ATTENDANCE LIST
Date : November 17 2023, 13.00 – 15:30 (GMT+7)
Location : Ms Teams Meeting
Subject : Stacker Reclaimer Mechanical Package Equipment Weekly Meeting
Minutes of Meeting
No. MOM :
Date : November 17 2023, 13:00 – 15:30 (GMT+7)
Location : Microsoft Teams
- RHC Iljin confirm for item number 1-6 already sent within
third shipment in the packages number: MI6362/3RD/018
(SLEWING)
- WIKA request detail drawing for CPD orientation installation, according to foundation
2 Installation for CPD (Center Position Device) Cable & Hose Reel
drawing, the suggested orientation of CPD are:
- WIKA propose & request to RHC Iljin for possibility to install the cable CPD with attached
RHC Iljin will check & inform to WIKA by Tuesday 21 November 2023
direction
- WIKA request installation instruction or drawing for CPD (center position device) /
RHC Iljin confirm & will inform to WIKA on Tuesday 21/11/2023
orientation of cable & hose reel
a.Opera on Manual
b.Maintenance Manual RHC Iljin will confirm submission date by next Tuesday (21/11/2023) >>
3 Remaining Document for Comm and Operation Phase
c.Spare Parts List estimated on mid of December 2023
d.SMDR remaining document a ached
- Incoming ACB: GIPAM3000FI and ETU Setting >> is had the protection relay setting? please
4 Protection relay setting RHC Iljin will confirm submission date by next Tuesday (21/11/2023)
provide
- Travel Inverter Panel: 6SL3210-1PE32-1AL0 >> is had the inverter setting? please provide RHC Iljin will confirm submission date by next Tuesday (21/11/2023)
- B/W Inverter Panel: 6SL3210-1PE27-5AL0 >> is had the inverter setting? please provide RHC Iljin will confirm submission date by next Tuesday (21/11/2023)
- Overload Relay for MCC (All Feeders) >> are the setting in MCC feeder correct for the load?
RHC Iljin will confirm submission date by next Tuesday (21/11/2023)
Or in default setting
- WIKA need clarification that PLC (logic) are already programmed or still need further setting
5 PLC RHC Iljin will confirm submission date by next Tuesday (21/11/2023)
by RHC Iljin supervisor included with memory card?
- WIKA need clarification for memory card in PLC, is it already included in PLC? WIKA request
RHC Iljin will confirm submission date by next Tuesday (21/11/2023)
to included in PLC that will be delivered.
- hydraulic system cable 1305,1305A,1306,1307: WIKA request layout for hydraulic module
6 Termination work with detail equipment + KKS valve motor & actuator. WIKA informed the connection list are RHC Iljin will confirm submission date by next Tuesday (21/11/2023)
not relevant with actual equipment.
7 Pending document - WIKA will send pending document list with SMDR list RHC-Iljin will update the submission date
8 Lubrication system - WIKA will send the detail drawing regarding lubrication system (DN10 actual DN 15
- Proximity switch
WIKA request for detail drawing & actual requirement for proximity switch:
Update:
9 Instrumentation Equipment Drawing requirement 8 pcs
Instrument list requirement 6 pcs
Actual material on site 12 pcs
WIKA ask about the actual requirement? Is there spare pieces or for another missing drawing?
- Tilt switch, WIKA request detail layout for the installation of tripper plunging & boom
plunging chute
- WIKA request detail installation for storm anchor proximity censor
- WIKA request detail installation for rail clamp open limit proximity censor
-WIKA request layout for travelling correction position striker
These accessories cannot be found in S-R ship-
ment. Please confirm which packing list are these RHC ILjin confirm will supply, the remaining
bracket (encoder slewing) >> november NOTES :
accessories packed. shipment
( )
( -00 .027)
13 PL-12x220x662 SS275 EA 1 - 12.5
20
14 PL-12x220x662 SS275 EA 1 - 12.4 4. INSIDE-WELDMENT SHALL BE WATERTIGHT.
FINALLY WELD OUTSIDE AFTER CHECKING
∅16 h8
15 L-50x6x50 SS275 EA 4 - 0.9
12
16 PIPE 80A-212 SPP EA 1 - 1.9 COMPLETION OF INSIDE WELDING.
17 KEY PL-12x8x13 SCM440-Q.T EA 1 - 0.0 5. AIR TIGHT TEST INSIDE BOX. (PLUG POSITION)
.25 6. LEGEND
R0 18 R.B-Ø55x685.5 S25C EA 1 - 10.8
.4
1
- B.G : BACK GOUGING
R0
C
19 RUBBER COUPLING PURCH EA 1 - 0.0
- U.T : UT CHECK AFTER COMPLETION
R1
15
Ø 50
Ø 55
Ø 50
Ø 20
20 RACK PINION PURCH EA 1 - 0.0
R1 OF WELDING.
