Professional Documents
Culture Documents
A
A
C
CLIENT OCCIDENTAL OF OMAN INC.
C
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =LT Page 1
AP-LVS COVER SHEET
2 Revised as per Comments 23.05.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC LT-13006-01 +LT-13006-01 Of 16
SINGLE LINE DIAGRAM FOR
1 Revised as per Comments 01.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
415V LV SWITCHGEAR (SB-2773).
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
Table of contents
A
A
Page Page Type Page Description ABB Drawing number Ver. Client Drawing number Rev. Date.
1 / 16 Title page / cover sheet SINGLE LINE DIAGRAM FOR 415V LV SWITCHGEAR (SB-2773). LT-13006-01 A 09.10.13
2 / 16 Table of contents SINGLE LINE DIAGRAM FOR 415V LV SWITCHGEAR (SB-2773). LT-13006-01 A 09.10.13
3 / 16 Schematic single-line SINGLE LINE DIAGRAM FOR 415V LV SWITCHGEAR (SB-2773). LT-13006-01 A 09.10.13
4 / 16 Schematic single-line SINGLE LINE DIAGRAM FOR 415V LV SWITCHGEAR (SB-2773). LT-13006-01 A 09.10.13
B B
5 / 16 Schematic single-line SINGLE LINE DIAGRAM FOR 415V LV SWITCHGEAR (SB-2773). LT-13006-01 A 09.10.13
6 / 16 Schematic single-line SINGLE LINE DIAGRAM FOR 415V LV SWITCHGEAR (SB-2773). LT-13006-01 A 09.10.13
7 / 16 Schematic single-line SINGLE LINE DIAGRAM FOR 415V LV SWITCHGEAR (SB-2773). LT-13006-01 A 09.10.13
8 / 16 Schematic single-line SINGLE LINE DIAGRAM FOR 415V LV SWITCHGEAR (SB-2773). LT-13006-01 A 09.10.13
9 / 16 Schematic single-line SINGLE LINE DIAGRAM FOR 415V LV SWITCHGEAR (SB-2773). LT-13006-01 A 09.10.13
C 10 / 16 Schematic single-line SINGLE LINE DIAGRAM FOR 415V LV SWITCHGEAR (SB-2773). LT-13006-01 A 09.10.13
C
11 / 16 Schematic single-line SINGLE LINE DIAGRAM FOR 415V LV SWITCHGEAR (SB-2773). LT-13006-01 A 09.10.13
12 / 16 Schematic single-line SINGLE LINE DIAGRAM FOR 415V LV SWITCHGEAR (SB-2773). LT-13006-01 A 09.10.13
13 / 16 Schematic single-line SINGLE LINE DIAGRAM FOR 415V LV SWITCHGEAR (SB-2773). LT-13006-01 A 09.10.13
14 / 16 Device tag list SINGLE LINE DIAGRAM FOR 415V LV SWITCHGEAR (SB-2773). LT-13006-01 A 09.10.13
15 / 16 Device tag list SINGLE LINE DIAGRAM FOR 415V LV SWITCHGEAR (SB-2773). LT-13006-01 A 09.10.13
D D
16 / 16 Summarized parts list SINGLE LINE DIAGRAM FOR 415V LV SWITCHGEAR (SB-2773). LT-13006-01 A 09.10.13
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =LT Page 2
AP-LVS INDEX SHEET
2 Revised as per Comments 23.05.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC LT-13006-01 +LT-13006-01 Of 16
SINGLE LINE DIAGRAM FOR
1 Revised as per Comments 01.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
415V LV SWITCHGEAR (SB-2773).
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
-KM1 -KM1
38A, AC-3 50A,AC-3
3P, AF38 3P,AF50
3 3
-F2 -F2
C EF19-18.9 E45DU45 C
5.70-18.9A 15-45A
3+PE 3+PE
-M1
M -M1
M
3~ 3~
FEEDER DETAILS
1 ITEM TAG UPS-2770 - - P-613B M-101B M-6212
NOTE:
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =LT Page 3
AP-LVS
2 Revised as per Comments 23.05.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC LT-13006-01 +LT-13006-01 Of 16
SINGLE LINE DIAGRAM FOR
1 Revised as per Comments 01.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
415V LV SWITCHGEAR (SB-2773).
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
-X1 -X1
OPEN OPEN
4 4
CLOSE CLOSE
-Q1 -Q1
In=125A I> In=400A I>
Icu=70KA TRIP Icu=70KA I>> TRIP
B TMD,4P MCCB PR221DS-LS/I B
T2H160R125 4P MCCB
T5H400R400
C C
-X2 -X2
3Ph + N 3Ph + N D
D
FEEDER DETAILS
1 ITEM TAG M-111B M-1300 - -
NOTE:
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =LT Page 4
AP-LVS
2 Revised as per Comments 23.05.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC LT-13006-01 +LT-13006-01 Of 16
SINGLE LINE DIAGRAM FOR
1 Revised as per Comments 01.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
415V LV SWITCHGEAR (SB-2773).
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
A -CFA -VT1A
OPEN HR HY HB 3 -Q11A A
4
-S22
LOCAL/ CLOSE 415V 110V
-Q01 4
REMOTE
-Q12 -S11 -P11
√3 /
√3
4
-S21 Y/γ, 15VA, CL. 0.5
In=1600A TRIP/ TRIP V
Icw=65KA NEUTRAL/
CLOSE
-IPR1
4P ACB 0-500V
(SWITCH -CF -VT1
DISCONNECTOR) 3 -Q11 F96
4
E2S/MS-20 TCS RELAY
TTB 25
WT : WINDING TEMPERATURE -CT11-14
415V 110V
√3 / √3
OT : OIL TEMPERATURE
1600/1A
CL.5P20
IEC-61850
COMMUNICATION
Y/γ, 15VA, CL. 0.5
B -IPR1 15VA B
MT : MECHANICAL TRIP REF630
-S22
25
TRIPS LOCAL/ OPEN
WT OT MT REMOTE
86
-CT11-14 TTB -S21
50 50N TRIP/
CLOSE
1600/1A IEC-61850 4
CL.5P20 51 51N COMMUNICATION -Q03 NEUTRAL/
CLOSE
In=1600A
15VA
REF630 F96 Icw=65KA
TCS RELAY 4P ACB
-S10 -P10 (SWITCH
REF 611 DISCONNECTOR)
-CT1-3 A IEC-61850 E2S/MS-20
1600/1A 51G COMMUNICATION
0-1600/1920A
CL.1
C BUS-A VOLTAGE -CFB -VT1B C
15VA
FROM BUS-SECTION 3 -Q11B
4
FEEDER DETAILS
1 ITEM TAG - -
INCOMING FROM EXISTING
2 DESCRIPTION 11kV SWITCHGEAR (FEEDER# BUS SECTION
R6) AT RGRS S/S
3 ENCL./CUBICLE NO. EN02F EN03F
E E
4 CUBICLE SIZE FULL FULL
5 SCHEMATIC DWG. REF. ST-13006-ACB-4P-INC1-01 ST-13006-ACB-4P-BC-01
NOTE:
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =LT Page 5
AP-LVS
2 Revised as per Comments 23.05.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC LT-13006-01 +LT-13006-01 Of 16
SINGLE LINE DIAGRAM FOR
1 Revised as per Comments 01.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
415V LV SWITCHGEAR (SB-2773).
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
A
HR HY HB A
OPEN
-S22
LOCAL/
REMOTE CLOSE -Q12 -S11 -P11
-Q02 4 4
-S21
In=1600A TRIP/
TRIP
V
Icw=65KA NEUTRAL/
CLOSE 0-500V
4P ACB
(SWITCH -CF -VT1
DISCONNECTOR) 3 -Q11
4
E2S/MS-20
415V 110V
/ WT : WINDING TEMPERATURE
√3 √3
Y/γ, 15VA, CL. 0.5 OT : OIL TEMPERATURE
B -IPR1 B
MT : MECHANICAL TRIP
25
TRIPS
WT OT MT
86
-CT11-14 TTB
50 50N IEC-61850
1600/1A
CL.5P20 51 51N COMMUNICATION
15VA
REF630 F96
TCS RELAY
-S10 -P10
REF 611
-CT1-3 A IEC-61850
1600/1A 51G COMMUNICATION
0-1600/1920A
CL.1
C 15VA BUS-B VOLTAGE C
FROM BUS-SECTION
LINK
N
3
E -CT
PANEL
-E 1600/1A
EARTH CLASS:5P20
PROVISION TX-2764 20VA
FOR EXTERNAL 1000KVA
EARTH 11/0.433KV
Z=5%
Dyn11 3
D D
FEEDER DETAILS
1 ITEM TAG - - -
TRANSITION CUBICLE FOR
2 DESCRIPTION SHIPPING SECTION & BUSBAR INCOMING FROM RMU-1802A CONTROL & RELAY PANEL
CONNECTION
3 ENCL./CUBICLE NO. EN03AF EN04F EN04AF
E E
4 CUBICLE SIZE FULL FULL FULL
5 SCHEMATIC DWG. REF. - ST-13006-ACB-4P-INC2-01 -
NOTE:
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =LT Page 6
AP-LVS
2 Revised as per Comments 23.05.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC LT-13006-01 +LT-13006-01 Of 16
SINGLE LINE DIAGRAM FOR
1 Revised as per Comments 01.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
415V LV SWITCHGEAR (SB-2773).
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
3 4 4 4 3 4
CLOSE CLOSE CLOSE CLOSE RUN CLOSE
-Q1 -Q1 -Q1 -Q1 -Q1 I> -Q1
In=63A I> In=63A I> In=63A I> In=63A I> In=12.5A In=100A I>
Icu=70KA TRIP Icu=70KA TRIP Icu=70KA TRIP Icu=70KA TRIP Im=175A FAULT Icu=70KA TRIP
B B
TMD,3P MCCB TMD,4P MCCB TMD,4P MCCB TMD,4P MCCB Icu=70kA TMD,4P MCCB
T2H160R63 T2H160R63 T2H160R63 T2H160R63 TP MCCB T2H160R100
(WIRED AS 2P) XT2H160MF12.5
-KM1
38A, AC-3
3P, AF38
C
-F2
EF19-18.9 C
5.70-18.9A
3+PE
-M1
M
3~
FEEDER DETAILS
1 ITEM TAG UPS 2771 - UPS-2770 - P-613A H-3103
1 PHASE SUPPLY FOR SOLAR WELDING SOCKET OUTLET WELDING SOCKET FOR 1MVA LUBE OIL TANK IMMERSION
2 DESCRIPTION 110V DC UPS I/C-2 DRAIN PUMP-1
120V DC BATTERY CHARGER NEAR COMPRESSOR SHED TRANSFORMER HEATER 25kW
E E
3 ENCL./CUBICLE NO. EN05F.1A EN05F.1B EN05F.2A EN05F.2B EN05F.3 EN05F.4
NOTE:
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =LT Page 7
AP-LVS
2 Revised as per Comments 23.05.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC LT-13006-01 +LT-13006-01 Of 16
SINGLE LINE DIAGRAM FOR
1 Revised as per Comments 01.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
415V LV SWITCHGEAR (SB-2773).
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
A
A
-KM1 -KM1
50A,AC-3 50A,AC-3
3P,AF50 3P,AF50
3 3
-F2 -F2
E45DU45 E45DU45
C 15-45A 15-45A
C
3Ph + N 3Ph + N
D D
3+PE 3+PE
-M1
M -M1
M
3~ 3~
FEEDER DETAILS
1 ITEM TAG M-6211 M-101A - H-612B
VENTILATION SYSTEM
2 DESCRIPTION LPC GAS COOLER MOTOR-1 SPARE FUEL GAS HEATER SKID-2
MOTOR-1 15kW
NOTE:
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =LT Page 8
AP-LVS
2 Revised as per Comments 23.05.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC LT-13006-01 +LT-13006-01 Of 16
SINGLE LINE DIAGRAM FOR
1 Revised as per Comments 01.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
415V LV SWITCHGEAR (SB-2773).
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
-KM1
50A,AC-3
3P,AF50
3
-F2
C E45DU45 C
15-45A
3+PE
-M1
M
3~
FEEDER DETAILS
1 ITEM TAG DB-2774 - - - M-3150 DB-2772
LPG TANKER PUMP FOR WELDING SOCKET OUTLET PRE/POST LUBE OIL PUMP CONTAINER SUBSTATION
2 DESCRIPTION AUXILIARY POWER DB EMPTY
PROPANE BULLET PROJECT NEAR CONTAINER S/S MOTOR POWER SUPPLY
NOTE:
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =LT Page 9
AP-LVS
2 Revised as per Comments 23.05.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC LT-13006-01 +LT-13006-01 Of 16
SINGLE LINE DIAGRAM FOR
1 Revised as per Comments 01.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
415V LV SWITCHGEAR (SB-2773).
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
A
A
-KM1 -KM1
50A,AC-3 50A,AC-3
3P,AF50 3P,AF50
3 3
-F2 -F2
E45DU45 E45DU45
C 15-45A 15-45A
C
3Ph + N 3Ph + N
D D
3+PE 3+PE
-M1
M -M1
M
3~ 3~
FEEDER DETAILS
1 ITEM TAG M-3220-1 M-111A - -
2 DESCRIPTION LUBE OIL COOLER MOTOR-1 HPC GAS COOLER MOTOR-1 SPARE SPARE
NOTE:
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =LT Page 10
AP-LVS
2 Revised as per Comments 23.05.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC LT-13006-01 +LT-13006-01 Of 16
SINGLE LINE DIAGRAM FOR
1 Revised as per Comments 01.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
415V LV SWITCHGEAR (SB-2773).
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
A
A
B B
C C
D D
FEEDER DETAILS
1 ITEM TAG - - -
9 MATERIAL LIST
10 FEEDER TYPE - - -
NOTE:
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =LT Page 11
AP-LVS
2 Revised as per Comments 23.05.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC LT-13006-01 +LT-13006-01 Of 16
SINGLE LINE DIAGRAM FOR
1 Revised as per Comments 01.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
415V LV SWITCHGEAR (SB-2773).
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
A
A
-KM1
50A,AC-3
3P,AF50
3
-F2
E45DU45
C 15-45A
C
D D
3+PE
-M1
M
3~
FEEDER DETAILS
1 ITEM TAG - DB-2776 DB-2771 - M-3220-2 -
2 DESCRIPTION EOT CRANE NEW AUXILIARY DB LIGHTING DB FOR PLANT AREA EMPTY LUBE OIL COOLER MOTOR-2 SPARE
NOTE:
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =LT Page 12
AP-LVS
2 Revised as per Comments 23.05.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC LT-13006-01 +LT-13006-01 Of 16
SINGLE LINE DIAGRAM FOR
1 Revised as per Comments 01.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
415V LV SWITCHGEAR (SB-2773).
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
A
A
-KM1 -KM1
50A,AC-3 50A,AC-3
3P,AF50 3P,AF50
3 3
-F2 -F2
E45DU45 E45DU45
C 15-45A 15-45A
C
3Ph + N
D D
3+PE 3+PE
-M1
M -M1
M
3~ 3~
FEEDER DETAILS
1 ITEM TAG - - H-612A -
NOTE:
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =LT Page 13
AP-LVS
2 Revised as per Comments 23.05.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC LT-13006-01 +LT-13006-01 Of 16
SINGLE LINE DIAGRAM FOR
1 Revised as per Comments 01.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
415V LV SWITCHGEAR (SB-2773).
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
A FEEDER LIST
A
ENCL. No. TAG No. kW A DESCRIPTION SCHEMATIC REF. NO MATERIAL LILST REF. NO. TYPE SIZE CABLE
-EN01F.1A UPS-2770 8kW 63A 110V DC UPS I/C-1 ST-13006-FDR-4P-01 ML-13006-FDR-4P-10 FDR-4P 8E/2 4Cx16
-EN01F.1B - - 63A WELDING SOCKET FOR 4MVA TRANSFORMER AREA ST-13006-FDR-4P-01 ML-13006-FDR-4P-10 FDR-4P 8E/2 4Cx35
-EN01F.3 P-613B 5.5KW 11.50A DRAIN PUMP-2 ST-13006-DOL-3PH-02 ML-13006-DOL-3PH-10 DOL-3Ph 8E 3Cx10
-EN01F.4 M-101B 30kW 125A LPC GAS COOLER MOTOR-2 ST-13006-FDR-4P-02 ML-13006-FDR-4P-13 FDR-4P 8E 4Cx70
-EN01F.5 M-6212 15KW 29A VENTILATION SYSTEM MOTOR-2 ST-13006-DOL-3PH-01 ML-13006-DOL-3PH-13 DOL-3Ph 8E 3Cx25
-EN01F.6 M-111B 22kW 125A HPC GAS COOLER MOTOR-2 ST-13006-FDR-4P-02 ML-13006-FDR-4P-13 FDR-4P 8E 4Cx70
B B
-EN01F.7 M-1300 132kW 400A VARIABLE FREQUENCY DRIVE STARTER MOTOR ST-13006-FDR-4P-03 ML-13006-FDR-4P-19 FDR-4P 16E 2Rx4CX185
-EN01R.1B DB-2776 - 63A NEW AUXILIARY DB ST-13006-FDR-4P-01 ML-13006-FDR-4P-10 FDR-4P 8E/2 4Cx16
-EN01R.2A DB-2771 - 63A LIGHTING DB FOR PLANT AREA ST-13006-FDR-4P-01 ML-13006-FDR-4P-10 FDR-4P 8E/2 4Cx35
-EN01R.3 M-3220-2 15KW 29A LUBE OIL COOLER MOTOR-2 ST-13006-DOL-3PH-01 ML-13006-DOL-3PH-13 DOL-3Ph 8E 3Cx25
-EN02F - - 1600A INCOMING FROM EXISTING 11kV SWITCHGEAR (FEEDER# R6) AT RGRS S/S
ST-13006-ACB-4P-INC1-01 ML-13006-4P-ACB-INC1-09 INCOMER-A FULL 3x1C-630 sq.mm/Ph + 2x1C-630 sq.mm/N
-EN04F - - 1600A INCOMING FROM RMU-1802A ST-13006-ACB-4P-INC2-01 ML-13006-4P-ACB-INC2-09 INCOMER-B FULL 3x1C-630 sq.mm/Ph + 2x1C-630 sq.mm/N
-EN05F.1A UPS 2771 - 63A 1 PHASE SUPPLY FOR SOLAR 120V DC BATTERY CHARGER ST-13006-FDR-2P-01 ML-13006-FDR-2P-10 FDR-1P 8E/2 3Cx25
-EN05F.1B - - 63A WELDING SOCKET OUTLET NEAR COMPRESSOR SHED ST-13006-FDR-4P-01 ML-13006-FDR-4P-10 FDR-4P 8E/2 4Cx35
-EN05F.2A UPS-2770 8kW 63A 110V DC UPS I/C-2 ST-13006-FDR-4P-01 ML-13006-FDR-4P-10 FDR-4P 8E/2 4Cx16
-EN05F.2B - - 63A WELDING SOCKET FOR 1MVA TRANSFORMER ST-13006-FDR-4P-01 ML-13006-FDR-4P-10 FDR-4P 8E/2 4Cx35
D D
-EN05F.3 P-613A 5.5KW 11.5A DRAIN PUMP-1 ST-13006-DOL-3PH-02 ML-13006-DOL-3PH-10 DOL-3Ph 8E 3Cx10
-EN05F.4 H-3103 - 100A LUBE OIL TANK IMMERSION HEATER 25kW ST-13006-FDR-4P-02 ML-13006-FDR-4P-12 FDR-4P 8E 4Cx50
-EN05F.5 M-6211 15KW 29A VENTILATION SYSTEM MOTOR-1 15kW ST-13006-DOL-3PH-01 ML-13006-DOL-3PH-13 DOL-3Ph 8E 3Cx25
-EN05F.6 M-101A 30kW 125A LPC GAS COOLER MOTOR-1 ST-13006-FDR-4P-02 ML-13006-FDR-4P-13 FDR-4P 8E 4Cx70
-EN05F.8 H-612B 115kW 400A FUEL GAS HEATER SKID-2 ST-13006-FDR-4P-03 ML-13006-FDR-4P-19 FDR-4P 16E 2Rx4Cx185
-EN05R.1A DB-2774 - 63A AUXILIARY POWER DB ST-13006-FDR-4P-01 ML-13006-FDR-4P-10 FDR-4P 8E/2 4Cx35
-EN05R.1B - 7.5kW 63A LPG TANKER PUMP FOR PROPANE BULLET PROJECT ST-13006-FDR-4P-01 ML-13006-FDR-4P-10 FDR-4P 8E/2 4Cx35
E -EN05R.2A - - 63A WELDING SOCKET OUTLET NEAR CONTAINER S/S ST-13006-FDR-4P-01 ML-13006-FDR-4P-10 FDR-4P 8E/2 4Cx35 E
-EN05R.3 M-3150 11.2KW 22A PRE/POST LUBE OIL PUMP MOTOR ST-13006-DOL-3PH-01 ML-13006-DOL-3PH-12 DOL-3Ph 8E 3Cx25
-EN05R.4 DB-2772 - 100A CONTAINER SUBSTATION POWER SUPPLY ST-13006-FDR-4P-02 ML-13006-FDR-4P-12 FDR-4P 8E 4Cx35
-EN05R.5 M-3220-1 15KW 29A LUBE OIL COOLER MOTOR-1 ST-13006-DOL-3PH-01 ML-13006-DOL-3PH-13 DOL-3Ph 8E 3Cx25
-EN05R.6 M-111A 22kW 125A HPC GAS COOLER MOTOR-1 ST-13006-FDR-4P-02 ML-13006-FDR-4P-13 FDR-4P 8E 4Cx70
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =LT Page 14
AP-LVS
2 Revised as per Comments 23.05.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC LT-13006-01 +LT-13006-01 Of 16
SINGLE LINE DIAGRAM FOR
1 Revised as per Comments 01.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
415V LV SWITCHGEAR (SB-2773).
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
A FEEDER LIST
A
ENCL. No. TAG No. kW A DESCRIPTION SCHEMATIC REF. NO MATERIAL LILST REF. NO. TYPE SIZE CABLE
-EN05R.7 - 15KW 29A SPARE ST-13006-DOL-3PH-01 ML-13006-DOL-3PH-13 DOL-3Ph 8E -
B B
C C
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =LT Page 15
AP-LVS
2 Revised as per Comments 23.05.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC LT-13006-01 +LT-13006-01 Of 16
SINGLE LINE DIAGRAM FOR
1 Revised as per Comments 01.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
415V LV SWITCHGEAR (SB-2773).
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =LT Page 16
AP-LVS (Scheme Ref. List - Qty)
2 Revised as per Comments 23.05.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC LT-13006-01 +LT-13006-01 Of 16
SINGLE LINE DIAGRAM FOR
1 Revised as per Comments 01.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
415V LV SWITCHGEAR (SB-2773).
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
A
A
C
CLIENT OCCIDENTAL OF OMAN INC.
C
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 1
AP-LVS COVER SHEET
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC LEGEND SHEET +LEGEND SHEET Of 5
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
FOR 415V LV SWITCHGEAR (SB-2773).
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
Table of contents
A
A
Page Page Type Page Description ABB Drawing number Ver. Client Drawing number Rev. Date.
1 /5 Title page / cover sheet SCHEMATIC DIAGRAM FOR FOR 415V LV SWITCHGEAR (SB-2773). LEGEND SHEET A 09.10.13
2 /5 Table of contents SCHEMATIC DIAGRAM FOR FOR 415V LV SWITCHGEAR (SB-2773). LEGEND SHEET A 09.10.13
3 /5 Graphic SCHEMATIC DIAGRAM FOR FOR 415V LV SWITCHGEAR (SB-2773). LEGEND SHEET A 09.10.13
4 /5 Graphic SCHEMATIC DIAGRAM FOR FOR 415V LV SWITCHGEAR (SB-2773). LEGEND SHEET A 09.10.13
B B
5 /5 Graphic SCHEMATIC DIAGRAM FOR FOR 415V LV SWITCHGEAR (SB-2773). LEGEND SHEET A 09.10.13
C C
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 2
AP-LVS INDEX SHEET
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC LEGEND SHEET +LEGEND SHEET Of 5
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
FOR 415V LV SWITCHGEAR (SB-2773).
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
1 3 5
3
7 1 3 5 4 POLE NON AUTO CIRCUIT BREAKER,
Q- D/O TYPE (MOTORISED) Q- 3 POLE MCCB WITH TMD / LI
4
I> I> I> I>
8 2 4 6
2 4 6
1 3 5
1 3 5 3 POLE NON AUTO CIRCUIT BREAKER,
Q- D/O TYPE (MOTORISED)
3
Q- 3 POLE MCCB MAGNETIC TYPE / I B
B 3 I> I> I>
I>
2 4 6 2 4 6
1 3
Q- 2 POLE MCB 3
2
2 4 -F2 THERMAL OVERLOAD RELAY
C C
6 4 2
Q- 3 POLE MCB
3
-KM1 POWER CONTACTOR
5 3 1
1 3 5 7
2 4 6 8
M -M1 3PHASE MOTOR
D D
3~
1 3 5 7
4
2 4 6 8
E E
1 3 5 7
4
2 4 6 8
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 3
AP-LVS
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC LEGEND SHEET +LEGEND SHEET Of 5
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
FOR 415V LV SWITCHGEAR (SB-2773).
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
X2
1
B
NL- X1
B
NEUTRAL LINK CT-
X11- CT SHORTING TERMINAL
CURRENT TRANSFORMER
X2
E EARTHING
TTB TEST TERMINAL BLOCK
C C
V P-
VOLTMETER FUSE
MONITORING
F- FUSE MONITORING RELAY
D D
A P-
AMMETER
HEATER
H-
E E
MOTOR OPERATED
M
X- PLUG IN CONTACT
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 4
AP-LVS
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC LEGEND SHEET +LEGEND SHEET Of 5
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
FOR 415V LV SWITCHGEAR (SB-2773).
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
A
A
B B
I > IDMT EARTH FAULT PROTECTION (51N)
C C
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 5
AP-LVS
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC LEGEND SHEET +LEGEND SHEET Of 5
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
FOR 415V LV SWITCHGEAR (SB-2773).
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
A
A
C
CLIENT OCCIDENTAL OF OMAN INC.
C
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 1
AP-LVS COVER SHEET
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-ACB-INC1-01 +ST-13006-ACB-INC1-01 Of 28
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P ACB TRANSFORMER INCOMER-A
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
Table of contents
A
A
Page Page Type Page Description ABB Drawing number Ver. Client Drawing number Rev. Date.
1 / 28 Title page / cover sheet SCHEMATIC DIAGRAM FOR 4P ACB TRANSFORMER INCOMER-A ST-13006-ACB-INC1-01 A 09.10.13
2 / 28 Table of contents SCHEMATIC DIAGRAM FOR 4P ACB TRANSFORMER INCOMER-A ST-13006-ACB-INC1-01 A 09.10.13
3 / 28 Table of contents SCHEMATIC DIAGRAM FOR 4P ACB TRANSFORMER INCOMER-A ST-13006-ACB-INC1-01 A 09.10.13
4 / 28 Schematic multi-line SCHEMATIC DIAGRAM FOR 4P ACB TRANSFORMER INCOMER-A ST-13006-ACB-INC1-01 A 09.10.13
B B
5 / 28 Schematic multi-line SCHEMATIC DIAGRAM FOR 4P ACB TRANSFORMER INCOMER-A ST-13006-ACB-INC1-01 A 09.10.13
6 / 28 Schematic multi-line SCHEMATIC DIAGRAM FOR 4P ACB TRANSFORMER INCOMER-A ST-13006-ACB-INC1-01 A 09.10.13
7 / 28 Schematic multi-line SCHEMATIC DIAGRAM FOR 4P ACB TRANSFORMER INCOMER-A ST-13006-ACB-INC1-01 A 09.10.13
8 / 28 Schematic multi-line SCHEMATIC DIAGRAM FOR 4P ACB TRANSFORMER INCOMER-A ST-13006-ACB-INC1-01 A 09.10.13
9 / 28 Schematic multi-line SCHEMATIC DIAGRAM FOR 4P ACB TRANSFORMER INCOMER-A ST-13006-ACB-INC1-01 A 09.10.13
C 10 / 28 Schematic multi-line SCHEMATIC DIAGRAM FOR 4P ACB TRANSFORMER INCOMER-A ST-13006-ACB-INC1-01 A 09.10.13
C
11 / 28 Schematic multi-line SCHEMATIC DIAGRAM FOR 4P ACB TRANSFORMER INCOMER-A ST-13006-ACB-INC1-01 A 09.10.13
12 / 28 Schematic multi-line SCHEMATIC DIAGRAM FOR 4P ACB TRANSFORMER INCOMER-A ST-13006-ACB-INC1-01 A 09.10.13
13 / 28 Schematic multi-line SCHEMATIC DIAGRAM FOR 4P ACB TRANSFORMER INCOMER-A ST-13006-ACB-INC1-01 A 09.10.13
14 / 28 Schematic multi-line SCHEMATIC DIAGRAM FOR 4P ACB TRANSFORMER INCOMER-A ST-13006-ACB-INC1-01 A 09.10.13
15 / 28 Schematic multi-line SCHEMATIC DIAGRAM FOR 4P ACB TRANSFORMER INCOMER-A ST-13006-ACB-INC1-01 A 09.10.13
D D
16 / 28 Schematic multi-line SCHEMATIC DIAGRAM FOR 4P ACB TRANSFORMER INCOMER-A ST-13006-ACB-INC1-01 A 09.10.13
17 / 28 Schematic multi-line SCHEMATIC DIAGRAM FOR 4P ACB TRANSFORMER INCOMER-A ST-13006-ACB-INC1-01 A 09.10.13
18 / 28 Schematic multi-line SCHEMATIC DIAGRAM FOR 4P ACB TRANSFORMER INCOMER-A ST-13006-ACB-INC1-01 A 09.10.13
19 / 28 Schematic multi-line SCHEMATIC DIAGRAM FOR 4P ACB TRANSFORMER INCOMER-A ST-13006-ACB-INC1-01 A 09.10.13
20 / 28 Schematic multi-line SCHEMATIC DIAGRAM FOR 4P ACB TRANSFORMER INCOMER-A ST-13006-ACB-INC1-01 A 09.10.13
E 21 / 28 Schematic multi-line SCHEMATIC DIAGRAM FOR 4P ACB TRANSFORMER INCOMER-A ST-13006-ACB-INC1-01 A 09.10.13
E
22 / 28 Schematic multi-line SCHEMATIC DIAGRAM FOR 4P ACB TRANSFORMER INCOMER-A ST-13006-ACB-INC1-01 A 09.10.13
23 / 28 Terminal diagram SCHEMATIC DIAGRAM FOR 4P ACB TRANSFORMER INCOMER-A ST-13006-ACB-INC1-01 A 09.10.13
24 / 28 Terminal diagram SCHEMATIC DIAGRAM FOR 4P ACB TRANSFORMER INCOMER-A ST-13006-ACB-INC1-01 A 09.10.13
25 / 28 Terminal diagram SCHEMATIC DIAGRAM FOR 4P ACB TRANSFORMER INCOMER-A ST-13006-ACB-INC1-01 A 09.10.13
26 / 28 Terminal diagram SCHEMATIC DIAGRAM FOR 4P ACB TRANSFORMER INCOMER-A ST-13006-ACB-INC1-01 A 09.10.13
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 2
AP-LVS INDEX SHEET
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-ACB-INC1-01 +ST-13006-ACB-INC1-01 Of 28
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P ACB TRANSFORMER INCOMER-A
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
Table of contents
A
A
Page Page Type Page Description ABB Drawing number Ver. Client Drawing number Rev. Date.
27 / 28 Terminal diagram SCHEMATIC DIAGRAM FOR 4P ACB TRANSFORMER INCOMER-A ST-13006-ACB-INC1-01 A 09.10.13
28 / 28 Terminal diagram SCHEMATIC DIAGRAM FOR 4P ACB TRANSFORMER INCOMER-A ST-13006-ACB-INC1-01 A 09.10.13
B B
C C
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 3
AP-LVS INDEX SHEET
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-ACB-INC1-01 +ST-13006-ACB-INC1-01 Of 28
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P ACB TRANSFORMER INCOMER-A
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
(6.1F) (6.1F) (6.1F) (6.1F)
-N1 -R1 -Y1 -B1
A73
-X12 -TTB1
2 TEST TERMINAL BLOCK
P2 S2
A
-CT11 A10
1 A11 A12
-/1A 1 2
P1 S1 -A12 / (6.6B) A
CLASS:5P20
A32
3 4
A74
4 -A32 / (6.6B)
P2 S2
A52
5 6
-CT12 A30
3 A31 -A52 / (6.6C)
-/1A A72
P1 S1
CLASS:5P20 7 8
-A72 / (6.6C)
A75 A82
6 9 10
P2 S2
-A82 / (6.6C)
-CT13 A50
5 A51
-/1A 11 12
P1 S1
CLASS:5P20
13 (/9.2C) 14
B A76
8 B
P2 S2
15 (/9.2E) 16
-CT14 A70
7 A71
-/1A
CLASS:5P20 P1 S1
17 (/5.3E) 18
A90 A81
9
19 (/5.3E) 20
E
21 (/6.6D) 22
-S10
D10
-X11 D11
AMMETER 23 (/6.6D) 24
1 SELECTOR SWITCH
P2 S2
6
(/6.6D)
-CT1 D71
2 D70
25 26
C C
-/1A
CLASS:1 P1 S1
27 (/6.6D) 28
D30 D31 D1
3
P2 S2
2 1
-CT2 D72
4 1
-/1A
CLASS:1 P1 S1
A -P10
(0-1600A)
D50
5 D51 D2 2 AMMETER
P2 S2
8 3
-CT3 D73
6
-/1A
P1 S1
CLASS:1
D D90 D70 D
7
5
E
LINK
E E
E
PANEL
EARTH
-E -N -R -Y -B
PROVISION INCOMING SUPPLY
FOR EXTERNAL
EARTH
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 4
AP-LVS
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-ACB-INC1-01 +ST-13006-ACB-INC1-01 Of 28
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P ACB TRANSFORMER INCOMER-A
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
A
A
TCS
REF611 -X100
X120 24
1 PO4
23
BI1
2
TCS
B B
3 19
BI2 PO3
18
14
4 SO2
13
BI3
11 12
C C
TRIP (51G)
SO1
(/19.6B)
10
9
7 1/5A
PO2 TRIP (51G)
8 (/9.7B)
IL1
8 N
7
9 1/5A TRIP (51G)
PO1 6
IL2 (/13.4B)
10 N
+FIELD
5
D IRF D
11
4
MOUNTED ON 1/5A
T/F NEUTRAL (/19.1B)
IL3
EARTH 12 N
3
(NOT IN ABB SCOPE
OF SUPPLY) 2 J02
13 1/5A
-
-TTB1 J02 / (16.6E) 110V DC
-X12
Uaux
A181 (/4.6B) A183 Iσ J2 POWER SUPPLY
P1 S1 10 17 18 14 N 1
J2 / (16.6A) TO RELAYS
-CT15 X1
+
-/1A 11 A182 -TTB1 A184
S2 19 20
CLASS:5P20 P2
(/4.6B)
A95
12
E COMMUNICATION
E (IEC-61850)
E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 5
AP-LVS
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-ACB-INC1-01 +ST-13006-ACB-INC1-01 Of 28
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P ACB TRANSFORMER INCOMER-A
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
-N1 / (7.2F)
-R1 / (7.2F)
-B1 / (7.2F)
-Y1 / (7.2F)
A
-S11 A
VOLTMETER
SELECTOR SWITCH
V1
9 10
1
-IPR1
5 V -P11 REF-630
V2 0-500V AC INTELLIGENT PROTECTION RELAY
2 VOLTMETER
1 12 X1
X1 X1 X1
11 COMMUNICATION
X101 (IEC-61850)
-HR -HY -HB
(RED) (YELLOW) (BLUE) (4.7A) / -A12 1
X2 X2 X2
B B
(CT-1)
2
PHASE INDICATION LAMP
(4.7A) / -A32 3
E107
E207
E307 (CT-2)
E407
4
2 4 6 8 (4.7A) / -A52 5
50
-F5 -Q12 (CT-3)
2A 4P MCB
1 3 5 7 6 50N
FUSE
A72 7
C MONITORING (4.7B) / -A72 C
51
(CT-4)
A82 8
(4.7B) / -A82
13 14 (/9.5C) 51N
9
21 22
-VT1
(415/√3)/(110/√3)V -Q11 (CT-5)
86
CLASS:0.5
10
-CF81 STAR/STAR -TTB1
1 2 1 2 21 (/4.6C) 22
E101 E102 E103 E104 E105 X102 25
2A -CF82 (/4.6C) 3
E201 1 2 E202 E203 3 4 E204 23 24 E205
-CF83 2A (VT-1)
D 1 2 5 6 25 (/4.6C) 26 D
E301 E302 E303 E304 E305
4
2A
7 8 27 (/4.6C) 28
E171 E404 E405
5
2A 4P MCB
(VT-2)
14 11 (/9.5C) 6
12
98 95 (/9.5C) 7
96
(VT-3)
8
-XB2A -XB2
E 1 1 E
-HE104A E106 9
110V FROM
BUS-A VT
(VT-4)
(FOR DEAD BUS 2 2
VOLTAGE MONITORING) -HE204A E206 10
+BUS SECTION
(ABB REF. DWG NO.ST-13006-ACB-BC-01)
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 6
AP-LVS
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-ACB-INC1-01 +ST-13006-ACB-INC1-01 Of 28
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P ACB TRANSFORMER INCOMER-A
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
-Q01
(/14.5B) (/16.8C) (/13.1E) (/13.3E) (/9.4B) (/9.3C) (/14.2B) (/14.3B) (/14.2C) (/9.4C) (/14.4B) (/9.3B) (/13.3C) (/13.7C)
104
154
-S33M/1
2
S75I/1 S75I/3
2 4 6 8
101
151
124
174
4P ACB
2
(SWITCH -F1 1 1
S75T/1 S75T/2
13 11 23 21
DISCONNECTOR) YC YO Q/1 Q/2 Q/3 Q/4
121
171
134
184
D/O TYPE 37 2 2 14 12 24 22
2
S33M/2 M S75E/1 S75E/3
131
181
38
(/17.3A) (/17.4A) (/18.2A) (/17.5A) (/20.6B) (/21.1A) (/18.2D) (/21.2A) (/17.1A) (/17.2A) (/17.2A) (/17.3A) (/20.3B)
(*) NOTE:
-23 OPERATING STATUS SHOWN - THE CIRCUIT DIAGRAM IS FOR THE FOLLOWING CONDITIONS
-WITHDRAWABLE CIRCUIT-BREAKER, OPEN AND RACKED-IN
-CIRCUITS DE-ENERGISED
-MOTOR OPERATING MECHANISM WITH SPRINGS DISCHARGED.
