Part D - 013B - Reflected Ceiling Plan-A1 Landscape
Part D - 013B - Reflected Ceiling Plan-A1 Landscape
WC GF017
Ae A A
2550
B
Be B
A A A A A A A A A SWITCH
AC.
2450 Dis. WC B ROOM
B B GF021 GF023
2450 2450 2450
AC.
Be
A Ae A Ae Ae A A Ae Ae Ae
2450 Ae 2450
CORRIDOR
GF019
Ae A A
CPD Ae 2450
GF020
Ae Ae
2450 Ae
KITCHEN
2450 GF026
A LOBBY
A GF014 GF030
Be 2450 Ae
STORE
GF031
A
A
GF013
2450
A A
A Ae
2450
SHADOW BATTEN
38mm x 50mm shadow batten to be installed around perimeter, to be primed using
Dulux Trade Quick Drying Primer undercoat and finished with 2no. coats of Dulux
Satinwood, colour to be RAL7016 anthracite grey.
CEILING VOID
Contractor to identify any superfluous elements such as redundant
M&E/services/pipework/wiring/trunking etc. and carefully remove and cart away.
Builders clean and wipe down trusses and ledges to remove dust. Fire detection to be
installed to all ceiling voids.
NOTES
1234 denotes proposed ceiling height, ceiling heights to each room to be confirmed,
2450mm height shown for costing purposes. GENERAL NOTES:
Ae - 600 x 600 emergency modular recessed LED luminaire with 3 hour The Contractor is to allow for ALL making good of
Ae battery back up. NVC Sterling UGR19 LED light ref. NST/UGR19/66/LO/840 rooms/corridors/lobbies in areas of disruption including
and N/REC/M3/PACK or similar approved. area adjacent to the primary site where windows and
Project.
Drawing Title.
Drawing Status.
TENDER
Scale. Date. Dwg No.