You are on page 1of 1

MAPLE LEAF CEMENT FACTORY LIMITED.

GCD

INSPECTION NOTE

MLCF /Stores/23 DATE: 14-Jul-23

GENERAL MANAGER
The following materials have been received from M/s. ABCO Technical (Pvt.) Ltd.

DEMAND PURCHASE ORDER # T.R/R.R/P.P/TCS/BY HAND # DATE FREIGHT INWARD GATE PASS # DATE
DEPT. S.R.V. #
# DATE DATE RS.
41224 7347 DT 11.07.2023
ELECT.
45556 12-Jun-23 L-III
- 43347 13-Jul-23 7039
6-Jul-23 DC#. 30 DT 10.07.2023
kindly arrange its necessary inspection and send report as early as possible enabling us to release the Store
Receiving Report.

SR. # DESCRIPTION U/M QTY. ITEMS CODE #

1 CYLINDRICAL ROLLER BEARINGS, SINGLE ROW TYPE:NU309ECP/C3, MAKE SKF NOS 1 GS-CNK-ESP-0116

ATHAR BUKHARI
PREPARED BY SR. MANAGER (STORE) ACCEPTED BY
MCF-123
Office Copy

You might also like