212
214
222
224
232
234
242
244
252
254
262
264
272
274
282
284
292
294
302
304
312
314
322
324
332
334
342
344
S75E/1,3: RACK OUT/REMOVED POSITION
S75T/1,2: TEST ISOLATED/TEST POSITION
D Q/11 Q/12 Q/13 Q/14 Q/15 Q/16 Q/17 Q/18 Q/19 Q/20 Q/21 Q/22 Q/23 Q/24 Q/25 YO: SHUNT OPENING RELEASE D
201
211
221
231
241
251
261
271
281
291
301
311
321
331
341
YC: SHUNT CLOSING RELEASE
Q/1;-4,11-25: BREAKER AUXILIARY CONTACTS
OPEN/CLOSE
STATUS
E E
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 7
AP-LVS
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-ACB-INC1-01 +ST-13006-ACB-INC1-01 Of 28
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P ACB TRANSFORMER INCOMER-A
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
3 CB OPEN
(/13.3B) 3 3 3
4 COMMAND BO2_PO BO2_PO BO2_PO
(/19.2D)
BO2_PO SPARE OUTPUT
4 4 4
5
B 5 5 5 B
6 BO3_PO (/19.4D) SPARE OUTPUT BO3_PO SPARE OUTPUT BO3_PO
(/19.3D)
BO3_PO
6 6 6
7
(/20.1A) LOCKOUT TRIP( 86-1)
8 COMMAND
BO4_PO 7 7 7
BO4_SO BO4_SO BO4_SO
8 8 8
9 LOCKOUT TRIP (86-2)
(/20.2A) COMMAND
10
BO5_PO 9 9 9
BO5_SO (/18.4A) CB UNSAFE TRIP BO5_SO BO5_SO
C 10 10 C
10
11 (PROTECTION TRIP
(/14.7B)
12 FOR INDICATION)
BO6_PO 11 11 INCOMER 11
BO6_SO (/18.3A) BO6_SO UNDERVOLTAGE BO6_SO
(CB SAFE TRIP) (/18.3D)
12 12 START 12
13 13 13
14 14 14
BO8_SO BO8_SO BO8_SO
D 15 15 15 D
BO7_SO BO7_SO BO7_SO
13
BO7_SO
14
18 18 18
17 17 17
BO9_SO 16 BO9_SO 16 BO9_SO 16
15
BO8_SO
16
E E
17
BO9_SO
18
-X309
3
1 (/19.1B) IRF (WATCHDOG FEATURE)
IRF 2
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 8
AP-LVS
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-ACB-INC1-01 +ST-13006-ACB-INC1-01 Of 28
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P ACB TRANSFORMER INCOMER-A
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
SELECTOR SWITCH IN
REMOTE POSITION
A
SPRING CHARGED
CB IN RACKEDOUT
FUSE BLOWN/MCB
LOCAL POSITION
LOCAL/REMOTE
CB IN SERVICE
LOCAL/REMOTE
TRIP/OFF (LINE
TCS HEALTHY
SEL. SWITCH
SEL. SWITCH
CB MOTOR
CB IN TEST
POSITION
CB OPENED
CB CLOSED
(ACTIVE IN
(ACTIVE IN
POSITION
POSITION
VOLTAGE)
110V DC
+110V DC
(22.2C) / -J2 -J2 / (11.1A)
(/21.6A)
-J2
-J2 -J2
-S22 21 31 13 23
1 2
-F51G-X100 8
101
B 11 11 B
(/5.5C)
-Q01-21 -Q01-31 -K55 LOCAL/ 22 32 14 24
PO2
(/7.8C) 12 REMOTE POS.1 (LOCAL) POS.2 (REMOTE) 9
104
2
(/7.5B) (/14.5E) 12 14 TRIP (51G)
Q/2 SELECTOR
S75I/1
SWITCH
11
13 -K56
(/14.5E) 12 14
121
181
C 11
(/6.5D) -S21 1-0-2
1 5 9 3 7 11 C
14 96 98 TRIP/
-K54 -Q01-31 -Q01-31 12 14
NEUTRAL
2
124
2
184
(/14.4E) 12 14 (/7.5B) (/7.7C) /CLOSE 2 6 10 4 8 12
S75T/1 S75E/3 SELECTOR POS.1 (TRIP) NEUTRAL POS.2 (CLOSE)
13
SWITCH
-F5
(/6.2C) 14 (SPRING
(FUSE RETURN
J2A BLOWN) TO NEUTRAL)
REF630 D
D
CENTRAL UNIT K21 K22 K23 K24 K25 K26 K27 K28 K29 K30 K33
K31
K32
-IPR1
X0
X0 (HMI)
REF630
HMI 3
-X410 +
-
GND GND
PE PE 1
X304 2 3 4 5 7 8 9 10 12 13 14 16 17 18
E J02A -IPR1 E
REF630
INPUT
-BI1 -BI2 -BI3 -BI4 -BI5 -BI6 -BI7 -BI8 -BI9 -BI10 -BI11 -BI12 -BI13 -BI14
16 MODULES
-TTB1
(/4.6B)
15 X304 1 6 11 15
-110V DC
(22.2C) / -J02 -J02 / (10.1E)
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 9
AP-LVS
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-ACB-INC1-01 +ST-13006-ACB-INC1-01 Of 28
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P ACB TRANSFORMER INCOMER-A
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
(FUTURE PROVISION)
FROM UPSTREAM CB
INTERTRIP FROM
OPEN COMMAND
FROM REMOTE
FROM REMOTE
UPSTREAM CB
A
A
PROVISION
PROVISION
REF630
REF630
REF630
REF630
REF630
+110V DC
(11.5A) / -J2 -J2 / (12.1A)
J2 J2 J2 J2 J2 J2 J2 J2
B -X24 1 3 5 7 9 11 13 15 B
+FIELD
+FIELD
+FIELD
+FIELD
+FIELD
+FIELD
+FIELD
13
-K80
(/15.5E) 14
C C
-X24 2 4 6 8 10 12 14 16 -X24 17 18 19 20
SPARE
K177
K171 K172 K173 K174 K175 K176 K178 K179
D D
X324 2 5 6 9 10 13 14 17 18
-IPR1
REF630
INPUT
-BI1 -BI2 -BI3 -BI4 -BI5 -BI6 -BI7 -BI8 -BI9
MODULE
E E
X324 1 4 8 12 16
-110V DC
(9.8F) / -J02 -J02 / (11.1F)
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 10
AP-LVS
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-ACB-INC1-01 +ST-13006-ACB-INC1-01 Of 28
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P ACB TRANSFORMER INCOMER-A
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
BUS-A VT FAILURE
INCOMER-B OPEN
A
UNDERVOLTAGE
INCOMER-B
START
TRIP
(9.8B) / -J2 -J2 / (10.1A)
J2
J2 J2 J2
B B
-XB1 1 9 11 -XB1 17 19
-XB3 1 9 11 -XB4 1 3
+BUS SECTION
+01_INCOMER_B
ST-13006-ACB-INC2-01)
ST-13006-ACB-BC-01)
(REF. DWG No.
-XB3 2 10 12 -XB4 2 4
-XB1 2 10 12 -XB1 18 20
D D
X329 2 5 6 9 10 13 14 17 18
E -IPR1 E
REF630
INPUT
-BI1 -BI2 -BI3 -BI4 -BI5 -BI6 -BI7 -BI8 -BI9
MODULE
X329 1 4 8 12 16
-110V DC
(10.6E) / -J02 -J02 / (12.1E) - & * : PREFIX NUMBER OF CUBICLE
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 11
AP-LVS
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-ACB-INC1-01 +ST-13006-ACB-INC1-01 Of 28
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P ACB TRANSFORMER INCOMER-A
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
OIL TEMPERATURE
OIL TEMPERATURE
PRESSURE RELIEF
TRANSFORMER
TRANSFORMER
TRANSFORMER
TRANSFORMER
TEMPERATURE
TEMPERATURE
A
ALARM (WT)
ALARM (OT)
A
TRIP (WT)
TRIP (MT)
TRIP (OT)
WINDING
WINDING
DEVICE
+110V DC
(10.7A) / -J2 -J2 / (13.2A)
J2 J2 J2 J2 J2
13 11
13
-K63T -K49A
B -K49T (/15.3E) 12 14
B
(/15.1E) 14 (/15.2E) 14
11
13
-K26A
-K26T (/15.4E) 12 14
(/15.2E) 14
C C
D D
X334 2 5 6 9 10 13 14 17 18
-IPR1
REF630
INPUT
-BI1 -BI2 -BI3 -BI4 -BI5 -BI6 -BI7 -BI8 -BI9
MODULE
E E
X334 1 4 8 12 16
-110V DC
(11.5F) / -J02 -J02 / (13.2E)
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 12
AP-LVS
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-ACB-INC1-01 +ST-13006-ACB-INC1-01 Of 28
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P ACB TRANSFORMER INCOMER-A
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
+110V DC +110V DC
J3 J2
(22.3C) / -J3 (12.7A) / -J2 -J2 / (14.1A)
A
A
12
2 O/P-2
-IPR1-X307 K43 ALARM
11
(/8.1A) 1
BO1_PO SOR
C C
CLOSE
COMMAND
23 21
-Q01-21 -Q01-21
(/7.8C) 24 (/7.8C) 22
Q/3 Q/4
D D
K41
K42
C1
1 C11
1
-Q01-2 YC
(/7.4C) 2 -Q01-4 YO
(/7.4C) 2
C2
C12
-110V DC -110V DC
E J03 J02
(22.3C) / -J03 (12.7E) / -J02 -J02 / (14.1E) E
ACB SHUNT
CLOSING COIL
ACB SHUNT
OPENING COIL
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 13
AP-LVS
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-ACB-INC1-01 +ST-13006-ACB-INC1-01 Of 28
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P ACB TRANSFORMER INCOMER-A
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
A
A
+110V DC
(13.8A) / -J2 -J2 / (15.1A)
13
-Q21 B
151
B 11
131
13 37
(/22.2B) 14
-Q01-31 -Q01-21 -Q01-11 -IPR1-X307
-Q01-31 (/8.1C) 12
154
2
(/7.6B) (/7.7C) 14 (/7.3C) 38
2
134
(/7.6C) BO6_PO
S75E/1 S75I/3 Q/1 S33M/2
7
PROTECTION
-F96 TRIP
9
8
(/13.7B) K68
171
O/P-1
TEST
-Q01-31
2
174
(/7.6B)
S75T/2 13
-Q22
(/22.3B) 14
C C
K69
13
-Q23
(/22.4B) 14
D D
A1 A1 A1 A1 A1 A1 A1 A1
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 14
AP-LVS
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-ACB-INC1-01 +ST-13006-ACB-INC1-01 Of 28
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P ACB TRANSFORMER INCOMER-A
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
OIL TEMPERATURE
OIL TEMPERATURE
PRESSURE RELIEF
TRANSFORMER
TEMPERATURE
TRANSFORMER
INTERTRIP FROM
TRANSFORMER
TRANSFORMER
TEMPERATURE
ALARM (WT)
ALARM (OT)
UPSTREAM CB
WINDING
TRIP (MT)
TRIP (WT)
TRIP (OT)
WINDING
A
DEVICE
A
+110V DC
(14.8A) / -J2 -J2 / (16.1A)
-X31 1 3 5 7 9 -X31 11
B B
+TRANSF. MARSHALLING BOX
+FIELD
C C
SPARE
D D
A1 A1 A1 A1 A1 A1
-K49T -K26T -K63T -K49A -K26A -K80
A2 A2 A2 A2 A2 A2
E -110V DC
E
(14.8E) / -J02 -J02 / (16.1E)
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 15
AP-LVS
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-ACB-INC1-01 +ST-13006-ACB-INC1-01 Of 28
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P ACB TRANSFORMER INCOMER-A
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
A
A
+110V DC
(15.8A) / -J2 -J2 / (5.7E)
21 31 21
-S23 11
-K54 -K56 -K55
LAMP TEST 13 (/14.4E) 22 24
-K58 (/14.5E) 32 34 (/14.5E) 22 24
(/14.7E) 12 14
B B
14
(22.4C) / -J6
110V DC
J06 J6
C
-Q01-1 C
2 2 2 2 2 (/7.3C)
-H11D1 -H12D2 -H13D3 -H14D4 -H15D5 (ACB Motor U1
DIODE BLOCK 1 1 1 1 1 Mechanism)
(MOUNTED ON -S33M/1
LAMP BLOCK)
-F1
K85
M
K84
D U2 D
K83
K82
K81
X1 X1 X1 X1 X1
-H11 -H12 -H13 -H14 -H15
(GREEN) X2 (RED) X2 (YELLOW) X2 (WHITE) X2 (BLUE) X2
E -110V DC E
(15.8E) / -J02 -J02 / (5.7D)
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 16
AP-LVS
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-ACB-INC1-01 +ST-13006-ACB-INC1-01 Of 28
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P ACB TRANSFORMER INCOMER-A
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
A
A
221
231
251
301
311
321
331
-Q01-23 -Q01-23 -Q01-23
-Q01-23 -Q01-23 -Q01-23 -Q01-23
222
224
232
234
252
254
(/7.3D) (/7.3D) (/7.4D)
302
304
312
314
322
324
332
334
(/7.5D) (/7.5D) (/7.5D) (/7.5D) Q/13 Q/14 Q/16
Q/21 Q/22 Q/23 Q/24
K211 K212 K213 K214 K215 K216 K217 K218 K219 K220 K221 K222 K223 K224 K225 K226 K227 K228 K229 K230 K231
-X21 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 -X21 22 23 24 25
B B
SPARE
CB OPENED/CLOSED STATUS
SPARE
C C
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 17
AP-LVS
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-ACB-INC1-01 +ST-13006-ACB-INC1-01 Of 28
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P ACB TRANSFORMER INCOMER-A
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
A
A
11 9
241
-IPR1-X321 -IPR1-X321
-Q01-23 (/8.3C) 12 (/8.3C) 10
242
244
(/7.3D) BO6_SO BO5_SO
Q/15
B B
-XB3 1 2 3 4 5 6
+BUS SECTION
INPUTS TO BUS SECTION
REF630 RELAY (REF. DWG NO
-XB1 1 2 3 4 5 6
ST-1306-ACB-BC-01) COM ACB OPEN COM ACB SAFE TRIP COM ACB UNSAFE TRIP
C C
D D
281
11
-Q01-23 -IPR1-X326
282
284
(/7.4D) (/8.5C) 12
Q/19 BO6_SO
-XB4 1 2 3 4
+01_INCOMER_B
INPUTS TO INCOMER-B
REF 630 RELAY (REF. DWG NO.
-XB1 17 18 19 20
ST-13006-ACB-INC2-01) COM ACB OPEN COM ACB
UNDERVOLTAGE
START
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 18
AP-LVS
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-ACB-INC1-01 +ST-13006-ACB-INC1-01 Of 28
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P ACB TRANSFORMER INCOMER-A
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
A
A
3
-IPR1-X309
(/8.1E) 2 1
IRF
B 21 21 10 B
K262A 21 33 21 21
33
-K52 -K53 33
-K49A -K26A -F51G-X100 -K57
-K49T -K26T
-F51G-X100 (/14.2E) 22 24 (/14.3E) 22 24
(/15.1E) 34
-K63T (/15.3E) 22 24 (/15.4E) 22 24 (/5.5C) 11 12 (/14.6E) 22 24
(/15.2E) 34 (/15.2E) 34 SO1
(/5.5D) 3
TRIP
IRF (51G)
4 5
K261 K262 K263 K264 K265 K266 K267 K268 K269 K270 K271 K272 K273 K274 K275 K276 K277 K278 K279 K280
-X25 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 21 22
C C
REF 630/REF 611 ACB TEST ACB RACKED-IN TRANSFOREMR TRANSFOREMR PRESSURE RELIEF TRANSFOREMR TRANSFOREMR STANDBY EARTH FAULT DC CONTROL SUPPLY
IRF WATCHDOG POSITION POSITION WINDING OIL TEMPERATURE DEVICE WINDING OIL TEMPERATURE RELAY TRIP (51G) MCCB CLOSED
(RELAY HEALTHY) TEMPERATURE TRIP (OT) TRIP (MT) TEMPERATURE ALARM (OT) (HEALTHY)
TRIP (WT) ALARM (WT) (SPARE)
D D
3 5
5
-IPR1-X326 -IPR1-X326
(/8.5B) 6
-IPR1-X321
(/8.5B) 4 (/8.3B) 6
BO2_PO BO3_PO
BO3_PO
-X25 25 26 27 28 29 30 -X25 31 32 33 34
E E
SPARE
REF 630 SPARE OUTPUT REF 630 SPARE OUTPUT REF 630 SPARE OUTPUT
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 19
AP-LVS
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-ACB-INC1-01 +ST-13006-ACB-INC1-01 Of 28
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P ACB TRANSFORMER INCOMER-A
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
A
A
261
7 9 31 21 1
341
11
-IPR1-X307 -IPR1-X307 -K51 -K51 -Q01-23 -IPR1-X326
(/8.1B) 8 (/8.1C) 10 (/14.2E) 34 32 -Q01-23 -K53
262
264
(/14.2E) 22 24 (/7.4D) (/8.5A) 2
342
344
BO4_PO BO5_PO (/7.6D) (/14.3E) 12 14 Q/17 BO1_PO
LOCKOUT LOCKOUT Q/25
TRIP (86-1) TRIP (86-2)
COMMAND COMMAND
B B
K371 K372 K373 K374 K375 K376 K377 K378 K379 K380 K381 K382 K383 K384
-X200 1 2 3 4 5 6 7 8 9 10 11 12 13 14 -X200 15 16 17 18
LOCKOUT TRIP (86-2 ) ACB OPEN ACB IN RACKED OUT ACB CLOSE TRAFO MECHANICAL SPARE
LOCKOUT TRIP (86-1) ACB IN SERVICE
TO UPSTREAM CB & CB DRAWOUT POS. TO UPSTREAM CB POSITION POSITION TO UPSTREAM CB TRIP (WT, OT & MT)
TO INTERTRIP (SPARE) TO UPSTREAM (SPARE) TO UPSTREAM (SPARE) (SPARE)
UPSTREAM CB
C C
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 20
AP-LVS
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-ACB-INC1-01 +ST-13006-ACB-INC1-01 Of 28
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P ACB TRANSFORMER INCOMER-A
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
A
A
31
271 21
291
11 31 23
31 11 -K57 1
-Q01-23 -K51 -K52 -K58 -K56
-Q01-23 -K53 (/14.5E) 22 24 -S22 (/14.6E) 32 34 -IPR1-X321
272
274
292
294
(/7.5D) (/14.3E) 32 34 (/9.6B) (/8.3A) 2
Q/18 Q/20 BO1_PO
K351 K352 K353 K354 K355 K356 K357 K358 K359 K360 K361 K362 K363 K364 K365 K366 K367 K368 K369 K370
B B
-X201 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 -X201 21 22 23 24
ACB OPENED ACB CLOSED ACB IN TEST TCS HEALTHY DC CONTROL SUPPLY COMMON ALARAM SPARE
ACB IN SERVICE ACB IN DRAWOUT PROTECTION TRIP (SPARE) LOCAL/REMOTE SWITCH
(PLC) (PLC) POSITION POSITION POSITION (PLC) MCCB CLOSED FOR TRAFO
IN REMOTE POS.
(PLC) (PLC) (PLC) (HEALTHY) FAULT(PLC)
(SPARE)
(SPARE)
C C
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 21
AP-LVS
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-ACB-INC1-01 +ST-13006-ACB-INC1-01 Of 28
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P ACB TRANSFORMER INCOMER-A
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
A -XD -XD
1 1 A
-J110+ 110V DC CONTROL WIRE BUS +VE
-XD -XD
2 2
-J110- 110V DC CONTROL WIRE BUS -VE
1 3 13 1 3 13 1 3 13
-Q21 -Q22 -Q23
6A, 2P MCB 2 4 14 6A, 2P MCB 2 4 14 6A, 2P MCB 2 4 14
(/14.6B)
(/14.6C)
(/14.6D)
B B
J2 J02
J3 J03 J6 J06
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 22
AP-LVS
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-ACB-INC1-01 +ST-13006-ACB-INC1-01 Of 28
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P ACB TRANSFORMER INCOMER-A
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
A
Terminal diagram
(=ST+ST-13006-ACB-INC1-01) A
X21
K211
-Q01-23:301 -------------------------- 1 (/17.1B) CB OPENED/CLOSED STATUS
K212
-Q01-23:302 -------------------------- 2 (/17.1B) CB OPENED/CLOSED STATUS
K213
-Q01-23:304 -------------------------- 3 (/17.1B) CB OPENED/CLOSED STATUS
K214
-Q01-23:311 -------------------------- 4 (/17.2B) CB OPENED/CLOSED STATUS
K215
-Q01-23:312 -------------------------- 5 (/17.2B) CB OPENED/CLOSED STATUS
K216
-Q01-23:314 -------------------------- 6 (/17.2B) CB OPENED/CLOSED STATUS
K217
-Q01-23:321 -------------------------- 7 (/17.2B) CB OPENED/CLOSED STATUS
B B
K218
-Q01-23:322 -------------------------- 8 (/17.2B) CB OPENED/CLOSED STATUS
K219
-Q01-23:324 -------------------------- 9 (/17.2B) CB OPENED/CLOSED STATUS
K220
-Q01-23:331 -------------------------- 10 (/17.3B) CB OPENED/CLOSED STATUS
K221
-Q01-23:332 -------------------------- 11 (/17.3B) CB OPENED/CLOSED STATUS
K222
-Q01-23:334 -------------------------- 12 (/17.3B) CB OPENED/CLOSED STATUS
K223
-Q01-23:221 -------------------------- 13 (/17.3B) CB OPENED/CLOSED STATUS
K224
-Q01-23:222 -------------------------- 14 (/17.3B) CB OPENED/CLOSED STATUS
K225
-Q01-23:224 -------------------------- 15 (/17.4B) CB OPENED/CLOSED STATUS
K226
-Q01-23:231 -------------------------- 16 (/17.4B) CB OPENED/CLOSED STATUS
K227
C -Q01-23:232 -------------------------- 17 (/17.4B) CB OPENED/CLOSED STATUS
C
K228
-Q01-23:234 -------------------------- 18 (/17.4B) CB OPENED/CLOSED STATUS
K229
-Q01-23:251 -------------------------- 19 (/17.4B) CB OPENED/CLOSED STATUS
K230
-Q01-23:252 -------------------------- 20 (/17.4B) CB OPENED/CLOSED STATUS
K231
-Q01-23:254 -------------------------- 21 (/17.5B) CB OPENED/CLOSED STATUS
22 (/17.6B) SPARE
23 (/17.6B) SPARE
24 (/17.6B) SPARE
25 (/17.6B) SPARE
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 23
AP-LVS TERMINAL DIAGRAM
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-ACB-INC1-01 +ST-13006-ACB-INC1-01 Of 28
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P ACB TRANSFORMER INCOMER-A
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
A
Terminal diagram
(=ST+ST-13006-ACB-INC1-01) A
X24
J2
-X24:3 -------------------------- 1 (/10.2B) SPARE INPUTS FOR REF630
K171
-IPR1-2 -------------------------- 2 (/10.2C) SPARE INPUTS FOR REF630
J2
-X24:1 -------------------------- 3 (/10.2B) CLOSE COMMAND PROVISION FROM REMOTE
K172
-IPR1-5 -------------------------- 4 (/10.2C) CLOSE COMMAND PROVISION FROM REMOTE
J2
-X24:3 -------------------------- 5 (/10.3B) OPEN COMMAND PROVISION FROM REMOTE
K173
-IPR1-6 -------------------------- 6 (/10.3C) OPEN COMMAND PROVISION FROM REMOTE
J2
-X24:5 -------------------------- 7 (/10.3B) CLOSE PERMISSIVE FROM UPSTREAM CB (FUTURE PROVISION)
B B
K174
-IPR1-9 -------------------------- 8 (/10.3C) CLOSE PERMISSIVE FROM UPSTREAM CB (FUTURE PROVISION)
J2
-X24:7 -------------------------- 9 (/10.4B) SPARE INPUTS FOR REF630
K175
-IPR1-10 -------------------------- 10 (/10.4C) SPARE INPUTS FOR REF630
J2
-X24:9 -------------------------- 11 (/10.4B) SPARE INPUTS FOR REF630
K176
-IPR1-13 -------------------------- 12 (/10.4C) SPARE INPUTS FOR REF630
J2
-X24:11 -------------------------- 13 (/10.4B) SPARE INPUTS FOR REF630
K177
-IPR1-14 -------------------------- 14 (/10.4C) SPARE INPUTS FOR REF630
J2
-K80:13 -------------------------- 15 (/10.5B) SPARE INPUTS FOR REF630
K178
-IPR1-17 -------------------------- 16 (/10.5C) SPARE INPUTS FOR REF630
C 17 (/10.6C) SPARE
C
18 (/10.6C) SPARE
19 (/10.6C) SPARE
20 (/10.6C) SPARE
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 24
AP-LVS TERMINAL DIAGRAM
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-ACB-INC1-01 +ST-13006-ACB-INC1-01 Of 28
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P ACB TRANSFORMER INCOMER-A
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
A
Terminal diagram
(=ST+ST-13006-ACB-INC1-01) A
X25
K261
-IPR1-X309:3 -------------------------- 1 (/19.1C) REF 630/REF 611 IRF WATCHDOG (RELAY HEALTHY)
K262
-F51G-X100:5 -------------------------- 2 (/19.1C) REF 630/REF 611 IRF WATCHDOG (RELAY HEALTHY)
K263
-K52:21 -------------------------- 3 (/19.2C) ACB TEST POSITION
K264
-K52:24 -------------------------- 4 (/19.2C) ACB TEST POSITION
K265
-K53:21 -------------------------- 5 (/19.2C) ACB RACKED-IN POSITION
K266
-K53:24 -------------------------- 6 (/19.2C) ACB RACKED-IN POSITION
K267
-K49T:33 -------------------------- 7 (/19.3C) TRANSFOREMR WINDING TEMPERATURE TRIP (WT)
B B
K268
-K49T:34 -------------------------- 8 (/19.3C) TRANSFOREMR WINDING TEMPERATURE TRIP (WT)
K269
-K26T:33 -------------------------- 9 (/19.3C) TRANSFOREMR OIL TEMPERATURE TRIP (OT)
K270
-K26T:34 -------------------------- 10 (/19.4C) TRANSFOREMR OIL TEMPERATURE TRIP (OT)
K271
-K63T:33 -------------------------- 11 (/19.4C) PRESSURE RELIEF DEVICE TRIP (MT)
K272
-K63T:34 -------------------------- 12 (/19.4C) PRESSURE RELIEF DEVICE TRIP (MT)
K273
-K49A:21 -------------------------- 13 (/19.5C) TRANSFOREMR WINDING TEMPERATURE ALARM (WT)
K274
-K49A:24 -------------------------- 14 (/19.5C) TRANSFOREMR WINDING TEMPERATURE ALARM (WT)
K275
-K26A:21 -------------------------- 15 (/19.5C) TRANSFOREMR OIL TEMPERATURE ALARM (OT)
K276
-K26A:24 -------------------------- 16 (/19.6C) TRANSFOREMR OIL TEMPERATURE ALARM (OT)
K277
C -F51G-X100:10 -------------------------- 17 (/19.6C) STANDBY EARTH FAULT RELAY TRIP (51G)
C
K278
-F51G-X100:12 -------------------------- 18 (/19.6C) STANDBY EARTH FAULT RELAY TRIP (51G)
K279
-K57:21 -------------------------- 21 (/19.7C) DC CONTROL SUPPLY MCCB CLOSED (HEALTHY) (SPARE)
K280
-K57:24 -------------------------- 22 (/19.8C) DC CONTROL SUPPLY MCCB CLOSED (HEALTHY) (SPARE)
K283
-IPR1-X326:3 -------------------------- 25 (/19.2E) REF 630 SPARE OUTPUT
K284
-IPR1-X326:4 -------------------------- 26 (/19.2E) ACB TEST POSITION
K285
-IPR1-X326:5 -------------------------- 27 (/19.2E) REF 630 SPARE OUTPUT
K286
-IPR1-X326:6 -------------------------- 28 (/19.3E) REF 630 SPARE OUTPUT
K287
-IPR1-X321:5 -------------------------- 29 (/19.3E) REF 630 SPARE OUTPUT
K288
-IPR1-X321:6 -------------------------- 30 (/19.4E) REF 630 SPARE OUTPUT
D 31 (/19.4E) SPARE D
32 (/19.4E) SPARE
33 (/19.4E) SPARE
34 (/19.5E) SPARE
-K63T:43 -------------------------- 35 (/13.6B) EXTERNAL PROVISION FOR CB COIL TRIP
-K63T:44 -------------------------- 36 (/13.6B) EXTERNAL PROVISION FOR CB COIL TRIP
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 25
AP-LVS TERMINAL DIAGRAM
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-ACB-INC1-01 +ST-13006-ACB-INC1-01 Of 28
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P ACB TRANSFORMER INCOMER-A
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
A
Terminal diagram
(=ST+ST-13006-ACB-INC1-01) A
X31
-J2
-IPR1-X307:11 -------------------------- 1 (/15.1B) TRANSFORMER WINDING TEMPERATURE TRIP (WT)
K671
-K49T:A1 -------------------------- 2 (/15.1D) TRANSFORMER WINDING TEMPERATURE TRIP (WT)
-J2
-X31:1 -------------------------- 3 (/15.2B) TRANSFORMER OIL TEMPERATURE TRIP (OT)
K672
-K26T:A1 -------------------------- 4 (/15.2D) TRANSFORMER OIL TEMPERATURE TRIP (OT)
-J2
-X31:3 -------------------------- 5 (/15.2B) PRESSURE RELIEF DEVICE TRIP (MT)
K673
-K63T:A1 -------------------------- 6 (/15.2D) PRESSURE RELIEF DEVICE TRIP (MT)
-J2
-X31:5 -------------------------- 7 (/15.3B) TRANSFORMER WINDING TEMPERATURE ALARM (WT)
B B
K675
-K49A:A1 -------------------------- 8 (/15.3D) TRANSFORMER WINDING TEMPERATURE ALARM (WT)
-J2
-X31:7 -------------------------- 9 (/15.4B) TRANSFORMER OIL TEMPERATURE ALARM (OT)
K676
-K26A:A1 -------------------------- 10 (/15.4D) TRANSFORMER OIL TEMPERATURE ALARM (OT)
-S23:13 -------------------------- 11 (/15.5B) INTERTRIP FROM UPSTREAM CB
K677
-K80:A1 -------------------------- 12 (/15.5D) INTERTRIP FROM UPSTREAM CB
13 (/15.6D) SPARE
14 (/15.6D) SPARE
15 (/15.6D) SPARE
16 (/15.6D) SPARE
C C
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 26
AP-LVS TERMINAL DIAGRAM
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-ACB-INC1-01 +ST-13006-ACB-INC1-01 Of 28
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P ACB TRANSFORMER INCOMER-A
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
A
Terminal diagram
(=ST+ST-13006-ACB-INC1-01) A
X200
K371
-IPR1-X307:7 -------------------------- 1 (/20.1B) LOCKOUT TRIP (86-1) TO UPSTREAM CB
K372
-IPR1-X307:8 -------------------------- 2 (/20.1B) LOCKOUT TRIP (86-1) TO UPSTREAM CB
K373
-IPR1-X307:9 -------------------------- 3 (/20.2B) LOCKOUT TRIP (86-2 ) & CB DRAWOUT POS. TO INTERTRIP UPSTREAM CB
K374
-IPR1-X307:10 -------------------------- 4 (/20.2B) LOCKOUT TRIP (86-2 ) & CB DRAWOUT POS. TO INTERTRIP UPSTREAM CB
K375
-Q01-23:341 -------------------------- 5 (/20.3B) ACB OPEN TO UPSTREAM CB (SPARE)
K376
-Q01-23:342 -------------------------- 6 (/20.3B) ACB OPEN TO UPSTREAM CB (SPARE)
K377
-K53:11 -------------------------- 7 (/20.4B) ACB IN SERVICE POSITION TO UPSTREAM (SPARE)
B B
K378
-K53:14 -------------------------- 8 (/20.4B) ACB IN SERVICE POSITION TO UPSTREAM (SPARE)
K379
-K51:21 -------------------------- 9 (/20.5B) ACB IN RACKED OUT POSITION TO UPSTREAM (SPARE)
K380
-K51:24 -------------------------- 10 (/20.5B) ACB IN RACKED OUT POSITION TO UPSTREAM (SPARE)
K381
-Q01-23:261 -------------------------- 11 (/20.6B) ACB CLOSE TO UPSTREAM CB (SPARE)
K382
-Q01-23:264 -------------------------- 12 (/20.6B) ACB CLOSE TO UPSTREAM CB (SPARE)
K383
-IPR1-X326:1 -------------------------- 13 (/20.7B) TRAFO MECHANICAL TRIP (WT, OT & MT)
K384
-IPR1-X326:2 -------------------------- 14 (/20.7B) TRAFO MECHANICAL TRIP (WT, OT & MT)
15 (/20.8B) SPARE
16 (/20.8B) SPARE
C 17 (/20.8B) SPARE
C
18 (/20.8B) SPARE
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 27
AP-LVS TERMINAL DIAGRAM
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-ACB-INC1-01 +ST-13006-ACB-INC1-01 Of 28
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P ACB TRANSFORMER INCOMER-A
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
A
Terminal diagram
(=ST+ST-13006-ACB-INC1-01) A
X201
K351
-Q01-23:271 -------------------------- 1 (/21.1B) ACB OPENED (PLC)
K352
-Q01-23:272 -------------------------- 2 (/21.1B) ACB OPENED (PLC)
K353
-Q01-23:291 -------------------------- 3 (/21.1B) ACB CLOSED (PLC)
K354
-Q01-23:294 -------------------------- 4 (/21.2B) ACB CLOSED (PLC)
K355
-K53:31 -------------------------- 5 (/21.2B) ACB IN SERVICE POSITION (PLC)
K356
-K53:34 -------------------------- 6 (/21.3B) ACB IN SERVICE POSITION (PLC)
K357
-K51:11 -------------------------- 7 (/21.3B) ACB IN DRAWOUT POSITION (PLC)
B B
K358
-K51:14 -------------------------- 8 (/21.3B) ACB IN DRAWOUT POSITION (PLC)
K359
-K52:11 -------------------------- 9 (/21.4B) ACB IN TEST POSITION (PLC)
K360
-K52:14 -------------------------- 10 (/21.4B) ACB IN TEST POSITION (PLC)
K361
-K58:31 -------------------------- 11 (/21.5B) PROTECTION TRIP (PLC)
K362
-K58:34 -------------------------- 12 (/21.5B) PROTECTION TRIP (PLC)
K363
-K56:21 -------------------------- 13 (/21.5B) TCS HEALTHY (SPARE)
K364
-K56:24 -------------------------- 14 (/21.5B) TCS HEALTHY (SPARE)
K365
-S22:23 -------------------------- 15 (/21.6B) LOCAL/REMOTE SWITCH IN REMOTE POS. (SPARE)
K366
-S22:24 -------------------------- 16 (/21.6B) LOCAL/REMOTE SWITCH IN REMOTE POS. (SPARE)
K367
C -K57:31 -------------------------- 17 (/21.6B) DC CONTROL SUPPLY MCCB CLOSED (HEALTHY) (SPARE)
C
K368
-K57:34 -------------------------- 18 (/21.7B) DC CONTROL SUPPLY MCCB CLOSED (HEALTHY) (SPARE)
K369
-IPR1-X321:1 -------------------------- 19 (/21.7B) COMMON ALARAM FOR TRAFO FAULT(PLC)
K370
-IPR1-X321:2 -------------------------- 20 (/21.8B) COMMON ALARAM FOR TRAFO FAULT(PLC)
21 (/21.8B) SPARE
22 (/21.8B) SPARE
23 (/21.8B) SPARE
24 (/21.8B) SPARE
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 28
AP-LVS TERMINAL DIAGRAM
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-ACB-INC1-01 +ST-13006-ACB-INC1-01 Of 28
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P ACB TRANSFORMER INCOMER-A
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
A
A
C
CLIENT OCCIDENTAL OF OMAN INC.
