You are on page 1of 12

6.

6 KV NUMERICAL RELAY
TEST REPORTS

6.6 KV L01-INCOMER 1 DATE: 14/01/2020

TYPE OF RELAY : SIEMENS

LOCATION : BHOLA, BANGLADESH

FEEDER : INCOMER FEEDER 1

PANEL NO : L01(LZ01)

RELAY MFLB : 7SJ6621-5EB90-1FE4-OR

SERIAL NO : GF1809516031

CT RATED PRIMARY CURRENT : 1600 A

CT RATED SECONDARY CURRENT : 1A

PT RATED PRIMARY VOLTAGE : 6.6KV

PT RATED SECONDARY VOLTAGE : 110V

1. MEASURED VALUE TEST

Inject current in the relay as per table below. Observe the reading on the relay
display in primary values.

CURRENT PRIMARY CURRENT READ ON THE RELAY DISPLAY IN (A)


PHASE INJECTED (A)
R Y B In
R-N 1 1600 0 0 1600

Y-N 1 0 1600 0 1600

B-N 1 0 0 1600 1600

RYB 1 1600 1600 1600 0

Tested By Witnessed By Witnessed By Witnessed By


(Reliserv Solution) (SBL) (Bisho Infra Projects (Toshiba)
Ltd)
6.6 KV NUMERICAL RELAY
TEST REPORTS

6.6 KV L01-INCOMER 1 DATE: 14/01/2020

VOLGTAGE PRIMARY VOLTAGE READ ON THE RELAY DISPLAY IN (KV)


PHASE INJECTED (V)
UAB UBC UCA Uen
R-E 63.5 3.81 0 3.81 3.81

Y-E 63.5 3.81 3.81 0 3.81

B-E 63.5 0 3.81 3.81 3.81

RYB 63.5 6.6 6.6 6.6 0

25% 50% 75% 100%


PHASE
SECONDARY PRIMARY SECONDARY PRIMARY SECONDARY PRIMARY SECONDARY PRIMARY
(A) (A) (A) (A) (A) (A) (A) (A)
R-N 0.25 400 0.50 800 0.75 1199 1.0 1601

Y-N 0.25 400 0.50 799 0.75 1201 1.0 1600

B-N 0.25 399 0.50 800 0.75 1202 1.0 1601

2. BINARY INPUT CHECKING:

S.NO BINARY INPUTS PICKUP VOLTAGE DROP VOLTAGE


1. BINARY INPUT 1 69 67
2. BINARY INPUT 2 72 69
3. BINARY INPUT 3 73 69
4. BINARY INPUT 4 70 68
5. BINARY INPUT 5 68 66
6. BINARY INPUT 6 67 66
7. BINARY INPUT 7 70 68
8. BINARY INPUT 8 69 67
9. BINARY INPUT 9 68 66
10. BINARY INPUT 10 71 69
11. BINARY INPUT 11 70 68
12. BINARY INPUT 12 68 66
13. BINARY INPUT 13 67 65

Tested By Witnessed By Witnessed By Witnessed By


(Reliserv Solution) (SBL) (Bisho Infra Projects (Toshiba)
Ltd)
6.6 KV NUMERICAL RELAY
TEST REPORTS

6.6 KV L01-INCOMER 1 DATE: 14/01/2020

14. BINARY INPUT 14 69 67


15. BINARY INPUT 15 69 67
16. BINARY INPUT 16 70 68
17. BINARY INPUT 17 71 69
18. BINARY INPUT 18 69 67
19. BINARY INPUT 19 68 67
20. BINARY INPUT 20 70 68
21. BINARY INPUT 21 69 67
22. BINARY INPUT 22 69 67

3. BINARY OUTPUT CHECKING:

S.NO BINARY OUTPUTS CONTACT CHECKING REMARKS


1. BINARY OUTPUT 1 NO & NC OK
2. BINARY OUTPUT 2 NO & NC OK
3. BINARY OUTPUT 3 NO & NC OK
4. BINARY OUTPUT 4 NO & NC OK
5. BINARY OUTPUT 5 NO & NC OK
6. BINARY OUTPUT 6 NO & NC OK
7. BINARY OUTPUT 7 NO & NC OK
8. BINARY OUTPUT 8 NO & NC OK
9. BINARY OUTPUT 9 NO & NC OK
10. BINARY OUTPUT 10 NO & NC OK

