TOTAL EXPENSES ON SHOPS

Expenses QTY UNIT PRICE


PVC ceiling boards, 6 pieces per shop x 2 Shops 12 ZMW 130.00
PVC corner pieces, 4 pieces per shop x 2 Shops 8 ZMW 70.00
Transportation of PVC boards from solwezi to kisasa 1 ZMW 200.00
Transport of worker from manyama to kisasa and back 2 ZMW 70.00
Guesthouse fees for worker for 3 days 3 ZMW 150.00
Labourers rations for 3 days 3 ZMW 50.00
Iron sheets for roof extension 2 ZMW 180.00
Timber used for roof extension 4 ZMW 50.00
Bag of Nails(per KG) used for roof extension and ceiling 2 ZMW 50.00
Labour fees for ceilings and roof extension 1 ZMW 1,200.00
Glass sheets for shop windows 2 ZMW 600.00
Patty, 3 per shop x 2 Shops 6 ZMW 20.00
Washable water paint (bucket) 1 ZMW 1,500.00
Oil paint (tin) 1 ZMW 500.00
Electrical cables - 20m Red, 20m black 40 ZMW 7.00
Sockets 3 ZMW 65.00
Switch 1 ZMW 30.00
Floscent tube 1 ZMW 200.00
Bulb holders 4 ZMW 13.00
Conduit pipes 2 ZMW 20.00
Cable clips 1 ZMW 40.00
Labour for electrician 1 ZMW 300.00

TOTAL
TOTAL PRICE
ZMW 1,560.00
ZMW 560.00
ZMW 200.00
ZMW 140.00
ZMW 450.00
ZMW 150.00
ZMW 360.00
ZMW 200.00
ZMW 100.00
ZMW 1,200.00
ZMW 1,200.00
ZMW 120.00
ZMW 1,500.00
ZMW 500.00
ZMW 280.00
ZMW 195.00
ZMW 30.00
ZMW 200.00
ZMW 52.00
ZMW 40.00
ZMW 40.00
ZMW 300.00

ZMW 9,377.00