C
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 1
AP-LVS COVER SHEET
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-ACB-INC2-01 +ST-13006-ACB-INC2-01 Of 28
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P ACB TRANSFORMER INCOMER-B
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
Table of contents
A
A
Page Page Type Page Description ABB Drawing number Ver. Client Drawing number Rev. Date.
1 / 28 Title page / cover sheet SCHEMATIC DIAGRAM FOR 4P ACB TRANSFORMER INCOMER-B ST-13006-ACB-INC2-01 A 09.10.13
2 / 28 Table of contents SCHEMATIC DIAGRAM FOR 4P ACB TRANSFORMER INCOMER-B ST-13006-ACB-INC2-01 A 09.10.13
3 / 28 Table of contents SCHEMATIC DIAGRAM FOR 4P ACB TRANSFORMER INCOMER-B ST-13006-ACB-INC2-01 A 09.10.13
4 / 28 Schematic multi-line SCHEMATIC DIAGRAM FOR 4P ACB TRANSFORMER INCOMER-B ST-13006-ACB-INC2-01 A 09.10.13
B B
5 / 28 Schematic multi-line SCHEMATIC DIAGRAM FOR 4P ACB TRANSFORMER INCOMER-B ST-13006-ACB-INC2-01 A 09.10.13
6 / 28 Schematic multi-line SCHEMATIC DIAGRAM FOR 4P ACB TRANSFORMER INCOMER-B ST-13006-ACB-INC2-01 A 09.10.13
7 / 28 Schematic multi-line SCHEMATIC DIAGRAM FOR 4P ACB TRANSFORMER INCOMER-B ST-13006-ACB-INC2-01 A 09.10.13
8 / 28 Schematic multi-line SCHEMATIC DIAGRAM FOR 4P ACB TRANSFORMER INCOMER-B ST-13006-ACB-INC2-01 A 09.10.13
9 / 28 Schematic multi-line SCHEMATIC DIAGRAM FOR 4P ACB TRANSFORMER INCOMER-B ST-13006-ACB-INC2-01 A 09.10.13
C 10 / 28 Schematic multi-line SCHEMATIC DIAGRAM FOR 4P ACB TRANSFORMER INCOMER-B ST-13006-ACB-INC2-01 A 09.10.13
C
11 / 28 Schematic multi-line SCHEMATIC DIAGRAM FOR 4P ACB TRANSFORMER INCOMER-B ST-13006-ACB-INC2-01 A 09.10.13
12 / 28 Schematic multi-line SCHEMATIC DIAGRAM FOR 4P ACB TRANSFORMER INCOMER-B ST-13006-ACB-INC2-01 A 09.10.13
13 / 28 Schematic multi-line SCHEMATIC DIAGRAM FOR 4P ACB TRANSFORMER INCOMER-B ST-13006-ACB-INC2-01 A 09.10.13
14 / 28 Schematic multi-line SCHEMATIC DIAGRAM FOR 4P ACB TRANSFORMER INCOMER-B ST-13006-ACB-INC2-01 A 09.10.13
15 / 28 Schematic multi-line SCHEMATIC DIAGRAM FOR 4P ACB TRANSFORMER INCOMER-B ST-13006-ACB-INC2-01 A 09.10.13
D D
16 / 28 Schematic multi-line SCHEMATIC DIAGRAM FOR 4P ACB TRANSFORMER INCOMER-B ST-13006-ACB-INC2-01 A 09.10.13
17 / 28 Schematic multi-line SCHEMATIC DIAGRAM FOR 4P ACB TRANSFORMER INCOMER-B ST-13006-ACB-INC2-01 A 09.10.13
18 / 28 Schematic multi-line SCHEMATIC DIAGRAM FOR 4P ACB TRANSFORMER INCOMER-B ST-13006-ACB-INC2-01 A 09.10.13
19 / 28 Schematic multi-line SCHEMATIC DIAGRAM FOR 4P ACB TRANSFORMER INCOMER-B ST-13006-ACB-INC2-01 A 09.10.13
20 / 28 Schematic multi-line SCHEMATIC DIAGRAM FOR 4P ACB TRANSFORMER INCOMER-B ST-13006-ACB-INC2-01 A 09.10.13
E 21 / 28 Schematic multi-line SCHEMATIC DIAGRAM FOR 4P ACB TRANSFORMER INCOMER-B ST-13006-ACB-INC2-01 A 09.10.13
E
22 / 28 Schematic multi-line SCHEMATIC DIAGRAM FOR 4P ACB TRANSFORMER INCOMER-B ST-13006-ACB-INC2-01 A 09.10.13
23 / 28 Terminal diagram SCHEMATIC DIAGRAM FOR 4P ACB TRANSFORMER INCOMER-B ST-13006-ACB-INC2-01 A 09.10.13
24 / 28 Terminal diagram SCHEMATIC DIAGRAM FOR 4P ACB TRANSFORMER INCOMER-B ST-13006-ACB-INC2-01 A 09.10.13
25 / 28 Terminal diagram SCHEMATIC DIAGRAM FOR 4P ACB TRANSFORMER INCOMER-B ST-13006-ACB-INC2-01 A 09.10.13
26 / 28 Terminal diagram SCHEMATIC DIAGRAM FOR 4P ACB TRANSFORMER INCOMER-B ST-13006-ACB-INC2-01 A 09.10.13
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 2
AP-LVS INDEX SHEET
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-ACB-INC2-01 +ST-13006-ACB-INC2-01 Of 28
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P ACB TRANSFORMER INCOMER-B
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
Table of contents
A
A
Page Page Type Page Description ABB Drawing number Ver. Client Drawing number Rev. Date.
27 / 28 Terminal diagram SCHEMATIC DIAGRAM FOR 4P ACB TRANSFORMER INCOMER-B ST-13006-ACB-INC2-01 A 09.10.13
28 / 28 Terminal diagram SCHEMATIC DIAGRAM FOR 4P ACB TRANSFORMER INCOMER-B ST-13006-ACB-INC2-01 A 09.10.13
B B
C C
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 3
AP-LVS INDEX SHEET
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-ACB-INC2-01 +ST-13006-ACB-INC2-01 Of 28
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P ACB TRANSFORMER INCOMER-B
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
(6.1F) (6.1F) (6.1F) (6.1F)
-N1 -R1 -Y1 -B1
A73
-X12 -TTB1
2 TEST TERMINAL BLOCK
P2 S2
A
-CT11 A10
1 A11 A12
-/1A 1 2
P1 S1 -A12 / (6.6B) A
CLASS:5P20
A32
3 4
A74
4 -A32 / (6.6B)
P2 S2
A52
5 6
-CT12 A30
3 A31 -A52 / (6.6C)
-/1A A72
P1 S1
CLASS:5P20 7 8
-A72 / (6.6C)
A75 A82
6 9 10
P2 S2
-A82 / (6.6C)
-CT13 A50
5 A51
-/1A 11 12
P1 S1
CLASS:5P20
13 (/9.2C) 14
B A76
8 B
P2 S2
15 (/9.2E) 16
-CT14 A70
7 A71
-/1A
CLASS:5P20 P1 S1
17 (/5.3E) 18
A90 A81
9
19 (/5.3E) 20
E
21 (/6.6D) 22
-S10
D10
-X11 D11
AMMETER 23 (/6.6D) 24
1 SELECTOR SWITCH
P2 S2
6
(/6.6D)
-CT1 D71
2 D70
25 26
C C
-/1A
CLASS:1 P1 S1
27 (/6.6D) 28
D30 D31 D1
3
P2 S2
2 1
-CT2 D72
4 1
-/1A
CLASS:1 P1 S1
A -P10
(0-1600A)
D50
5 D51 D2 2
P2 S2
8 3
-CT3 D73
6
-/1A
P1 S1
CLASS:1
D D90 D70 D
7
5
E
LINK
E E
E
PANEL
EARTH
-E -N -R -Y -B
PROVISION INCOMING SUPPLY
FOR EXTERNAL
EARTH
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 4
AP-LVS
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-ACB-INC2-01 +ST-13006-ACB-INC2-01 Of 28
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P ACB TRANSFORMER INCOMER-B
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
A
A
TCS
REF611 -X100
X120 24
1 PO4
23
BI1
2
TCS
B B
3 19
BI2 PO3
18
14
4 SO2
13
BI3
11 12
C C
TRIP (51G)
SO1
(/19.6B)
10
9
7 1/5A
PO2 TRIP (51G)
8 (/9.7B)
IL1
8 N
7
9 1/5A TRIP (51G)
PO1 6
IL2 (/13.4B)
10 N
+FIELD
5
D IRF D
11
4
MOUNTED ON 1/5A
T/F NEUTRAL (/19.1B)
IL3
EARTH 12 N
3
(NOT IN ABB SCOPE
OF SUPPLY) 2 J02
13 1/5A
-
-TTB1 J02 / (16.6E) 110V DC
-X12
Uaux
A181 (/4.6B) A183 Iσ J2 POWER SUPPLY
P1 S1 10 17 18 14 N 1
J2 / (16.6A) TO RELAYS
-CT15 X1
+
-/1A 11 A182 -TTB1 A184
S2 19 20
CLASS:5P20 P2
(/4.6B)
A95
12
E COMMUNICATION
E (IEC-61850)
E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 5
AP-LVS
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-ACB-INC2-01 +ST-13006-ACB-INC2-01 Of 28
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P ACB TRANSFORMER INCOMER-B
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
-N1 / (7.2F)
-R1 / (7.2F)
-B1 / (7.2F)
-Y1 / (7.2F)
A
-S11 A
VOLTMETER
SELECTOR SWITCH
V1
9 10
1
-IPR1
5 V -P11 REF-630
V2 0-500V AC
2
1 12 X1
X1 X1 X1
11 COMMUNICATION
X101 (IEC-61850)
-HR -HY -HB
(RED) (YELLOW) (BLUE) (4.7A) / -A12 1
X2 X2 X2
B B
(CT-1)
2
PHASE INDICATION LAMP
(4.7A) / -A32 3
E107
E207
E307 (CT-2)
E407
4
2 4 6 8 (4.7A) / -A52 5
50
-F5 -Q12 (CT-3)
2A 4P MCB
1 3 5 7 6 50N
FUSE
A72 7
C MONITORING (4.7B) / -A72 C
51
(CT-4)
A82 8
(4.7B) / -A82
13 14 (/9.5C) 51N
9
21 22
-VT1
(415/√3)/(110/√3)V -Q11 (CT-5)
86
CLASS:0.5
10
-CF81 STAR/STAR -TTB1
1 2 1 2 21 (/4.6C) 22
E101 E102 E103 E104 E105 X102 25
2A -CF82 (/4.6C) 3
E201 1 2 E202 E203 3 4 E204 23 24 E205
-CF83 2A (VT-1)
D 1 2 5 6 25 (/4.6C) 26 D
E301 E302 E303 E304 E305
4
2A
7 8 27 (/4.6C) 28
E171 E404 E405
5
2A 4P MCB
(VT-2)
14 11 (/9.5C) 6
12
98 95 (/9.5C) 7
96
(VT-3)
8
-XB2B -XB2
E 1 1 E
-HE104B E106 9
110V FROM
BUS-B VT (VT-4)
(FOR DEAD BUS 2 2
-HE204B E206 10
VOLTAGE MONITORING)
+BUS SECTION
(ABB REF. DWG NO.ST-13006-ACB-BC-01)
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 6
AP-LVS
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-ACB-INC2-01 +ST-13006-ACB-INC2-01 Of 28
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P ACB TRANSFORMER INCOMER-B
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
-Q02
(/14.5B) (/16.8C) (/13.1E) (/13.3E) (/9.4B) (/9.3C) (/14.2B) (/14.3B) (/14.2C) (/9.4C) (/14.4B) (/9.3B) (/13.3C) (/13.7C)
104
154
-S33M/1
2
S75I/1 S75I/3
2 4 6 8
101
151
124
174
4P ACB
2
(SWITCH -F1 1 1
S75T/1 S75T/2
13 11 23 21
DISCONNECTOR) YC YO Q/1 Q/2 Q/3 Q/4
121
171
134
184
D/O TYPE 37 2 2 14 12 24 22
2
S33M/2 M S75E/1 S75E/3
131
181
38
(/17.3A) (/17.4A) (/18.2A) (/17.5A) (/20.6B) (/21.1A) (/18.2D) (/21.2A) (/17.1A) (/17.2A) (/17.2A) (/17.3A) (/20.3B)
(*) NOTE:
-23 OPERATING STATUS SHOWN - THE CIRCUIT DIAGRAM IS FOR THE FOLLOWING CONDITIONS
-WITHDRAWABLE CIRCUIT-BREAKER, OPEN AND RACKED-IN
-CIRCUITS DE-ENERGISED
-MOTOR OPERATING MECHANISM WITH SPRINGS DISCHARGED.
212
214
222
224
232
234
242
244
252
254
262
264
272
274
282
284
292
294
302
304
312
314
322
324
332
334
342
344
S75E/1,3: RACK OUT/REMOVED POSITION
S75T/1,2: TEST ISOLATED/TEST POSITION
D Q/11 Q/12 Q/13 Q/14 Q/15 Q/16 Q/17 Q/18 Q/19 Q/20 Q/21 Q/22 Q/23 Q/24 Q/25 YO: SHUNT OPENING RELEASE D
201
211
221
231
241
251
261
271
281
291
301
311
321
331
341
YC: SHUNT CLOSING RELEASE
Q/1;-4,11-25: BREAKER AUXILIARY CONTACTS
OPEN/CLOSE
STATUS
E E
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 7
AP-LVS
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-ACB-INC2-01 +ST-13006-ACB-INC2-01 Of 28
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P ACB TRANSFORMER INCOMER-B
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
3 CB OPEN
(/13.3B) 3 3 3
4 COMMAND BO2_PO BO2_PO BO2_PO
(/19.2D)
BO2_PO SPARE OUTPUT
4 4 4
5
B 5 5 5 B
6 BO3_PO (/19.4D) SPARE OUTPUT BO3_PO SPARE OUTPUT BO3_PO
(/19.3D)
BO3_PO
6 6 6
7
(/20.1A) LOCKOUT TRIP( 86-1)
8 COMMAND
BO4_PO 7 7 7
BO4_SO BO4_SO BO4_SO
8 8 8
9 LOCKOUT TRIP (86-2)
(/20.2A) COMMAND
10
BO5_PO 9 9 9
BO5_SO (/18.4A) CB UNSAFE TRIP BO5_SO BO5_SO
C 10 10 C
10
11 (PROTECTION TRIP
(/14.7B)
12 FOR INDICATION)
BO6_PO 11 11 INCOMER 11
BO6_SO (/18.3A) BO6_SO UNDERVOLTAGE BO6_SO
(CB SAFE TRIP) (/18.3D)
12 12 START 12
13 13 13
14 14 14
BO8_SO BO8_SO BO8_SO
D 15 15 15 D
BO7_SO BO7_SO BO7_SO
13
BO7_SO
14
18 18 18
17 17 17
BO9_SO 16 BO9_SO 16 BO9_SO 16
15
BO8_SO
16
E E
17
BO9_SO
18
-X309
3
1 (/19.1B) IRF (WATCHDOG FEATURE)
IRF 2
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 8
AP-LVS
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-ACB-INC2-01 +ST-13006-ACB-INC2-01 Of 28
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P ACB TRANSFORMER INCOMER-B
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
SELECTOR SWITCH IN
REMOTE POSITION
A
SPRING CHARGED
CB IN RACKEDOUT
FUSE BLOWN/MCB
LOCAL POSITION
LOCAL/REMOTE
CB IN SERVICE
LOCAL/REMOTE
TRIP/OFF (LINE
TCS HEALTHY
SEL. SWITCH
SEL. SWITCH
CB MOTOR
CB IN TEST
POSITION
CB OPENED
CB CLOSED
(ACTIVE IN
(ACTIVE IN
POSITION
POSITION
VOLTAGE)
110V DC
+110V DC
(22.2C) / -J2 -J2 / (11.1A)
(/21.6A)
-J2
-J2 -J2
-S22 21 31 13 23
1 2
-F51G-X100 8
101
B 11 11 B
(/5.5C)
-Q02-21 -Q02-31 -K55 LOCAL/ 22 32 14 24
PO2
(/7.8C) 12 REMOTE POS.1 (LOCAL) POS.2 (REMOTE) 9
104
2
(/7.5B) (/14.5E) 12 14 TRIP (51G)
Q/2 SELECTOR
S75I/1
SWITCH
11
13 -K56
(/14.5E) 12 14
-Q11 95 -Q11
-TTB1 (/6.5D) 11
(/6.5D)
(/4.6B)
121
181
C 11 96 98 -S21 1-0-2
1 5 9 3 7 11 C
14 12 14 TRIP/
-K54 -Q02-31 -Q02-31 NEUTRAL
2
124
2
184
(/14.4E) 12 14 (/7.5B) (/7.7C) /CLOSE 2 6 10 4 8 12
S75T/1 S75E/3 13 POS.1 (TRIP) NEUTRAL POS.2 (CLOSE)
SELECTOR
-F5 SWITCH
(/6.2C) 14
(SPRING
(FUSE RETURN
BLOWN) TO NEUTRAL)
J2A
REF630 D
D
CENTRAL UNIT K21 K22 K23 K24 K25 K26 K27 K28 K29 K30 K33
K31
K32
-IPR1
X0
X0 (HMI)
REF630
HMI 3
-X410 +
-
GND GND
PE PE 1
X304 2 3 4 5 7 8 9 10 12 13 14 16 17 18
E J02A -IPR1 E
REF630
INPUT
-BI1 -BI2 -BI3 -BI4 -BI5 -BI6 -BI7 -BI8 -BI9 -BI10 -BI11 -BI12 -BI13 -BI14
16 MODULES
-TTB1
(/4.6B)
15 X304 1 6 11 15
-110V DC
(22.2C) / -J02 -J02 / (10.1E)
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 9
AP-LVS
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-ACB-INC2-01 +ST-13006-ACB-INC2-01 Of 28
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P ACB TRANSFORMER INCOMER-B
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
(FUTURE PROVISION)
FROM UPSTREAM CB
INTERTRIP FROM
OPEN COMMAND
FROM REMOTE
FROM REMOTE
UPSTREAM CB
A
A
PROVISION
PROVISION
REF630
REF630
REF630
REF630
REF630
+110V DC
(11.5A) / -J2 -J2 / (12.1A)
J2 J2 J2 J2 J2 J2 J2 J2
B -X24 1 3 5 7 9 11 13 15 B
+FIELD
+FIELD
+FIELD
+FIELD
+FIELD
+FIELD
+FIELD
13
-K80
(/15.5E) 14
C C
-X24 2 4 6 8 10 12 14 16 -X24 17 18 19 20
SPARE
K177
K171 K172 K173 K174 K175 K176 K178 K179
D D
X324 2 5 6 9 10 13 14 17 18
-IPR1
REF630
INPUT
-BI1 -BI2 -BI3 -BI4 -BI5 -BI6 -BI7 -BI8 -BI9
MODULE
E E
X324 1 4 8 12 16
-110V DC
(9.8F) / -J02 -J02 / (11.1F)
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 10
AP-LVS
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-ACB-INC2-01 +ST-13006-ACB-INC2-01 Of 28
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P ACB TRANSFORMER INCOMER-B
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
BUS-B VT FAILURE
INCOMER-A OPEN
A
UNDERVOLTAGE
INCOMER-A
START
TRIP
(9.8B) / -J2 -J2 / (10.1A)
J2
J2 J2 J2
B B
-XB1 1 9 11 -XB1 17 19
-XB4 1 9 11 -XB4 1 3
+BUS SECTION
+01_INCOMER_A
ST-13006-ACB-INC1-01)
ST-13006-ACB-BC-01)
(REF. DWG No.
-XB4 2 10 12 -XB4 2 4
-XB1 2 10 12 -XB1 18 20
D D
X329 2 5 6 9 10 13 14 17 18
E -IPR1 E
REF630
INPUT
-BI1 -BI2 -BI3 -BI4 -BI5 -BI6 -BI7 -BI8 -BI9
MODULE
X329 1 4 8 12 16
-110V DC
(10.6E) / -J02 -J02 / (12.1E) - & * : PREFIX NUMBER OF CUBICLE
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 11
AP-LVS
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-ACB-INC2-01 +ST-13006-ACB-INC2-01 Of 28
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P ACB TRANSFORMER INCOMER-B
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
OIL TEMPERATURE
OIL TEMPERATURE
PRESSURE RELIEF
TRANSFORMER
TRANSFORMER
TRANSFORMER
TRANSFORMER
TEMPERATURE
TEMPERATURE
A
ALARM (WT)
ALARM (OT)
A
TRIP (WT)
TRIP (MT)
TRIP (OT)
WINDING
WINDING
DEVICE
+110V DC
(10.7A) / -J2 -J2 / (13.2A)
J2 J2 J2 J2 J2
13 11
13
-K63T -K49A
B -K49T (/15.3E) 12 14
B
(/15.1E) 14 (/15.2E) 14
11
13
-K26A
-K26T (/15.4E) 12 14
(/15.2E) 14
C C
D D
X334 2 5 6 9 10 13 14 17 18
-IPR1
REF630
INPUT
-BI1 -BI2 -BI3 -BI4 -BI5 -BI6 -BI7 -BI8 -BI9
MODULE
E E
X334 1 4 8 12 16
-110V DC
(11.5F) / -J02 -J02 / (13.2E)
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 12
AP-LVS
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-ACB-INC2-01 +ST-13006-ACB-INC2-01 Of 28
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P ACB TRANSFORMER INCOMER-B
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
+110V DC +110V DC
J3 J2
(22.3C) / -J3 (12.7A) / -J2 -J2 / (14.1A)
A
A
12
2 O/P-2 (/14.5C)
-IPR1-X307 K43 ALARM
11
(/8.1A) 1
BO1_PO SOR
C C
CLOSE
COMMAND
23 21
-Q02-21 -Q02-21
(/7.8C) 24 (/7.8C) 22
Q/3 Q/4
D D
K41
K42
C1
1 C11
1
-Q02-2 YC
(/7.4C) 2 -Q02-4 YO
(/7.4C) 2
C2
C12
-110V DC -110V DC
E J03 J02
(22.3C) / -J03 (12.7E) / -J02 -J02 / (14.1E) E
ACB SHUNT
CLOSING COIL
ACB SHUNT
OPENING COIL
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 13
AP-LVS
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-ACB-INC2-01 +ST-13006-ACB-INC2-01 Of 28
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P ACB TRANSFORMER INCOMER-B
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
A
A
+110V DC
(13.8A) / -J2 -J2 / (15.1A)
13
-Q21 B
151
B 11
131
13 37
(/22.2B) 14
-Q02-31 -Q02-21 -Q02-11 -IPR1-X307
-Q02-31 (/8.1C) 12
154
2
(/7.6B) (/7.7C) 14 (/7.3C) 38
2
134
(/7.6C) BO6_PO
S75E/1 S75I/3 Q/1 S33M/2
PROTECTION
TRIP
K68
171
10
-Q02-31 -F96
12
11
(/13.7C)
2
174
(/7.6B)
S75T/2 O/P-2
13
-Q22
(/22.3B) 14
C C
K69
13
-Q23
(/22.4B) 14
D D
A1 A1 A1 A1 A1 A1 A1 A1
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 14
AP-LVS
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-ACB-INC2-01 +ST-13006-ACB-INC2-01 Of 28
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P ACB TRANSFORMER INCOMER-B
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
OIL TEMPERATURE
OIL TEMPERATURE
PRESSURE RELIEF
TRANSFORMER
TEMPERATURE
TRANSFORMER
INTERTRIP FROM
TRANSFORMER
TRANSFORMER
TEMPERATURE
ALARM (WT)
ALARM (OT)
UPSTREAM CB
WINDING
TRIP (MT)
TRIP (WT)
TRIP (OT)
WINDING
A
DEVICE
A
+110V DC
(14.8A) / -J2 -J2 / (16.1A)
-X31 1 3 5 7 9 -X31 11
B B
+TRANSF. MARSHALLING BOX
+FIELD
C C
SPARE
D D
A1 A1 A1 A1 A1 A1
-K49T -K26T -K63T -K49A -K26A -K80
A2 A2 A2 A2 A2 A2
E -110V DC
E
(14.8E) / -J02 -J02 / (16.1E)
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 15
AP-LVS
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-ACB-INC2-01 +ST-13006-ACB-INC2-01 Of 28
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P ACB TRANSFORMER INCOMER-B
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
A
A
+110V DC
(15.8A) / -J2 -J2 / (5.7E)
21 31 21
-S23 11
-K54 -K56 -K55
LAMP TEST 13 (/14.4E) 22 24
-K58 (/14.5E) 32 34 (/14.5E) 22 24
(/14.7E) 12 14
B B
14
(22.4C) / -J6
110V DC
J06 J6
C
-Q02-1 C
2 2 2 2 2 (/7.3C)
-H11D1 -H12D2 -H13D3 -H14D4 -H15D5 (ACB Motor U1
DIODE BLOCK 1 1 1 1 1 Mechanism)
(MOUNTED ON -S33M/1
LAMP BLOCK)
-F1
K85
M
K84
D U2 D
K83
K82
K81
X1 X1 X1 X1 X1
-H11 -H12 -H13 -H14 -H15
(GREEN) X2 (RED) X2 (YELLOW) X2 (WHITE) X2 (BLUE) X2
E -110V DC E
(15.8E) / -J02 -J02 / (5.7D)
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 16
AP-LVS
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-ACB-INC2-01 +ST-13006-ACB-INC2-01 Of 28
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P ACB TRANSFORMER INCOMER-B
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
A
A
221
231
251
301
311
321
331
-Q02-23 -Q02-23 -Q02-23
-Q02-23 -Q02-23 -Q02-23 -Q02-23
222
224
232
234
252
254
(/7.3D) (/7.3D) (/7.4D)
302
304
312
314
322
324
332
334
(/7.5D) (/7.5D) (/7.5D) (/7.5D) Q/13 Q/14 Q/16
Q/21 Q/22 Q/23 Q/24
K211 K212 K213 K214 K215 K216 K217 K218 K219 K220 K221 K222 K223 K224 K225 K226 K227 K228 K229 K230 K231
-X21 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 -X21 22 23 24 25
B B
SPARE
CB OPENED/CLOSED STATUS
SPARE
C C
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 17
AP-LVS
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-ACB-INC2-01 +ST-13006-ACB-INC2-01 Of 28
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P ACB TRANSFORMER INCOMER-B
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
A
A
11 9
241
-IPR1-X321 -IPR1-X321
-Q02-23 (/8.3C) 12 (/8.3C) 10
242
244
(/7.3D) BO6_SO BO5_SO
Q/15
B B
-XB3 1 2 3 4 5 6
+BUS SECTION
INPUTS TO BUS SECTION
REF630 RELAY (REF. DWG NO
-XB2 1 2 3 4 5 6
ST-1306-ACB-BC-01) COM ACB OPEN COM ACB SAFE TRIP COM ACB UNSAFE TRIP
C C
D D
281
11
-Q02-23 -IPR1-X326
282
284
(/7.4D) (/8.5C) 12
Q/19 BO6_SO
-XB4 1 2 3 4
+01_INCOMER_A
INPUTS TO INCOMER-B
REF 630 RELAY (REF. DWG NO.
-XB1 17 18 19 20
ST-13006-ACB-INC1-01) COM ACB OPEN COM ACB
UNDERVOLTAGE
START
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 18
AP-LVS
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-ACB-INC2-01 +ST-13006-ACB-INC2-01 Of 28
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P ACB TRANSFORMER INCOMER-B
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
A
A
3
-IPR1-X309
(/8.1E) 2 1
IRF
B 21 21 10 B
K262A 21 33 21 21
33
-K52 -K53 33
-K49A -K26A -F51G-X100 -K57
-K49T -K26T
-F51G-X100 (/14.2E) 22 24 (/14.3E) 22 24
(/15.1E) 34
-K63T (/15.3E) 22 24 (/15.4E) 22 24 (/5.5C) 11 12 (/14.6E) 22 24
(/15.2E) 34 (/15.2E) 34 SO1
(/5.5D) 3
TRIP
IRF (51G)
4 5
K261 K262 K263 K264 K265 K266 K267 K268 K269 K270 K271 K272 K273 K274 K275 K276 K277 K278 K279 K280
-X25 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 21 22
C C
REF 630/REF 611 ACB TEST ACB RACKED-IN TRANSFOREMR TRANSFOREMR PRESSURE RELIEF TRANSFOREMR TRANSFOREMR STANDBY EARTH FAULT DC CONTROL SUPPLY
IRF WATCHDOG POSITION POSITION WINDING OIL TEMPERATURE DEVICE WINDING OIL TEMPERATURE RELAY TRIP (51G) MCCB CLOSED
(RELAY HEALTHY) TEMPERATURE TRIP (OT) TRIP (MT) TEMPERATURE ALARM (OT) (HEALTHY)
TRIP (WT) ALARM (WT) (SPARE)
D D
3 5
5
-IPR1-X326 -IPR1-X326
(/8.5B) 6
-IPR1-X321
(/8.5B) 4 (/8.3B) 6
BO2_PO BO3_PO
BO3_PO
-X25 25 26 27 28 29 30 -X25 31 32 33 34
E E
SPARE
REF 630 SPARE OUTPUT REF 630 SPARE OUTPUT REF 630 SPARE OUTPUT
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 19
AP-LVS
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-ACB-INC2-01 +ST-13006-ACB-INC2-01 Of 28
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P ACB TRANSFORMER INCOMER-B
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
A
A
261
7 9 31 21 1
341
11
-IPR1-X307 -IPR1-X307 -K51 -K51 -Q02-23 -IPR1-X326
(/8.1B) 8 (/8.1C) 10 (/14.2E) 34 32 -Q02-23 -K53
262
264
(/14.2E) 22 24 (/7.4D) (/8.5A) 2
342
344
BO4_PO BO5_PO (/7.6D) (/14.3E) 12 14 Q/17 BO1_PO
LOCKOUT LOCKOUT Q/25
TRIP (86-1) TRIP (86-2)
COMMAND COMMAND
B B
K371 K372 K373 K374 K375 K376 K377 K378 K379 K380 K381 K382 K383 K384
-X200 1 2 3 4 5 6 7 8 9 10 11 12 13 14 -X200 15 16 17 18
LOCKOUT TRIP (86-2 ) ACB OPEN ACB IN RACKED OUT ACB CLOSE TRAFO MECHANICAL SPARE
LOCKOUT TRIP (86-1) ACB IN SERVICE
TO UPSTREAM CB & CB DRAWOUT POS. TO UPSTREAM CB POSITION POSITION TO UPSTREAM CB TRIP (WT, OT & MT)
TO INTERTRIP (SPARE) TO UPSTREAM (SPARE) TO UPSTREAM (SPARE) (SPARE)
UPSTREAM CB
C C
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 20
AP-LVS
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-ACB-INC2-01 +ST-13006-ACB-INC2-01 Of 28
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P ACB TRANSFORMER INCOMER-B
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
A
A
31
271
21
291
11 31 23
31 11 -K57 1
-Q02-23 -K51 -K52 -K58 -K56
-Q02-23 -K53 (/14.5E) 22 24 -S22 (/14.6E) 32 34 -IPR1-X321
272
274
(/7.4D) (/14.2E) 12 14 (/14.2E) 12 14 (/14.7E) 32 34 24
292
294
(/7.5D) (/14.3E) 32 34 (/9.6B) (/8.3A) 2
Q/18 Q/20 BO1_PO
K351 K352 K353 K354 K355 K356 K357 K358 K359 K360 K361 K362 K363 K364 K365 K366 K367 K368 K369 K370
B B
-X201 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 -X201 21 22 23 24
ACB OPENED ACB CLOSED ACB IN TEST TCS HEALTHY DC CONTROL SUPPLY COMMON ALARAM SPARE
ACB IN SERVICE ACB IN DRAWOUT PROTECTION TRIP (SPARE) LOCAL/REMOTE SWITCH
(PLC) (PLC) POSITION POSITION POSITION (PLC) MCCB CLOSED FOR TRAFO
IN REMOTE POS.
