Bahrain City Centre Drainage Test Reports

1. The document reports on several inspection and testing checklists for an underground drainage system at the Bahrain City Centre project. 2. Items on the checklists include verifying material compliance, dimensional aspects, proper installation of couplings, supports, and seals. 3. A pressure test was also conducted over 24 hours with no signs of leakage observed and the pressure maintained above required levels.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
467 views9 pages

Bahrain City Centre Drainage Test Reports

1. The document reports on several inspection and testing checklists for an underground drainage system at the Bahrain City Centre project. 2. Items on the checklists include verifying material compliance, dimensional aspects, proper installation of couplings, supports, and seals. 3. A pressure test was also conducted over 24 hours with no signs of leakage observed and the pressure maintained above required levels.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd

Checklist Report - Rev.

0 - 01 July 2006

Cebarco - WCT W.L.L.

CHECKLIST
Report No. 1124-VL-TR-P-0004 Project Bahrain City Centre
Date 19 July, 2006 Time 09:00 AM Drawing No. CW/BCC/M/M/1000-12

Location Central Mall Area System Under Ground Drainage

Grid Ref. Grid A - F, 27 - 28 Service Foul Water Pipe


Material Used Dimension

Item Description Reference Remarks


Confirm compliance with approved Material Approval
1 Material Submittal Yes No Request
Confirm compliance with approved
2 Method Statement Yes No Method Statement
Confirm Material is in usable
3 condition (no damage / defects) Yes No
Check conformance to dimensional
4 aspects Yes No Shop Drawing
Check and ensure proper fitting of the
5 coupling Yes No
Check and ensure the mounting to be
6 flush with floor level Yes No
Check and ensure proper supports are
7 provided Yes No
Check and ensure proper supports of
8 grating Yes No
Check for proper seating of sealing
9 ring Yes No
Check for proper installation and
10 installation of spigot with socket Yes No
11

12

Checked by Sub-contractor:
Designation :
Signature : Date : 19 July, 2006
MAP Manager Review and Approval :
Comments :

Signature :
Date :

Consultant Acknowledgement :
Comments :

Approved : Yes No
Signature :
Date :
Presssure Test Report - Rev. 0 - 01 July 2006

Cebarco - WCT W.L.L.

PRESSURE TEST REPORT


Report No. 1124-VL-TR-P-0008 Project Bahrain City Centre
Date 19 July, 2006 Time 09:00 AM Drawing No. CW/BCC/M/M/1000-12
Location Central Mall Area System Under Ground Drainage
Grid Ref. Grid A - F, 27 - 28 Service Foul Water Pipe
Pressure Test
Item SL No. Line No. Drawing No. Remarks
Required Observed

1
2
3
4
5
6
7
8
9
10
Test Duration :

Checked by Sub-contractor:
Designation :
Signature : Date : 19 July, 2006

MEP Manager Review and Approval :


Comments :

Signature :
Date :

Consultant Acknowledgement :
Comments :

Approved : Yes No
Signature :
Date :
Refrigerant Test Report

PRESSURE TEST REPORT


Proposed New Blaine Plant and
Report No. 001 Project Warehouse Complex
Date December 21, 2018 Drawing No.
System VRF refrigerant Pipe Attachment WHOLE DRWG

Location Second Floor Hallway SKETCH / EXCERPT

Grid Ref. Sketch/Excrpt Drg.No


Material Used Nitrogen Time
11:00 AM
Item Description Value
Specs/Dwgs Actual % Variation
1 System Working Pressure(PSI) 1.5 times working pressure 600
400
2 Test Pressure(PSI) 650 1.08
3 Duration of Test(Hrs) 24

4 Test Started at 11:00 AM December 20,2018

5 Test Finished at 11:00AM December 21, 2018

Remarks:
Test conducted last December 20 2018 and it was finished last December 21 2018, There will be no
signs of leak for the last 24 hours testing, pressure was 650 psi

Checked by Sub-contractor:
Designation :
Signature : Date :

MEP Manager Review and Approval :


Comments :

Signature :
Date :

Consultant Acknowledgement :
Comments :

Approved : Yes No
Signature :
Date :
Drainage Water Test Report - Rev. 0 - 01 July 2006

Cebarco - WCT W.L.L.

DRAINAGE WATER TEST REPORT Project BAHRAIN CITY CENTRE

Date : Time : Drawing No. :


Location : Discipline :
Grid Line : Services :
Item Description Value Remarks
Minimum Head Clearance ( from lowest invert level to
1
top of pipe: 1.5m = 5 feet)
2 Actual Measured Head
3 Duration of Test
4 Drop of Water Level (mm)
5 Pipe joints / connection
6 Overall Length
7 Diameter of Pipe
8 Calculation : Actual Water Loss; Ltr. / 30 mins. /
9 Permissible Water Loss Ltr. / 30 mins. /
10 Overall Visual Inspection
Pipe Diameter (mm) PERMISSIBLE WATER LOSS
in mm Ltr/Mtr/30 Min.
a 100 mm 0.05
b 150 mm 0.075
c 200 mm 0.1

Checked by Sub-contractor;
Designation :
Signature : Date :

MEP Manager Review and Approval


Comments :

Signature :
Date :

Consultant Acknowledgement
Comments :

Approved : Yes No
Signature :
Date :