to choose it?
material as a function and its benefits. based on a calendar or hours of work by
referring to the manual instruction book - Lubricating oil used in machinery for
- Preventing sudden heavy damage , and reduced the friction between every sliding
prevent the decline in efficiency that care on a daily, weekly , monthly ,
quarterly , annual , five- yearly surface.
- Reduce the sudden damage or - To avoid frictional wear and high vibration
unemployment time of the engine.
- Reduce the amount of repair and the Explain how to work safety - To choice the lub oil must be seen to it’s
repair time when the ship docks carry out in the engine room? visconity value, density, flash point,
annual - Used working pack, safety shoes, safety suplhure content according to the type and
- Menammbah knowledge and educate helmet, ear plug. kind of engine or machineries.
fishers to have a sense of responsibility and - If you do the scrupping or cutting work
work discipline. you should wear safety goggles.
- On the hot working job the first you must Explain how to work safety in
be done the hot working check list. the engine room?
+ GE’s governor LO renew = 1000 hrs
- Used working pack, safety shoes, safety engine room when ship at + GE’s driven LO separator cleaning =500 hrs
helmet, ear plug.
- If you do the scrupping or cutting work sea. * FO purifier inner bowl cleaning = 3000 hrs
you should wear safety goggles. A duty engineer have a great *ME’s LOpurifier inner bowl cleaning= 2500
- On the hot working job the first you must responsibility he should keep the hrs
be done the hot working check list. *GE’s LO purifier inner bowl cleaning=500 hrs
machine that is operating, such us control
- If you working into the enclosed space the the wasting gas temperature, he controls
checking list must be done too. . how do you operate the oily
the pressure, like gas ,fuel, lub oil, engine
- Working at the high position or climbing rpm etc. The officer in charge of the water separator ( OWS ).
should be wear safety belt. enginnering watch shall ensure that the  Open all valves sea water line intake
e. Explain how the procedure overhaule established watchkeeping arrangements to the suction pump.
main engine while the ship alongside at are maintained and that under direction,  Open all valves at the pipe line from
harbour : engine room ratings, if forming part of the pump to the separating tank and fro separating
- Permission to the master regarding the engineering watch, assist in the safe and tank to overboard discharged port.
regulation every port is not the same. efficient operation of the propulsion  Full open between primary and
- Calculation how long the overhaule take machinery and auxiliary equipment. secondary separation column.
the time refer to the ship while alongside.  Open separated oil discharge valve
- If all everything are possible for working on top secondary separation column.
so why not to overhaule Write anything about engine  Turn handle solenoid valve direction
anticlockwise to stop position and adjust valve
room watch keeping. to “shut” position.
. Overhauling 2 cylinders of Jawab :  Make sure the source power lamp is
main engine : The Engineer on watch duty in the engine appear when power switch of automatic level
- Preparation of spare part that will be room must be very carefully during controller adjust to “ON” ( oil discharge lamp at
renewed due to running hours, or warm out checking : level controller is appear and solenoid valve
under size and over size. - The important think are lube oil level and automatic will close when high position in the
- Preparation of equipment for Over haul, pressure, temperature of cooling system primary separation column lower than low test
cock position and electrode in the air.
for example : Special tool, jack hydraulic ( oil and water ), fuel oil level service &
 Close discharge lamp at appear level
sets, spanners, etc. settling tank and pressure on engine, controller and solenoid valve will close
- Coordination with Master and agent due to water bilge level for knowing every automatically when a higher at the primary
sailing schedule and time in Harbor. leakage of sea water to the engine room column after sea water through out from the
- For the special port, important to ask or any water fitting maybe leaks whatever valve.
permission from the port officer. we have to do must be recorded in the Keep run about 10 minute of sea water through
- Preparation manual instruction book, if engine room log book for responsibilities. out and checked and then stopped the pump.
any problem in job.
- Divided of job to engineer and engine
ratings, engine foreman for job descriptions.
Buatlah perencanaan perawatan
. ISM CODE
berkala untuk permesinan ! :
Routine test of emergency - ME’s cylinder major overhaul =10.000 hrs
system : - ME’s FO injection pump overhaule =8000 hrs ISM CODE ADALAH STANDAR
- ME’s piston under side cleaning = 1500 hrs INTERNASIONAL MANAJEMEN KESELAMATAN
- For weekly : emergency generator, DALAM PENGOPERASIAN KAPAL SERTA
emergency compressor, emergency fire - ME’s scavenging manifold cleaning = 3000
UPAYA PENCEGAHAN DAN PENGENDALIAN
hrs
pump, live boat engine an emergency PERNCEMARAN LINGKUNGAN..