(PLC) (PLC) (PLC) (HEALTHY) FAULT(PLC)
(SPARE)
(SPARE)
C C
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 21
AP-LVS
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-ACB-INC2-01 +ST-13006-ACB-INC2-01 Of 28
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P ACB TRANSFORMER INCOMER-B
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
A -XD -XD
1 1 A
-J110+ 110V DC CONTROL WIRE BUS +VE
-XD -XD
2 2
-J110- 110V DC CONTROL WIRE BUS -VE
1 3 13 1 3 13 1 3 13
-Q21 -Q22 -Q23
6A, 2P MCB 2 4 14 6A, 2P MCB 2 4 14 6A, 2P MCB 2 4 14
(/14.6B)
(/14.6C)
(/14.6D)
B B
J2 J02
J3 J03 J6 J06
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 22
AP-LVS
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-ACB-INC2-01 +ST-13006-ACB-INC2-01 Of 28
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P ACB TRANSFORMER INCOMER-B
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
A
Terminal diagram
(=ST+ST-13006-ACB-INC2-01) A
X21
K211
-Q02-23:301 -------------------------- 1 (/17.1B) CB OPENED/CLOSED STATUS
K212
-Q02-23:302 -------------------------- 2 (/17.1B) CB OPENED/CLOSED STATUS
K213
-Q02-23:304 -------------------------- 3 (/17.1B) CB OPENED/CLOSED STATUS
K214
-Q02-23:311 -------------------------- 4 (/17.2B) CB OPENED/CLOSED STATUS
K215
-Q02-23:312 -------------------------- 5 (/17.2B) CB OPENED/CLOSED STATUS
K216
-Q02-23:314 -------------------------- 6 (/17.2B) CB OPENED/CLOSED STATUS
K217
-Q02-23:321 -------------------------- 7 (/17.2B) CB OPENED/CLOSED STATUS
B B
K218
-Q02-23:322 -------------------------- 8 (/17.2B) CB OPENED/CLOSED STATUS
K219
-Q02-23:324 -------------------------- 9 (/17.2B) CB OPENED/CLOSED STATUS
K220
-Q02-23:331 -------------------------- 10 (/17.3B) CB OPENED/CLOSED STATUS
K221
-Q02-23:332 -------------------------- 11 (/17.3B) CB OPENED/CLOSED STATUS
K222
-Q02-23:334 -------------------------- 12 (/17.3B) CB OPENED/CLOSED STATUS
K223
-Q02-23:221 -------------------------- 13 (/17.3B) CB OPENED/CLOSED STATUS
K224
-Q02-23:222 -------------------------- 14 (/17.3B) CB OPENED/CLOSED STATUS
K225
-Q02-23:224 -------------------------- 15 (/17.4B) CB OPENED/CLOSED STATUS
K226
-Q02-23:231 -------------------------- 16 (/17.4B) CB OPENED/CLOSED STATUS
K227
C -Q02-23:232 -------------------------- 17 (/17.4B) CB OPENED/CLOSED STATUS
C
K228
-Q02-23:234 -------------------------- 18 (/17.4B) CB OPENED/CLOSED STATUS
K229
-Q02-23:251 -------------------------- 19 (/17.4B) CB OPENED/CLOSED STATUS
K230
-Q02-23:252 -------------------------- 20 (/17.4B) CB OPENED/CLOSED STATUS
K231
-Q02-23:254 -------------------------- 21 (/17.5B) CB OPENED/CLOSED STATUS
22 (/17.6B) SPARE
23 (/17.6B) SPARE
24 (/17.6B) SPARE
25 (/17.6B) SPARE
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 23
AP-LVS TERMINAL DIAGRAM
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-ACB-INC2-01 +ST-13006-ACB-INC2-01 Of 28
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P ACB TRANSFORMER INCOMER-B
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
A
Terminal diagram
(=ST+ST-13006-ACB-INC2-01) A
X24
J2
-X24:3 -------------------------- 1 (/10.2B) SPARE INPUTS FOR REF630
K171
-IPR1-2 -------------------------- 2 (/10.2C) SPARE INPUTS FOR REF630
J2
-X24:1 -------------------------- 3 (/10.2B) CLOSE COMMAND PROVISION FROM REMOTE
K172
-IPR1-5 -------------------------- 4 (/10.2C) CLOSE COMMAND PROVISION FROM REMOTE
J2
-X24:3 -------------------------- 5 (/10.3B) OPEN COMMAND PROVISION FROM REMOTE
K173
-IPR1-6 -------------------------- 6 (/10.3C) OPEN COMMAND PROVISION FROM REMOTE
J2
-X24:5 -------------------------- 7 (/10.3B) CLOSE PERMISSIVE FROM UPSTREAM CB (FUTURE PROVISION)
B B
K174
-IPR1-9 -------------------------- 8 (/10.3C) CLOSE PERMISSIVE FROM UPSTREAM CB (FUTURE PROVISION)
J2
-X24:7 -------------------------- 9 (/10.4B) SPARE INPUTS FOR REF630
K175
-IPR1-10 -------------------------- 10 (/10.4C) SPARE INPUTS FOR REF630
J2
-X24:9 -------------------------- 11 (/10.4B) SPARE INPUTS FOR REF630
K176
-IPR1-13 -------------------------- 12 (/10.4C) SPARE INPUTS FOR REF630
J2
-X24:11 -------------------------- 13 (/10.4B) SPARE INPUTS FOR REF630
K177
-IPR1-14 -------------------------- 14 (/10.4C) SPARE INPUTS FOR REF630
J2
-K80:13 -------------------------- 15 (/10.5B) SPARE INPUTS FOR REF630
K178
-IPR1-17 -------------------------- 16 (/10.5C) SPARE INPUTS FOR REF630
C 17 (/10.6C) SPARE
C
18 (/10.6C) SPARE
19 (/10.6C) SPARE
20 (/10.6C) SPARE
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 24
AP-LVS TERMINAL DIAGRAM
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-ACB-INC2-01 +ST-13006-ACB-INC2-01 Of 28
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P ACB TRANSFORMER INCOMER-B
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
A
Terminal diagram
(=ST+ST-13006-ACB-INC2-01) A
X25
K261
-IPR1-X309:3 -------------------------- 1 (/19.1C) REF 630/REF 611 IRF WATCHDOG (RELAY HEALTHY)
K262
-F51G-X100:5 -------------------------- 2 (/19.1C) REF 630/REF 611 IRF WATCHDOG (RELAY HEALTHY)
K263
-K52:21 -------------------------- 3 (/19.2C) ACB TEST POSITION
K264
-K52:24 -------------------------- 4 (/19.2C) ACB TEST POSITION
K265
-K53:21 -------------------------- 5 (/19.2C) ACB RACKED-IN POSITION
K266
-K53:24 -------------------------- 6 (/19.2C) ACB RACKED-IN POSITION
K267
-K49T:33 -------------------------- 7 (/19.3C) TRANSFOREMR WINDING TEMPERATURE TRIP (WT)
B B
K268
-K49T:34 -------------------------- 8 (/19.3C) TRANSFOREMR WINDING TEMPERATURE TRIP (WT)
K269
-K26T:33 -------------------------- 9 (/19.3C) TRANSFOREMR OIL TEMPERATURE TRIP (OT)
K270
-K26T:34 -------------------------- 10 (/19.4C) TRANSFOREMR OIL TEMPERATURE TRIP (OT)
K271
-K63T:33 -------------------------- 11 (/19.4C) PRESSURE RELIEF DEVICE TRIP (MT)
K272
-K63T:34 -------------------------- 12 (/19.4C) PRESSURE RELIEF DEVICE TRIP (MT)
K273
-K49A:21 -------------------------- 13 (/19.5C) TRANSFOREMR WINDING TEMPERATURE ALARM (WT)
K274
-K49A:24 -------------------------- 14 (/19.5C) TRANSFOREMR WINDING TEMPERATURE ALARM (WT)
K275
-K26A:21 -------------------------- 15 (/19.5C) TRANSFOREMR OIL TEMPERATURE ALARM (OT)
K276
-K26A:24 -------------------------- 16 (/19.6C) TRANSFOREMR OIL TEMPERATURE ALARM (OT)
K277
C -F51G-X100:10 -------------------------- 17 (/19.6C) STANDBY EARTH FAULT RELAY TRIP (51G)
C
K278
-F51G-X100:12 -------------------------- 18 (/19.6C) STANDBY EARTH FAULT RELAY TRIP (51G)
K279
-K57:21 -------------------------- 21 (/19.7C) DC CONTROL SUPPLY MCCB CLOSED (HEALTHY) (SPARE)
K280
-K57:24 -------------------------- 22 (/19.8C) DC CONTROL SUPPLY MCCB CLOSED (HEALTHY) (SPARE)
K283
-IPR1-X326:3 -------------------------- 25 (/19.2E) REF 630 SPARE OUTPUT
K284
-IPR1-X326:4 -------------------------- 26 (/19.2E) ACB TEST POSITION
K285
-IPR1-X326:5 -------------------------- 27 (/19.2E) REF 630 SPARE OUTPUT
K286
-IPR1-X326:6 -------------------------- 28 (/19.3E) REF 630 SPARE OUTPUT
K287
-IPR1-X321:5 -------------------------- 29 (/19.3E) REF 630 SPARE OUTPUT
K288
-IPR1-X321:6 -------------------------- 30 (/19.4E) REF 630 SPARE OUTPUT
D 31 (/19.4E) SPARE D
32 (/19.4E) SPARE
33 (/19.4E) SPARE
34 (/19.5E) SPARE
-K63T:43 -------------------------- 35 (/13.6B) EXTERNAL PROVISION FOR CB COIL TRIP
-K63T:44 -------------------------- 36 (/13.6B) EXTERNAL PROVISION FOR CB COIL TRIP
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 25
AP-LVS TERMINAL DIAGRAM
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-ACB-INC2-01 +ST-13006-ACB-INC2-01 Of 28
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P ACB TRANSFORMER INCOMER-B
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
A
Terminal diagram
(=ST+ST-13006-ACB-INC2-01) A
X31
-J2
-IPR1-X307:11 -------------------------- 1 (/15.1B) TRANSFORMER WINDING TEMPERATURE TRIP (WT)
K671
-K49T:A1 -------------------------- 2 (/15.1D) TRANSFORMER WINDING TEMPERATURE TRIP (WT)
-J2
-X31:1 -------------------------- 3 (/15.2B) TRANSFORMER OIL TEMPERATURE TRIP (OT)
K672
-K26T:A1 -------------------------- 4 (/15.2D) TRANSFORMER OIL TEMPERATURE TRIP (OT)
-J2
-X31:3 -------------------------- 5 (/15.2B) PRESSURE RELIEF DEVICE TRIP (MT)
K673
-K63T:A1 -------------------------- 6 (/15.2D) PRESSURE RELIEF DEVICE TRIP (MT)
-J2
-X31:5 -------------------------- 7 (/15.3B) TRANSFORMER WINDING TEMPERATURE ALARM (WT)
B B
K675
-K49A:A1 -------------------------- 8 (/15.3D) TRANSFORMER WINDING TEMPERATURE ALARM (WT)
-J2
-X31:7 -------------------------- 9 (/15.4B) TRANSFORMER OIL TEMPERATURE ALARM (OT)
K676
-K26A:A1 -------------------------- 10 (/15.4D) TRANSFORMER OIL TEMPERATURE ALARM (OT)
-S23:13 -------------------------- 11 (/15.5B) INTERTRIP FROM UPSTREAM CB
K677
-K80:A1 -------------------------- 12 (/15.5D) INTERTRIP FROM UPSTREAM CB
13 (/15.6D) SPARE
14 (/15.6D) SPARE
15 (/15.6D) SPARE
16 (/15.6D) SPARE
C C
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 26
AP-LVS TERMINAL DIAGRAM
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-ACB-INC2-01 +ST-13006-ACB-INC2-01 Of 28
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P ACB TRANSFORMER INCOMER-B
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
A
Terminal diagram
(=ST+ST-13006-ACB-INC2-01) A
X200
K371
-IPR1-X307:7 -------------------------- 1 (/20.1B) LOCKOUT TRIP (86-1) TO UPSTREAM CB
K372
-IPR1-X307:8 -------------------------- 2 (/20.1B) LOCKOUT TRIP (86-1) TO UPSTREAM CB
K373
-IPR1-X307:9 -------------------------- 3 (/20.2B) LOCKOUT TRIP (86-2 ) & CB DRAWOUT POS. TO INTERTRIP UPSTREAM CB
K374
-IPR1-X307:10 -------------------------- 4 (/20.2B) LOCKOUT TRIP (86-2 ) & CB DRAWOUT POS. TO INTERTRIP UPSTREAM CB
K375
-Q02-23:341 -------------------------- 5 (/20.3B) ACB OPEN TO UPSTREAM CB (SPARE)
K376
-Q02-23:342 -------------------------- 6 (/20.3B) ACB OPEN TO UPSTREAM CB (SPARE)
K377
-K53:11 -------------------------- 7 (/20.4B) ACB IN SERVICE POSITION TO UPSTREAM (SPARE)
B B
K378
-K53:14 -------------------------- 8 (/20.4B) ACB IN SERVICE POSITION TO UPSTREAM (SPARE)
K379
-K51:21 -------------------------- 9 (/20.5B) ACB IN RACKED OUT POSITION TO UPSTREAM (SPARE)
K380
-K51:24 -------------------------- 10 (/20.5B) ACB IN RACKED OUT POSITION TO UPSTREAM (SPARE)
K381
-Q02-23:261 -------------------------- 11 (/20.6B) ACB CLOSE TO UPSTREAM CB (SPARE)
K382
-Q02-23:264 -------------------------- 12 (/20.6B) ACB CLOSE TO UPSTREAM CB (SPARE)
K383
-IPR1-X326:1 -------------------------- 13 (/20.7B) TRAFO MECHANICAL TRIP (WT, OT & MT)
K384
-IPR1-X326:2 -------------------------- 14 (/20.7B) TRAFO MECHANICAL TRIP (WT, OT & MT)
15 (/20.8B) SPARE
16 (/20.8B) SPARE
C 17 (/20.8B) SPARE
C
18 (/20.8B) SPARE
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 27
AP-LVS TERMINAL DIAGRAM
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-ACB-INC2-01 +ST-13006-ACB-INC2-01 Of 28
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P ACB TRANSFORMER INCOMER-B
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
A
Terminal diagram
(=ST+ST-13006-ACB-INC2-01) A
X201
K351
-Q02-23:271 -------------------------- 1 (/21.1B) ACB OPENED (PLC)
K352
-Q02-23:272 -------------------------- 2 (/21.1B) ACB OPENED (PLC)
K353
-Q02-23:291 -------------------------- 3 (/21.2B) ACB CLOSED (PLC)
K354
-Q02-23:294 -------------------------- 4 (/21.2B) ACB CLOSED (PLC)
K355
-K53:31 -------------------------- 5 (/21.2B) ACB IN SERVICE POSITION (PLC)
K356
-K53:34 -------------------------- 6 (/21.3B) ACB IN SERVICE POSITION (PLC)
K357
-K51:11 -------------------------- 7 (/21.3B) ACB IN DRAWOUT POSITION (PLC)
B B
K358
-K51:14 -------------------------- 8 (/21.3B) ACB IN DRAWOUT POSITION (PLC)
K359
-K52:11 -------------------------- 9 (/21.3B) ACB IN TEST POSITION (PLC)
K360
-K52:14 -------------------------- 10 (/21.4B) ACB IN TEST POSITION (PLC)
K361
-K58:31 -------------------------- 11 (/21.4B) PROTECTION TRIP (PLC)
K362
-K58:34 -------------------------- 12 (/21.5B) PROTECTION TRIP (PLC)
K363
-K56:21 -------------------------- 13 (/21.5B) TCS HEALTHY (SPARE)
K364
-K56:24 -------------------------- 14 (/21.5B) TCS HEALTHY (SPARE)
K365
-S22:23 -------------------------- 15 (/21.6B) LOCAL/REMOTE SWITCH IN REMOTE POS. (SPARE)
K366
-S22:24 -------------------------- 16 (/21.6B) LOCAL/REMOTE SWITCH IN REMOTE POS. (SPARE)
K367
C -K57:31 -------------------------- 17 (/21.6B) DC CONTROL SUPPLY MCCB CLOSED (HEALTHY) (SPARE)
C
K368
-K57:34 -------------------------- 18 (/21.7B) DC CONTROL SUPPLY MCCB CLOSED (HEALTHY) (SPARE)
K369
-IPR1-X321:1 -------------------------- 19 (/21.7B) COMMON ALARAM FOR TRAFO FAULT(PLC)
K370
-IPR1-X321:2 -------------------------- 20 (/21.7B) COMMON ALARAM FOR TRAFO FAULT(PLC)
21 (/21.8B) SPARE
22 (/21.8B) SPARE
23 (/21.8B) SPARE
24 (/21.8B) SPARE
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 28
AP-LVS TERMINAL DIAGRAM
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-ACB-INC2-01 +ST-13006-ACB-INC2-01 Of 28
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P ACB TRANSFORMER INCOMER-B
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
A
A
C
CLIENT OCCIDENTAL OF OMAN INC.
C
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 1
AP-LVS COVER SHEET
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-ACB-BC-01 +ST-13006-ACB-BC-01 Of 21
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P ACB BUS SECTION
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
Table of contents
A
A
Page Page Type Page Description ABB Drawing number Ver. Client Drawing number Rev. Date.
1 / 21 Title page / cover sheet SCHEMATIC DIAGRAM FOR 4P ACB BUS SECTION ST-13006-ACB-BC-01 A 09.10.13
2 / 21 Table of contents SCHEMATIC DIAGRAM FOR 4P ACB BUS SECTION ST-13006-ACB-BC-01 A 09.10.13
3 / 21 Schematic multi-line SCHEMATIC DIAGRAM FOR 4P ACB BUS SECTION ST-13006-ACB-BC-01 A 09.10.13
4 / 21 Schematic multi-line SCHEMATIC DIAGRAM FOR 4P ACB BUS SECTION ST-13006-ACB-BC-01 A 09.10.13
B B
5 / 21 Schematic multi-line SCHEMATIC DIAGRAM FOR 4P ACB BUS SECTION ST-13006-ACB-BC-01 A 09.10.13
6 / 21 Schematic multi-line SCHEMATIC DIAGRAM FOR 4P ACB BUS SECTION ST-13006-ACB-BC-01 A 09.10.13
7 / 21 Schematic multi-line SCHEMATIC DIAGRAM FOR 4P ACB BUS SECTION ST-13006-ACB-BC-01 A 09.10.13
8 / 21 Schematic multi-line SCHEMATIC DIAGRAM FOR 4P ACB BUS SECTION ST-13006-ACB-BC-01 A 09.10.13
9 / 21 Schematic multi-line SCHEMATIC DIAGRAM FOR 4P ACB BUS SECTION ST-13006-ACB-BC-01 A 09.10.13
C 10 / 21 Schematic multi-line SCHEMATIC DIAGRAM FOR 4P ACB BUS SECTION ST-13006-ACB-BC-01 A 09.10.13
C
11 / 21 Schematic multi-line SCHEMATIC DIAGRAM FOR 4P ACB BUS SECTION ST-13006-ACB-BC-01 A 09.10.13
12 / 21 Schematic multi-line SCHEMATIC DIAGRAM FOR 4P ACB BUS SECTION ST-13006-ACB-BC-01 A 09.10.13
13 / 21 Schematic multi-line SCHEMATIC DIAGRAM FOR 4P ACB BUS SECTION ST-13006-ACB-BC-01 A 09.10.13
14 / 21 Schematic multi-line SCHEMATIC DIAGRAM FOR 4P ACB BUS SECTION ST-13006-ACB-BC-01 A 09.10.13
15 / 21 Schematic multi-line SCHEMATIC DIAGRAM FOR 4P ACB BUS SECTION ST-13006-ACB-BC-01 A 09.10.13
D D
16 / 21 Schematic multi-line SCHEMATIC DIAGRAM FOR 4P ACB BUS SECTION ST-13006-ACB-BC-01 A 09.10.13
17 / 21 Schematic multi-line SCHEMATIC DIAGRAM FOR 4P ACB BUS SECTION ST-13006-ACB-BC-01 A 09.10.13
18 / 21 Terminal diagram SCHEMATIC DIAGRAM FOR 4P ACB BUS SECTION ST-13006-ACB-BC-01 A 09.10.13
19 / 21 Terminal diagram SCHEMATIC DIAGRAM FOR 4P ACB BUS SECTION ST-13006-ACB-BC-01 A 09.10.13
20 / 21 Terminal diagram SCHEMATIC DIAGRAM FOR 4P ACB BUS SECTION ST-13006-ACB-BC-01 A 09.10.13
E 21 / 21 Terminal diagram SCHEMATIC DIAGRAM FOR 4P ACB BUS SECTION ST-13006-ACB-BC-01 A 09.10.13
E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 2
AP-LVS INDEX SHEET
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-ACB-BC-01 +ST-13006-ACB-BC-01 Of 21
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P ACB BUS SECTION
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
A A73
-X12 CT SHORTING LINKS
FOR MAINTANCE PURPOSE
2 A
P2 S2
-CT11 A10
1 A11
-/1A
P1 S1
CLASS:5P20
A74
4
P2 S2
-CT12 A30
3 A31 -IPR1
-/1A REF-630
P1 S1
CLASS:5P20
A75
X1
6
P2 S2
-CT13 COMMUNICATION
A50
5 A51 X101 (IEC-61850)
B -/1A B
P1 S1
CLASS:5P20 1
A76
8 (CT-1)
P2 S2
-CT14 2
A70 A71
7
-/1A 3
P1 S1
CLASS:5P20
-TTB1 (CT-2)
TEST TERMINAL BLOCK
A90
9 A81 4
E A12 5
1 2
A82 8
9 10
13 14 (/11.6C)
21 22 -VT1A 11 (/7.2C) 12
(415/√3)/(110/√3)V
CLASS:0.5 -Q11A 13 (/7.2E) 14
STAR/STAR
-CF81A X102 25
E101A 1 2 E102A E103A 1 2 E104A 15 16 E105A
D 1 D
2A -CF82A
E201A 1 2 E202A E203A 3 4 E204A 17 18 E205A (VT-1)
-CF83A 2A
2
E301A 1 2 E302A E303A 5 6 E304A 19 20 E305A
2A 3
E171A 7 8 E404A 21 22 E173A
2A 4P MCB (VT-2)
E104B 23 24
14 11 (/11.6B) (5.8B) / -E104B 4
12
98 95 (/11.6B) E204B 25 26
96 (5.8B) / -E204B 5
E304B 27 28 (VT-3)
(5.8B) / -E304B
E E
6
E105B 7
(VT-4)
8
-XB2A 1 2
-HE104A -HE204A
E205B 9
+01_INC_A
(ABB REF. DWG NO. (VT-5)
-L1:1 -L1:1 ST-13006-ACB-INC1-01) -XB2 1 2
E305B 10
-L2:1 -L2:1
F -L3:1 -L3:1 110V BUS-A VT SUPPLY TO F
INCOMER-A REF 630
-N:1 -N:1
BUS-A MAIN BUS BAR
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 3
AP-LVS
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-ACB-BC-01 +ST-13006-ACB-BC-01 Of 21
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P ACB BUS SECTION
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
A
BUS-B MAIN BUS BAR A
-L1:1 -L1:1
-L2:1 -L2:1
-L3:1 -L3:1
-N:1 -N:1
-Q03
(/11.4B) (/12.7D) (/10.2E) (/10.5E) (/7.4B) (/7.3C) (/16.3A) (/11.2C) (/11.1C) (/7.4C) (/11.3B) (/7.3B) (/10.5C) (/10.7C)
104
154
-S33M/1
2
S75I/1 S75I/3
2 4 6 8
101
151
124
174
2
2
4P ACB -F1 1 1
S75T/1 S75T/2
13 11 23 21
(SWITCH YC YO Q/1 Q/2 Q/3 Q/4
121
171
134
184
DISCONNECTOR) 37 2 2 14 12 24 22
2
D/O TYPE
S33M/2 M S75E/1 S75E/3
131
181
38
(/16.1A) (/16.2A) (/14.2A) (/14.2D) (/13.1A) (/13.2A) (/13.2A) (/13.3A) (/13.3A) (/13.4A) (/13.4A) (/13.5A) (/13.5A)
(*)
-23
202
204
212
214
222
224
232
234
242
244
252
254
262
264
272
274
282
284
292
294
302
304
312
314
322
324
332
334
342
344
D Q/11 Q/12 Q/13 Q/14 Q/15 Q/16 Q/17 Q/18 Q/19 Q/20 Q/21 Q/22 Q/23 Q/24 Q/25 D
201
211
221
231
241
251
261
271
281
291
301
311
321
331
341
OPEN/CLOSE
STATUS
NOTE:
OPERATING STATUS SHOWN - THE CIRCUIT DIAGRAM IS FOR THE FOLLOWING CONDITIONS
-WITHDRAWABLE CIRCUIT-BREAKER, OPEN AND RACKED-IN
-CIRCUITS DE-ENERGISED
-MOTOR OPERATING MECHANISM WITH SPRINGS DISCHARGED.
E E
S75I/1,3: RACK IN/CONNECTED POSITION
S75E/1,3: RACK OUT/REMOVED POSITION (*) CONTACT OPERATED IN SERVICE POSITION ONLY
S75T/1,2: TEST ISOLATED/TEST POSITION
YO: SHUNT OPENING RELEASE
YC: SHUNT CLOSING RELEASE
Q/1;-4,11-25: BREAKER AUXILIARY CONTACTS
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 4
AP-LVS
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-ACB-BC-01 +ST-13006-ACB-BC-01 Of 21
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P ACB BUS SECTION
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
A
A
-F5B
FUSE
MONITORING
13 14 (/11.7C)
21 22
-VT1B
(415/√3)/(110/√3)V -Q11B
CLASS:0.5
B -CF81B STAR/STAR B
E101B 1 2 E102B E103B 1 2 E104B
-E104B / (3.5E)
2A -CF82B
E201B 1 2 E202B E203B 3 4 E204B
-E204B / (3.5E)
-CF83B 2A
E301B 1 2 E302B E303B 5 6 E304B
-E304B / (3.5E)
2A
E171B 7 8
2A 4P MCB
14 11 (/11.7B)
12
C 98 95 (/11.7B)
96 C
-XB2B 1 2
-HE104B -HE204B
+01_INC_B
(ABB REF. DWG NO.
ST-13006-ACB-INC2-01) -XB2 1 2
D D
E E
-L1:1 -L1:1
-L2:1 -L2:1
-L3:1 -L3:1
-N:1 -N:1
BUS-B MAIN BUS BAR
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 5
AP-LVS
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-ACB-BC-01 +ST-13006-ACB-BC-01 Of 21
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P ACB BUS SECTION
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
-IPR1 REF OUTPUT MODULE REF OUTPUT MODULE REF OUTPUT MODULE
A REF630 -X327 -X316 -X321
OUTPUT A
MODULES 1 1 1
CB CLOSE (/15.4B) COMMON ALARM
(/10.2C) BO1_PO BO1_PO (/15.5B)
2 COMMAND SPARE OUTPUT
BO1_PO 2 2
3 CB OPEN 3 3
(/10.5B) BO2_PO BO2_PO
4 COMMAND (/15.6B)
SPARE OUTPUT
BO2_PO 4 4
5
5 5
6 BO3_PO BO3_PO (/15.7B) SPARE OUTPUT B
B
BO3_PO 6 6
7
8 7 7
BO4_PO BO4_SO (/14.4A) CB UNSAFE TRIP BO4_SO
8 (FOR INCOMER-A) 8
9
10
BO5_PO 9 9
BO5_SO (/14.4D) CB UNSAFE TRIP BO5_SO
(FOR INCOMER-B) 10
10
C C
11
12
BO6_PO 11 11
BO6_SO BO6_SO
12 12
13 13
14 14
BO8_SO BO8_SO
15 15
BO7_SO BO7_SO
D D
13
BO7_SO
14
18 18
17 17
BO9_SO 16 BO9_SO 16
15
BO8_SO
16
17
E BO9_SO E
18
-X329
3
1 (/15.3B) IRF (WATCHDOG FEATURE)
IRF 2
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 6
AP-LVS
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-ACB-BC-01 +ST-13006-ACB-BC-01 Of 21
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P ACB BUS SECTION
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
SELECTOR SWITCH IN
SELECTOR SWITCH IN
A
SPRING CHARGED
REMOTE POSITION
FUSE BLOWN/MCB
FUSE BLOWN/MCB
TO REF630 RELAY
LOCAL POSITION
TRIP/OFF (BUS-B
TRIP/OFF (BUS-A
LOCAL/REMOTE
POWER SUPPLY
TCS HEALTHY
CB IN SERVICE
RACKEDOUT
ACB MOTOR
SEL. SWITCH
SEL. SWITCH
CB IN TEST
POSITION
CB OPENED
CB CLOSED
(ACTIVE IN
(ACTIVE IN
POSITION
POSITION
VOLTAGE)
VOLTAGE)
ACB IN
110V DC
+110V DC
-J2 -J2
(17.1C) / -J2 -J2 / (8.1A)
B B
101
11 11
-Q03-31 11 11
-Q03-21 -K56
-K55 -K44
104
2
(/4.5B)
(/4.8C) 12 S75I/1 (/11.4E) 12 14
(/11.4E) 12 14 (/11.7E) 12 14
Q/2
11
-S21 1-0-2
1 5 9 3 7 11
TRIP/
(/16.5A)
NEUTRAL
/CLOSE 2 6 10 4 8 12
-TTB1
SELECTOR POS.1 (TRIP) NEUTRAL POS.2 (CLOSE)
(/3.5D) -S22 21 31 13 23 SWITCH
1 2
12 (SPRING
LOCAL/ RETURN
121
22 32 14 24
11
181
C REMOTE TO NEUTRAL)
11 POS.1 (LOCAL) POS.2 (REMOTE) C
-K54 -Q03-31 SELECTOR
-Q03-31 -K43
2
124
(/11.3E) 12 14 (/4.5B) SWITCH
2
184
S75T/1 (/4.7C) (/11.6E) 12 14
S75E/3
J2A
REF630
CENTRAL UNIT
-IPR1
D X0 X0 (HMI) D
K21 K22 K23 K24 K25 K26 K27 K28 K29 K30 K31 K32 K33
REF630
HMI 3
-X430 +
-
GND GND
PE PE 1
J02A
X304 2 3 4 5 7 8 9 10 12 13 14 16 17 18
-IPR1
REF630
INPUT
-BI1 -BI2 -BI3 -BI4 -BI5 -BI6 -BI7 -BI8 -BI9 -BI10 -BI11 -BI12 -BI13 -BI14
MODULE
E 14
E
-TTB1
(/3.5D)
13 X304 1 6 11 15
-110V DC -J02
(17.2C) / -J02 -J02 / (8.1F)
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 7
AP-LVS
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-ACB-BC-01 +ST-13006-ACB-BC-01 Of 21
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P ACB BUS SECTION
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
OPEN COMMAND
FROM REMOTE
FROM REMOTE
A
PROVISION
PROVISION
A
REF630
REF630
REF630
REF630
REF630
+110V DC
J2
(7.8B) / -J2 J2 -J2 / (9.2B)
J2 J2
B B
-X24 1 3 5 7 9 11 13
+FIELD
+FIELD
+FIELD
+FIELD
+FIELD
+FIELD
+FIELD
C C
-X24 2 4 6 8 10 12 14 -X24 15 16 17 18
SPARE
D D
X319 2 5 6 9 10 13 14 17 18
-IPR1
REF630
E INPUT
-BI1 -BI2 -BI3 -BI4 -BI5 -BI6 -BI7 -BI8 -BI9 E
MODULE
X319 1 4 8 12 16
-110V DC J02
(7.8F) / -J02 -J02 / (9.1F)
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 8
AP-LVS
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-ACB-BC-01 +ST-13006-ACB-BC-01 Of 21
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P ACB BUS SECTION
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
A
A
UNSAFE TRIP
UNSAFE TRIP
INCOMER-A
INCOMER-A
INCOMER-B
INCOMER-B
INCOMER-B
INCOMER-A
SAFE TRIP
SAFE TRIP
OPEN
OPEN
J2
(8.6A) / -J2 -J2 / (10.4A)
-XB1 1 3 5 -XB2 1 3 5
B B
-XB3 1 3 5 -XB3 1 3 5
+01_INC_A
+01_INC_B
ST-13006-ACB-INC2-01)
ST-13006CB-INC1-01)
(REF. DWG No.
-XB3 2 4 6 -XB3 2 4 6
D D
-XB1 2 4 6 -XB2 2 4 6
X324 2 5 6 9 10 13 14 17 18
E -IPR1 E
REF630
INPUT
-BI1 -BI2 -BI3 -BI4 -BI5 -BI6 -BI7 -BI8 -BI9
MODULE
X324 1 4 8 12 16
-110V DC
(8.6F) / -J02 -J02 / (10.4F)
- & * : PREFIX NUMBER OF CUBICLE
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 9
AP-LVS
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-ACB-BC-01 +ST-13006-ACB-BC-01 Of 21
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P ACB BUS SECTION
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
+110V DC +110V DC
J3 J2
(17.2C) / -J3 (9.6B) / -J2 -J2 / (11.1A)
A
A
(TCS RELAY)
4 -X25 25 -F96
EXTERNAL
-IPR1-X327 PROVISION FOR CB
(/6.1B) 3 COIL TRIP 1 (+)
BO2_PO -X25 26 AUX. SUPPLY
OPEN 3 (-)
B B
COMMAND 7
9
O/P-1 (/11.4C)
4(+) TEST
8
-XD96
- + K44 10
5(-)
12
2 O/P-2 (/15.8B)
-IPR1-X327 K43 ALARM
11
(/6.1A) 1
BO1_PO SOR
C CLOSE C
COMMAND
23 21
-Q03-21 -Q03-21
(/4.8C) 24 (/4.8C) 22
Q/3 Q/4
D D
K41
K42
E E
C1
1 C11
1
-Q03-2 YC
(/4.4C) 2 -Q03-4 YO
(/4.4C) 2
C2
C12
-110V DC -110V DC
J03 J02
(17.3C) / -J03 (9.6F) / -J02 -J02 / (11.1E)
ACB SHUNT
CLOSING COIL
ACB SHUNT
NOTE: THE OPERATION OF THE BREAKER(CLOSE/OPEN) IN SERVICE OPENING COIL
F POSITION(WITH REQUIRED INTERLOCKS AND IN TEST POSITION SHALL BE F
DONE THROUGH REF630 RELAY
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 10
AP-LVS
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-ACB-BC-01 +ST-13006-ACB-BC-01 Of 21
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P ACB BUS SECTION
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
A
A
+110V DC
(10.8A) / -J2 -J2 / (12.1A)
13
-Q21
(/17.1B) 14
B K69 B
13 37
-Q03-21 -Q03-11 -Q11A 95-Q11A -Q11B 95-Q11B
(/4.7C) 14 (/4.3C) 38 11 (/5.6B) 11
(/3.4D) (/3.4D) (/5.6B)
Q/1 S33M/2
13 96 98 96 98
12 14 12 14
-Q22
(/17.2B) 14
171
151
13 13
7
-Q03-31 -Q03-31 -F96 -F5A -F5B
(/5.3A) 14
2
174
154
2
9
8
(/10.7B)
S75T/2 S75I/3 K68
(FUSE (FUSE
O/P-1
BLOWN) BLOWN)
TEST
C C
13
-Q23
(/17.3B) 14
D D
K71 K72
K62 K63 K66 K67
K64 K65
A1 A1 A1 A1 A1 A1 A1 A1
-K52 -K53 -K54 -K55 -K56 -K57 -K43 -K44
A2 A2 A2 A2 A2 A2 A2 A2
E -110V DC E
(10.8F) / -J02 -J02 / (12.1E)
CB CLOSE CB MOTOR TRIP COIL CKT DC CONTROL SUPPLY FUSE BLOWN/MCB TRIP/OFF FUSE BLOWN/MCB TRIP/OFF
ACB IN TEST POS. ACB IN SERVICE POS. (ACTIVE IN SPRING CHARGED HEALTHY MCB's CLOSED (BUS-A VOLTAGE) (BUS-B VOLTAGE)
SERVICE & TEST)
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 11
AP-LVS
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-ACB-BC-01 +ST-13006-ACB-BC-01 Of 21
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P ACB BUS SECTION
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
A
A
+110V DC
(11.8A) / -J2
21
21 21
-K55
-S23 -K54 -K56 (/11.4E) 22 24
LAMP TEST (/11.3E) 22 24 (/11.4E) 22 24
13
14
B B
K86
2 2 2 2 (17.3C) / -J6
C C
-H11D1 -H12D2 -H14D4 -H15D5
110V DC
DIODE BLOCK 1 1 1 1
(MOUNTED ON (17.4C) / -J06
LAMP BLOCK)
J06 J6
K85
-Q03-1
(/4.3C)
K84 (ACB Motor U1
Mechanism)
-S33M/1
D D
-F1
K82
K81
M
X1 X1 X1 X1 U2
-H11 -H12 -H14 -H15
(GREEN) X2 (RED) X2 (WHITE) X2 (BLUE) X2
-110V DC
(11.8E) / -J02
E E
CB OPEN CB CLOSE TCS HEALTHY CB MOTOR
CHARGED
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 12
AP-LVS
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-ACB-BC-01 +ST-13006-ACB-BC-01 Of 21
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P ACB BUS SECTION
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
A
A
291
301
311
321
331
341
281
261
271
-Q03-23 -Q03-23 -Q03-23 -Q03-23 -Q03-23 -Q03-23
-Q03-23 -Q03-23 -Q03-23
292
294
302
304
312
314
322
324
332
334
342
344
(/4.5D) (/4.5D) (/4.5D) (/4.5D) (/4.5D) (/4.6D)
282
284
(/4.4D)
262
264
272
274
(/4.4D) (/4.4D) Q/20 Q/21 Q/22 Q/23 Q/24 Q/25
Q/17 Q/18 Q/19
K211 K212 K213 K214 K215 K216 K217 K218 K219 K220 K221 K222 K223 K224 K225 K226 K227 K228 K229 K230 K231 K232 K233 K234 K235 K236 K237
B X21 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 B
-X21 28 29 30 31
ACB OPENED/
CLOSED STATUS SPARE
SPARE
C C
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 13
AP-LVS
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-ACB-BC-01 +ST-13006-ACB-BC-01 Of 21
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P ACB BUS SECTION
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
A
A
241
-Q03-23 21 7
-K43
242
244
(/4.3D)
Q/15
-IPR1-X316
(/11.6E) 22 24 (/6.3B) 8
BO4_SO
-XB3 1 2 9 10 11 12
B B
*H351 *H352 *H359 *H360 *H361 *H362
+01_INCOMER_A
INPUTS TO INCOMER-A -XB1 1 2 9 10 11 12
REF 630 RELAY
(REF. DWG NO. COM ACB OPEN COM BUS-A COM ACB
ST-13006-ACB-INC1-01) VT FAILURE UNSAFE TRIP
C C
21 9
251
D -K44 -IPR1-X316 D
-Q03-23 (/11.7E) 22 24 (/6.3C) 10
252
254
(/4.4D) BO5_SO
Q/16
-XB4 1 2 9 10 11 12
E E
+01_INCOMER_B
INPUTS TO INCOMER-B -XB1 1 2 9 10 11 12
REF 630 RELAY
COM ACB OPEN COM BUS-B COM ACB
(REF. DWG NO.
VT FAILURE UNSAFE TRIP
ST-13006-ACB-INC2-01)
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 14
AP-LVS
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-ACB-BC-01 +ST-13006-ACB-BC-01 Of 21
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P ACB BUS SECTION
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
A
A
B B
1 5
10
1 3
11 3 -IPR1-X316 -IPR1-X321 -IPR1-X321 -F96
21 21 -IPR1-X321
-K57 -IPR1-X329 (/6.3A) 2 (/6.5B) 6
12
11
(/6.5A) 2 (/10.7C)
-K52 -K53 (/6.1E) 2 1 BO1_PO BO1_PO
(/6.5B) 4 BO3_PO O/P-2
(/11.5E) 12 14 (/11.2E) 22 24 BO2_PO
(/11.1E) 22 24 IRF ALARM
K261 K262 K263 K264 K265 K266 K267 K268 K269 K270 K273 K274 K275 K276 K277 K278 K279 K280
-X25 1 2 3 4 5 6 7 8 9 10 13 14 15 16 17 18 19 20
-X25 21 22 23 24
C C
DC CONTROL SUPPLY
MCCB CLOSED ACB TEST POSITION ACB RACKED-IN REF 630 COMMON ALARAM REF 630 SPARE REF 630 SPARE OUTPUT REF 630 SPARE OUTPUT TCS FAILURE ALARM SPARE
(HEALTHY) POSITION IRF WATCHDOG OUTPUT
(RELAY HEALTHY)
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 15
AP-LVS
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-ACB-BC-01 +ST-13006-ACB-BC-01 Of 21
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P ACB BUS SECTION
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
A 31
31
131
31 A
231
23 31 31
221
31
-K56 -K57
-Q03-31 -K52 -K43 -K44
-Q03-23 -Q03-23 -K53 (/11.1E) 32 34 (/11.4E) 32 34 -S22 (/11.5E) 32 34
2
134
(/4.6C) 24 (/11.6E) 32 34 (/11.7E) 32 34
232
234
(/4.3D) (/11.2E) 32 34
222
224
(/4.3D) S75E/1 (/7.6C)
Q/13 Q/14
K351 K352 K353 K354 K355 K356 K357 K358 K359 K360 K363 K364 K365 K366 K367 K368 K369 K370 K371 K372
-X201 1 2 3 4 5 6 7 8 9 10 13 14 15 16 17 18 19 20 21 22 -X201 23 24 25 26
B SPARE B
ACB OPENED ACB CLOSED ACB IN SERVICE ACB IN DRAWOUT ACB IN TEST TCS HEALTHY BUS-A VT FAIL BUS-B VT FAIL DC CONTROL SUPPLY
LOCAL/REMOTE SWITCH
(PLC) (PLC) POSITION (PLC) POSITION (PLC) POSITION (PLC) (SPARE) ALARM (SPARE) ALARM (SPARE) MCCB CLOSED
IN REMOTE POS.
