Professional Documents
Culture Documents
1. MAIN BEARING:
Install main bearing cap with FRONT and caps part number toward front of the block
3 1 2 4
2. CON-ROD CAP:
B D
A C
3. CYLINDER LINER:
Bore in liner new: 6.693 to 6.702”
Thickness of flange liner: .498 ± .001”
4. LINER PROJECTION:
1. Install gasket and spacer plate, install cover washer and bolt
to hold spacer plate thirteen the bolt evenly four steep
10 lb.ft
25 lb.ft
50 lb.ft
70 lb.ft
2. Install tool liner projection, Tighten bolts for cross bar evenly four steep
5 lb.ft
15 lb.ft
25 lb.ft
50 lb.ft
3. Average Measurement from any cylinder: .0023” to .0078”
Maximum permissible deferent between all four measurements: .002”
5. CAM SHAFT
End ply : . .007” to 025”
Cam shaft gear bolting torque :100 ± 11 lb.ft
Gear magneto tighten to : 270 ± 30 lb.ft
Hit bolt and tighten again : 270 ± 30 lb.ft
6. FLY WHEEL
7. CRANK SHAFT
End ply : .007” to .025”
Oil clearance for con-rob bearing : .0042” to .0086”
Oil clearance for main bearing : .0048” to .0095”
8. CYLINDER HEAD
Tighten all bolt to : 22 ± 4 lb.ft 6 5
200 ± 26 lb.ft
300 ± 15 lb.ft 4 2
1 3
valve clearance IN: .020” EX: .040”
tighten nut to : 50 ± 11 lb.ft 8 7
VALVE SETTING :
TOP I, IN : 1 – 2 – 5 – 7 – 8 - 12 – 13 - 14
EX: 1- 2- 3- 4- 5- 6- 8- 9
TOP 16 IN : 3 - 4 - 6 - 9 - 10 - 11 - 15 - 16
EX : 7 – 10 – 11 – 12 – 13 – 14 – 15 - 16