You are on page 1of 1

MAPLE LEAF CEMENT FACTORY LIMITED.

GCD

INSPECTION NOTE

MLCF /Stores/23 DATE: 18-Nov-23

GENERAL MANAGER
The following materials have been received from M/s. ABCO Technical (Pvt.) Ltd.

DEMAND PURCHASE ORDER # T.R/R.R/P.P/TCS/BY HAND # DATE FREIGHT INWARD GATE PASS # DATE
DEPT. S.R.V. #
# DATE DATE RS.
41224 (OLD) 8747 DT 14.11.2023
ELECT.
45556 12-Jun-23 L-III
- 52803 16-Nov-23 7246
FUSION P.O REQUIRED DC#. 780 DT 14.11.2023

kindly arrange its necessary inspection and send report as early as possible enabling us to release the Store
Receiving Report.

SR. # DESCRIPTION U/M QTY. ITEMS CODE #

1 CYLINDERICAL ROLLER BEARING, SINGLE ROW TYPE: NU309ECP/C3 NOS 1 GS-CNK-ESP-0116

ATHAR BUKHARI
PREPARED BY SR. MANAGER (STORE) ACCEPTED BY
MCF-123
Office Copy

You might also like