- ME’s exhaust valve exchange = 1500 hrs (ISM CODE IS STANDARD INTERNATIONAL
lighting.
- ME’s FO injection valve exchange = 1500 hrs SAFETY MANAGEMENT IN THE OPERATION OF
- For monthly : emergency fire - ME’s cylinder head cover exchange = 8000 THE SHIP AND THE PREVENTION/CONTROL OF
dampers, tank quick closing valve, hrs ENVIRONMENTAL POLLUTION)
emergency vent blower. - ME’s inter cooler cleaning = 5000 hrs TUJUAN DARI PADA ISM CODE
- Fire drills : - ME’s T/C air filter renew = 500 hrs Tujuan dari Pedoman ini adalah untuk
- Emergency alarm sound - ME’s LO drain box checking = 500 hrs memberikan standar internasional untuk
- All new assembled at Muster Station. -ME’s LO stuffing box drain tank checking = pengelolaan yang aman dan pengoperasian
- Divided to 2 parts : Fire fighting part are 500 hrs kapal dan pencegahan polusi .
lead by Chief Officer and back up part are - ME’s FO duplex filter cleaning = 2400 MEMASTIKAN KESELAMATAN DI
lead by Chief Engineer. hrs LAUT,PENCEGAHAN CEDERA PADA MANUSIA
DAN KEHILANGAN NYAWA,DAN
- Fire fighting stimulation carried out by + GE’s crank assy major overhaule = 15.000 MENGHINDARI KERUSAKAN
fire crews. hrs LINGKUNGAN,KHUSUS NYA LINGKUNGAN
- Fire drill review conducted by Master. + GE’s injection timing check = 5000 hrs DILAUT DAN PROPERTI.
+GE’s FO injection pump overhaule = 5000 hrs The purpose of this Code is to
+GE’s turbo charge overhaule = 15.000 hrs
provide an international standard for
What is the responsibility of +GE’s FO injection valve exchange = 1000 hrs
the safe management and operation of
+ GE’s T/C air filter renew = 500 hrs
the duty engineer in the + GE’s T/C LO renew = 1000 hrs ships and for pollution prevention.
+ GE’s alternator air filter renew =500 hrs (THE OBJECTIVES OF ISM CODE ARE TO
ENSURE SAFETY AT SEA,PREVENTION OF
+ GE’s LO & FO filter cleaning = 500 hrs
HUMAN INJURY OR LOS OF LIFE,AND baik,sehingga meningkatkan kinerja kapal
AVOIDANCE OF DAMAGE TO THE The purpose of this code is to
dan mencapai maksud dan tujuan yang
ENVIROMENT,IN PARTICULAR TO THE MARINE provide a standardized, consistent
ENVIRONMENT AND TO PROFERTY sudah di tetapkan para manejer di kantor
framework for evaluating risk , pusat.
enabling governments to offset changes
SOLAS mengadopsi Kode in threat with a case of changing the
3. Memperhatikan pekerjaan yang paling
mahal berkaitan dengan waktu dan material
ISM pada tahun 1994 dan dimasukkan ke value of the vulnerability of the ships ,sehingga mereka,yang terlibat dapat
dalam bab IX . Pada tahun 1998 banyak and port facilities through meneliti metode untuk dapat mengurangi
masyarakat pelayaran komersial diperlukan determination of appropriate levels of biaya.
harus sesuai dengan kode ISM . Pada tahun security and safety measures are 4. Dapat melaksanakan tugas secara sistematis
2002 hampir semua masyarakat pelayaran tanpa mengabaikan hal-hal terkait,dan
appropriate .
internasional diperlukan untuk mematuhi melakukan pekerjaannya dengan cara
Kode ISM Tujuan dari Kode ini adalah paling ekonomis.