(HEALTHY) (SPARE)
(SPARE)
C C
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 16
AP-LVS
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-ACB-BC-01 +ST-13006-ACB-BC-01 Of 21
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P ACB BUS SECTION
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
-XD -XD
1 1
-J110+ 110V DC CONTROL WIRE BUS +VE
A
A
-XD -XD
2 2
-J110- 110V DC CONTROL WIRE BUS -VE
1 3 13 1 3 13 1 3 13
-Q21 -Q22 -Q23
6A, 2P MCB 2 4 14 6A, 2P MCB 2 4 14 6A, 2P MCB 2 4 14
(/11.5B)
(/11.5B)
(/11.5C)
B B
J2 J02 J3 J03 J6 J06
C C
CONTROL SUPPLY CONTROL SUPPLY CONTROL SUPPLY
FOR FOR CLOSING FOR ACB SPRING
TRIPPING/PROTECTION/INDICATION CIRCUIT CHARGE MOTOR
CIRCUIT
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 17
AP-LVS
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-ACB-BC-01 +ST-13006-ACB-BC-01 Of 21
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P ACB BUS SECTION
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
A
Terminal diagram
(=ST+ST-13006-ACB-BC-01) A
X21
K211
-Q03-23:261 -------------------------- 1 (/13.1B) ACB OPENED/ CLOSED STATUS
K212
-Q03-23:262 -------------------------- 2 (/13.1B) ACB OPENED/ CLOSED STATUS
K213
-Q03-23:264 -------------------------- 3 (/13.1B) ACB OPENED/ CLOSED STATUS
K214
-Q03-23:271 -------------------------- 4 (/13.1B) ACB OPENED/ CLOSED STATUS
K215
-Q03-23:272 -------------------------- 5 (/13.2B) ACB OPENED/ CLOSED STATUS
K216
-Q03-23:274 -------------------------- 6 (/13.2B) ACB OPENED/ CLOSED STATUS
K217
-Q03-23:281 -------------------------- 7 (/13.2B) ACB OPENED/ CLOSED STATUS
B B
K218
-Q03-23:282 -------------------------- 8 (/13.2B) ACB OPENED/ CLOSED STATUS
K219
-Q03-23:284 -------------------------- 9 (/13.2B) ACB OPENED/ CLOSED STATUS
K220
-Q03-23:291 -------------------------- 10 (/13.2B) ACB OPENED/ CLOSED STATUS
K221
-Q03-23:292 -------------------------- 11 (/13.3B) ACB OPENED/ CLOSED STATUS
K222
-Q03-23:294 -------------------------- 12 (/13.3B) ACB OPENED/ CLOSED STATUS
K223
-Q03-23:301 -------------------------- 13 (/13.3B) ACB OPENED/ CLOSED STATUS
K224
-Q03-23:302 -------------------------- 14 (/13.3B) ACB OPENED/ CLOSED STATUS
K225
-Q03-23:304 -------------------------- 15 (/13.3B) ACB OPENED/ CLOSED STATUS
K226
-Q03-23:311 -------------------------- 16 (/13.4B) ACB OPENED/ CLOSED STATUS
K227
C -Q03-23:312 -------------------------- 17 (/13.4B) ACB OPENED/ CLOSED STATUS
C
K228
-Q03-23:314 -------------------------- 18 (/13.4B) ACB OPENED/ CLOSED STATUS
K229
-Q03-23:321 -------------------------- 19 (/13.4B) ACB OPENED/ CLOSED STATUS
K230
-Q03-23:322 -------------------------- 20 (/13.4B) ACB OPENED/ CLOSED STATUS
K231
-Q03-23:324 -------------------------- 21 (/13.4B) ACB OPENED/ CLOSED STATUS
K232
-Q03-23:331 -------------------------- 22 (/13.5B) ACB OPENED/ CLOSED STATUS
K233
-Q03-23:332 -------------------------- 23 (/13.5B) ACB OPENED/ CLOSED STATUS
K234
-Q03-23:334 -------------------------- 24 (/13.5B) ACB OPENED/ CLOSED STATUS
K235
-Q03-23:341 -------------------------- 25 (/13.5B) ACB OPENED/ CLOSED STATUS
K236
-Q03-23:342 -------------------------- 26 (/13.5B) ACB OPENED/ CLOSED STATUS
K237
D -Q03-23:344 -------------------------- 27 (/13.6B) ACB OPENED/ CLOSED STATUS D
28 (/13.6B) SPARE
29 (/13.6B) SPARE
30 (/13.6B) SPARE
31 (/13.7B) SPARE
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 18
AP-LVS TERMINAL DIAGRAM
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-ACB-BC-01 +ST-13006-ACB-BC-01 Of 21
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P ACB BUS SECTION
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
A
Terminal diagram
(=ST+ST-13006-ACB-BC-01) A
X24
-J2
-S21:3 -------------------------- 1 (/8.2B) SPARE
K181
-IPR1-2 -------------------------- 2 (/8.2C) SPARE
J2
-X24:1 -------------------------- 3 (/8.2B) CLOSE COMMAND PROVISION FROM REMOTE
K182
-IPR1-5 -------------------------- 4 (/8.2C) CLOSE COMMAND PROVISION FROM REMOTE
J2
-X24:3 -------------------------- 5 (/8.3B) SPARE INPUTS FOR REF630
K183
-IPR1-6 -------------------------- 6 (/8.3C) SPARE INPUTS FOR REF630
J2
-X24:5 -------------------------- 7 (/8.3B) SPARE INPUTS FOR REF630
B B
K184
-IPR1-9 -------------------------- 8 (/8.3C) SPARE INPUTS FOR REF630
-X24:7 -------------------------- 9 (/8.4B) SPARE INPUTS FOR REF630
K185
-IPR1-10 -------------------------- 10 (/8.4C) SPARE INPUTS FOR REF630
-X24:9 -------------------------- 11 (/8.4B) SPARE INPUTS FOR REF630
K186
-IPR1-13 -------------------------- 12 (/8.4C) SPARE INPUTS FOR REF630
-X24:11 -------------------------- 13 (/8.4B) SPARE INPUTS FOR REF630
K187
-IPR1-14 -------------------------- 14 (/8.4C) SPARE INPUTS FOR REF630
15 (/8.6C) SPARE
16 (/8.6C) SPARE
C 17 (/8.6C) SPARE
C
18 (/8.6C) SPARE
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 19
AP-LVS TERMINAL DIAGRAM
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-ACB-BC-01 +ST-13006-ACB-BC-01 Of 21
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P ACB BUS SECTION
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
A
Terminal diagram
(=ST+ST-13006-ACB-BC-01) A
X25
K261
-K57:11 -------------------------- 1 (/15.1C) DC CONTROL SUPPLY MCCB CLOSED (HEALTHY)
K262
-K57:14 -------------------------- 2 (/15.1C) DC CONTROL SUPPLY MCCB CLOSED (HEALTHY)
K263
-K52:21 -------------------------- 3 (/15.1C) ACB TEST POSITION
K264
-K52:24 -------------------------- 4 (/15.2C) ACB TEST POSITION
K265
-K53:21 -------------------------- 5 (/15.2C) ACB RACKED-IN POSITION
K266
-K53:24 -------------------------- 6 (/15.2C) ACB RACKED-IN POSITION
K267
-IPR1-X329:3 -------------------------- 7 (/15.3C) REF 630 IRF WATCHDOG (RELAY HEALTHY)
B B
K268
-IPR1-X329:1 -------------------------- 8 (/15.3C) REF 630 IRF WATCHDOG (RELAY HEALTHY)
K269
-IPR1-X316:1 -------------------------- 9 (/15.3C) COMMON ALARAM
K270
-IPR1-X316:2 -------------------------- 10 (/15.4C) COMMON ALARAM
K273
-IPR1-X321:1 -------------------------- 13 (/15.5C) REF 630 SPARE OUTPUT
K274
-IPR1-X321:2 -------------------------- 14 (/15.5C) REF 630 SPARE OUTPUT
K275
-IPR1-X321:3 -------------------------- 15 (/15.6C) REF 630 SPARE OUTPUT
K276
-IPR1-X321:4 -------------------------- 16 (/15.6C) REF 630 SPARE OUTPUT
K277
-IPR1-X321:5 -------------------------- 17 (/15.6C) REF 630 SPARE OUTPUT
K278
-IPR1-X321:6 -------------------------- 18 (/15.7C) REF 630 SPARE OUTPUT
K279
C -F96:10 -------------------------- 19 (/15.7C) REF 630 SPARE OUTPUT
C
K280
-F96:11 -------------------------- 20 (/15.8C) REF 630 SPARE OUTPUT
21 (/15.8C) SPARE
22 (/15.8C) SPARE
23 (/15.8C) SPARE
24 (/15.8C) SPARE
-IPR1-X327:4 -------------------------- 25 (/10.6B) EXTERNAL PROVISION FOR CB COIL TRIP
K43
-Q03-21:23 -------------------------- 26 (/10.6B) EXTERNAL PROVISION FOR CB COIL TRIP
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 20
AP-LVS TERMINAL DIAGRAM
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-ACB-BC-01 +ST-13006-ACB-BC-01 Of 21
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P ACB BUS SECTION
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
A
Terminal diagram
(=ST+ST-13006-ACB-BC-01) A
X201
K351
-Q03-23:221 -------------------------- 1 (/16.1B) ACB OPENED (PLC)
K352
-Q03-23:222 -------------------------- 2 (/16.1B) ACB OPENED (PLC)
K353
-Q03-23:231 -------------------------- 3 (/16.2B) ACB CLOSED (PLC)
K354
-Q03-23:234 -------------------------- 4 (/16.2B) ACB CLOSED (PLC)
K355
-K53:31 -------------------------- 5 (/16.2B) ACB IN SERVICE POSITION (PLC)
K356
-K53:34 -------------------------- 6 (/16.2B) ACB IN SERVICE POSITION (PLC)
K357
-Q03-31:131 -------------------------- 7 (/16.3B) ACB IN DRAWOUT POSITION (PLC)
B B
K358
-Q03-31:134 -------------------------- 8 (/16.3B) ACB IN DRAWOUT POSITION (PLC)
K359
-K52:31 -------------------------- 9 (/16.3B) ACB IN TEST POSITION (PLC)
K360
-K52:34 -------------------------- 10 (/16.4B) ACB IN TEST POSITION (PLC)
K363
-K56:31 -------------------------- 13 (/16.4B) TCS HEALTHY (SPARE)
K364
-K56:34 -------------------------- 14 (/16.4B) TCS HEALTHY (SPARE)
K365
-S22:23 -------------------------- 15 (/16.5B) LOCAL/REMOTE SWITCH IN REMOTE POS. (SPARE)
K366
-S22:24 -------------------------- 16 (/16.5B) LOCAL/REMOTE SWITCH IN REMOTE POS. (SPARE)
K367
-K43:31 -------------------------- 17 (/16.6B) BUS-A VT FAIL ALARM (SPARE)
K368
-K43:34 -------------------------- 18 (/16.6B) BUS-A VT FAIL ALARM (SPARE)
K369
C -K44:31 -------------------------- 19 (/16.6B) BUS-B VT FAIL ALARM (SPARE)
C
K370
-K44:34 -------------------------- 20 (/16.6B) BUS-B VT FAIL ALARM (SPARE)
K371
-K57:31 -------------------------- 21 (/16.7B) DC CONTROL SUPPLY MCCB CLOSED (HEALTHY) (SPARE)
K372
-K57:34 -------------------------- 22 (/16.7B) DC CONTROL SUPPLY MCCB CLOSED (HEALTHY) (SPARE)
23 (/16.8B) SPARE
24 (/16.8B) SPARE
25 (/16.8B) SPARE
26 (/16.8B) SPARE
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 21
AP-LVS TERMINAL DIAGRAM
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-ACB-BC-01 +ST-13006-ACB-BC-01 Of 21
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P ACB BUS SECTION
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
A
A
SB-2773.
C
CLIENT OCCIDENTAL OF OMAN INC.
C
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 1
AP-LVS COVER SHEET
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-DOL-3PH-01 +ST-13006-DOL-3PH-01 Of 7
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
DOL STARTER WITHOUT PLC
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' (REMOTE) START/STOP, 8E MODULE FOR SB-2773. Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
Table of contents
A
A
Page Page Type Page Description ABB Drawing number Ver. Client Drawing number Rev. Date.
1 /7 Title page / cover sheet SCHEMATIC DIAGRAM FOR DOL STARTER WITHOUT PLC (REMOTE) START/STOP, 8E MODULE FOR SB-2773. ST-13006-DOL-3PH-01 A 09.10.13
2 /7 Table of contents SCHEMATIC DIAGRAM FOR DOL STARTER WITHOUT PLC (REMOTE) START/STOP, 8E MODULE FOR SB-2773. ST-13006-DOL-3PH-01 A 09.10.13
3 /7 Schematic multi-line SCHEMATIC DIAGRAM FOR DOL STARTER WITHOUT PLC (REMOTE) START/STOP, 8E MODULE FOR SB-2773. ST-13006-DOL-3PH-01 A 09.10.13
4 /7 Schematic multi-line SCHEMATIC DIAGRAM FOR DOL STARTER WITHOUT PLC (REMOTE) START/STOP, 8E MODULE FOR SB-2773. ST-13006-DOL-3PH-01 A 09.10.13
B B
5 /7 Plug diagram SCHEMATIC DIAGRAM FOR DOL STARTER WITHOUT PLC (REMOTE) START/STOP, 8E MODULE FOR SB-2773. ST-13006-DOL-3PH-01 A 09.10.13
6 /7 Plug diagram SCHEMATIC DIAGRAM FOR DOL STARTER WITHOUT PLC (REMOTE) START/STOP, 8E MODULE FOR SB-2773. ST-13006-DOL-3PH-01 A 09.10.13
7 /7 Plug diagram SCHEMATIC DIAGRAM FOR DOL STARTER WITHOUT PLC (REMOTE) START/STOP, 8E MODULE FOR SB-2773. ST-13006-DOL-3PH-01 A 09.10.13
C C
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 2
AP-LVS INDEX SHEET
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-DOL-3PH-01 +ST-13006-DOL-3PH-01 Of 7
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
DOL STARTER WITHOUT PLC
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' (REMOTE) START/STOP, 8E MODULE FOR SB-2773. Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
MAIN BUSBAR
-R:1 -R:1
A -Y:1 -Y:1
A
-B:1 -B:1
-N:1 -N:1
-X1 L1 L2 L3 N
E70 E70
-NL10 K01
K01 / (4.1E)
(/4.4B) (/3.8E) (/4.4C)
-X5 12 14 22 24 96 98
-Q1
B -21 B
12 14 22 24 96 98
1 3 5
12 14 22 24
-S01 Q/1 Q/2
21 I> I> I> 11 21
96 98
2 4 6
22 SY/1
TRIP 95
(/4.4B)
CONTACTS
POSITION 13-14 21-22
OPERATION - - - -
11 21 95
TEST X X
C C
MOVABLE - - - -
ISOLATED - - - -
-X5 11 21 95
OPEN/CLOSE OPEN/CLOSE TRIP
1 3 5
-KM1
1 (/4.7E) 2 4 6
-CF20 -NL20
D 2A 2 D
K31
1 3 5 95 97
-F2
K33 THERMAL 2 4 6 96 98
21X OVERLOAD
(/4.5B)
(/4.4C)
-KM1 RELAY
(/4.7E) 22X (AUTO RESET)
(L) 21
K32 13 31 41
5 7
-Q1-21
240V AC SUPPLY FOR -KM1 -K41 -S22 -S22 -KM1
MOTOR SPACE
-X2 U V W
(/4.7E) 14 (/4.4E) 32 34 (/4.7E) 42
(/3.3B) 22 24
(/4.7C) 6 (/4.8C) 8 Q/2
HEATER (L) 1 Pos 2 Pos (L)
E E
+FIELD -X10.2 11 12
U1 V1 W1 -X10.1
-E1 11 12 13 14 15 16 17 21 22 23 24 25 26 27
ANTICONDENSATION
SPACE HEATER M COM RUN COM FAULT COM LOCAL/REMOTE COM LOCAL/REMOTE COM STOP COM CB OPEN CB CLOSE
3~ SWITCH IN LOCAL MODE SWITCH IN REMOTE MODE
MOTOR
F F
STATUS FEEDBACK TO REMOTE (IF REQUIRED)
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 3
AP-LVS
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-DOL-3PH-01 +ST-13006-DOL-3PH-01 Of 7
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
DOL STARTER WITHOUT PLC
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' (REMOTE) START/STOP, 8E MODULE FOR SB-2773. Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
REMOVE LINK
IF CONNECTED
-X10.2
13
A
PROVISION A
FUTURE
I/L
-X10.2
14
-Q1-21 -F2 -K41
11 14 K11 95 96 K12 11 14
(3.8A) / K10 REMOVE LINK
12 12 K13 K14
NO TRIP IF CONNECTED
Q/1 (/3.2D) (/4.4E) -X10.2
(/3.3B) (TRIP) 15
-S01
21 22
B B
(/3.1B) LCS
EMG. STOP
(TEST POS=NC)
-X10.2
16
K15
21 13X 21 95
13 97
-KM1 -K41
(/3.5E)
(/3.6E)
-S23 -KM1 -Q1-21
(/4.7E) 22 (/4.7E) 14X (/4.4E) 22 24 (/3.3B) 96 98
-F2
LAMP 14 (/3.2D) 98
TEST PB (L) SY/1
TRIP -S22 1 5 3 7
1 2
11
-S2
STOP 12 -X10.2 21
-HB 2 3 4 PB
6 K18
REMOTE
START/
11 13 STOP
D -K31 -S1 D
(/4.7E) 12 14 START 14
PB
-X10.2 22
K26
1 A1 A1 A1
(3.8B) / K01
FAULT RELAY CONTACTOR
14 11 (/4.6D)
14 11 (/4.6B) 1 2 (/3.2D) 12
12 3 4 (/3.2D) 24 21
24 21 (/4.3C) 5 6 (/3.2D) 22
22 21 22 (/4.2C) 34 31
34 31 (/3.5E) 21X 22X (/3.1D) 32
32 13X 14X (/4.3C)
41 42 (/3.7E)
F F
13 14 (/3.4E)
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 4
AP-LVS
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-DOL-3PH-01 +ST-13006-DOL-3PH-01 Of 7
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
DOL STARTER WITHOUT PLC
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' (REMOTE) START/STOP, 8E MODULE FOR SB-2773. Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
A
Terminal/Pin Connection diagram
(=ST+ST-13006-DOL-3PH-01) A
X2
-F2:2 -------------------------- (/3.2E) U TO MOTOR
C C
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 5
AP-LVS TERMINAL DIAGRAM
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-DOL-3PH-01 +ST-13006-DOL-3PH-01 Of 7
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
DOL STARTER WITHOUT PLC
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' (REMOTE) START/STOP, 8E MODULE FOR SB-2773. Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
A
Terminal/Pin Connection diagram
(=ST+ST-13006-DOL-3PH-01) A
X10.1
K31 (/3.4E) 11
-KM1:13 -------------------------- COM
K32 (/3.4E) 12
-KM1:14 -------------------------- RUN
K33 (/3.4E) 13
-K41:31 -------------------------- COM
B K34 (/3.5E) 14 B
-K41:32 -------------------------- FAULT
K35 (/3.5E) 15
-K41:34 -------------------------- FAULT
K36 (/3.5E) 16
-S22:5 -------------------------- COM
K37 (/3.5E) 17
-S22:6 -------------------------- LOCAL/REMOTE SWITCH IN LOCAL MODE
- 18 SPARE
K38 (/3.6E) 21
-S22:7 -------------------------- COM
K39 (/3.6E) 22
-S22:8 -------------------------- LOCAL/REMOTE SWITCH IN REMOTE MODE
K40 (/3.7E) 23
-KM1:41 -------------------------- COM
C K41 (/3.7E) 24
-KM1:42 -------------------------- STOP C
K42 (/3.7E) 25
-Q1-21:21 -------------------------- COM
K43 (/3.8E) 26
-Q1-21:22 -------------------------- CB OPEN
K44 (/3.8E) 27
-Q1-21:24 -------------------------- CB CLOSE
- 28 SPARE
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 6
AP-LVS TERMINAL DIAGRAM
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-DOL-3PH-01 +ST-13006-DOL-3PH-01 Of 7
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
DOL STARTER WITHOUT PLC
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' (REMOTE) START/STOP, 8E MODULE FOR SB-2773. Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
A
Terminal/Pin Connection diagram
(=ST+ST-13006-DOL-3PH-01) A
X10.2
K32 (/3.1E) 11 +FIELD-E1:x1
-KM1:22X -------------------------- 240V AC SUPPLY FOR MOTOR SPACE HEATER
K33 (/3.1E) 12 +FIELD-E1:x2
-NL20:2 -------------------------- 240V AC SUPPLY FOR MOTOR SPACE HEATER
- 17 SPARE
- 18 SPARE
- 23 SPARE
C - 24 SPARE C
- 25 SPARE
- 26 SPARE
- 27 SPARE
- 28 SPARE
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 7
AP-LVS TERMINAL DIAGRAM
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-DOL-3PH-01 +ST-13006-DOL-3PH-01 Of 7
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
DOL STARTER WITHOUT PLC
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' (REMOTE) START/STOP, 8E MODULE FOR SB-2773. Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
A
A
SB-2773.
C
CLIENT OCCIDENTAL OF OMAN INC.
C
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 1
AP-LVS COVER SHEET
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-DOL-3PH-02 +ST-13006-DOL-3PH-02 Of 7
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
DOL STARTER WITH PLC
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' (REMOTE) START/STOP, 8E MODULE FOR SB-2773. Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
Table of contents
A
A
Page Page Type Page Description ABB Drawing number Ver. Client Drawing number Rev. Date.
1 /7 Title page / cover sheet SCHEMATIC DIAGRAM FOR DOL STARTER WITH PLC (REMOTE) START/STOP, 8E MODULE FOR SB-2773. ST-13006-DOL-3PH-02 A 09.10.13
2 /7 Table of contents SCHEMATIC DIAGRAM FOR DOL STARTER WITH PLC (REMOTE) START/STOP, 8E MODULE FOR SB-2773. ST-13006-DOL-3PH-02 A 09.10.13
3 /7 Schematic multi-line SCHEMATIC DIAGRAM FOR DOL STARTER WITH PLC (REMOTE) START/STOP, 8E MODULE FOR SB-2773. ST-13006-DOL-3PH-02 A 09.10.13
4 /7 Schematic multi-line SCHEMATIC DIAGRAM FOR DOL STARTER WITH PLC (REMOTE) START/STOP, 8E MODULE FOR SB-2773. ST-13006-DOL-3PH-02 A 09.10.13
B B
5 /7 Plug diagram SCHEMATIC DIAGRAM FOR DOL STARTER WITH PLC (REMOTE) START/STOP, 8E MODULE FOR SB-2773. ST-13006-DOL-3PH-02 A 09.10.13
6 /7 Plug diagram SCHEMATIC DIAGRAM FOR DOL STARTER WITH PLC (REMOTE) START/STOP, 8E MODULE FOR SB-2773. ST-13006-DOL-3PH-02 A 09.10.13
7 /7 Plug diagram SCHEMATIC DIAGRAM FOR DOL STARTER WITH PLC (REMOTE) START/STOP, 8E MODULE FOR SB-2773. ST-13006-DOL-3PH-02 A 09.10.13
C C
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 2
AP-LVS INDEX SHEET
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-DOL-3PH-02 +ST-13006-DOL-3PH-02 Of 7
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
DOL STARTER WITH PLC
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' (REMOTE) START/STOP, 8E MODULE FOR SB-2773. Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
MAIN BUSBAR
-R:1 -R:1
A -Y:1 -Y:1
A
-B:1 -B:1
-N:1 -N:1
-X1 L1 L2 L3 N
E70 E70
-NL10 K01
K01 / (4.1E)
(/4.4B) (/3.8E) (/4.4C)
-X5 12 14 22 24 96 98
-Q1
B -21 B
12 14 22 24 96 98
1 3 5
12 14 22 24
-S01 Q/1 Q/2
21 I> I> I> 11 21
96 98
PLC START PLC STOP
2 4 6
22 SY/1
TRIP 95
(/4.4B)
CONTACTS
POSITION 13-14 21-22
OPERATION - - - -
11 21 95
TEST X X
C C
MOVABLE
ISOLATED
-
-
-
-
-
-
-
-
-X10.2 25 26 27 28
-X10.2 -X10.2
21 J13
24V DC + 23 24V DC + J15
-X5 11 21 95
OPEN/CLOSE OPEN/CLOSE TRIP
J17 J18
(/4.4C)
-KM1 RELAY
(/4.7E) 22X (AUTO RESET)
(L) 21
K32 13 31 41
5 7
-Q1-21
-KM1 -K41 -S22 -S22 -KM1
240V AC SUPPLY FOR -X2 U V W
(/4.7E) 14 (/4.4E) 32 34 (/4.7E) 42
(/3.3B) 22 24
MOTOR SPACE (/4.7C) 6 (/4.8C) 8 Q/2
(L) 1 Pos 2 Pos (L)
HEATER
E E
+FIELD -X10.2 11 12
U1 V1 W1 -X10.1
-E1 11 12 13 14 15 16 17 21 22 23 24 25 26 27
ANTICONDENSATION
SPACE HEATER M COM RUN COM FAULT COM LOCAL/REMOTE COM LOCAL/REMOTE COM STOP COM CB OPEN CB CLOSE
3~ SWITCH IN LOCAL MODE SWITCH IN REMOTE MODE
MOTOR
F F
STATUS FEEDBACK TO REMOTE (IF REQUIRED)
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 3
AP-LVS
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-DOL-3PH-02 +ST-13006-DOL-3PH-02 Of 7
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
DOL STARTER WITH PLC
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' (REMOTE) START/STOP, 8E MODULE FOR SB-2773. Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
REMOVE LINK
IF CONNECTED
-X10.2
13
A
(/3.3F) PROVISION A
FUTURE
I/L
-X10.2
14
-Q1-21 -F2 -K41
11 14 K11 95 96 K12 11 14 (/3.3F)
(3.8A) / K10 REMOVE LINK
12 12 K13 K14
NO TRIP IF CONNECTED
Q/1 (/3.2D) (/4.4E) -X10.2
(/3.3B) (TRIP) 15
-S01
(/3.3F) PROVISION
21 22
B B
(/3.1B) REMOTE
EMG. STOP
(TEST POS=NC)
-X10.2
16
K15
(/3.3F)
21 13X 21 95
13 97
-KM1 -K41
(/3.5E)
(/3.6E)
-S23 -KM1 -Q1-21
(/4.7E) 22 (/4.7E) 14X (/4.4E) 22 24 (/3.3B) 96 98
-F2
LAMP 14 (/3.2D) 98
TEST PB (L) SY/1
TRIP -S22 1 5 3 7
1 2
11
11
-KR22
-S2 (/3.8D) 12 14
STOP 12 STOP COMMAND
-HB 2 3 4 PB FROM PLC
K19
6 K18
11 21
11 13
-KR21 -K31
D -K31 -S1 (/3.6D) 12 14 (/4.7E) 22 24
D
(/4.7E) 12 14 START 14 START COMMAND
PB FROM PLC
K26
1 A1 A1 A1
(3.8B) / K01
FAULT RELAY CONTACTOR
14 11 (/4.6D)
14 11 (/4.6B) 1 2 (/3.2D) 12
12 3 4 (/3.2D) 24 21 (/4.8D)
24 21 (/4.3C) 5 6 (/3.2D) 22
22 13 14 (/3.4E) 34 31
34 31 (/3.5E) 32
21 22 (/4.2C)
32
41 42 (/3.7E)
13X 14X (/4.3C)
F F
21X 22X (/3.1D)
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 4
AP-LVS
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-DOL-3PH-02 +ST-13006-DOL-3PH-02 Of 7
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
DOL STARTER WITH PLC
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' (REMOTE) START/STOP, 8E MODULE FOR SB-2773. Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
A
Terminal/Pin Connection diagram
(=ST+ST-13006-DOL-3PH-02) A
X2
-F2:2 -------------------------- (/3.2E) U TO MOTOR
C C
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 5
AP-LVS TERMINAL DIAGRAM
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-DOL-3PH-02 +ST-13006-DOL-3PH-02 Of 7
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
DOL STARTER WITH PLC
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' (REMOTE) START/STOP, 8E MODULE FOR SB-2773. Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
A
Terminal/Pin Connection diagram
(=ST+ST-13006-DOL-3PH-02) A
X10.1
K31 (/3.4E) 11
-KM1:13 -------------------------- COM
K32 (/3.4E) 12
-KM1:14 -------------------------- RUN
K33 (/3.4E) 13
-K41:31 -------------------------- COM
B K34 (/3.5E) 14 B
-K41:32 -------------------------- FAULT
K35 (/3.5E) 15
-K41:34 -------------------------- FAULT
K36 (/3.5E) 16
-S22:5 -------------------------- COM
K37 (/3.5E) 17
-S22:6 -------------------------- LOCAL/REMOTE SWITCH IN LOCAL MODE
- 18 SPARE
K38 (/3.6E) 21
-S22:7 -------------------------- COM
K39 (/3.6E) 22
-S22:8 -------------------------- LOCAL/REMOTE SWITCH IN REMOTE MODE
K40 (/3.7E) 23
-KM1:41 -------------------------- COM
C K41 (/3.7E) 24
-KM1:42 -------------------------- STOP C
K42 (/3.7E) 25
-Q1-21:21 -------------------------- COM
K43 (/3.8E) 26
-Q1-21:22 -------------------------- CB OPEN
K44 (/3.8E) 27
-Q1-21:24 -------------------------- CB CLOSE
- 28 SPARE
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 6
AP-LVS TERMINAL DIAGRAM
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-DOL-3PH-02 +ST-13006-DOL-3PH-02 Of 7
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
DOL STARTER WITH PLC
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' (REMOTE) START/STOP, 8E MODULE FOR SB-2773. Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
A
Terminal/Pin Connection diagram
(=ST+ST-13006-DOL-3PH-02) A
X10.2
K32 (/3.1E) 11 +FIELD-E1:x1
-KM1:22X -------------------------- 240V AC SUPPLY FOR MOTOR SPACE HEATER
K33 (/3.1E) 12 +FIELD-E1:x2
-NL20:2 -------------------------- 240V AC SUPPLY FOR MOTOR SPACE HEATER
- 17 SPARE
- 18 SPARE
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 7
AP-LVS TERMINAL DIAGRAM
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-DOL-3PH-02 +ST-13006-DOL-3PH-02 Of 7
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
DOL STARTER WITH PLC
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' (REMOTE) START/STOP, 8E MODULE FOR SB-2773. Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
A
A
C
CLIENT OCCIDENTAL OF OMAN INC.
C
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 1
AP-LVS COVER SHEET
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-FDR-2P-01 +ST-13006-FDR-2P-01 Of 5
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
2P MCCB OUTGOING FEEDER
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' 63A FOR SB-2773. Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
Table of contents
A
A
Page Page Type Page Description ABB Drawing number Ver. Client Drawing number Rev. Date.
1 /5 Title page / cover sheet SCHEMATIC DIAGRAM FOR 2P MCCB OUTGOING FEEDER 63A FOR SB-2773. ST-13006-FDR-2P-01 A 09.10.13
2 /5 Table of contents SCHEMATIC DIAGRAM FOR 2P MCCB OUTGOING FEEDER 63A FOR SB-2773. ST-13006-FDR-2P-01 A 09.10.13
3 /5 Schematic multi-line SCHEMATIC DIAGRAM FOR 2P MCCB OUTGOING FEEDER 63A FOR SB-2773. ST-13006-FDR-2P-01 A 09.10.13
4 /5 Plug diagram SCHEMATIC DIAGRAM FOR 2P MCCB OUTGOING FEEDER 63A FOR SB-2773. ST-13006-FDR-2P-01 A 09.10.13
B B
5 /5 Plug diagram SCHEMATIC DIAGRAM FOR 2P MCCB OUTGOING FEEDER 63A FOR SB-2773. ST-13006-FDR-2P-01 A 09.10.13
C C
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 2
AP-LVS INDEX SHEET
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-FDR-2P-01 +ST-13006-FDR-2P-01 Of 5
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
2P MCCB OUTGOING FEEDER
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' 63A FOR SB-2773. Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
MAIN BUSBAR
R R
Y Y
A B B
N N A
-X1 L1 N
E70
-NL10 K01
-Q1
-21 11 11
12 14 22 24 32 34 96 98 95 13 B
B
-S23 -Q1-21 -K41
1 3 5 12 14 22 24 32 34
-Q1-21 (/3.2B) 12 14 (/3.5D) 12 14
(/3.3B) 96 98 LAMP 14
TEST PB Q/1
Q/1 Q/2 Q/3 SY/1
3P, MCCB
OPEN/ 11 OPEN/ 21 OPEN/ 31 96 98
TRIP
TMD K62 K63
I> I> I> CLOSE CLOSE CLOSE K64
K61
K60
SY/1
2 4 6 TRIP 95
-HD 2 3 4
6
11 21 31 95
C C
-X5 11 21 31 95
OPEN/CLOSE OPEN/CLOSE OPEN/CLOSE TRIP
A1
GREEN RED AMBER
-K41
A2
D D
OPEN CLOSE TRIP
14 11 (/3.7B)
12
24 21
22
34 31 (/3.7E)
32
21 31
-Q1-21 -K41
(/3.2B) 22 24 (/3.5D) 32 34
E Q/2 E
K31
K32 K33 K35
K36 K37
-X10.1 11 12 13 14 15 16
-X2 L N
COM CB OPEN CB CLOSE COM CB TRIP
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 3
AP-LVS
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-FDR-2P-01 +ST-13006-FDR-2P-01 Of 5
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
2P MCCB OUTGOING FEEDER
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' 63A FOR SB-2773. Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
A
Terminal/Pin Connection diagram
(=ST+ST-13006-FDR-2P-01) A
X2
1 (/3.1E) L
-Q1:4 -------------------------- TO LOAD
1 (/3.1E) N
-Q1:6 -------------------------- TO LOAD
B B
C C
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 4
AP-LVS TERMINAL DIAGRAM
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-FDR-2P-01 +ST-13006-FDR-2P-01 Of 5
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
2P MCCB OUTGOING FEEDER
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' 63A FOR SB-2773. Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
A
Terminal/Pin Connection diagram
(=ST+ST-13006-FDR-2P-01) A
X10.1
- 10 SPARE
K31 (/3.6E) 11
-Q1-21:21 -------------------------- COM
K32 (/3.6E) 12
-Q1-21:22 -------------------------- CB OPEN
B K33 (/3.6E) 13 B
-Q1-21:24 -------------------------- CB CLOSE
K35 (/3.7E) 14
-K41:31 -------------------------- COM
K36 (/3.7E) 15
-K41:32 -------------------------- CB TRIP
- 16 SPARE
- 17 SPARE
- 18 SPARE
- 19 SPARE
- 20 SPARE
C - 21 SPARE C
- 22 SPARE
- 23 SPARE
- 24 SPARE
- 25 SPARE
- 26 SPARE
- 27 SPARE
- 28 SPARE
- 29 SPARE
D D
(20 PIN MNS TYPE)
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 5
AP-LVS TERMINAL DIAGRAM
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-FDR-2P-01 +ST-13006-FDR-2P-01 Of 5
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
2P MCCB OUTGOING FEEDER
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' 63A FOR SB-2773. Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
A
A
C
CLIENT OCCIDENTAL OF OMAN INC.
C
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 1
AP-LVS COVER SHEET
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-FDR-4P-01 +ST-13006-FDR-4P-01 Of 5
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P MCCB OUTGOING
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' FEEDER 8E/2 MODULE FOR SB-2773. Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
Table of contents
A
A
Page Page Type Page Description ABB Drawing number Ver. Client Drawing number Rev. Date.
