PREHEAT (QW‐406)
Preheat temperature:35º C Interpass temperature: Maximum 250ºC
Doc No. : K N M - W P S - 0 2
Page 2 of 4
Page 3 of 4
TECHNIQUE (Q W – 410)
Removal of line –Up Clamp: After at least 65% of the Root Pass.
Bead Characteristics: Root by String bead others by Weave bead
Bead width Restriction: Max 3 times the electrode diameter
Orifice or Gas Cup size: N/A.
Speed of Travel: 2.0 – 4.0”/min
Method of Inter pass cleaning: Grinding/ Mechanical Power Brush.
Time Lapse Between Completion of Root Pass and start of Hot Pass: 5 Minutes Max
Time Lapse Between Completion of Hot Pass and start of
5 Minutes Max
Other Passes:
Minimum Number of passes Before Joint is Allowed to Cool: 3 Passes
Maximum Time Between Commencement and Completion of Weld: 45 minutes
Type of Heater To be Used Propane Gas Torch With Rosebud Nozzle
Peening NO
To maintain the low hydrogen content, electrode shall be baked in accordance with manufacturer’s
recommendation and transferred to heat quivers with minimum temperature of 70C
We certify that the statements in this WPS are correct and were prepared, in accordance with the requirements of
section IX of the ASME Code.
30o50
2.0
2.0mm 0.79.mm
Doc No. : K N M - W P S - 0 2
Page 4 of 4
4
3
3
T 2
1
SEQENCE OF BEAD
Note:
Weld joints should be free from any contamination.
Use shade no 11 DIN for welding glass.
Wear safety protection during welding.
Make use of approved brand of consumables as per QAP or client specification.
Use calibrated & well maintains welding machine having DC output only shall be used for working with this
procedure.
The welding shall not be carried out when wind velocity is > 8 km / hr