4. LED CHECKING:

S.NO LEDS LED CHECKING


1. LED 1 OK
2. LED 2 OK
3. LED 3 OK
4. LED 4 OK
5. LED 5 OK
6. LED 6 OK
7. LED 7 OK

Tested By Witnessed By Witnessed By Witnessed By


(Reliserv Solution) (SBL) (Bisho Infra Projects (Toshiba)
Ltd)
6.6 KV NUMERICAL RELAY
TEST REPORTS

6.6 KV L01-INCOMER 1 DATE: 14/01/2020

5. SETTINGS :

DESCRIPTION SETTINGS

DMT-PICKUP –I> 3.19 A


DMT- TIME DELAY-I> 0.70 Sec

DMT-PICKUP –I>> 4A

DMT- TIME DELAY-I>> 0 Sec

IDMT-PICKUP –IP 0.95 A


CURVE TYPE NORMAL INVERSE
IDMT- TIME DELAY-IP 0.36

IDMT-PICKUP –IP 0.95 A


CURVE TYPE VERY INVERSE
IDMT- TIME DELAY-IP 0.36

DMT-PICKUP –IE> 0.24 A


DMT- TIME DELAY-IE> 0.70 Sec
DMT-PICKUP –IE>> 0.50 A
DMT- TIME DELAY-IE>> 0.10 Sec
IDMT-PICKUP –IEP 0.05 A
CURVE TYPE NORMAL INVERSE
IDMT- TIME DELAY-IEP 0.19
IDMT-PICKUP –IEP 0.05 A
CURVE TYPE VERY INVERSE
IDMT- TIME DELAY-IEP 0.19
UNDER VOLTAGE PICKUP – U< 99 V
UNDER VOLTAGE TIME DELAY –U< 3 Sec
UNDER VOLTAGE PICKUP – U<< 88
UNDER VOLTAGE TIME DELAY –U<< 2 Sec
OVER VOLTAGE PICKUP – U> 121 V

Tested By Witnessed By Witnessed By Witnessed By


(Reliserv Solution) (SBL) (Bisho Infra Projects (Toshiba)
Ltd)
6.6 KV NUMERICAL RELAY
TEST REPORTS

6.6 KV L01-INCOMER 1 DATE: 14/01/2020

OVER VOLTAGE TIME DELAY –U> 3 Sec


OVER VOLTAGE PICKUP – U>> 135
OVER VOLTAGE TIME DELAY –U>> 2 Sec
SYNCHRONIZING FUNCTION ON
MAXIMUM VOLTAGE LIMIT -UMAX 99 V
MINIMUM VOLTAGE LIMIT -UMINI 121 V
THRESHOLD U1,U2 WITHOUT VOLTAHE 22 V
THRESHOLD U1,U2 WITH VOLTAHE 88 V
U1> AND U2< YES
U1<AND U2> YES
U1<AND U2< NO
TSUP VOLTAGE 0 Sec
T-SYN SUPERVISION 2 Sec
BALANCING V1/V2 1
ANGLE ADJUSTM 00
CONNECTION of V2 A-B
VT Vn2, primary 6.6KV
dV SYNCHK V2>V1 11V
dV SYNCHK V2<V1 11V
df SYNCHK f2>f1 0.1HZ
df SYNCHK f2<f1 0.1HZ
dα SYNCHK α2>α1 200
dα SYNCHK α2<α1 200

Tested By Witnessed By Witnessed By Witnessed By


(Reliserv Solution) (SBL) (Bisho Infra Projects (Toshiba)
Ltd)
6.6 KV NUMERICAL RELAY
TEST REPORTS

6.6 KV L01-INCOMER 1 DATE: 14/01/2020

6. OVER CURRENT DMT – I>:

PHASE SETTING (A) PICKUP (A) TRIP TIME (msec)

R-N 3.19 3.19 739

Y-N 3.19 3.19 741

B-N 3.19 3.19 738

RYB 3.19 3.19 741

7. OVER CURRENT DMT – I>>:

PHASE SETTING (A) PICKUP (A) TRIP TIME (msec)