1 /5 Title page / cover sheet SCHEMATIC DIAGRAM FOR 4P MCCB OUTGOING FEEDER 8E/2 MODULE FOR SB-2773. ST-13006-FDR-4P-01 A 09.10.13
2 /5 Table of contents SCHEMATIC DIAGRAM FOR 4P MCCB OUTGOING FEEDER 8E/2 MODULE FOR SB-2773. ST-13006-FDR-4P-01 A 09.10.13
3 /5 Schematic multi-line SCHEMATIC DIAGRAM FOR 4P MCCB OUTGOING FEEDER 8E/2 MODULE FOR SB-2773. ST-13006-FDR-4P-01 A 09.10.13
4 /5 Plug diagram SCHEMATIC DIAGRAM FOR 4P MCCB OUTGOING FEEDER 8E/2 MODULE FOR SB-2773. ST-13006-FDR-4P-01 A 09.10.13
B B
5 /5 Plug diagram SCHEMATIC DIAGRAM FOR 4P MCCB OUTGOING FEEDER 8E/2 MODULE FOR SB-2773. ST-13006-FDR-4P-01 A 09.10.13
C C
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 2
AP-LVS INDEX SHEET
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-FDR-4P-01 +ST-13006-FDR-4P-01 Of 5
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P MCCB OUTGOING
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' FEEDER 8E/2 MODULE FOR SB-2773. Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
MAIN BUSBAR
R R
Y Y
A B B
N N A
-X1 L1 L2 L3 N
E70
-NL10 K01
-Q1
-21 11 11
12 14 22 24 32 34 96 98 95 13 B
B
-S23 -Q1-21 -K41
1 3 5 7 12 14 22 24 32 34
-Q1-21 (/3.2B) 12 14 (/3.5D) 12 14
(/3.3B) 96 98 LAMP 14
TEST PB Q/1
Q/1 Q/2 Q/3 SY/1
4P, MCCB
OPEN/ 11 OPEN/ 21 OPEN/ 31 96 98
TRIP
TMD K62 K63
I> I> I> I> CLOSE CLOSE CLOSE K64
K61
K60
SY/1
2 4 6 8 TRIP 95
-HD 2 3 4
6
11 21 31 95
C C
-X5 11 21 31 95
OPEN/CLOSE OPEN/CLOSE OPEN/CLOSE TRIP
A1
GREEN RED AMBER
-K41
A2
D D
OPEN CLOSE TRIP
14 11 (/3.7B)
12
24 21
22
34 31 (/3.7E)
32
21 31
-Q1-21 -K41
(/3.2B) 22 24 (/3.5D) 32 34
E Q/2 E
K31
K32 K33 K35
K36 K37
-X10.1 11 12 13 14 15 16
-X2 U V W N
COM CB OPEN CB CLOSE COM CB TRIP
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 3
AP-LVS
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-FDR-4P-01 +ST-13006-FDR-4P-01 Of 5
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P MCCB OUTGOING
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' FEEDER 8E/2 MODULE FOR SB-2773. Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
A
Terminal/Pin Connection diagram
(=ST+ST-13006-FDR-4P-01) A
X2
1 (/3.2E) N
-Q1:8 -------------------------- TO LOAD
1 (/3.1E) U
-Q1:2 -------------------------- TO LOAD
1 (/3.1E) V
-Q1:4 -------------------------- TO LOAD
B 1 (/3.1E) W B
-Q1:6 -------------------------- TO LOAD
C C
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 4
AP-LVS TERMINAL DIAGRAM
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-FDR-4P-01 +ST-13006-FDR-4P-01 Of 5
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P MCCB OUTGOING
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' FEEDER 8E/2 MODULE FOR SB-2773. Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
A
Terminal/Pin Connection diagram
(=ST+ST-13006-FDR-4P-01) A
X10.1
- 10 SPARE
K31 (/3.6E) 11
-Q1-21:21 -------------------------- COM
K32 (/3.6E) 12
-Q1-21:22 -------------------------- CB OPEN
B K33 (/3.6E) 13 B
-Q1-21:24 -------------------------- CB CLOSE
K35 (/3.7E) 14
-K41:31 -------------------------- COM
K36 (/3.7E) 15
-K41:32 -------------------------- CB TRIP
- 16 SPARE
- 17 SPARE
- 18 SPARE
- 19 SPARE
- 20 SPARE
C - 21 SPARE C
- 22 SPARE
- 23 SPARE
- 24 SPARE
- 25 SPARE
- 26 SPARE
- 27 SPARE
- 28 SPARE
- 29 SPARE
D D
(20 PIN MNS TYPE)
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 5
AP-LVS TERMINAL DIAGRAM
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-FDR-4P-01 +ST-13006-FDR-4P-01 Of 5
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P MCCB OUTGOING
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' FEEDER 8E/2 MODULE FOR SB-2773. Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
A
A
C
CLIENT OCCIDENTAL OF OMAN INC.
C
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 1
AP-LVS COVER SHEET
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-FDR-4P-02 +ST-13006-FDR-4P-02 Of 5
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P MCCB OUTGOING
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' FEEDER 8E MODULE FOR SB-2773. Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
Table of contents
A
A
Page Page Type Page Description ABB Drawing number Ver. Client Drawing number Rev. Date.
1 /5 Title page / cover sheet SCHEMATIC DIAGRAM FOR 4P MCCB OUTGOING FEEDER 8E MODULE FOR SB-2773. ST-13006-FDR-4P-02 A 09.10.13
2 /5 Table of contents SCHEMATIC DIAGRAM FOR 4P MCCB OUTGOING FEEDER 8E MODULE FOR SB-2773. ST-13006-FDR-4P-02 A 09.10.13
3 /5 Schematic multi-line SCHEMATIC DIAGRAM FOR 4P MCCB OUTGOING FEEDER 8E MODULE FOR SB-2773. ST-13006-FDR-4P-02 A 09.10.13
4 /5 Plug diagram SCHEMATIC DIAGRAM FOR 4P MCCB OUTGOING FEEDER 8E MODULE FOR SB-2773. ST-13006-FDR-4P-02 A 09.10.13
B B
5 /5 Plug diagram SCHEMATIC DIAGRAM FOR 4P MCCB OUTGOING FEEDER 8E MODULE FOR SB-2773. ST-13006-FDR-4P-02 A 09.10.13
C C
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 2
AP-LVS INDEX SHEET
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-FDR-4P-02 +ST-13006-FDR-4P-02 Of 5
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P MCCB OUTGOING
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' FEEDER 8E MODULE FOR SB-2773. Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
MAIN BUSBAR
R R
Y Y
A B B
N N A
-X1 L1 L2 L3 N
E70
-NL10 K01
-Q1
-21 11 11
12 14 22 24 32 34 96 98 95 13 B
B
-S23 -Q1-21 -K41
1 3 5 7 12 14 22 24 32 34
-Q1-21 (/3.2B) 12 14 (/3.5D) 12 14
(/3.3B) 96 98 LAMP 14
TEST PB Q/1
Q/1 Q/2 Q/3 SY/1
4P, MCCB
OPEN/ 11 OPEN/ 21 OPEN/ 31 96 98
TRIP
TMD K62 K63
I> I> I> I> CLOSE CLOSE CLOSE K64
K61
K60
SY/1
2 4 6 8 TRIP 95
-HD 2 3 4
6
11 21 31 95
C C
-X5 11 21 31 95
OPEN/CLOSE OPEN/CLOSE OPEN/CLOSE TRIP
A1
GREEN RED AMBER
-K41
A2
D D
OPEN CLOSE TRIP
14 11 (/3.7B)
12
24 21
22
34 31 (/3.7E)
32
21 31
-Q1-21 -K41
(/3.2B) 22 24 (/3.5D) 32 34
E Q/2 E
K31
K32 K33 K35
K36 K37
-X10.1 11 12 13 14 15 16
-X2 U V W N
COM CB OPEN CB CLOSE COM CB TRIP
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 3
AP-LVS
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-FDR-4P-02 +ST-13006-FDR-4P-02 Of 5
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P MCCB OUTGOING
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' FEEDER 8E MODULE FOR SB-2773. Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
A
Terminal/Pin Connection diagram
(=ST+ST-13006-FDR-4P-02) A
X2
1 (/3.2E) N
-Q1:8 -------------------------- TO LOAD
1 (/3.1E) U
-Q1:2 -------------------------- TO LOAD
1 (/3.1E) V
-Q1:4 -------------------------- TO LOAD
B 1 (/3.1E) W B
-Q1:6 -------------------------- TO LOAD
C C
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 4
AP-LVS TERMINAL DIAGRAM
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-FDR-4P-02 +ST-13006-FDR-4P-02 Of 5
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P MCCB OUTGOING
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' FEEDER 8E MODULE FOR SB-2773. Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
A
Terminal/Pin Connection diagram
(=ST+ST-13006-FDR-4P-02) A
X10.1
K31 (/3.6E) 11
-Q1-21:21 -------------------------- COM
K32 (/3.6E) 12
-Q1-21:22 -------------------------- CB OPEN
K33 (/3.6E) 13
-Q1-21:24 -------------------------- CB CLOSE
B K35 (/3.7E) 14 B
-K41:31 -------------------------- COM
K36 (/3.7E) 15
-K41:32 -------------------------- CB TRIP
- 16 SPARE
- 17 SPARE
- 18 SPARE
- 21 SPARE
- 22 SPARE
- 23 SPARE
C - 24 SPARE C
- 25 SPARE
- 26 SPARE
- 27 SPARE
- 28 SPARE
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 5
AP-LVS TERMINAL DIAGRAM
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-FDR-4P-02 +ST-13006-FDR-4P-02 Of 5
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P MCCB OUTGOING
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' FEEDER 8E MODULE FOR SB-2773. Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
A
A
C
CLIENT OCCIDENTAL OF OMAN INC.
C
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 1
AP-LVS COVER SHEET
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-FDR-4P-03 +ST-13006-FDR-4P-03 Of 5
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P MCCB OUTGOING
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' FEEDER 8E/16E MODULE FOR SB-2773. Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
Table of contents
A
A
Page Page Type Page Description ABB Drawing number Ver. Client Drawing number Rev. Date.
1 /5 Title page / cover sheet SCHEMATIC DIAGRAM FOR 4P MCCB OUTGOING FEEDER 8E/16E MODULE FOR SB-2773. ST-13006-FDR-4P-03 A 09.10.13
2 /5 Table of contents SCHEMATIC DIAGRAM FOR 4P MCCB OUTGOING FEEDER 8E/16E MODULE FOR SB-2773. ST-13006-FDR-4P-03 A 09.10.13
3 /5 Schematic multi-line SCHEMATIC DIAGRAM FOR 4P MCCB OUTGOING FEEDER 8E/16E MODULE FOR SB-2773. ST-13006-FDR-4P-03 A 09.10.13
4 /5 Plug diagram SCHEMATIC DIAGRAM FOR 4P MCCB OUTGOING FEEDER 8E/16E MODULE FOR SB-2773. ST-13006-FDR-4P-03 A 09.10.13
B B
5 /5 Plug diagram SCHEMATIC DIAGRAM FOR 4P MCCB OUTGOING FEEDER 8E/16E MODULE FOR SB-2773. ST-13006-FDR-4P-03 A 09.10.13
C C
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 2
AP-LVS INDEX SHEET
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-FDR-4P-03 +ST-13006-FDR-4P-03 Of 5
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P MCCB OUTGOING
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' FEEDER 8E/16E MODULE FOR SB-2773. Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
MAIN BUSBAR
R R
Y Y
A B B
N N A
-X1 L1 L2 L3 N
E70
-NL10 K01
-Q1
-21
B 12 14 22 24 32 34 96 98 11 11 B
95 13
1 3 5 7 -S23 -Q1-21 -K41
12 14 22 24 32 34 -Q1-21 (/3.2B) 12 14 (/3.5D) 12 14
(/3.3B) 96 98 LAMP 14
Q/1 Q/2 Q/3 TEST PB Q/1
4P, MCCB SY/1
OPEN/ 11 OPEN/ 21 OPEN/ 31 96 98 TRIP
PR221DS-LS/I
I> I> I> I> CLOSE CLOSE CLOSE K62 K63
K61
I>> I>> I>> I>> SY/1 K60 K64
TRIP 95
2 4 6 8
-HD 2 3 4
6
11 21 31 95
C C
-X5 11 21 31 95
OPEN/CLOSE OPEN/CLOSE OPEN/CLOSE TRIP
A1
GREEN RED AMBER
-K41
A2
1
D D
21 31
-Q1-21 -K41
(/3.2B) 22 24 (/3.5D) 32 34
E Q/2 E
K31
K32 K33 K35
K36 K37
-X10.1 11 12 13 14 15 16
-X2 U V W N
COM CB OPEN CB CLOSE COM CB TRIP
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 3
AP-LVS
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-FDR-4P-03 +ST-13006-FDR-4P-03 Of 5
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P MCCB OUTGOING
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' FEEDER 8E/16E MODULE FOR SB-2773. Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
A
Terminal/Pin Connection diagram
(=ST+ST-13006-FDR-4P-03) A
X2
1 (/3.2E) N
-Q1:8 -------------------------- TO LOAD
1 (/3.1E) U
-Q1:2 -------------------------- TO LOAD
1 (/3.1E) V
-Q1:4 -------------------------- TO LOAD
B 1 (/3.1E) W B
-Q1:6 -------------------------- TO LOAD
C C
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 4
AP-LVS TERMINAL DIAGRAM
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-FDR-4P-03 +ST-13006-FDR-4P-03 Of 5
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P MCCB OUTGOING
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' FEEDER 8E/16E MODULE FOR SB-2773. Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
A
Terminal/Pin Connection diagram
(=ST+ST-13006-FDR-4P-03) A
X10.1
K31 (/3.6E) 11
-Q1-21:21 -------------------------- COM
K32 (/3.6E) 12
-Q1-21:22 -------------------------- CB OPEN
K33 (/3.6E) 13
-Q1-21:24 -------------------------- CB CLOSE
B K35 (/3.7E) 14 B
-K41:31 -------------------------- COM
K36 (/3.7E) 15
-K41:32 -------------------------- CB TRIP
- 16 SPARE
- 17 SPARE
- 18 SPARE
- 21 SPARE
- 22 SPARE
- 23 SPARE
C - 24 SPARE C
- 25 SPARE
- 26 SPARE
- 27 SPARE
- 28 SPARE
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 5
AP-LVS TERMINAL DIAGRAM
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-FDR-4P-03 +ST-13006-FDR-4P-03 Of 5
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P MCCB OUTGOING
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' FEEDER 8E/16E MODULE FOR SB-2773. Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
A
A
C
CLIENT OCCIDENTAL OF OMAN INC.
C
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 1
AP-LVS COVER SHEET
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-DC-BUS-01 +ST-13006-DC-BUS-01 Of 4
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
FOR 110V DC FOR 415V LV SWITCHGEAR (SB-2773
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' ). Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
Table of contents
A
A
Page Page Type Page Description ABB Drawing number Ver. Client Drawing number Rev. Date.
1 /4 Title page / cover sheet SCHEMATIC DIAGRAM FOR FOR 110V DC FOR 415V LV SWITCHGEAR (SB-2773). ST-13006-DC-BUS-01 A 09.10.13
2 /4 Table of contents SCHEMATIC DIAGRAM FOR FOR 110V DC FOR 415V LV SWITCHGEAR (SB-2773). ST-13006-DC-BUS-01 A 09.10.13
3 /4 Schematic multi-line SCHEMATIC DIAGRAM FOR FOR 110V DC FOR 415V LV SWITCHGEAR (SB-2773). ST-13006-DC-BUS-01 A 09.10.13
4 /4 Terminal diagram SCHEMATIC DIAGRAM FOR FOR 110V DC FOR 415V LV SWITCHGEAR (SB-2773). ST-13006-DC-BUS-01 A 09.10.13
B B
C C
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 2
AP-LVS INDEX SHEET
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-DC-BUS-01 +ST-13006-DC-BUS-01 Of 4
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
FOR 110V DC FOR 415V LV SWITCHGEAR (SB-2773
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' ). Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
(/3.3A)
TO REMOTE(IF REQUIRED)
B K805 B
(HARDWIRED SIGNALS)
X1
A1 B1
-H41
-K501 M 27
(WHITE) X2
J110-
TRIP DELAY A2 B2
(0,0.1-30s)
C C
D D
J110-
J110+
J110+ J110-
J110+ J110-
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 3
AP-LVS
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-DC-BUS-01 +ST-13006-DC-BUS-01 Of 4
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
FOR 110V DC FOR 415V LV SWITCHGEAR (SB-2773
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' ). Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
A
Terminal diagram
(=ST+ST-13006-DC-BUS-01) A
X103.
K801
-Q31:1 -------------------------- 1 (/3.4A) 110V DC CONTROL SUPPLY FROM DB-2775 FEEDER No. 2 FROM EXTERNAL SOURCE
K802
-Q31:3 -------------------------- 2 (/3.5A) 110V DC CONTROL SUPPLY FROM DB-2775 FEEDER No. 2 FROM EXTERNAL SOURCE
K809
-K501:11 -------------------------- 3 (/3.2B) 110V DC CONTROL SUPPLY HEALTHY/FAILURE INPUTS. TO REMOTE(IF REQUIRED)
K810
-K501:12 -------------------------- 4 (/3.2B) 110V DC CONTROL SUPPLY HEALTHY/FAILURE INPUTS. TO REMOTE(IF REQUIRED)
K815
-K501:14 -------------------------- 5 (/3.2B) 110V DC CONTROL SUPPLY HEALTHY/FAILURE INPUTS. TO REMOTE(IF REQUIRED)
K813
-Q31:97 -------------------------- 6 (/3.3B) 110V DC MCB TRIP TO REMOTE
K814
-Q31:98 -------------------------- 7 (/3.3B) 110V DC MCB TRIP TO REMOTE
B B
8 (/3.3B) SPARE
9 (/3.4B) SPARE
10 (/3.4B) SPARE
C C
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 4
AP-LVS TERMINAL DIAGRAM
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-DC-BUS-01 +ST-13006-DC-BUS-01 Of 4
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
FOR 110V DC FOR 415V LV SWITCHGEAR (SB-2773
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' ). Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
A
A
C
CLIENT OCCIDENTAL OF OMAN INC.
C
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 1
AP-LVS COVER SHEET
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-ACH-BUS-01 +ST-13006-ACH-BUS-01 Of 3
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
FOR 240V AC SUPPLY (ACH & PANEL LIGHTING) FO
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' R 415V LV SWITCHGEAR (SB-2773). Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
Table of contents
A
A
Page Page Type Page Description ABB Drawing number Ver. Client Drawing number Rev. Date.
1 /3 Title page / cover sheet SCHEMATIC DIAGRAM FOR FOR 240V AC SUPPLY (ACH & PANEL LIGHTING) FOR 415V LV SWITCHGEAR (SB-2773). ST-13006-ACH-BUS-01 A 09.10.13
2 /3 Table of contents SCHEMATIC DIAGRAM FOR FOR 240V AC SUPPLY (ACH & PANEL LIGHTING) FOR 415V LV SWITCHGEAR (SB-2773). ST-13006-ACH-BUS-01 A 09.10.13
3 /3 Schematic multi-line SCHEMATIC DIAGRAM FOR FOR 240V AC SUPPLY (ACH & PANEL LIGHTING) FOR 415V LV SWITCHGEAR (SB-2773). ST-13006-ACH-BUS-01 A 09.10.13
B B
C C
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 2
AP-LVS INDEX SHEET
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-ACH-BUS-01 +ST-13006-ACH-BUS-01 Of 3
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
FOR 240V AC SUPPLY (ACH & PANEL LIGHTING) FO
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' R 415V LV SWITCHGEAR (SB-2773). Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
EN04AF
240V AC SUPPLY FROM 240V AC SUPPLY FROM
EXTERNAL SOURCE-1 FROM EXTERNAL SOURCE-2 FROM
A DB-2776 DB-2776
FEEDER NO.4 FEEDER NO.5 A
-X100 1 2
-X100 3 4
-Q51 1 3 -Q52 1 3
2P,10A 2P,10A
MCB 2 4 MCB 2 4
L50 L050 L51 L051
A1
-K21
B (/3.4B) A2 B
230V AC
1 7 R3 R5
-K21
(/3.4B) 2 8 R4 R6
-XL L901
-XL L901 L901
-XL
1 1 1
-XL L900
-XL L900
240V AC BUS FOR ACH
L900
-XL
2 2 2
1 1 1
E E
-X50 1 -X50 1
-X49 -X50 1
-X49 -X49
HEATER+THERMOSTAT
HEATER+THERMOSTAT
1 1 1
HEATER+THERMOSTAT
-ACH50 X1 X1 -ACH50 X1
100W
x1 -ACH50 x1
100W
x1
100W
240V AC -H50 240V AC
-H50 240V AC -H50
30-150°C (WHITE) -H49 30-150°C (WHITE) -H49 30-150°C (WHITE) -H49
PANEL X2 8W X2 8W X2 8W
HEATER ON PANEL LIGHT x2 PANEL LIGHT x2 PANEL LIGHT x2
-X49 2 -X49 2 -X49 2
-X50 2 -X50 2
-X50 2
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ST Page 3
AP-LVS
3 Revised as per Comments 27.08.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ST-13006-ACH-BUS-01 +ST-13006-ACH-BUS-01 Of 3
SCHEMATIC DIAGRAM FOR
2 Revised as per Comments 23.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
FOR 240V AC SUPPLY (ACH & PANEL LIGHTING) FO
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' R 415V LV SWITCHGEAR (SB-2773). Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
A
A
C
CLIENT OCCIDENTAL OF OMAN INC.
C
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ML Page 1
AP-LVS COVER SHEET
2 Revised as per Comments 23.05.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ML-13006-4P-ACB-INC1-09 +ML-13006-4P-ACB-INC1-09 Of 6
MATERIAL LIST FOR
1 Revised as per Comments 01.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P ACB TRANSFORMER INCOMER-A
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
Table of contents
A
A
Page Page Type Page Description ABB Drawing number Ver. Client Drawing number Rev. Date.
1 /6 Title page / cover sheet MATERIAL LIST FOR 4P ACB TRANSFORMER INCOMER-A ML-13006-4P-ACB-INC1-09 A 09.10.13
2 /6 Table of contents MATERIAL LIST FOR 4P ACB TRANSFORMER INCOMER-A ML-13006-4P-ACB-INC1-09 A 09.10.13
3 /6 Parts list MATERIAL LIST FOR 4P ACB TRANSFORMER INCOMER-A ML-13006-4P-ACB-INC1-09 A 09.10.13
4 /6 Parts list MATERIAL LIST FOR 4P ACB TRANSFORMER INCOMER-A ML-13006-4P-ACB-INC1-09 A 09.10.13
B B
5 /6 Parts list MATERIAL LIST FOR 4P ACB TRANSFORMER INCOMER-A ML-13006-4P-ACB-INC1-09 A 09.10.13
6 /6 Parts list MATERIAL LIST FOR 4P ACB TRANSFORMER INCOMER-A ML-13006-4P-ACB-INC1-09 A 09.10.13
C C
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ML Page 2
AP-LVS INDEX SHEET
2 Revised as per Comments 23.05.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ML-13006-4P-ACB-INC1-09 +ML-13006-4P-ACB-INC1-09 Of 6
MATERIAL LIST FOR
1 Revised as per Comments 01.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P ACB TRANSFORMER INCOMER-A
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
=ML+ML-13006-4P-ACB-INC1-09/3
Parts List
A
A
DT. Part No. Type/Model No. Technical Specification Manufacturer Qty. Remarks
CF81-83 . 1TDC000054B0003 C10G2 HRC FUSE LINK (CYLINDRICAL) - 2A, 120kA, 10.3x38mm, gG, 500V AC. BUSSMANN 3
CF81-83 . 2CSM200923R1801 E91/32 FUSE HOLDER, 400V AC, 32A (10.3x38mm) ABB 3
CT11-14 . 1TDC000051B9027 CURRENT TRANSFORMER (RECTANGULAR TAPE WRAPPED), CTR:1600/1A, 15VA, CLASS:5P20, (E2, 36kA) HOBUT 4
F51G . REF611HBAADA1NN1XE REF611 PROTECTION RELAY (NON-DIR. OC/NON-DIR. EF), 1A/5A, Ethernet 100Base TX (3*RJ45), IEC61850, 48V-250V DC / 100-240V AC Power Supply ABB 1
F96 . 1SDA050228R0001 SOR TEST UNIT SHUNT OPENING RELEASE TEST UNIT, (E1/6), T7 with manual RESET button. Auxiliary supply 24V...250V AC/DC ABB 1
H11 . 1SFA611400R1002 ML1-100G PILOT HEAD FOR INDICATION LAMP - GREEN ABB 1
H11 . 1SFA611605R1200 MCBH-001 LAMP BLOCK WITH HOLDER FOR MAX. 2W, 230V AC/DC FILAMENT BULB OR LED ABB 1
H12 . 1SFA611605R1200 MCBH-001 LAMP BLOCK WITH HOLDER FOR MAX. 2W, 230V AC/DC FILAMENT BULB OR LED ABB 1
H13 . 1SFA611400R1003 ML1-100Y PILOT HEAD FOR INDICATION LAMP - YELLOW ABB 1
H13 . 1SFA611605R1200 MCBH-001 LAMP BLOCK WITH HOLDER FOR MAX. 2W, 230V AC/DC FILAMENT BULB OR LED ABB 1
D D
H14 . 1SFA611400R1005 ML1-100W PILOT HEAD FOR INDICATION LAMP - WHITE ABB 1
H14 . 1SFA611605R1200 MCBH-001 LAMP BLOCK WITH HOLDER FOR MAX. 2W, 230V AC/DC FILAMENT BULB OR LED ABB 1
H15 . 1SFA611400R1004 ML1-100L PILOT HEAD FOR INDICATION LAMP - BLUE ABB 1
H15 . 1SFA611605R1200 MCBH-001 LAMP BLOCK WITH HOLDER FOR MAX. 2W, 230V AC/DC FILAMENT BULB OR LED ABB 1
E E
HB . 1SFA611400R1004 ML1-100L PILOT HEAD FOR INDICATION LAMP - BLUE ABB 1
HB . 1SFA611605R1100 MCBH-00 HOLDER FOR PBs, LAMPS & SWITCHES FOR 3 BLOCKS ABB 1
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ML Page 3
AP-LVS
2 Revised as per Comments 23.05.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ML-13006-4P-ACB-INC1-09 +ML-13006-4P-ACB-INC1-09 Of 6
MATERIAL LIST FOR
1 Revised as per Comments 01.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P ACB TRANSFORMER INCOMER-A
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
=ML+ML-13006-4P-ACB-INC1-09/4
Parts List
A
A
DT. Part No. Type/Model No. Technical Specification Manufacturer Qty. Remarks
HR . 1SFA611605R1100 MCBH-00 HOLDER FOR PBs, LAMPS & SWITCHES FOR 3 BLOCKS ABB 1
HY . 1SFA611605R1100 MCBH-00 HOLDER FOR PBs, LAMPS & SWITCHES FOR 3 BLOCKS ABB 1
B B
IPR1 . 2RCA021736 REF-630 CONNECTOR SET FOR ONE 6U HOUSING IED INCLUDING ANALOG INPUT VARIANT 4I+5U OR 5I+4U ABB 1
IPR1 . 1KHL400452R0001 WALL-MOUNTING KIT FOR DIRECT REAR WALL MOUNTING (WITH CABLING TO THE FRONT) OF ONE 6U HALF 19" HOUSING IED 1
K49T,K26T,K63T,K80 . 1SBH137001R1331 NF31E-13 4-pole Contactor (AC/DC Operated); 100…250V AC/DC- 50/60Hz, Number of Contacts fitted: 3 NO + 1 NC ABB 4
K51-58,49A,26A . 1SVR405612R8100 CR-M110DC3L PLUG-IN MINIATURE RELAY, LED, 110V DC, 10A, 3 C/O ABB 10
C C
K51-58,49A,26A . 1SVR405651R2000 CR-M3SS STANDARD SOCKET FOR 3 C/O PLUG-INRELAY ABB 10
P10 . 1TDC000053B0032 IQ96 AMMETER, CTR:1600/1A, CLASS:1.5, 90deg SCALE: 0-1600A/1920A, 96x96mm CEWE 1
P11 . 1TDC000053B1003 IQ96 VOLTMETER, VTR:415/√3 / 110/√3 V AC, CLASS:1.5, 90deg SCALE: 0-500V AC, 96x96mm CEWE 1
Q01 . 1SDA059764R0001 E2S W FP 4P ACB WITH DRAWABLE FIXED PART, E2S(W) FP, HR, 4P ABB 1
Q01-2 . 1SDA038300R0001 1SDA038300R0001 SHUNT CLOSING RELEASE 110/120V AC/DC E1/6,POWER AC= 5VA, DC = 5W ABB 1
Q01-4 . 1SDA038290R0001 1SDA038290R0001 SHUNT OPEN.RELEASE 110/120V AC/DC E1/6, POWER AC= 5VA, DC = 5W ABB 1
Q01-21 . 1SDA038326R0001 E1/6 - 4 aux. 4 OPEN/CLOSED AUX.CONTACTS E1/6 PR121/P, E1/6 MS, E1/6 MTP *Included with PR121/P ACB. ABB 1
E E
Q01-23 . 1SDA048827R0001 E1-E6 15 AUX C/O 15 SUPPLEMENTARY AUXILIARY CONTACTS(FOR WITHDRAWABLE VERSION). ABB 1
Q01-31 . 1SDA043467R0001 E1-E2.4P 10 auxiliary contacts. Electrical signalling of circuit-breaker racked-in/test isolated/racked-out S75 ABB 1
Q01-(8C) . 1SDA058278R0001 1SDA058278R0001 Lock in racked-in/test/racked out for 1 circuit-breaker (different keys) ABB 1
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ML Page 4
AP-LVS
2 Revised as per Comments 23.05.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ML-13006-4P-ACB-INC1-09 +ML-13006-4P-ACB-INC1-09 Of 6
MATERIAL LIST FOR
1 Revised as per Comments 01.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P ACB TRANSFORMER INCOMER-A
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
=ML+ML-13006-4P-ACB-INC1-09/5
Parts List
A
A
DT. Part No. Type/Model No. Technical Specification Manufacturer Qty. Remarks
Q01-(DL) . 1SDA069869R0001 MECHANICAL COMPARTMENT DOOR LOCK FOR ACB (DOOR LOCK "IN/TEST' LEFT/RIGHT-E1/6) ABB 1
Q11 . 2CDS274001R0024 S204 M-C 2 MCB - 4P, 2A, Icn=10kA, Icu=15kA @ 400V AC ABB 1
Q11 . 2CDS200922R0001 S2C-S/H6R TRIP/AUXILIARY SELECTABLE CONTACT, 1 C/O (SUITABLE FOR MCB S200, RCCB F200, RCBO DS200) ABB 2
B B
Q12 . 2CDS274001R0024 S204 M-C 2 MCB - 4P, 2A, Icn=10kA, Icu=15kA @ 400V AC ABB 1
Q21-23 . 2CCF009025R0001 S502 UC-K5.3-8 2P, 5.3-8A, Icu up to 30kA, MCBs S500UC Seriies K characteristic. ABB 3
Q21-23 . 2CCF008681R0001 S500-H11 1 NO and 1 NC contact, Auxiliary contact for S500 ABB 3
S10 . 1SCA022533R5840 ONAU31PB AMMETER SELECTOR SWITCH, NORMAL, 25A, (48x48mm) 4 POSITION (L1,L2,L3,0) ABB 1
S11 . 1SCA022533R5500 ONV30PB VOLTMETER SELECTOR SWITCH, NORMAL, 25A,, (48x48mm) 7 POSITIONS (L1-L3,L2-L3,L1-L2,0,L1-N,L2-N,L3-N) ABB 1
S21 . 1SCA022532R8040 ONURR3PB 2 SIDED SPRING RETURN, 3POLE SELECTOR SWITCH (1R-0-2R). 25A, NORMAL(48x48mm) ABB 1
C C
S22 . 1SFA611204R2006 M2SS5-20B SELECTOR SWITCH WITH LONG HANDLE, 2-POS. BLACK ABB 1
S22 . 1SFA611610R1001 MCB-10 1NO AUXILIARY CONTACT BLOCK FOR PBs & SWITCHES (MODULAR) ABB 2
S22 . 1SFA611610R1010 MCB-01 1NC AUXILIARY CONTACT BLOCK FOR PBs & SWITCHES (MODULAR) ABB 2
S22 . 1SFA611605R1100 MCBH-00 HOLDER FOR PBs, LAMPS & SWITCHES FOR 3 BLOCKS ABB 1
S23 . 1SFA611100R2006 MP1-20B MOMENTARY PUSH BUTTON, FLUSH, BLACK (MODULAR) ABB 1
S23 . 1SFA611610R1001 MCB-10 1NO AUXILIARY CONTACT BLOCK FOR PBs & SWITCHES (MODULAR) ABB 1
D D
S23 . 1SFA611605R1100 MCBH-00 HOLDER FOR PBs, LAMPS & SWITCHES FOR 3 BLOCKS ABB 1
S23 . 1SFA611601R1100 MCBH5-00 HOLDER FOR PBs, LAMPS & SWITCHES FOR 5 BLOCKS ABB 1
VT1 . 1TDC000052B0009 1TDC000052B0009 VOLTAGE TRANSFORMER - 415/√3 / 110/√3V-3PH, 15VA, STAR-STAR, CLASS:0.5 ETE 1
X11, 12 . 1SNA195639R2400 M6/8.ST1.V0.IP20 M6/8.ST1.V0.IP20 CONNECTION DEVICE - TERMINAL BLOCK FOR CT ENTRELEC 19
XB1 . 1SNK505210R0000 ZS4-D2 DOUBLE LEVEL TERMINAL BLOCK - 4 Sq.mm, Grey-Colour ABB 5
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ML Page 5
AP-LVS
2 Revised as per Comments 23.05.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ML-13006-4P-ACB-INC1-09 +ML-13006-4P-ACB-INC1-09 Of 6
MATERIAL LIST FOR
1 Revised as per Comments 01.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P ACB TRANSFORMER INCOMER-A
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
=ML+ML-13006-4P-ACB-INC1-09/6
Parts List
A
A
DT. Part No. Type/Model No. Technical Specification Manufacturer Qty. Remarks
XB3 . 1SNK505210R0000 ZS4-D2 DOUBLE LEVEL TERMINAL BLOCK - 4 Sq.mm, Grey-Colour ABB 3
XB4 . 1SNK505210R0000 ZS4-D2 DOUBLE LEVEL TERMINAL BLOCK - 4 Sq.mm, Grey-Colour ABB 2
B B
C C
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ML Page 6
AP-LVS
2 Revised as per Comments 23.05.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ML-13006-4P-ACB-INC1-09 +ML-13006-4P-ACB-INC1-09 Of 6
MATERIAL LIST FOR
1 Revised as per Comments 01.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P ACB TRANSFORMER INCOMER-A
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
A
A
C
CLIENT OCCIDENTAL OF OMAN INC.
C
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ML Page 1
AP-LVS COVER SHEET
2 Revised as per Comments 23.05.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ML-13006-4P-ACB-INC2-09 +ML-13006-4P-ACB-INC2-09 Of 6
MATERIAL LIST FOR
1 Revised as per Comments 01.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P ACB TRANSFORMER INCOMER-B
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
Table of contents
A
A
Page Page Type Page Description ABB Drawing number Ver. Client Drawing number Rev. Date.