. SOLAS adopted the ISM Code in 1994 and menyediakan standar, kerangka kerja 5. Memberikan kesinambungan perawatan.
incorporated it into chapter IX. By 1998 yang konsisten untuk mengevaluasi 6. Menghasilkan fleksibilitas.
much of the commercial shipping risiko, memungkinkan Pemerintah 7. Memberikan informasi umpan balik yang
community was required to be in compliance untuk mengimbangi apabila terjadi dapat di percaya ke kantor pusat.
with the ISM code. By 2002 almost all of the perubahan ancaman dengan merubah 8. Sebagai bahan informasi yang di perlukan
international shipping community was nilai kerentanan pada kapal dan bagi pelatihan.
required to comply with the ISM Code.
fasilitas pelabuhan melalui penentuan
tingkat keamanan yang sesuai dan
ISPS CODE langkah-langkah keamanan yang
sesuai. The Purpose of the
ISPS CODE ADALAH MERUPAKAN ATURAN
YANG MENYELURUH MENGENAI LANGKAH maintenance planning
LANGKAH UNTUK MENINGKAT KAN
KEAMANAN TERHADAP KAPAL DAN
PMS system ( PMS ) :
FASILITAS PELABUHAN,ATURAN INI DI 1. Allows the vessel to operate on a regular
KEMBANGKAN SEBAGAI TANGGAPAN basis and meningkatkankeselamatan either
TERHADAP ANCAMAN YG DI RASAKAN (PLAN MAINTENANCE crew or equipment .
DAPAT TERJADI TERHADAP KAPAL DAN
FASILITAS PELABUHAN PASCA SERANGAN 11
SYSTEM 2. Assist the ship's officers to plan and
SEPTEMBER DI AMERIKA-SERIKAT. regulate better , thus improving the
ISPS CODE IS A THE RULE THAT performance of vessels and to achieve the
COMPREHENSIVE INFORMATION REGARDING PMS ADALAH SUATU MANAJEMEN DARI objectives that have been set managers at
MEASURE TO IMPROVE THE SAFETY OF SHIPS SETIAP TINDAKAN YG DILAKUKAN UNTUK
AND PORT FASILITIES,THESE RULES WERE MENJAGA SISTEM/PERLENGKAPAN DALAM headquarters .
DEVELOVED IN RESPONSE TO A PERCIVED PROSES PERAWATANNYA SAMPAI KONDISI 3. Taking into account the most expensive
THREAT CAN HAPPEN TO SHIPS AND PORT DPT DI TERIMA.PERENCANAAN MENGIKUT work related to time and materials , so that
FASILITIES AFTER THE SEPTEMBER 11 SERTAKAN PENGEMBANGAN DARI SELURUH those who are involved can examine
ATTACK IN UNITED STATE OF AMERICA LINTASAN KEGIATAN YG MENCAKUP SEMUA
KEGIATAN PERAWATAN,REPARASI,DAN methods to reduce costs.
PEKERJAAN OVEHAUL. 4. Can carry out tasks without ignoring
YANG TERMASUK KEGIATAN systematically related matters , and did his
KEGIATAN DALAM PMS ADALAH: job the most economical way .
TUJUAN UTAMA DARI -DAILY REPORT MAINTENANCE 5. Provide continuity of care .
-WEEKLY REPORT MAINTENANCE AND 6. Produce flexibility.
ISPS CODE ADALAH -MONTHLY REPORT MAINTENANCE
-UNTUK MENDETEKSI ANCAMAN 7. Provide feedback information that can
KEAMANAN DAN MENERAPKAN LANGKAH PMS IS SYSTEM WHERE THE PLANING be believed to headquarters .
LANGKAH KEAMANAN AND MAINTENANCE FOLLOW INCLUDE 8. As the material information necessary
-UNTUK MENETAPKAN PERAN DAN DEVELOPMENT FROM ALL OVER THE PATH
OF ACTIVITIES INCLUDE ALL ACTIVITIES for training .
TANGGUNG JAWAB TENTANG KEAMANAN
MARITIM BAGI PEMERINTAH,PEMERINTAH MAINTENANCE,REPAIR AND JOB OVERHAUL.