R-N 2.0 2.0 35.80

Y-N 2.0 2.0 35.80

B-N 2.0 2.0 35.90

RYB 2.0 2.0 35.80

8. OVER CURRENT IDMT IP –NORMAL INVERSE:

TRIP TIME (S)


PHASE INJ.CURRENT (A)
CALCULATED (S) MEASURED (S)

2 TIMES 1.9 3.610 3.623


R
5 TIMES 4.75 1.541 1.551
10 TIMES 9.5 1.069 1.063
2 TIMES 1.9 3.610 3.624
Y
5 TIMES 4.75 1.541 1.552
10 TIMES 9.5 1.069 1.062
2 TIMES 1.9 3.610 3.621

Tested By Witnessed By Witnessed By Witnessed By


(Reliserv Solution) (SBL) (Bisho Infra Projects (Toshiba)
Ltd)
6.6 KV NUMERICAL RELAY
TEST REPORTS

6.6 KV L01-INCOMER 1 DATE: 14/01/2020

B 5 TIMES 4.75 1.541 1.550


10 TIMES 9.5 1.069 1.066
2 TIMES 1.9 3.610 3.628
RYB
5 TIMES 4.75 1.541 1.553
10 TIMES 9.5 1.069 1.062

9. OVER CURRENT IDMT IP –VERY INVERSE:

TRIP TIME (S)


PHASE INJ.CURRENT (A)
CALCULATED (S) MEASURED (S)

2 TIMES 1.90 4.860 4.868


R
5 TIMES 4.75 1.215 1.216
10 TIMES 9.50 0.540 0.543
2 TIMES 1.90 4.860 4.862
Y
5 TIMES 4.75 1.215 1.216
10 TIMES 9.50 0.540 0.545
2 TIMES 1.90 4.860 4.863
B
5 TIMES 4.75 1.215 1.216
10 TIMES 9.50 0.540 0.544
2 TIMES 1.90 4.860 4.862
RYB
5 TIMES 4.75 1.215 1.216
10 TIMES 9.50 0.540 0.543

Tested By Witnessed By Witnessed By Witnessed By


(Reliserv Solution) (SBL) (Bisho Infra Projects (Toshiba)
Ltd)
6.6 KV NUMERICAL RELAY
TEST REPORTS

6.6 KV L01-INCOMER 1 DATE: 14/01/2020

10. EARTH FAULT DMT – IE>:

PHASE SETTING (A) PICKUP (A) TRIP TIME (msec)

R-N 0.24 0.25 735

Y-N 0.24 0.25 729

B-N 0.24 0.25 731

11. EARTH FAULT DMT – IE>>:

PHASE SETTING (A) PICKUP (A) TRIP TIME (msec)

R-N 0.5 0.55 130

Y-N 0.5 0.55 131

B-N 0.5 0.55 128

12. EARTH FAULT IDMT IEP – NORMAL INVERSE:

TRIP TIME (S)


PHASE INJ.CURRENT (A)
CALCULATED (S) MEASURED (S)

2 TIMES 0.1 1.906 1.948


R
5 TIMES 0.25 0.813 0.817
10 TIMES 0.50 0.564 0.577
2 TIMES 0.1 1.906 1.947
Y
5 TIMES 0.25 0.813 0.819
10 TIMES 0.50 0.564 0.578
2 TIMES 0.1 1.906 1.943
B
5 TIMES 0.25 0.813 0.818
10 TIMES 0.50 0.564 0.571

Tested By Witnessed By Witnessed By Witnessed By


(Reliserv Solution) (SBL) (Bisho Infra Projects (Toshiba)
Ltd)
6.6 KV NUMERICAL RELAY
TEST REPORTS

6.6 KV L01-INCOMER 1 DATE: 14/01/2020

13. EARTH FAULT IDMT IEP – VERY INVERSE:

TRIP TIME (S)


PHASE INJ.CURRENT (A)
CALCULATED (S) MEASURED (S)