R1
R1
6
1
22 ABSOLUTE ROTARY ENCODER PURCH EA 1 - 0.0
1
h7
1
1
C
These whole accessories
SAELANTcannot be found
in S-R
0
C
C
1
(TRANSPARENT RECOMMANDED)
R1
2-M6 DP:20
24 HEX. B. N.SW. PW M16x60 4T SET 4 - 0.0 SITE
G shipment. Please confirm which packing list are
25 ENCODER COVER-01 SET 1 - 5.6
Total Weight of 1 Assembly 84.0 kg these accessories packed.
SEALANT SEALANT
6
1 PL-2.3x245.4x680 SS275 EA 1 - 3.0 shipment.
3SIDESPlease confirm which packing list are
INTERMITTENT
1
2 PL-2.3x220x240 SS275 EA 1 - 1.0
these accessories packed.
∅50
C
4 1
R0.
14 +0.1
13 12 C
9 +0.1
0
14 0-0.1
5
Ø 20
8. COATING METHODS FOR
0.
5
0.
C
C
0.
5 HEX. B. N. SW M12x35 4T SET 4 - 0.0 SITE
BOLTS, NUTS, WASHERS
5
8
∅1
0H
10 10
)
7
( 0+0.02
8(
+0
0
.02
8
2
these accessories packed.
6H
)
∅1
1
TYP.
2
50
2.3
30
3 2
117.7
3 1
.5
27 3
R
235.4
240
240
240
55
16
14
8
117.7
5
13
30
2.3
6
50
20
20
24 11
18 7
3D VIEW
110
12 4
9 6 80 6 9
12 89 6 2-Ø7x30L
15 40 40
140 850.5 SLOT HOLES
662 TYP.
4
NOTES :
25
9
40 1. UNLESS NOTED OTHERWISE,
76.8
ALL SCALLOPS/CHAMFERS SHALL BE R25/C10.
50
2. UNLESS NOTED OTHERWISE, SPECIFIED
5
WELDING SHOULD BE FILLET WELDS BY 70 %
00
∅1
OF THINNER SIDE.
20
3. ALL MACHINING PARTS SHALL BE MACHINED
∅5
60
70
30
AFTER COMPLETION OF WELDING.
30
20
100
4. INSIDE-WELDMENT SHALL BE WATERTIGHT.
20
14
FINALLY WELD OUTSIDE AFTER CHECKING
25
COMPLETION OF INSIDE WELDING.
5
10 5. AIR TIGHT TEST INSIDE BOX. (PLUG POSITION)
21 6. LEGEND
50
DETAIL C - B.G : BACK GOUGING
105.5
- U.T : UT CHECK AFTER COMPLETION
R3
72 OF WELDING.
7. WATERTIGHT TREATMENT WITH (SILICON)
220
9
9 SEALANT TO UNWELDED LIKE BELOW.
64
105.5
50 12 140 (TRANSPARENT SAELANT RECOMMANDED)
78.5 78.5 240
2x2-Ø19 D.H 140
13
LE)
(HO 0
41.5 157 41.5 SEALANT SEALANT
∅9
20
9
5
110
3SIDES INTERMITTENT
182
220
110
(H ∅90 (O ∅56
OL PE
E) N) 8. COATING METHODS FOR
9
BOLTS, NUTS, WASHERS
: DACHROTIZING FOR ALL
20
HIGH-TENSIONAL, GALVANIZING FOR OTHER
SECTION D-D 14 SECTION E-E SECTION F-F
50 12 140 30 240 30
50
22
50
112
21 19
70
150
D C D
25
338
18
Ø 20 19
Ø 50 Ø 90 TYP.
TYP. 3
166
24 6 14
138
14
572
552
14
6
1
12
12
6 16
80
Ø 55 Ø 89.1
212
R1
212
These whole accessories cannot be found in S-R
200
0 9 Ø 110
F 220 F
13
shipment. Please check which packing list are
C
6
12
7
25
10 9 182 9 10 6
these accessories packed.
12
8
25
6
C
R1
10
0 Ø 80
240 13
202
E E
181
181
8 TYP. TYP.
5 6 4
Ø 55
20
8
70
C
9
11
100.5
100.5
7
9
5 157 5 Ø 50 1
Ø 40 h6 ( 0-0.016)
13
13
20 Ø 40 23
51 80 51
Ø 40 H7 ( +0.025
0 ) 2
10 182 10
9 9
SECTION B-B
Ø 50 220