DAERAH,INDUSTRI KAPAL DAN PELABUHAN THE ACTIVITIES OF MAINTENANCE TUJUAN PMS ADALAH
DI TINGKAT NASIONAL DAN TINGKAT INCLUDE IN PMS ARE:
INTERNASIONAL
-UNTUK MENGHASILKAN SUATU ALAT
-DAILY REPORT MAINTENANCE PENGELOLA YG LEBIH BAIK DALAM
-UNTUK MENYUSUN DAN MENYEBAR
LUASKAN INFORMASI YG BERHUBUNGAN -WEEKLY REPORT MAINTENANCE MENINGKATKAN KESELAMATAN CREW
DENGAN KEAMANAN. -MONTHLY REPORT MAINTENANCE DAN MUATANNYA
THE MAIN PURPOSE OF ISPS Tujuan dari system PURPOSE OF PMS IS TO PRODUCE A
BETTER MANAGEMENT TOOL IN
CODE perencanaan perawatan IMPROVING THE SAFETY OF CREW AN
-TO DETECT SECURITY THREATS AND CARGO
IMPLEMENT SECURITY STEPS
-TO DEFINE RULES AND RESPONSIBILITY FOR
(PMS): PRINSIP PMS ADALAH
GOVERMENT AND SHIPS INDUSTRY AND 1. Memungkinkan kapal beroperasi secara -KONTROL BERKALA DARI PERALATAN
PORT AT NATIONAL AND INTERNATIONAL reguler dan meningkatkankeselamatan baik
LEVEL DAN MESIN2 UNTUK MENDUKUNG
-TO COLLATE AND DISSEMINATE awak kapal atau peralatan. SUATU MESIN BEKERJA SECARA
INFORMATION RELATED TO SECURITY 2. Membantu perwira kapal menyusun OPTIMAL DAN MEMPERKECIL
rencana dan mengatur dengan lebih
TERJADINYA KERUSAKAN / The preparation of the annual 3. Port Facility Security Plan
PENYUSUTAN
-MENJAGA KONDISI MESIN / maintenance plan will follow (PFSP) or Port Facility Security Plan is a
PESAWAT2,MENGATASI,MEREPARASI these steps: design that is built to ensure the
SEHINGGA DAPAT MEMINIMALKAN 1. Determine what work is required, such as: implementation of the measures / actions
BIAYA OPERASI · Adjust the standard rules of care of the designed waking up to protect the port
PRINSIPLE OF PMS IS: system / equipment. facility and ships, people, cargo, cargo
-PERIODIC CONTROL OF EQUIPMENT · Notes damage. transport units and ship supplies within the
AND MACHINERY TO SUPPORT AN · Annual planning beforehand. facility harbor of risk events / security
ENGINE TO WORK OPTIMALLY AND · Work order received from the user.
events
MINIMIE THE DAMAGE AND SHRINKAGE 2. sorting work.
-MAINTENING THE CONDITION OF THE 3. tentatively estimated time intervals.
ENGINE AND THE MACHINERIS 4. To estimate the work schedule.
OVERCOME,REFIT SO AS TO MINIMIZE 5. To estimate the time required.
6. To estimate the costs involved.
OPERATING COST
7. Perform checks on procurement and manage
4 Ship Security
workloads. Officer (SSO) atau
ü Planning monthly (monthly manintenance Perwira Keamanan Kapal adalah
plans), planning is based on the monthly plan personil diatas kapal, yang
Klasifikasi Perencanaan which includes the preparation and execution of bertanggung jawab kepada
Perawatan maintenance work, development, setting Nakhoda, yang ditunjuk oleh
workload, etc.
Klasifikasi perencanaan perawatan yang Perusahaan sebagai penanggung
ü weekly and daily planning (weekly
didasarkan pada jenisnya, terdiri dari: maintenance plans), concerning the jawab terhadap keamanan
 Perencanaan tahunan (annual implementation plans, arrangement of labor, kapal, termasuk implementasi
maintenance plans), yang meliputi control the progress of the implementation of dan pemeliharaan dari
anggaran, rencana inspeksi, persiapan, maintenance work, etc. rancangan keamanan kapal dan
pengaturan sub-kontrak, pengaturan tenaga untuk berkoordinasi dengan
kerja, dll. Petugas Keamanan Perusahaan
Persiapan pembuatan perencanaan
2.Ship Security dan Petugas Keamanan
perawatan tahunan akan mengikuti langkah Plan (SSP) atau Fasilitas Pelabuhan.
berikut: Rancangan Keamanan Kapal 4. Ship Security Officer
1. Menentukan pekerjaan apa yang adalah suatu rancangan yang
diperlukan, seperti: dibuat untuk memastikan
(SSO) or Ship Security Officer is the
 Sesuaikan dengan aturan standar penerapannya terhadap personnel on board, which is accountable
perawatan dari sistem/equipment. langkah/tindakan diatas kapal to the master, designated by the Company
 Catatan kerusakan. yang dirancang bangun untuk in charge of the security of the ship,
 Perencanaan tahunan sebelumnya. melindungi manusia diatas including implementation and maintenance
 Work order yang diterima dari user. kapal, muatannya, unit of the ship security plan and to coordinate