2 TIMES 0.1 2.565 2.567


R
5 TIMES 0.25 0.641 0.643
10 TIMES 0.50 0.285 0.287
2 TIMES 0.1 2.565 2.568
Y
5 TIMES 0.25 0.641 0.643
10 TIMES 0.50 0.285 0.283
2 TIMES 0.1 2.565 2.567
B
5 TIMES 0.25 0.641 0.643
10 TIMES 0.50 0.285 0.288

14. UNDER VOLTAGE –U<:

PHASE INJECT VOLTAGE TRIP TIME (Sec)

RYB 99V 3.029

15. UNDER VOLTAGE –U<<:

PHASE INJECT VOLTAGE TRIP TIME (Sec)

RYB 88V 2.025

16. OVER VOLTAGE –U>:

PHASE INJECT VOLTAGE TRIP TIME (Sec)

RYB 121V 3.031

Tested By Witnessed By Witnessed By Witnessed By


(Reliserv Solution) (SBL) (Bisho Infra Projects (Toshiba)
Ltd)
6.6 KV NUMERICAL RELAY
TEST REPORTS

6.6 KV L01-INCOMER 1 DATE: 14/01/2020

17. OVER VOLTAGE –U>>:

PHASE INJECT VOLTAGE TRIP TIME (Sec)

RYB 135V 2.067

18. SYNCH CONDITIONS:

CASE-1:

BUS PT2 BUS PT1 FREQUENCY SYNCH RESULT


PHASE VOLTAGE VOLTAGE (HZ)
(V) (V)
R-N 63.51∟0
ALL SYNCH
Y-N 63.51∟240 110∟30 50 CONDITIONS OK
SYNCH OK
B-N 63.51∟120

CASE-2:

PHASE IN WHICH BUS PT2 BUS PT1 FREQUENCY SYNCH RESULT


VOLTAGE VOLTAGE VOLTAGE (HZ)
INJECTED (V) (V)
R-N 63.51∟0
VOLTAGE DIFFERENCE
Y-N 63.51∟240 98∟30 50 TOO LARGE
SYNCH NOT OK
B-N 63.51∟120

Tested By Witnessed By Witnessed By Witnessed By


(Reliserv Solution) (SBL) (Bisho Infra Projects (Toshiba)
Ltd)
6.6 KV NUMERICAL RELAY
TEST REPORTS

6.6 KV L01-INCOMER 1 DATE: 14/01/2020

CASE-3:

PHASE IN WHICH LINE PT1 LINE PT2 FREQUENCY SYNCH RESULT


VOLTAGE VOLTAGE VOLTAGE (HZ)
INJECTED (V) (V)
R-N 63.51∟0
ANGLE DIFFERENCE
Y-N 63.51∟240 110∟8 0
50 TOO LARGE
SYNCH NOT OK
B-N 63.51∟120

CASE-4:

PHASE IN WHICH LINE PT1 LINE PT2 ANGLE SYNCH RESULT


VOLTAGE VOLTAGE VOLTAGE
INJECTED (V) (V)
R-N 63.51∟50
FREQ DIFFERENCE
Y-N 63.51∟50 110∟49.8 30 TOO LARGE
SYNCH NOT OK
B-N 63.51∟50

CASE-5:

PHASE IN WHICH LINE PT1 LINE PT2 FREQUENC SYNCH RESULT


VOLTAGE VOLTAGE VOLTAGE Y (HZ)
INJECTED (V) (V)
R-N 75∟50
Y-N 75∟50 V1>MAX
110∟30 50
SYNCH NOT OK
B-N 75∟50

Tested By Witnessed By Witnessed By Witnessed By


(Reliserv Solution) (SBL) (Bisho Infra Projects (Toshiba)
Ltd)
6.6 KV NUMERICAL RELAY
TEST REPORTS

6.6 KV L01-INCOMER 1 DATE: 14/01/2020

19. REMARKS:

ALL BINARY INPUTS AS PER DRAWINGS : OK

ALL BINARY OUTPUTS AS PER DRAWINGS : OK

ALL LED INDICATORS : OK

TRIPPING OF LOCKOUT RELAY (86) CHECKED : OK

RELAY FOUND HEALTHY : OK

Tested By Witnessed By Witnessed By Witnessed By


(Reliserv Solution) (SBL) (Bisho Infra Projects (Toshiba)
Ltd)

You might also like