1 /6 Title page / cover sheet MATERIAL LIST FOR 4P ACB TRANSFORMER INCOMER-B ML-13006-4P-ACB-INC2-09 A 09.10.13
2 /6 Table of contents MATERIAL LIST FOR 4P ACB TRANSFORMER INCOMER-B ML-13006-4P-ACB-INC2-09 A 09.10.13
3 /6 Parts list MATERIAL LIST FOR 4P ACB TRANSFORMER INCOMER-B ML-13006-4P-ACB-INC2-09 A 09.10.13
4 /6 Parts list MATERIAL LIST FOR 4P ACB TRANSFORMER INCOMER-B ML-13006-4P-ACB-INC2-09 A 09.10.13
B B
5 /6 Parts list MATERIAL LIST FOR 4P ACB TRANSFORMER INCOMER-B ML-13006-4P-ACB-INC2-09 A 09.10.13
6 /6 Parts list MATERIAL LIST FOR 4P ACB TRANSFORMER INCOMER-B ML-13006-4P-ACB-INC2-09 A 09.10.13
C C
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ML Page 2
AP-LVS INDEX SHEET
2 Revised as per Comments 23.05.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ML-13006-4P-ACB-INC2-09 +ML-13006-4P-ACB-INC2-09 Of 6
MATERIAL LIST FOR
1 Revised as per Comments 01.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P ACB TRANSFORMER INCOMER-B
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
=ML+ML-13006-4P-ACB-INC2-09/3
Parts List
A
A
DT. Part No. Type/Model No. Technical Specification Manufacturer Qty. Remarks
CF81-83 . 1TDC000054B0003 C10G2 HRC FUSE LINK (CYLINDRICAL) - 2A, 120kA, 10.3x38mm, gG, 500V AC. BUSSMANN 3
CF81-83 . 2CSM200923R1801 E91/32 FUSE HOLDER, 400V AC, 32A (10.3x38mm) ABB 3
CT11-14 . 1TDC000051B9027 CURRENT TRANSFORMER (RECTANGULAR TAPE WRAPPED), CTR:1600/1A, 15VA, CLASS:5P20, (E2, 36kA) HOBUT 4
F51G . REF611HBAADA1NN1XE REF611 PROTECTION RELAY (NON-DIR. OC/NON-DIR. EF), 1A/5A, Ethernet 100Base TX (3*RJ45), IEC61850, 48V-250V DC / 100-240V AC Power Supply ABB 1
F96 . 1SDA050228R0001 SOR TEST UNIT SHUNT OPENING RELEASE TEST UNIT, (E1/6), T7 with manual RESET button. Auxiliary supply 24V...250V AC/DC ABB 1
H11 . 1SFA611400R1002 ML1-100G PILOT HEAD FOR INDICATION LAMP - GREEN ABB 1
H11 . 1SFA611605R1200 MCBH-001 LAMP BLOCK WITH HOLDER FOR MAX. 2W, 230V AC/DC FILAMENT BULB OR LED ABB 1
H12 . 1SFA611605R1200 MCBH-001 LAMP BLOCK WITH HOLDER FOR MAX. 2W, 230V AC/DC FILAMENT BULB OR LED ABB 1
H13 . 1SFA611400R1003 ML1-100Y PILOT HEAD FOR INDICATION LAMP - YELLOW ABB 1
H13 . 1SFA611605R1200 MCBH-001 LAMP BLOCK WITH HOLDER FOR MAX. 2W, 230V AC/DC FILAMENT BULB OR LED ABB 1
D D
H14 . 1SFA611400R1005 ML1-100W PILOT HEAD FOR INDICATION LAMP - WHITE ABB 1
H14 . 1SFA611605R1200 MCBH-001 LAMP BLOCK WITH HOLDER FOR MAX. 2W, 230V AC/DC FILAMENT BULB OR LED ABB 1
H15 . 1SFA611400R1004 ML1-100L PILOT HEAD FOR INDICATION LAMP - BLUE ABB 1
H15 . 1SFA611605R1200 MCBH-001 LAMP BLOCK WITH HOLDER FOR MAX. 2W, 230V AC/DC FILAMENT BULB OR LED ABB 1
E E
HB . 1SFA611400R1004 ML1-100L PILOT HEAD FOR INDICATION LAMP - BLUE ABB 1
HB . 1SFA611605R1100 MCBH-00 HOLDER FOR PBs, LAMPS & SWITCHES FOR 3 BLOCKS ABB 1
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ML Page 3
AP-LVS
2 Revised as per Comments 23.05.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ML-13006-4P-ACB-INC2-09 +ML-13006-4P-ACB-INC2-09 Of 6
MATERIAL LIST FOR
1 Revised as per Comments 01.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P ACB TRANSFORMER INCOMER-B
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
=ML+ML-13006-4P-ACB-INC2-09/4
Parts List
A
A
DT. Part No. Type/Model No. Technical Specification Manufacturer Qty. Remarks
HR . 1SFA611605R1100 MCBH-00 HOLDER FOR PBs, LAMPS & SWITCHES FOR 3 BLOCKS ABB 1
HY . 1SFA611605R1100 MCBH-00 HOLDER FOR PBs, LAMPS & SWITCHES FOR 3 BLOCKS ABB 1
B B
IPR1 . 2RCA021736 REF-630 CONNECTOR SET FOR ONE 6U HOUSING IED INCLUDING ANALOG INPUT VARIANT 4I+5U OR 5I+4U ABB 1
IPR1 . 1KHL400452R0001 WALL-MOUNTING KIT FOR DIRECT REAR WALL MOUNTING (WITH CABLING TO THE FRONT) OF ONE 6U HALF 19" HOUSING IED 1
K49T,K26T,K63T,K80 . 1SBH137001R1331 NF31E-13 4-pole Contactor (AC/DC Operated); 100…250V AC/DC- 50/60Hz, Number of Contacts fitted: 3 NO + 1 NC ABB 4
K51-58,49A,26A . 1SVR405612R8100 CR-M110DC3L PLUG-IN MINIATURE RELAY, LED, 110V DC, 10A, 3 C/O ABB 10
C C
K51-58,49A,26A . 1SVR405651R2000 CR-M3SS STANDARD SOCKET FOR 3 C/O PLUG-INRELAY ABB 10
P10 . 1TDC000053B0032 IQ96 AMMETER, CTR:1600/1A, CLASS:1.5, 90deg SCALE: 0-1600A/1920A, 96x96mm CEWE 1
P11 . 1TDC000053B1003 IQ96 VOLTMETER, VTR:415/√3 / 110/√3 V AC, CLASS:1.5, 90deg SCALE: 0-500V AC, 96x96mm CEWE 1
Q02 . 1SDA059764R0001 E2S W FP 4P ACB WITH DRAWABLE FIXED PART, E2S(W) FP, HR, 4P ABB 1
Q02-2 . 1SDA038300R0001 1SDA038300R0001 SHUNT CLOSING RELEASE 110/120V AC/DC E1/6,POWER AC= 5VA, DC = 5W ABB 1
Q02-4 . 1SDA038290R0001 1SDA038290R0001 SHUNT OPEN.RELEASE 110/120V AC/DC E1/6, POWER AC= 5VA, DC = 5W ABB 1
Q02-21 . 1SDA038326R0001 E1/6 - 4 aux. 4 OPEN/CLOSED AUX.CONTACTS E1/6 PR121/P, E1/6 MS, E1/6 MTP *Included with PR121/P ACB. ABB 1
E E
Q02-23 . 1SDA048827R0001 E1-E6 15 AUX C/O 15 SUPPLEMENTARY AUXILIARY CONTACTS(FOR WITHDRAWABLE VERSION). ABB 1
Q02-31 . 1SDA043467R0001 E1-E2.4P 10 auxiliary contacts. Electrical signalling of circuit-breaker racked-in/test isolated/racked-out S75 ABB 1
Q02-(8C) . 1SDA058278R0001 1SDA058278R0001 Lock in racked-in/test/racked out for 1 circuit-breaker (different keys) ABB 1
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ML Page 4
AP-LVS
2 Revised as per Comments 23.05.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ML-13006-4P-ACB-INC2-09 +ML-13006-4P-ACB-INC2-09 Of 6
MATERIAL LIST FOR
1 Revised as per Comments 01.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P ACB TRANSFORMER INCOMER-B
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
=ML+ML-13006-4P-ACB-INC2-09/5
Parts List
A
A
DT. Part No. Type/Model No. Technical Specification Manufacturer Qty. Remarks
Q02-(DL) . 1SDA069869R0001 MECHANICAL COMPARTMENT DOOR LOCK FOR ACB (DOOR LOCK "IN/TEST' LEFT/RIGHT-E1/6) ABB 1
Q11 . 2CDS274001R0024 S204 M-C 2 MCB - 4P, 2A, Icn=10kA, Icu=15kA @ 400V AC ABB 1
Q11 . 2CDS200922R0001 S2C-S/H6R TRIP/AUXILIARY SELECTABLE CONTACT, 1 C/O (SUITABLE FOR MCB S200, RCCB F200, RCBO DS200) ABB 2
B B
Q12 . 2CDS274001R0024 S204 M-C 2 MCB - 4P, 2A, Icn=10kA, Icu=15kA @ 400V AC ABB 1
Q21-23 . 2CCF009025R0001 S502 UC-K5.3-8 2P, 5.3-8A, Icu up to 30kA, MCBs S500UC Seriies K characteristic. ABB 3
Q21-23 . 2CCF008681R0001 S500-H11 1 NO and 1 NC contact, Auxiliary contact for S500 ABB 3
S10 . 1SCA022533R5840 ONAU31PB AMMETER SELECTOR SWITCH, NORMAL, 25A, (48x48mm) 4 POSITION (L1,L2,L3,0) ABB 1
S11 . 1SCA022533R5500 ONV30PB VOLTMETER SELECTOR SWITCH, NORMAL, 25A,, (48x48mm) 7 POSITIONS (L1-L3,L2-L3,L1-L2,0,L1-N,L2-N,L3-N) ABB 1
S21 . 1SCA022532R8040 ONURR3PB 2 SIDED SPRING RETURN, 3POLE SELECTOR SWITCH (1R-0-2R). 25A, NORMAL(48x48mm) ABB 1
C C
S22 . 1SFA611204R2006 M2SS5-20B SELECTOR SWITCH WITH LONG HANDLE, 2-POS. BLACK ABB 1
S22 . 1SFA611610R1001 MCB-10 1NO AUXILIARY CONTACT BLOCK FOR PBs & SWITCHES (MODULAR) ABB 2
S22 . 1SFA611610R1010 MCB-01 1NC AUXILIARY CONTACT BLOCK FOR PBs & SWITCHES (MODULAR) ABB 2
S22 . 1SFA611605R1100 MCBH-00 HOLDER FOR PBs, LAMPS & SWITCHES FOR 3 BLOCKS ABB 1
S23 . 1SFA611100R2006 MP1-20B MOMENTARY PUSH BUTTON, FLUSH, BLACK (MODULAR) ABB 1
S23 . 1SFA611610R1001 MCB-10 1NO AUXILIARY CONTACT BLOCK FOR PBs & SWITCHES (MODULAR) ABB 1
D D
S23 . 1SFA611605R1100 MCBH-00 HOLDER FOR PBs, LAMPS & SWITCHES FOR 3 BLOCKS ABB 1
S23 . 1SFA611601R1100 MCBH5-00 HOLDER FOR PBs, LAMPS & SWITCHES FOR 5 BLOCKS ABB 1
VT1 . 1TDC000052B0009 1TDC000052B0009 VOLTAGE TRANSFORMER - 415/√3 / 110/√3V-3PH, 15VA, STAR-STAR, CLASS:0.5 ETE 1
X11, 12 . 1SNA195639R2400 M6/8.ST1.V0.IP20 M6/8.ST1.V0.IP20 CONNECTION DEVICE - TERMINAL BLOCK FOR CT ENTRELEC 19
XB1 . 1SNK505210R0000 ZS4-D2 DOUBLE LEVEL TERMINAL BLOCK - 4 Sq.mm, Grey-Colour ABB 5
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ML Page 5
AP-LVS
2 Revised as per Comments 23.05.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ML-13006-4P-ACB-INC2-09 +ML-13006-4P-ACB-INC2-09 Of 6
MATERIAL LIST FOR
1 Revised as per Comments 01.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P ACB TRANSFORMER INCOMER-B
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
=ML+ML-13006-4P-ACB-INC2-09/6
Parts List
A
A
DT. Part No. Type/Model No. Technical Specification Manufacturer Qty. Remarks
XB3 . 1SNK505210R0000 ZS4-D2 DOUBLE LEVEL TERMINAL BLOCK - 4 Sq.mm, Grey-Colour ABB 3
XB4 . 1SNK505210R0000 ZS4-D2 DOUBLE LEVEL TERMINAL BLOCK - 4 Sq.mm, Grey-Colour ABB 2
B B
C C
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ML Page 6
AP-LVS
2 Revised as per Comments 23.05.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ML-13006-4P-ACB-INC2-09 +ML-13006-4P-ACB-INC2-09 Of 6
MATERIAL LIST FOR
1 Revised as per Comments 01.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P ACB TRANSFORMER INCOMER-B
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
A
A
C
CLIENT OCCIDENTAL OF OMAN INC.
C
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ML Page 1
AP-LVS COVER SHEET
2 Revised as per Comments 23.05.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ML-13006-4P-ACB-BC-09 +ML-13006-4P-ACB-BC-09 Of 5
MATERIAL LIST FOR
1 Revised as per Comments 01.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P ACB BUS SECTION
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
Table of contents
A
A
Page Page Type Page Description ABB Drawing number Ver. Client Drawing number Rev. Date.
1 /5 Title page / cover sheet MATERIAL LIST FOR 4P ACB BUS SECTION ML-13006-4P-ACB-BC-09 A 09.10.13
2 /5 Table of contents MATERIAL LIST FOR 4P ACB BUS SECTION ML-13006-4P-ACB-BC-09 A 09.10.13
3 /5 Parts list MATERIAL LIST FOR 4P ACB BUS SECTION ML-13006-4P-ACB-BC-09 A 09.10.13
4 /5 Parts list MATERIAL LIST FOR 4P ACB BUS SECTION ML-13006-4P-ACB-BC-09 A 09.10.13
B B
5 /5 Parts list MATERIAL LIST FOR 4P ACB BUS SECTION ML-13006-4P-ACB-BC-09 A 09.10.13
C C
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ML Page 2
AP-LVS INDEX SHEET
2 Revised as per Comments 23.05.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ML-13006-4P-ACB-BC-09 +ML-13006-4P-ACB-BC-09 Of 5
MATERIAL LIST FOR
1 Revised as per Comments 01.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P ACB BUS SECTION
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
=ML+ML-13006-4P-ACB-BC-09/3
Parts List
A
A
DT. Part No. Type/Model No. Technical Specification Manufacturer Qty. Remarks
CF81A,B-83A,B . 1TDC000054B0003 C10G2 HRC FUSE LINK (CYLINDRICAL) - 2A, 120kA, 10.3x38mm, gG, 500V AC. BUSSMANN 6
CF81A,B-83A,B . 2CSM200923R1801 E91/32 FUSE HOLDER, 400V AC, 32A (10.3x38mm) ABB 6
CT11-14 . 1TDC000051B9027 CURRENT TRANSFORMER (RECTANGULAR TAPE WRAPPED), CTR:1600/1A, 15VA, CLASS:5P20, (E2, 36kA) HOBUT 4
F5A,B . 1SCA022459R8480 OFM690 BLOWN FUSE INDICATOR, 380-690V, 1NO+1NC AUX. ABB 2
F96 . 1SDA050228R0001 SOR TEST UNIT SHUNT OPENING RELEASE TEST UNIT, (E1/6), T7 with manual RESET button. Auxiliary supply 24V...250V AC/DC ABB 1
B B
H11 . 1SFA611400R1002 ML1-100G PILOT HEAD FOR INDICATION LAMP - GREEN ABB 1
H11 . 1SFA611605R1200 MCBH-001 LAMP BLOCK WITH HOLDER FOR MAX. 2W, 230V AC/DC FILAMENT BULB OR LED ABB 1
H12 . 1SFA611400R1001 ML1-100R PILOT HEAD FOR INDICATION LAMP - RED ABB 1
H14 . 1SFA611400R1005 ML1-100W PILOT HEAD FOR INDICATION LAMP - WHITE ABB 1
H14 . 1SFA611605R1200 MCBH-001 LAMP BLOCK WITH HOLDER FOR MAX. 2W, 230V AC/DC FILAMENT BULB OR LED ABB 1
H15 . 1SFA611400R1004 ML1-100L PILOT HEAD FOR INDICATION LAMP - BLUE ABB 1
IPR1 . 2RCA021735 REF-630 CONNECTOR SET FOR ONE 4U HOUSING IED INCLUDING ANALOG INPUT VARIANT 4I+5U OR 5I+4U ABB 1
IPR1 . 1KHL400449R0001 WALL-MOUNTING KIT (CABLING TO FRONT) FOR ONE 4U HALF 19" HOUSING IED 1
K43,44,K52-57 . 1SVR405612R8100 CR-M110DC3L PLUG-IN MINIATURE RELAY, LED, 110V DC, 10A, 3 C/O ABB 8
Q03 . 1SDA059764R0001 E2S W FP 4P ACB WITH DRAWABLE FIXED PART, E2S(W) FP, HR, 4P ABB 1
Q03-2 . 1SDA038300R0001 1SDA038300R0001 SHUNT CLOSING RELEASE 110/120V AC/DC E1/6,POWER AC= 5VA, DC = 5W ABB 1
Q03-4 . 1SDA038290R0001 1SDA038290R0001 SHUNT OPEN.RELEASE 110/120V AC/DC E1/6, POWER AC= 5VA, DC = 5W ABB 1
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ML Page 3
AP-LVS
2 Revised as per Comments 23.05.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ML-13006-4P-ACB-BC-09 +ML-13006-4P-ACB-BC-09 Of 5
MATERIAL LIST FOR
1 Revised as per Comments 01.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P ACB BUS SECTION
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
=ML+ML-13006-4P-ACB-BC-09/4
Parts List
A
A
DT. Part No. Type/Model No. Technical Specification Manufacturer Qty. Remarks
Q03-21 . 1SDA038326R0001 E1/6 - 4 aux. 4 OPEN/CLOSED AUX.CONTACTS E1/6 PR121/P, E1/6 MS, E1/6 MTP *Included with PR121/P ACB. ABB 1
Q03-23 . 1SDA048827R0001 E1-E6 15 AUX C/O 15 SUPPLEMENTARY AUXILIARY CONTACTS(FOR WITHDRAWABLE VERSION). ABB 1
Q03-31 . 1SDA043467R0001 E1-E2.4P 10 auxiliary contacts. Electrical signalling of circuit-breaker racked-in/test isolated/racked-out S75 ABB 1
Q03-(8C) . 1SDA058278R0001 1SDA058278R0001 Lock in racked-in/test/racked out for 1 circuit-breaker (different keys) ABB 1
B B
Q03-(DL) . 1SDA069869R0001 MECHANICAL COMPARTMENT DOOR LOCK FOR ACB (DOOR LOCK "IN/TEST' LEFT/RIGHT-E1/6) ABB 1
Q11A,B . 2CDS274001R0024 S204 M-C 2 MCB - 4P, 2A, Icn=10kA, Icu=15kA @ 400V AC ABB 2
C C
Q11A,B . 2CDS200922R0001 S2C-S/H6R TRIP/AUXILIARY SELECTABLE CONTACT, 1 C/O (SUITABLE FOR MCB S200, RCCB F200, RCBO DS200) ABB 4
Q21-23 . 2CCF009025R0001 S502 UC-K5.3-8 2P, 5.3-8A, Icu up to 30kA, MCBs S500UC Seriies K characteristic. ABB 3
Q21-23 . 2CCF008681R0001 S500-H11 1 NO and 1 NC contact, Auxiliary contact for S500 ABB 3
S21 . 1SCA022532R8040 ONURR3PB 2 SIDED SPRING RETURN, 3POLE SELECTOR SWITCH (1R-0-2R). 25A, NORMAL(48x48mm) ABB 1
S22 . 1SFA611204R2006 M2SS5-20B SELECTOR SWITCH WITH LONG HANDLE, 2-POS. BLACK ABB 1
S22 . 1SFA611610R1001 MCB-10 1NO AUXILIARY CONTACT BLOCK FOR PBs & SWITCHES (MODULAR) ABB 2
D D
S22 . 1SFA611610R1010 MCB-01 1NC AUXILIARY CONTACT BLOCK FOR PBs & SWITCHES (MODULAR) ABB 2
S22 . 1SFA611605R1100 MCBH-00 HOLDER FOR PBs, LAMPS & SWITCHES FOR 3 BLOCKS ABB 1
S23 . 1SFA611100R2006 MP1-20B MOMENTARY PUSH BUTTON, FLUSH, BLACK (MODULAR) ABB 1
S23 . 1SFA611610R1001 MCB-10 1NO AUXILIARY CONTACT BLOCK FOR PBs & SWITCHES (MODULAR) ABB 1
S23 . 1SFA611605R1100 MCBH-00 HOLDER FOR PBs, LAMPS & SWITCHES FOR 3 BLOCKS ABB 1
S23 . 1SFA611601R1100 MCBH5-00 HOLDER FOR PBs, LAMPS & SWITCHES FOR 5 BLOCKS ABB 1
E E
TTB1 . 1TDC000066B6301 MMLG02 TEST TERMINAL BLOCK ALSTOM 1
VT1A,B . 1TDC000052B0009 1TDC000052B0009 VOLTAGE TRANSFORMER - 415/√3 / 110/√3V-3PH, 15VA, STAR-STAR, CLASS:0.5 ETE 2
X12 . 1SNA195639R2400 M6/8.ST1.V0.IP20 M6/8.ST1.V0.IP20 CONNECTION DEVICE - TERMINAL BLOCK FOR CT ENTRELEC 9
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ML Page 4
AP-LVS
2 Revised as per Comments 23.05.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ML-13006-4P-ACB-BC-09 +ML-13006-4P-ACB-BC-09 Of 5
MATERIAL LIST FOR
1 Revised as per Comments 01.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P ACB BUS SECTION
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
=ML+ML-13006-4P-ACB-BC-09/5
Parts List
A
A
DT. Part No. Type/Model No. Technical Specification Manufacturer Qty. Remarks
XB1,XB2 . 1SNK505210R0000 ZS4-D2 DOUBLE LEVEL TERMINAL BLOCK - 4 Sq.mm, Grey-Colour ABB 6
XB3 . 1SNK505210R0000 ZS4-D2 DOUBLE LEVEL TERMINAL BLOCK - 4 Sq.mm, Grey-Colour ABB 3
XB4 . 1SNK505210R0000 ZS4-D2 DOUBLE LEVEL TERMINAL BLOCK - 4 Sq.mm, Grey-Colour ABB 3
B B
C C
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ML Page 5
AP-LVS
2 Revised as per Comments 23.05.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ML-13006-4P-ACB-BC-09 +ML-13006-4P-ACB-BC-09 Of 5
MATERIAL LIST FOR
1 Revised as per Comments 01.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P ACB BUS SECTION
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
A
A
C
CLIENT OCCIDENTAL OF OMAN INC.
C
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ML Page 1
AP-LVS COVER SHEET
2 Revised as per Comments 23.05.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ML-13006-DOL-3PH-10 +ML-13006-DOL-3PH-10 Of 4
MATERIAL LIST FOR
1 Revised as per Comments 01.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
DOL STARTER 5.5 kW
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' FOR SB-2773 . Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
Table of contents
A
A
Page Page Type Page Description ABB Drawing number Ver. Client Drawing number Rev. Date.
1 /4 Title page / cover sheet MATERIAL LIST FOR DOL STARTER 5.5 kW FOR SB-2773 . ML-13006-DOL-3PH-10 A 09.10.13
2 /4 Table of contents MATERIAL LIST FOR DOL STARTER 5.5 kW FOR SB-2773 . ML-13006-DOL-3PH-10 A 09.10.13
3 /4 Parts list MATERIAL LIST FOR DOL STARTER 5.5 kW FOR SB-2773 . ML-13006-DOL-3PH-10 A 09.10.13
4 /4 Parts list MATERIAL LIST FOR DOL STARTER 5.5 kW FOR SB-2773 . ML-13006-DOL-3PH-10 A 09.10.13
B B
C C
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ML Page 2
AP-LVS INDEX SHEET
2 Revised as per Comments 23.05.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ML-13006-DOL-3PH-10 +ML-13006-DOL-3PH-10 Of 4
MATERIAL LIST FOR
1 Revised as per Comments 01.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
DOL STARTER 5.5 kW
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' FOR SB-2773 . Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
=ML+ML-13006-DOL-3PH-10/3
Parts List
A
A
DT. Part No. Type/Model No. Technical Specification Manufacturer Qty. Remarks
CF10 . 1TDC000054B0004 C10G4 HRC FUSE LINK (CYLINDRICAL) - 4A, 120kA, 10x38mm, gG, 500V AC. BUSSMANN 1
CF10 . 2CSM200923R1801 E91/32 FUSE HOLDER, 400V AC, 32A (10.3x38mm) ABB 1
CF20 . 1TDC000054B0003 C10G2 HRC FUSE LINK (CYLINDRICAL) - 2A, 120kA, 10.3x38mm, gG, 500V AC. BUSSMANN 1
CF20 . 2CSM200923R1801 E91/32 FUSE HOLDER, 400V AC, 32A (10.3x38mm) ABB 1
F2 . 1SAX121001R1105 EF19-18.9, 5.70 - 18.9A ELECTRONIC OVERLOAD RELAY (TRIP CLASS 10,20,30 SELECTABLE) ABB 1
B B
K31,41 . 1SVR405612R3100 CR-M230AC3L PLUG-IN MINIATURE RELAY, LED, 230V/240V AC, 10A, 3 C/O ABB 2
KM1 . 1SBL297001R1300 AF38-30-00 3-pole Contactor (AC/DC Operated); 100....250V; 50/60Hz ABB 1
C C
KM1 . 1SBN010110R1001 CA4-01 Auxiliary Contact Blocks, Front Mounting 1 NC (CONTACTOR AF09...AF96) ABB 2
KM1 . 1SBN010110R1010 CA4-10 Auxiliary Contact Blocks, Front Mounting 1 NO (CONTACTOR AF09...AF96) ABB 1
KM1 . 1SBN010120R1011 CAL4-11 Auxiliary Contacts Blocks Side Mounting Type - 1 NO + 1NC (AF09-AF38) ABB 1
KR21,22 . 1SVR405611R1100 CR-M024DC2L PLUG-IN MINIATURE RELAY, LED, 24V DC, 12A, 2 C/O ABB 2
Q1 . 1SDA067774R0001 XT2 H 70kA , In=12.5, I3=175, XT2 160 MF/MA - Fixed (F) - 3P - Front terminals (F) Thermomagnetic trip unit -MF ABB 1
Q1-21 . 1SDA066433R1 AUX-C 2Q+1SY 250V AC Auxiliary Contacts for XT1-XT2-XT3-XT4 Fixed/Plug-in. Cabled version with 1m long cables ABB 1
Q1-HTC . 1SDA066666R1 HTC XT2 HTC XT2 3P High insulating terminal covers ABB 1
Q1-X5 . 1SNK505210R0000 ZS4-D2 DOUBLE LEVEL TERMINAL BLOCK - 4 Sq.mm, Grey-Colour ABB 5
E E
S1 . 1SFA611100R2002 MP1-20G MOMENTARY PUSH BUTTON, FLUSH, GREEN (MODULAR) ABB 1
S1 . 1SFA611610R1001 MCB-10 1NO AUXILIARY CONTACT BLOCK FOR PBs & SWITCHES (MODULAR) ABB 1
S1 . 1SFA611605R1100 MCBH-00 HOLDER FOR PBs, LAMPS & SWITCHES FOR 3 BLOCKS ABB 1
S01 . 1SFA611610R1010 MCB-01 1NC AUXILIARY CONTACT BLOCK FOR PBs & SWITCHES (MODULAR) ABB 1
S01 . 1SFA611610R1001 MCB-10 1NO AUXILIARY CONTACT BLOCK FOR PBs & SWITCHES (MODULAR) ABB 1
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ML Page 3
AP-LVS
2 Revised as per Comments 23.05.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ML-13006-DOL-3PH-10 +ML-13006-DOL-3PH-10 Of 4
MATERIAL LIST FOR
1 Revised as per Comments 01.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
DOL STARTER 5.5 kW
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' FOR SB-2773 . Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
=ML+ML-13006-DOL-3PH-10/4
Parts List
A
A
DT. Part No. Type/Model No. Technical Specification Manufacturer Qty. Remarks
S2 . 1SFA611610R1010 MCB-01 1NC AUXILIARY CONTACT BLOCK FOR PBs & SWITCHES (MODULAR) ABB 1
S2 . 1SFA611605R1100 MCBH-00 HOLDER FOR PBs, LAMPS & SWITCHES FOR 3 BLOCKS ABB 1
S22 . 1SFA611204R2006 M2SS5-20B SELECTOR SWITCH WITH LONG HANDLE, 2-POS. BLACK ABB 1
S22 . 1SFA611605R1100 MCBH-00 HOLDER FOR PBs, LAMPS & SWITCHES FOR 3 BLOCKS ABB 1
S22 . 1SFA611610R1001 MCB-10 1NO AUXILIARY CONTACT BLOCK FOR PBs & SWITCHES (MODULAR) ABB 2
B B
S22 . 1SFA611610R1010 MCB-01 1NC AUXILIARY CONTACT BLOCK FOR PBs & SWITCHES (MODULAR) ABB 2
S23 . 1SFA611100R2006 MP1-20B MOMENTARY PUSH BUTTON, FLUSH, BLACK (MODULAR) ABB 1
S23 . 1SFA611610R1001 MCB-10 1NO AUXILIARY CONTACT BLOCK FOR PBs & SWITCHES (MODULAR) ABB 1
S23 . 1SFA611605R1100 MCBH-00 HOLDER FOR PBs, LAMPS & SWITCHES FOR 3 BLOCKS ABB 1
X10.1, 2 . GILN100115R0002 16 PIN MNS TYPE SOCKET PART B8E 16P (11-18,21-28) ABB 2
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ML Page 4
AP-LVS
2 Revised as per Comments 23.05.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ML-13006-DOL-3PH-10 +ML-13006-DOL-3PH-10 Of 4
MATERIAL LIST FOR
1 Revised as per Comments 01.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
DOL STARTER 5.5 kW
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' FOR SB-2773 . Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
A
A
C
CLIENT OCCIDENTAL OF OMAN INC.
C
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ML Page 1
AP-LVS COVER SHEET
2 Revised as per Comments 23.05.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ML-13006-DOL-3PH-12 +ML-13006-DOL-3PH-12 Of 4
MATERIAL LIST FOR
1 Revised as per Comments 01.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
DOL STARTER 11.2 kW
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' FOR SB-2773 . Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
Table of contents
A
A
Page Page Type Page Description ABB Drawing number Ver. Client Drawing number Rev. Date.
1 /4 Title page / cover sheet MATERIAL LIST FOR DOL STARTER 11.2 kW FOR SB-2773 . ML-13006-DOL-3PH-12 A 09.10.13
2 /4 Table of contents MATERIAL LIST FOR DOL STARTER 11.2 kW FOR SB-2773 . ML-13006-DOL-3PH-12 A 09.10.13
3 /4 Parts list MATERIAL LIST FOR DOL STARTER 11.2 kW FOR SB-2773 . ML-13006-DOL-3PH-12 A 09.10.13
4 /4 Parts list MATERIAL LIST FOR DOL STARTER 11.2 kW FOR SB-2773 . ML-13006-DOL-3PH-12 A 09.10.13
B B
C C
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ML Page 2
AP-LVS INDEX SHEET
2 Revised as per Comments 23.05.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ML-13006-DOL-3PH-12 +ML-13006-DOL-3PH-12 Of 4
MATERIAL LIST FOR
1 Revised as per Comments 01.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
DOL STARTER 11.2 kW
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' FOR SB-2773 . Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
=ML+ML-13006-DOL-3PH-12/3
Parts List
A
A
DT. Part No. Type/Model No. Technical Specification Manufacturer Qty. Remarks
CF10 . 1TDC000054B0004 C10G4 HRC FUSE LINK (CYLINDRICAL) - 4A, 120kA, 10x38mm, gG, 500V AC. BUSSMANN 1
CF10 . 2CSM200923R1801 E91/32 FUSE HOLDER, 400V AC, 32A (10.3x38mm) ABB 1
CF20 . 1TDC000054B0003 C10G2 HRC FUSE LINK (CYLINDRICAL) - 2A, 120kA, 10.3x38mm, gG, 500V AC. BUSSMANN 1
CF20 . 2CSM200923R1801 E91/32 FUSE HOLDER, 400V AC, 32A (10.3x38mm) ABB 1
F2 . 1SAX211001R1102 E45DU 45, 15 - 45A ELECTRONIC OVERLOAD RELAY (TRIP CLASS 10,20,30 SELECTABLE) ABB 1
B B
K31,41 . 1SVR405612R3100 CR-M230AC3L PLUG-IN MINIATURE RELAY, LED, 230V/240V AC, 10A, 3 C/O ABB 2
KM1 . 1SBL357001R7000 AF 50-30-00 3-POLE, CONTACTOR AF50-30-00, 100-250V AC/DC, 50-60 Hz ABB 1
C C
KM1 . 1SBN010010R1001 CA5-01 Auxiliary Contact Blocks, Front Mounting 1 NC (CONTACTOR A9...A110) OR (AF45...AF110) ABB 2
KM1 . 1SBN010010R1010 CA5-10 Auxiliary Contact Blocks, Front Mounting 1 NO (CONTACTOR A9...A110) OR (AF45...AF110) ABB 1
KM1 . 1SBN010020R1011 CAL5-11 Auxiliary Contacts Blocks Side Mounting Type - 1 NO + 1NC (A9-A75) ABB 1
Q1 . 1SDA067776R0001 XT2 H 70kA , In=32, I3=192…448 , XT2 160 MF/MA - Fixed (F) - 3P - Front terminals (F) Thermomagnetic trip unit -MA ABB 1
Q1-21 . 1SDA066433R1 AUX-C 2Q+1SY 250V AC Auxiliary Contacts for XT1-XT2-XT3-XT4 Fixed/Plug-in. Cabled version with 1m long cables ABB 1
D D
Q1-HTC . 1SDA066666R1 HTC XT2 HTC XT2 3P High insulating terminal covers ABB 1
Q1-X5 . 1SNK505210R0000 ZS4-D2 DOUBLE LEVEL TERMINAL BLOCK - 4 Sq.mm, Grey-Colour ABB 5
S1 . 1SFA611610R1001 MCB-10 1NO AUXILIARY CONTACT BLOCK FOR PBs & SWITCHES (MODULAR) ABB 1
S1 . 1SFA611605R1100 MCBH-00 HOLDER FOR PBs, LAMPS & SWITCHES FOR 3 BLOCKS ABB 1
E E
S01 . 1SFA611610R1010 MCB-01 1NC AUXILIARY CONTACT BLOCK FOR PBs & SWITCHES (MODULAR) ABB 1
S01 . 1SFA611610R1001 MCB-10 1NO AUXILIARY CONTACT BLOCK FOR PBs & SWITCHES (MODULAR) ABB 1
S2 . 1SFA611610R1010 MCB-01 1NC AUXILIARY CONTACT BLOCK FOR PBs & SWITCHES (MODULAR) ABB 1
S2 . 1SFA611605R1100 MCBH-00 HOLDER FOR PBs, LAMPS & SWITCHES FOR 3 BLOCKS ABB 1
S22 . 1SFA611204R2006 M2SS5-20B SELECTOR SWITCH WITH LONG HANDLE, 2-POS. BLACK ABB 1
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ML Page 3
AP-LVS
2 Revised as per Comments 23.05.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ML-13006-DOL-3PH-12 +ML-13006-DOL-3PH-12 Of 4
MATERIAL LIST FOR
1 Revised as per Comments 01.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
DOL STARTER 11.2 kW
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' FOR SB-2773 . Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
=ML+ML-13006-DOL-3PH-12/4
Parts List
A
A
DT. Part No. Type/Model No. Technical Specification Manufacturer Qty. Remarks
S22 . 1SFA611605R1100 MCBH-00 HOLDER FOR PBs, LAMPS & SWITCHES FOR 3 BLOCKS ABB 1
S22 . 1SFA611610R1001 MCB-10 1NO AUXILIARY CONTACT BLOCK FOR PBs & SWITCHES (MODULAR) ABB 2
S22 . 1SFA611610R1010 MCB-01 1NC AUXILIARY CONTACT BLOCK FOR PBs & SWITCHES (MODULAR) ABB 2
S23 . 1SFA611100R2006 MP1-20B MOMENTARY PUSH BUTTON, FLUSH, BLACK (MODULAR) ABB 1
S23 . 1SFA611610R1001 MCB-10 1NO AUXILIARY CONTACT BLOCK FOR PBs & SWITCHES (MODULAR) ABB 1
B B
S23 . 1SFA611605R1100 MCBH-00 HOLDER FOR PBs, LAMPS & SWITCHES FOR 3 BLOCKS ABB 1
X10.1, 2 . GILN100115R0002 16 PIN MNS TYPE SOCKET PART B8E 16P (11-18,21-28) ABB 2
C C
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ML Page 4
AP-LVS
2 Revised as per Comments 23.05.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ML-13006-DOL-3PH-12 +ML-13006-DOL-3PH-12 Of 4
MATERIAL LIST FOR
1 Revised as per Comments 01.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
DOL STARTER 11.2 kW
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' FOR SB-2773 . Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
A
A
C
CLIENT OCCIDENTAL OF OMAN INC.
C
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ML Page 1
AP-LVS COVER SHEET
2 Revised as per Comments 23.05.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ML-13006-DOL-3PH-13 +ML-13006-DOL-3PH-13 Of 4
MATERIAL LIST FOR
1 Revised as per Comments 01.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
DOL STARTER 15 kW
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' FOR SB-2773 . Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
Table of contents
A
A
Page Page Type Page Description ABB Drawing number Ver. Client Drawing number Rev. Date.