2. Melakukan pemilahan pekerjaan. transportasi muatan, with the Company Security Officer and
3. Melakukan estimasi interval waktu perbekalan kapal atau Port Facility Security officer.
secara tentatif. kapalnya sendiri dari resiko
4. Melakukan estimasi jadwal kerja. peristiwa/kejadian keamanan. 5.Company Security
5. Melakukan estimasi waktu yang 2. Ship Security Plan (SSP) or the Officer (CSO) atau
diperlukan. Ship Security Plan is a plan that is Petugas Keamanan Perusahaan
6. Melakukan estimasi biaya yang designed to ensure implementation of the adalah personil yang ditugaskan
dibutuhkan. measures / actions on the vessel design and oleh perusahaan untuk memastikan
7. Melakukan pengecekan pada build to protect humans on board, cargo, bahwa penilaian keamanan kapal
procurement dan mengatur beban kerja. cargo transport units, supplies the ship or telah dilaksanakan; bahwa suatu
 Perencanaan bulanan (monthly rancangan keamanan kapal
the ship itself from the risk of events /
manintenance plans), perencanaan ini diperkuat, disampaikan untuk
security events. persetujuan, dan kemudian
didasarkan pada perencanaan bulanan yang menerapkannya dan memeliharanya,
meliputi persiapan dan pelaksanaan
pekerjaan perawatan, pengembangan, 3. Port Facility Security dan untuk berhubungan dengan
petugas fasilitas pelabuhan dan
pengaturan beban kerja, dll. Plan (PFSP) atau Rancangan petugas keamanan kapal.
 Perencanaan mingguan dan harian Keamanan Fasilitas Pelabuhan adalah 5. Company Security Officer
(weekly maintenance plans), menyangkut suatu rancangan yang dibangun untuk
rencana pelaksanaan, pengaturan tenaga
(CSO) or the Company Security Officer is
memastikan penerapannya terhadap the personnel assigned by the company to
kerja, pengendalian progress pelaksanaan langkah/tindakan yang dirancang bangun ensure that the ship security assessment has
pekerjaan perawatan, dll. untuk melindungi fasilitas pelabuhan dan been carried out; that a ship security plan is
Classification Maintenance Planning kapal-kapal, manusia, muatannya, unit reinforced, submitted for approval, and then
Classification Maintenance plan based on the type, transportasi muatan dan perbekalan kapal implement it and maintain it, and to get in touch
consisting of: with attendant port facilities and ship security
ü Annual planning (annual maintenance plans), which didalam fasilitas pelabuhan dari resiko
includes a budget, plan inspection, preparation, peristiwa/kejadian keamanan. officers.
subcontracting, labor arrangements, etc.
6.Port Facility 9. Security Level 3 atau
Security Officer Keamanan tingkat 3 adalah
(PFSO) atau Petugas Keamanan tingkat untuk kelanjutan tindakan
Fasilitas Pelabuhan adalah perlindungan secara khusus yang
personil yang ditugaskan sebagai semestinya ditetapkan untuk jangka
penanggung jawab untuk waktu terbatas ketika suatu
pengembangan, penerapan,
perubahan dan pemeliharaan dari peristiwa keamanan dimungkinkan
rancangan keamanan fasilitas atau nyata, meskipun bisa jadi tidak
pelabuhan dan untuk berhubungan
dengan petugas keamanan kapal
mungkin untuk dapat
dan petugas keamanan perusahaan. menemukan/mengenali tujuan
6. Port Facility Security Officer (PFSO) sasarannya yang khusus.
or Port Facility Security Officer was assigned
personnel as responsible for the development,
implementation, alteration and maintenance of 9. Security Level Security
the port facility security plan and to get in
touch with the ship security officers and level 3 or level 3 is for the
company security officers. continuation of special protection
measures which should be set for a
7. Security Level 1 limited period of time when a
atau Keamanan tingkat 1 security incident is possible or real,
adalah tingkat dimana although it may not be possible to
perlindungan minimum dari
langkah keamanan yang tepat be able to find / identify specific
semestinya tetap dipelihara targets of interest.
setiap saat.
7. Security Level 1 or Security level 1 is
the minimum level at which the protection
of proper security measures should be
maintained at all times.

8. Security level 2 atau


Keamanan tingkat 2 adalah
tingkat dimana tambahan perlindungan dari
langkah keamanan yang tepat semestinya
tetap dipelihara untuk jangka waktu
tertentu sebagai hasil dari peningkatan
resiko dari peristiwa keamanan.
8. Security Security level 2
or level 2 is the level at which the
additional protection of a proper security
measures should be maintained for a
certain period as a result of an increased
risk of a security incident