1 /4 Title page / cover sheet MATERIAL LIST FOR DOL STARTER 15 kW FOR SB-2773 . ML-13006-DOL-3PH-13 A 09.10.13
2 /4 Table of contents MATERIAL LIST FOR DOL STARTER 15 kW FOR SB-2773 . ML-13006-DOL-3PH-13 A 09.10.13
3 /4 Parts list MATERIAL LIST FOR DOL STARTER 15 kW FOR SB-2773 . ML-13006-DOL-3PH-13 A 09.10.13
4 /4 Parts list MATERIAL LIST FOR DOL STARTER 15 kW FOR SB-2773 . ML-13006-DOL-3PH-13 A 09.10.13
B B
C C
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ML Page 2
AP-LVS INDEX SHEET
2 Revised as per Comments 23.05.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ML-13006-DOL-3PH-13 +ML-13006-DOL-3PH-13 Of 4
MATERIAL LIST FOR
1 Revised as per Comments 01.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
DOL STARTER 15 kW
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' FOR SB-2773 . Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
=ML+ML-13006-DOL-3PH-13/3
Parts List
A
A
DT. Part No. Type/Model No. Technical Specification Manufacturer Qty. Remarks
CF10 . 1TDC000054B0004 C10G4 HRC FUSE LINK (CYLINDRICAL) - 4A, 120kA, 10x38mm, gG, 500V AC. BUSSMANN 1
CF10 . 2CSM200923R1801 E91/32 FUSE HOLDER, 400V AC, 32A (10.3x38mm) ABB 1
CF20 . 1TDC000054B0003 C10G2 HRC FUSE LINK (CYLINDRICAL) - 2A, 120kA, 10.3x38mm, gG, 500V AC. BUSSMANN 1
CF20 . 2CSM200923R1801 E91/32 FUSE HOLDER, 400V AC, 32A (10.3x38mm) ABB 1
F2 . 1SAX211001R1102 E45DU 45, 15 - 45A ELECTRONIC OVERLOAD RELAY (TRIP CLASS 10,20,30 SELECTABLE) ABB 1
B B
K31,41 . 1SVR405612R3100 CR-M230AC3L PLUG-IN MINIATURE RELAY, LED, 230V/240V AC, 10A, 3 C/O ABB 2
KM1 . 1SBL357001R7000 AF 50-30-00 3-POLE, CONTACTOR AF50-30-00, 100-250V AC/DC, 50-60 Hz ABB 1
C C
KM1 . 1SBN010010R1001 CA5-01 Auxiliary Contact Blocks, Front Mounting 1 NC (CONTACTOR A9...A110) OR (AF45...AF110) ABB 2
KM1 . 1SBN010010R1010 CA5-10 Auxiliary Contact Blocks, Front Mounting 1 NO (CONTACTOR A9...A110) OR (AF45...AF110) ABB 1
KM1 . 1SBN010020R1011 CAL5-11 Auxiliary Contacts Blocks Side Mounting Type - 1 NO + 1NC (A9-A75) ABB 1
Q1 . 1SDA067776R0001 XT2 H 70kA , In=32, I3=192…448 , XT2 160 MF/MA - Fixed (F) - 3P - Front terminals (F) Thermomagnetic trip unit -MA ABB 1
Q1-21 . 1SDA066433R1 AUX-C 2Q+1SY 250V AC Auxiliary Contacts for XT1-XT2-XT3-XT4 Fixed/Plug-in. Cabled version with 1m long cables ABB 1
D D
Q1-HTC . 1SDA066666R1 HTC XT2 HTC XT2 3P High insulating terminal covers ABB 1
Q1-X5 . 1SNK505210R0000 ZS4-D2 DOUBLE LEVEL TERMINAL BLOCK - 4 Sq.mm, Grey-Colour ABB 5
S1 . 1SFA611610R1001 MCB-10 1NO AUXILIARY CONTACT BLOCK FOR PBs & SWITCHES (MODULAR) ABB 1
S1 . 1SFA611605R1100 MCBH-00 HOLDER FOR PBs, LAMPS & SWITCHES FOR 3 BLOCKS ABB 1
E E
S01 . 1SFA611610R1010 MCB-01 1NC AUXILIARY CONTACT BLOCK FOR PBs & SWITCHES (MODULAR) ABB 1
S01 . 1SFA611610R1001 MCB-10 1NO AUXILIARY CONTACT BLOCK FOR PBs & SWITCHES (MODULAR) ABB 1
S2 . 1SFA611610R1010 MCB-01 1NC AUXILIARY CONTACT BLOCK FOR PBs & SWITCHES (MODULAR) ABB 1
S2 . 1SFA611605R1100 MCBH-00 HOLDER FOR PBs, LAMPS & SWITCHES FOR 3 BLOCKS ABB 1
S22 . 1SFA611204R2006 M2SS5-20B SELECTOR SWITCH WITH LONG HANDLE, 2-POS. BLACK ABB 1
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ML Page 3
AP-LVS
2 Revised as per Comments 23.05.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ML-13006-DOL-3PH-13 +ML-13006-DOL-3PH-13 Of 4
MATERIAL LIST FOR
1 Revised as per Comments 01.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
DOL STARTER 15 kW
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' FOR SB-2773 . Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
=ML+ML-13006-DOL-3PH-13/4
Parts List
A
A
DT. Part No. Type/Model No. Technical Specification Manufacturer Qty. Remarks
S22 . 1SFA611605R1100 MCBH-00 HOLDER FOR PBs, LAMPS & SWITCHES FOR 3 BLOCKS ABB 1
S22 . 1SFA611610R1001 MCB-10 1NO AUXILIARY CONTACT BLOCK FOR PBs & SWITCHES (MODULAR) ABB 2
S22 . 1SFA611610R1010 MCB-01 1NC AUXILIARY CONTACT BLOCK FOR PBs & SWITCHES (MODULAR) ABB 2
S23 . 1SFA611100R2006 MP1-20B MOMENTARY PUSH BUTTON, FLUSH, BLACK (MODULAR) ABB 1
S23 . 1SFA611610R1001 MCB-10 1NO AUXILIARY CONTACT BLOCK FOR PBs & SWITCHES (MODULAR) ABB 1
B B
S23 . 1SFA611605R1100 MCBH-00 HOLDER FOR PBs, LAMPS & SWITCHES FOR 3 BLOCKS ABB 1
X10.1, 2 . GILN100115R0002 16 PIN MNS TYPE SOCKET PART B8E 16P (11-18,21-28) ABB 2
C C
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ML Page 4
AP-LVS
2 Revised as per Comments 23.05.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ML-13006-DOL-3PH-13 +ML-13006-DOL-3PH-13 Of 4
MATERIAL LIST FOR
1 Revised as per Comments 01.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
DOL STARTER 15 kW
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' FOR SB-2773 . Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
A
A
C
CLIENT OCCIDENTAL OF OMAN INC.
C
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ML Page 1
AP-LVS COVER SHEET
2 Revised as per Comments 23.05.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ML-13006-FDR-2P-10 +ML-13006-FDR-2P-10 Of 3
MATERIAL LIST FOR
1 Revised as per Comments 01.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
2P MCCB OUTGOING FEEDER
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' 63A FOR SB-2773. Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
Table of contents
A
A
Page Page Type Page Description ABB Drawing number Ver. Client Drawing number Rev. Date.
1 /3 Title page / cover sheet MATERIAL LIST FOR 2P MCCB OUTGOING FEEDER 63A FOR SB-2773. ML-13006-FDR-2P-10 A 09.10.13
2 /3 Table of contents MATERIAL LIST FOR 2P MCCB OUTGOING FEEDER 63A FOR SB-2773. ML-13006-FDR-2P-10 A 09.10.13
3 /3 Parts list MATERIAL LIST FOR 2P MCCB OUTGOING FEEDER 63A FOR SB-2773. ML-13006-FDR-2P-10 A 09.10.13
B B
C C
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ML Page 2
AP-LVS INDEX SHEET
2 Revised as per Comments 23.05.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ML-13006-FDR-2P-10 +ML-13006-FDR-2P-10 Of 3
MATERIAL LIST FOR
1 Revised as per Comments 01.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
2P MCCB OUTGOING FEEDER
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' 63A FOR SB-2773. Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
=ML+ML-13006-FDR-2P-10/3
Parts List
A
A
DT. Part No. Type/Model No. Technical Specification Manufacturer Qty. Remarks
CF10 . 1TDC000054B0004 C10G4 HRC FUSE LINK (CYLINDRICAL) - 4A, 120kA, 10x38mm, gG, 500V AC. BUSSMANN 1
CF10 . 2CSM200923R1801 E91/32 FUSE HOLDER, 400V AC, 32A (10.3x38mm) ABB 1
HD . 1TDC000060B1060 HD22/48. ML31, 230/240V AC MULTILED INDICATOR 48x48,L1-GREEN-OPEN,L2-RED-CLOSE,L3-AMBER-TRIP, With LT provision DOMO 1
K41 . 1SVR405612R3100 CR-M230AC3L PLUG-IN MINIATURE RELAY, LED, 230V/240V AC, 10A, 3 C/O ABB 1
Q1 . 1SDA053440R0001 T2H160 F F, R63 MCCB, TMD, 63A, 3P, 70KA (50°C) ABB 1
Q1-21 . 1SDA051371R0001 AUX-C 3Q 1SY 250V AC/DC Auxiliary Contacts for T1-T2-T3. Cabled version with 1m long cables ABB 1
Q1-X5 . 1SNK505210R0000 ZS4-D2 DOUBLE LEVEL TERMINAL BLOCK - 4 Sq.mm, Grey-Colour ABB 6
C C
S23 . 1SFA611100R2006 MP1-20B MOMENTARY PUSH BUTTON, FLUSH, BLACK (MODULAR) ABB 1
S23 . 1SFA611610R1001 MCB-10 1NO AUXILIARY CONTACT BLOCK FOR PBs & SWITCHES (MODULAR) ABB 1
S23 . 1SFA611605R1100 MCBH-00 HOLDER FOR PBs, LAMPS & SWITCHES FOR 3 BLOCKS ABB 1
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ML Page 3
AP-LVS
2 Revised as per Comments 23.05.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ML-13006-FDR-2P-10 +ML-13006-FDR-2P-10 Of 3
MATERIAL LIST FOR
1 Revised as per Comments 01.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
2P MCCB OUTGOING FEEDER
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' 63A FOR SB-2773. Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
A
A
C
CLIENT OCCIDENTAL OF OMAN INC.
C
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ML Page 1
AP-LVS COVER SHEET
2 Revised as per Comments 23.05.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ML-13006-FDR-4P-10 +ML-13006-FDR-4P-10 Of 3
MATERIAL LIST FOR
1 Revised as per Comments 01.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P MCCB OUTGOING FEEDER
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' 63A FOR SB-2773. Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
Table of contents
A
A
Page Page Type Page Description ABB Drawing number Ver. Client Drawing number Rev. Date.
1 /3 Title page / cover sheet MATERIAL LIST FOR 4P MCCB OUTGOING FEEDER 63A FOR SB-2773. ML-13006-FDR-4P-10 A 09.10.13
2 /3 Table of contents MATERIAL LIST FOR 4P MCCB OUTGOING FEEDER 63A FOR SB-2773. ML-13006-FDR-4P-10 A 09.10.13
3 /3 Parts list MATERIAL LIST FOR 4P MCCB OUTGOING FEEDER 63A FOR SB-2773. ML-13006-FDR-4P-10 A 09.10.13
B B
C C
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ML Page 2
AP-LVS INDEX SHEET
2 Revised as per Comments 23.05.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ML-13006-FDR-4P-10 +ML-13006-FDR-4P-10 Of 3
MATERIAL LIST FOR
1 Revised as per Comments 01.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P MCCB OUTGOING FEEDER
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' 63A FOR SB-2773. Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
=ML+ML-13006-FDR-4P-10/3
Parts List
A
A
DT. Part No. Type/Model No. Technical Specification Manufacturer Qty. Remarks
CF10 . 1TDC000054B0004 C10G4 HRC FUSE LINK (CYLINDRICAL) - 4A, 120kA, 10x38mm, gG, 500V AC. BUSSMANN 1
CF10 . 2CSM200923R1801 E91/32 FUSE HOLDER, 400V AC, 32A (10.3x38mm) ABB 1
HD . 1TDC000060B1060 HD22/48. ML31, 230/240V AC MULTILED INDICATOR 48x48,L1-GREEN-OPEN,L2-RED-CLOSE,L3-AMBER-TRIP, With LT provision DOMO 1
K41 . 1SVR405612R3100 CR-M230AC3L PLUG-IN MINIATURE RELAY, LED, 230V/240V AC, 10A, 3 C/O ABB 1
Q1 . 1SDA053451R0001 T2H160, R63, 4P MCCB, TMD, 4P, 63A, 70kA (50°C), N=100% ABB 1
Q1-21 . 1SDA051371R0001 AUX-C 3Q 1SY 250V AC/DC Auxiliary Contacts for T1-T2-T3. Cabled version with 1m long cables ABB 1
Q1-X5 . 1SNK505210R0000 ZS4-D2 DOUBLE LEVEL TERMINAL BLOCK - 4 Sq.mm, Grey-Colour ABB 6
C C
S23 . 1SFA611100R2006 MP1-20B MOMENTARY PUSH BUTTON, FLUSH, BLACK (MODULAR) ABB 1
S23 . 1SFA611610R1001 MCB-10 1NO AUXILIARY CONTACT BLOCK FOR PBs & SWITCHES (MODULAR) ABB 1
S23 . 1SFA611605R1100 MCBH-00 HOLDER FOR PBs, LAMPS & SWITCHES FOR 3 BLOCKS ABB 1
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ML Page 3
AP-LVS
2 Revised as per Comments 23.05.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ML-13006-FDR-4P-10 +ML-13006-FDR-4P-10 Of 3
MATERIAL LIST FOR
1 Revised as per Comments 01.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P MCCB OUTGOING FEEDER
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' 63A FOR SB-2773. Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
A
A
C
CLIENT OCCIDENTAL OF OMAN INC.
C
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ML Page 1
AP-LVS COVER SHEET
2 Revised as per Comments 23.05.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ML-13006-FDR-4P-12 +ML-13006-FDR-4P-12 Of 3
MATERIAL LIST FOR
1 Revised as per Comments 01.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P MCCB OUTGOING FEEDER
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' 100A FOR SB-2773. Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
Table of contents
A
A
Page Page Type Page Description ABB Drawing number Ver. Client Drawing number Rev. Date.
1 /3 Title page / cover sheet MATERIAL LIST FOR 4P MCCB OUTGOING FEEDER 100A FOR SB-2773. ML-13006-FDR-4P-12 A 09.10.13
2 /3 Table of contents MATERIAL LIST FOR 4P MCCB OUTGOING FEEDER 100A FOR SB-2773. ML-13006-FDR-4P-12 A 09.10.13
3 /3 Parts list MATERIAL LIST FOR 4P MCCB OUTGOING FEEDER 100A FOR SB-2773. ML-13006-FDR-4P-12 A 09.10.13
B B
C C
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ML Page 2
AP-LVS INDEX SHEET
2 Revised as per Comments 23.05.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ML-13006-FDR-4P-12 +ML-13006-FDR-4P-12 Of 3
MATERIAL LIST FOR
1 Revised as per Comments 01.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P MCCB OUTGOING FEEDER
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' 100A FOR SB-2773. Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
=ML+ML-13006-FDR-4P-12/3
Parts List
A
A
DT. Part No. Type/Model No. Technical Specification Manufacturer Qty. Remarks
CF10 . 1TDC000054B0004 C10G4 HRC FUSE LINK (CYLINDRICAL) - 4A, 120kA, 10x38mm, gG, 500V AC. BUSSMANN 1
CF10 . 2CSM200923R1801 E91/32 FUSE HOLDER, 400V AC, 32A (10.3x38mm) ABB 1
HD . 1TDC000060B1060 HD22/48. ML31, 230/240V AC MULTILED INDICATOR 48x48,L1-GREEN-OPEN,L2-RED-CLOSE,L3-AMBER-TRIP, With LT provision DOMO 1
K41 . 1SVR405612R3100 CR-M230AC3L PLUG-IN MINIATURE RELAY, LED, 230V/240V AC, 10A, 3 C/O ABB 1
Q1 . 1SDA053453R0001 T2H160, R100, 4P MCCB, TMD, 4P, 100A, 70kA (50°C), N=100% ABB 1
Q1-21 . 1SDA051371R0001 AUX-C 3Q 1SY 250V AC/DC Auxiliary Contacts for T1-T2-T3. Cabled version with 1m long cables ABB 1
Q1-RHE_B . 1SDA051385R0001 RHE_B RHE_B JUST BASE FOR RHE T1-T2-T3 ABB 1
C C
Q1-X5 . 1SNK505210R0000 ZS4-D2 DOUBLE LEVEL TERMINAL BLOCK - 4 Sq.mm, Grey-Colour ABB 6
S23 . 1SFA611100R2006 MP1-20B MOMENTARY PUSH BUTTON, FLUSH, BLACK (MODULAR) ABB 1
S23 . 1SFA611610R1001 MCB-10 1NO AUXILIARY CONTACT BLOCK FOR PBs & SWITCHES (MODULAR) ABB 1
S23 . 1SFA611605R1100 MCBH-00 HOLDER FOR PBs, LAMPS & SWITCHES FOR 3 BLOCKS ABB 1
X10.1 . GILN100115R0002 16 PIN MNS TYPE SOCKET PART B8E 16P (11-18,21-28) ABB 1
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ML Page 3
AP-LVS
2 Revised as per Comments 23.05.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ML-13006-FDR-4P-12 +ML-13006-FDR-4P-12 Of 3
MATERIAL LIST FOR
1 Revised as per Comments 01.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P MCCB OUTGOING FEEDER
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' 100A FOR SB-2773. Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
A
A
C
CLIENT OCCIDENTAL OF OMAN INC.
C
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ML Page 1
AP-LVS COVER SHEET
2 Revised as per Comments 23.05.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ML-13006-FDR-4P-13 +ML-13006-FDR-4P-13 Of 3
MATERIAL LIST FOR
1 Revised as per Comments 01.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P MCCB OUTGOING FEEDER
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' 125A FOR SB-2773. Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
Table of contents
A
A
Page Page Type Page Description ABB Drawing number Ver. Client Drawing number Rev. Date.
1 /3 Title page / cover sheet MATERIAL LIST FOR 4P MCCB OUTGOING FEEDER 125A FOR SB-2773. ML-13006-FDR-4P-13 A 09.10.13
2 /3 Table of contents MATERIAL LIST FOR 4P MCCB OUTGOING FEEDER 125A FOR SB-2773. ML-13006-FDR-4P-13 A 09.10.13
3 /3 Parts list MATERIAL LIST FOR 4P MCCB OUTGOING FEEDER 125A FOR SB-2773. ML-13006-FDR-4P-13 A 09.10.13
B B
C C
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ML Page 2
AP-LVS INDEX SHEET
2 Revised as per Comments 23.05.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ML-13006-FDR-4P-13 +ML-13006-FDR-4P-13 Of 3
MATERIAL LIST FOR
1 Revised as per Comments 01.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P MCCB OUTGOING FEEDER
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' 125A FOR SB-2773. Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
=ML+ML-13006-FDR-4P-13/3
Parts List
A
A
DT. Part No. Type/Model No. Technical Specification Manufacturer Qty. Remarks
CF10 . 1TDC000054B0004 C10G4 HRC FUSE LINK (CYLINDRICAL) - 4A, 120kA, 10x38mm, gG, 500V AC. BUSSMANN 1
CF10 . 2CSM200923R1801 E91/32 FUSE HOLDER, 400V AC, 32A (10.3x38mm) ABB 1
HD . 1TDC000060B1060 HD22/48. ML31, 230/240V AC MULTILED INDICATOR 48x48,L1-GREEN-OPEN,L2-RED-CLOSE,L3-AMBER-TRIP, With LT provision DOMO 1
K41 . 1SVR405612R3100 CR-M230AC3L PLUG-IN MINIATURE RELAY, LED, 230V/240V AC, 10A, 3 C/O ABB 1
Q1 . 1SDA053454R0001 T2H160, R125, 4P MCCB, TMD, 4P, 125A, 70kA (50°C), N=50% ABB 1
Q1-21 . 1SDA051371R0001 AUX-C 3Q 1SY 250V AC/DC Auxiliary Contacts for T1-T2-T3. Cabled version with 1m long cables ABB 1
Q1-RHE_B . 1SDA051385R0001 RHE_B RHE_B JUST BASE FOR RHE T1-T2-T3 ABB 1
C C
Q1-X5 . 1SNK505210R0000 ZS4-D2 DOUBLE LEVEL TERMINAL BLOCK - 4 Sq.mm, Grey-Colour ABB 6
S23 . 1SFA611100R2006 MP1-20B MOMENTARY PUSH BUTTON, FLUSH, BLACK (MODULAR) ABB 1
S23 . 1SFA611610R1001 MCB-10 1NO AUXILIARY CONTACT BLOCK FOR PBs & SWITCHES (MODULAR) ABB 1
S23 . 1SFA611605R1100 MCBH-00 HOLDER FOR PBs, LAMPS & SWITCHES FOR 3 BLOCKS ABB 1
X10.1 . GILN100115R0002 16 PIN MNS TYPE SOCKET PART B8E 16P (11-18,21-28) ABB 1
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ML Page 3
AP-LVS
2 Revised as per Comments 23.05.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ML-13006-FDR-4P-13 +ML-13006-FDR-4P-13 Of 3
MATERIAL LIST FOR
1 Revised as per Comments 01.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P MCCB OUTGOING FEEDER
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' 125A FOR SB-2773. Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
A
A
C
CLIENT OCCIDENTAL OF OMAN INC.
C
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ML Page 1
AP-LVS COVER SHEET
2 Revised as per Comments 23.05.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ML-13006-FDR-4P-17 +ML-13006-FDR-4P-17 Of 3
MATERIAL LIST FOR
1 Revised as per Comments 01.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P MCCB OUTGOING FEEDER
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' 250A FOR SB-2773. Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
Table of contents
A
A
Page Page Type Page Description ABB Drawing number Ver. Client Drawing number Rev. Date.
1 /3 Title page / cover sheet MATERIAL LIST FOR 4P MCCB OUTGOING FEEDER 250A FOR SB-2773. ML-13006-FDR-4P-17 A 09.10.13
2 /3 Table of contents MATERIAL LIST FOR 4P MCCB OUTGOING FEEDER 250A FOR SB-2773. ML-13006-FDR-4P-17 A 09.10.13
3 /3 Parts list MATERIAL LIST FOR 4P MCCB OUTGOING FEEDER 250A FOR SB-2773. ML-13006-FDR-4P-17 A 09.10.13
B B
C C
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ML Page 2
AP-LVS INDEX SHEET
2 Revised as per Comments 23.05.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ML-13006-FDR-4P-17 +ML-13006-FDR-4P-17 Of 3
MATERIAL LIST FOR
1 Revised as per Comments 01.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P MCCB OUTGOING FEEDER
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' 250A FOR SB-2773. Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
=ML+ML-13006-FDR-4P-17/3
Parts List
A
A
DT. Part No. Type/Model No. Technical Specification Manufacturer Qty. Remarks
CF10 . 1TDC000054B0004 C10G4 HRC FUSE LINK (CYLINDRICAL) - 4A, 120kA, 10x38mm, gG, 500V AC. BUSSMANN 1
CF10 . 2CSM200923R1801 E91/32 FUSE HOLDER, 400V AC, 32A (10.3x38mm) ABB 1
HD . 1TDC000060B1060 HD22/48. ML31, 230/240V AC MULTILED INDICATOR 48x48,L1-GREEN-OPEN,L2-RED-CLOSE,L3-AMBER-TRIP, With LT provision DOMO 1
K41 . 1SVR405612R3100 CR-M230AC3L PLUG-IN MINIATURE RELAY, LED, 230V/240V AC, 10A, 3 C/O ABB 1
Q1 . 1SDA054059R0001 T4H250, In=250A MCCB, ELECTRONIC TRIP UNIT-PR221DS-LS/I, Icu=70kA, 4P F F, (O/L SETTING=0.40 - 1xIn) ABB 1
Q1-21 . 1SDA054911R0001 AUX-C 3Q 1SY 250V AC/DC Auxiliary Contacts for T4-T5-T6. Cabled version with 1m long cables ABB 1
Q1-HTC . 1SDA054959R0001 HTC T4 4P HIGH INSULATING TERMINAL COVERS - HTC T4 4P MCCB ABB 1
Q1-RHE_B . 1SDA054931R0001 1SDA054931R0001 Rotary Handle RHE_B T4-T5 base only ABB 1
C C
Q1-X5 . 1SNK505210R0000 ZS4-D2 DOUBLE LEVEL TERMINAL BLOCK - 4 Sq.mm, Grey-Colour ABB 6
S23 . 1SFA611100R2006 MP1-20B MOMENTARY PUSH BUTTON, FLUSH, BLACK (MODULAR) ABB 1
S23 . 1SFA611610R1001 MCB-10 1NO AUXILIARY CONTACT BLOCK FOR PBs & SWITCHES (MODULAR) ABB 1
S23 . 1SFA611605R1100 MCBH-00 HOLDER FOR PBs, LAMPS & SWITCHES FOR 3 BLOCKS ABB 1
X10.1 . GILN100115R0002 16 PIN MNS TYPE SOCKET PART B8E 16P (11-18,21-28) ABB 1
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ML Page 3
AP-LVS
2 Revised as per Comments 23.05.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ML-13006-FDR-4P-17 +ML-13006-FDR-4P-17 Of 3
MATERIAL LIST FOR
1 Revised as per Comments 01.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P MCCB OUTGOING FEEDER
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' 250A FOR SB-2773. Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
A
A
C
CLIENT OCCIDENTAL OF OMAN INC.
C
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ML Page 1
AP-LVS COVER SHEET
2 Revised as per Comments 23.05.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ML-13006-FDR-4P-19 +ML-13006-FDR-4P-19 Of 3
MATERIAL LIST FOR
1 Revised as per Comments 01.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P MCCB OUTGOING FEEDER
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' 400A FOR SB-2773. Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
Table of contents
A
A
Page Page Type Page Description ABB Drawing number Ver. Client Drawing number Rev. Date.
1 /3 Title page / cover sheet MATERIAL LIST FOR 4P MCCB OUTGOING FEEDER 400A FOR SB-2773. ML-13006-FDR-4P-19 A 09.10.13
2 /3 Table of contents MATERIAL LIST FOR 4P MCCB OUTGOING FEEDER 400A FOR SB-2773. ML-13006-FDR-4P-19 A 09.10.13
3 /3 Parts list MATERIAL LIST FOR 4P MCCB OUTGOING FEEDER 400A FOR SB-2773. ML-13006-FDR-4P-19 A 09.10.13
B B
C C
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ML Page 2
AP-LVS INDEX SHEET
2 Revised as per Comments 23.05.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ML-13006-FDR-4P-19 +ML-13006-FDR-4P-19 Of 3
MATERIAL LIST FOR
1 Revised as per Comments 01.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P MCCB OUTGOING FEEDER
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' 400A FOR SB-2773. Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
=ML+ML-13006-FDR-4P-19/3
Parts List
A
A
DT. Part No. Type/Model No. Technical Specification Manufacturer Qty. Remarks
CF10 . 1TDC000054B0004 C10G4 HRC FUSE LINK (CYLINDRICAL) - 4A, 120kA, 10x38mm, gG, 500V AC. BUSSMANN 1
CF10 . 2CSM200923R1801 E91/32 FUSE HOLDER, 400V AC, 32A (10.3x38mm) ABB 1
HD . 1TDC000060B1060 HD22/48. ML31, 230/240V AC MULTILED INDICATOR 48x48,L1-GREEN-OPEN,L2-RED-CLOSE,L3-AMBER-TRIP, With LT provision DOMO 1
K41 . 1SVR405612R3100 CR-M230AC3L PLUG-IN MINIATURE RELAY, LED, 230V/240V AC, 10A, 3 C/O ABB 1
Q1 . 1SDA054357R0001 T5H400, In=400A MCCB, ELECTRONIC TRIP UNIT-PR221DS-LS/I, Icu=70kA, 4P F F, (O/L SETTING=0.40 - 1xIn) ABB 1
Q1-21 . 1SDA054911R0001 AUX-C 3Q 1SY 250V AC/DC Auxiliary Contacts for T4-T5-T6. Cabled version with 1m long cables ABB 1
Q1-HTC . 1SDA054961R0001 HTC T5 4P HIGH INSULATING TERMINAL COVERS - HTC T5 4P MCCB ABB 1
Q1-RHE_B . 1SDA054931R0001 1SDA054931R0001 Rotary Handle RHE_B T4-T5 base only ABB 1
C C
Q1-X5 . 1SNK505210R0000 ZS4-D2 DOUBLE LEVEL TERMINAL BLOCK - 4 Sq.mm, Grey-Colour ABB 6
S23 . 1SFA611100R2006 MP1-20B MOMENTARY PUSH BUTTON, FLUSH, BLACK (MODULAR) ABB 1
S23 . 1SFA611610R1001 MCB-10 1NO AUXILIARY CONTACT BLOCK FOR PBs & SWITCHES (MODULAR) ABB 1
S23 . 1SFA611605R1100 MCBH-00 HOLDER FOR PBs, LAMPS & SWITCHES FOR 3 BLOCKS ABB 1
X10.1 . GILN100115R0002 16 PIN MNS TYPE SOCKET PART B8E 16P (11-18,21-28) ABB 1
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ML Page 3
AP-LVS
2 Revised as per Comments 23.05.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ML-13006-FDR-4P-19 +ML-13006-FDR-4P-19 Of 3
MATERIAL LIST FOR
1 Revised as per Comments 01.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
4P MCCB OUTGOING FEEDER
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' 400A FOR SB-2773. Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
A
A
C
CLIENT OCCIDENTAL OF OMAN INC.
C
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ML Page 1
AP-LVS COVER SHEET
2 Revised as per Comments 23.05.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ML-13006-DC-BUS-01 +ML-13006-DC-BUS-01 Of 3
MATERIAL LIST FOR
1 Revised as per Comments 01.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
FOR 110V DC FOR 415V LV SWITCHGEAR (SB-2773
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' ). Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
Table of contents
A
A
Page Page Type Page Description ABB Drawing number Ver. Client Drawing number Rev. Date.
1 /3 Title page / cover sheet MATERIAL LIST FOR FOR 110V DC FOR 415V LV SWITCHGEAR (SB-2773). ML-13006-DC-BUS-01 A 09.10.13
2 /3 Table of contents MATERIAL LIST FOR FOR 110V DC FOR 415V LV SWITCHGEAR (SB-2773). ML-13006-DC-BUS-01 A 09.10.13
3 /3 Parts list MATERIAL LIST FOR FOR 110V DC FOR 415V LV SWITCHGEAR (SB-2773). ML-13006-DC-BUS-01 A 09.10.13
B B
C C
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ML Page 2
AP-LVS INDEX SHEET
2 Revised as per Comments 23.05.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ML-13006-DC-BUS-01 +ML-13006-DC-BUS-01 Of 3
MATERIAL LIST FOR
1 Revised as per Comments 01.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
FOR 110V DC FOR 415V LV SWITCHGEAR (SB-2773
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' ). Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
=ML+ML-13006-DC-BUS-01/3
Parts List
A
A
DT. Part No. Type/Model No. Technical Specification Manufacturer Qty. Remarks
H41 . 1SFA611400R1005 ML1-100W PILOT HEAD FOR INDICATION LAMP - WHITE ABB 1
H41 . 1SFA611605R1200 MCBH-001 LAMP BLOCK WITH HOLDER FOR MAX. 2W, 230V AC/DC FILAMENT BULB OR LED ABB 1
K501 . 1SVR430830R0500 CM-ESS.M MULTIFUNCTIONAL VOLTAGE MONITORING RELAY, 1φ AC/DC, 24-240V AC/DC (REPLACE WITH NEW No.- 1SVR730830R0500) ABB 1
X103 . 1SNK900620R0000 PL8 TRANSPARENT PROTECTING COVER FOR ZS10 TERMINAL BLOCK ABB 2
C C
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ML Page 3
AP-LVS
2 Revised as per Comments 23.05.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ML-13006-DC-BUS-01 +ML-13006-DC-BUS-01 Of 3
MATERIAL LIST FOR
1 Revised as per Comments 01.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
FOR 110V DC FOR 415V LV SWITCHGEAR (SB-2773
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' ). Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
A
A
C
CLIENT OCCIDENTAL OF OMAN INC.
C
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ML Page 1
AP-LVS COVER SHEET
2 Revised as per Comments 23.05.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ML-13006-ACH-BUS-01 +ML-13006-ACH-BUS-01 Of 3
MATERIAL LIST FOR
1 Revised as per Comments 01.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
FOR 240V AC SUPPLY (ACH & PANEL LIGHTING) FO
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' R 415V LV SWITCHGEAR (SB-2773). Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
Table of contents
A
A
Page Page Type Page Description ABB Drawing number Ver. Client Drawing number Rev. Date.
1 /3 Title page / cover sheet MATERIAL LIST FOR FOR 240V AC SUPPLY (ACH & PANEL LIGHTING) FOR 415V LV SWITCHGEAR (SB-2773). ML-13006-ACH-BUS-01 A 09.10.13
2 /3 Table of contents MATERIAL LIST FOR FOR 240V AC SUPPLY (ACH & PANEL LIGHTING) FOR 415V LV SWITCHGEAR (SB-2773). ML-13006-ACH-BUS-01 A 09.10.13
3 /3 Parts list MATERIAL LIST FOR FOR 240V AC SUPPLY (ACH & PANEL LIGHTING) FOR 415V LV SWITCHGEAR (SB-2773). ML-13006-ACH-BUS-01 A 09.10.13
B B
C C
D D
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ML Page 2
AP-LVS INDEX SHEET
2 Revised as per Comments 23.05.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ML-13006-ACH-BUS-01 +ML-13006-ACH-BUS-01 Of 3
MATERIAL LIST FOR
1 Revised as per Comments 01.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
FOR 240V AC SUPPLY (ACH & PANEL LIGHTING) FO
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' R 415V LV SWITCHGEAR (SB-2773). Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.
1 2 3 4 5 6 7 8
=ML+ML-13006-ACH-BUS-01/3
Parts List
A
A
DT. Part No. Type/Model No. Technical Specification Manufacturer Qty. Remarks
ACH50 . GHV6017100V0006 ANTI CONDENSATION HEATER,100W, 240V AC, 30-150°C ABB 1 (PER CUBICLE)
CF49,50 . 1TDC000054B0003 C10G2 HRC FUSE LINK (CYLINDRICAL) - 2A, 120kA, 10.3x38mm, gG, 500V AC. BUSSMANN 2 (PER CUBICLE)
CF49,50 . 2CSM200923R1801 E91/32 FUSE HOLDER, 400V AC, 32A (10.3x38mm) ABB 2 (PER CUBICLE)
H49 . 1TDC000070B0001 PANEL LIGHT FLUORESCENT TYPE 12", 8W, 230V--240V AC, 50 Hz REPUTED 1 (PER CUBICLE)
H50 . 1SFA611400R1005 ML1-100W PILOT HEAD FOR INDICATION LAMP - WHITE ABB 1
B (PER CUBICLE) B
H50 . 1SFA616921R2025 KA2-2025 LED-24V AC/DC, WHITE 15mA. ABB 1 (PER CUBICLE)
H50 . 1SFA611605R1100 MCBH-00 HOLDER FOR PBs, LAMPS & SWITCHES FOR 3 BLOCKS ABB 1 (PER CUBICLE)
H50 . 1SFA616950R1012 KTR1-1012 TRANSFORMER BLOCK 220-250V AC/24V AC ABB 1 (PER CUBICLE)
HS50 . 1TDC000056B0001 FZK180 HYGROSTAT, 230V AC, IU008562, SETTINGS: 40-90% SCHRACK 1 (PER CUBICLE)
K21 . 1SBL137501R1300 AF09-22-00-13 CONTACTOR WITH 2NO + 2NC MAIN POLES, 100-250V AC AND DC, 50/60Hz, 25A, AC-1, θ<=40°C ABB 1
LS1 . 1TDC000085B0001 AZ7310 DOOR LIMIT SWITCH, 10A, 220V--240V AC, 50Hz MATSUSHITA 1
C (PER CUBICLE)
C
NL49,50 . 1SNA115236R1700 M6/8.ST NEUTRAL LINK, M 6/8 ST ENTRELEC 2 (PER CUBICLE)
Q51,52 . 2CDS272001R0104 S202M-C 10 MCB - 2P, 10A, Icn=10kA, Icu=15kA @ 400V AC ABB 2
S50 . 1SCA022531R3950 OMA1PB 2 POSITION, 1POLE SELECTOR SWITCH (0-1), 10A, MINIATURE ABB 1 (PER CUBICLE)
X49,50 . 1SNK505010R0000 ZS4 TERMINAL BLOCK - 4 Sq.mm, Grey-Colour ABB 4 (PER CUBICLE)
X49,50 . 1SNK900618R0000 PL5 TRANSPARENT PROTECTING COVER FOR ZS4 TERMINAL BLOCK ABB 4 (PER CUBICLE)
E E
F F
A AS-BUILT 09.10.13 VBS JDS NNR Project : Title. ABB Dwg. No. =ML Page 3
AP-LVS
2 Revised as per Comments 23.05.13 AYS JDS NNR K-610 GAS LIFT COMPRESSORS ABB Industries LLC ML-13006-ACH-BUS-01 +ML-13006-ACH-BUS-01 Of 3
MATERIAL LIST FOR
1 Revised as per Comments 01.05.13 AYS JDS NNR Dubai - UAE Client Dwg. No. ABB SAP/Ref.No. SLn.
FOR 240V AC SUPPLY (ACH & PANEL LIGHTING) FO
Rev. Comments Date Drawn Checked Approved Scale : NA Dwg. Format: A3, All Dim. in 'mm' R 415V LV SWITCHGEAR (SB-2773). Ver.
1 2 3 4 5 6 7 8
AEVBSHA / 10/10/2013
/ K:\EPLAN\Projects\2013\13006\AS-BUILT\01-SB-13006-01.elk **All rights are reserved for this document, even in case of issuance of a patent and registration of another industrial right. Misapplication, in particular reproduction or handing over to third parties is prohibited and actionable under civil and criminal law.