Procedure Mapping
Prepare the
D.A.P.S.
YES
Development Area
Inspection Team
D.A.I.T.
(D.A.I.S.)
(6) Scrutinize
TR-004 TAIS-002
the TR-004 and
fill the TAIS
A
1. OBTAINING THE TECHNICAL ADMINISTRATIVE INFORMATION SHEET (To Be)
Procedure Code: Page 2/2 _ Activities Number : 8 _ Time in days : to def. _ Cost: to def.
Section Assistant Engineer
D.A.P.S.A.E.
Development Area Permit
(D.A.P.S.)
(9a) Receive
notification
Secretary of the Building
S.B.C.A.
Control Authority
Y.C.D.C.
(9b) Approve
and send B
2. OBTAINING THE MINOR BUILDING WORKS APPROVAL (for Minor Building Works and Temporary Buildings) (To Be)
Procedure Code: Page 1/1 _ Activities Number : 9 _ Time in days : to def. _ Cost: to def.
Land Owner
Applicant /
Application
(1) Enter the NSB-001 (4) Pay the MBW-002
file
YDPS
START
Final Invoice D NR-001
C NM-001 END
Development Area
Send
on site and fill irregular action
notification
the check-list being
NSB-001
(CL-001-A) undertaken ?
NO
YES
Development Area Head of
D.A.H.I.S.
Inspection Section
(D.A.P.S.)
(3) Prepare
(2) Review the (5b) Scrutinize (7) Fill the
Is the file and send the
composition YES technically the Technical
complete ? SF Invoice
of the file application Report (TR-003)
(SF-001)
NO
Low Risk Building Technical
L.R.B.T.R.E.
Review Engineer
(D.A.P.S.)
Redact the
Redact the
Notification of (9) Redact the
D Notification of
Refusal (NR-001)
Modification (NM- C MBW-002
001)
NO YES
Section Assistant Engineer
D.A.P.S.A.E.
Development Area Permit
(D.A.P.S.)
(3) Prepare
Land
Land Invoice
Department
Invoice
YES
Low Risk Building Technical
L.R.B.T.R.E.
Review Engineer
Inspection Team
D.A.I.T.
Send
site and fill the irregular action CL-001-A
notification
check-list (CL-001- being
NSB-001
A) undertaken ?
YES
Development Area Head of
D.A.H.I.S.
Inspection Section
(D.A.P.S.)
(6b) Scrutinize
CL-001-B
technically the
application
A
3. OBTAINING THE BUILDING PERMIT (for Low-Risk Buildings without D-MAP) (To Be)
Procedure Code: Page 2/2 _ Activities Number : 12 _ Time in days : to def. _ Cost: to def.
Department
Land
Land History
(6c) Verify
B Land History
recommedation
Section Assistant Engineer
D.A.P.S.A.E.
Development Area Permit
(D.A.P.S.)
2 Weeks
L.R.B.T.R.E.
Review Engineer
(D.A.P.S.)
NO
Development Area Head of
D.A.H.P.S.
Permit Section
D.A.P.S.
(D.A.P.S.)
H.D.A.
NO
Professional
Certified
BP-002 and
NM-001 NR-001
END OSPI-001
4. OBTAINING THE BUILDING PERMIT (for Low-Risk Buildings with D-MAP) (To Be)
Procedure Code: Page 1/2 _ Activities Number : 11 _ Time in days : to def. _ Cost: to def.
Professional
Certified
(D.A.P.S.)
NO
Development Area
Inspection Team
D.A.I.T.
(6) Send
site and fill the irregular action CL-001-A
notification
check-list (CL-001- being
NSB-001
A) undertaken ?
YES
Development Area Head of
D.A.H.I.S.
Inspection Section
(D.A.P.S.)
(5b) Scrutinize
CL-001-B
technically the
application
A
4. OBTAINING THE BUILDING PERMIT (for Low-Risk Buildings with D-MAP) (To Be)
Procedure Code: Page 2/2 _ Activities Number : 11 _ Time in days : to def. _ Cost: to def.
Professional
Certified
BP-002 and
NR-001 NM-001
END OSPI-001
Low Risk Building Technical
L.R.B.T.R.E.
Review Engineer
(D.A.P.S.)
Redact the
Redact the (10) Redact the BP-002 and
Notification of
Notification of
Refusal (NR-001)
Modification (NM- C BP-002 and the
OSPI-001
OSPI-001
001)
Section Assistant Engineer
D.A.P.S.A.E.
Development Area Permit
(D.A.P.S.)
NO YES
Development Area Head of
D.A.H.P.S.
Permit Section
D.A.P.S.
(D.A.P.S.)
H.D.A.
NO
5. OBTAINING THE BUILDING PERMIT (for Medium Risk Buildings) (To Be)
Procedure Code: Page 1/3 _ Activities Number : 22 _ Time in days : to def. _ Cost: to def.
Professional
Sent
(22) Pay the
Certified
(D.A.P.S.)
NO
Development Area
Inspection Team
D.A.I.T.
Send
site and fill the irregular action CL-001-A
notification NO
check-list CL-001- being
NSB-001
A undertaken ?
YES
Development Area Head of
D.A.H.I.S.
Inspection Section
(D.A.P.S.)
NO
(D.A.P.S.)
Notification of Notification of
Approval in
Principle (AP-001)
F Modification Refusal (NR-
(NM-001) 001)
Section Assistant Engineer
Development Area Permit
(D.A.P.S.)
Yangon Regional
NO
(D.A.P.S.)
Y.R.G.
Government
(8) Review and
(13) Approve YES
comment on
the project
the TR-001
YES
Head of Development Area
NO
H.D.A.
YES
YES
Y.B.C.A.D.C.E.
Yangon Building Control
Y.B.C.A.S.
Authority Secretary
(Y.C.D.C.)
(Y.C.D.C.)
Is the TR-001
comment on the and comment
satisfactory ?
TR-001 on the TR-001
YES
Professional
Certified
Approval in
Application
Principle (15) Enter the NM-001 NR-001
(AP-001) YBPS
file for BP D
5. OBTAINING THE BUILDING PERMIT (for Medium Risk Buildings) (To Be)
Procedure Code: Page 3/3 _ Activities Number : 22 _ Time in days : to def. _ Cost: to def.
Medium and High Risk Building
NO
M.H.R.B.T.R.E.
Technical Review Engineer
(D.A.S.D.S.)
(17b)
YES CL-001-B
Scrutinize
the project
NO
Maanagement Task Force
D.S.M.T.F.
Drainage and Sewer
CL-001-B +
(17c)
DSMTF
Scrutinize
Invoice
the project
YES
Water and Water Supply
W.W.S.T.F.
YES
Task Force
(17d)
CL-001-B
Scrutinize
the project
D.A.P.S.A.E.
Development Area Permit
Section Assistant
(D.A.P.S.)
CL-001-B
Scrutinize Technical
the project Report (TR-001)
Development Area head of
Head of Development
D.A.H.P.S.
Permit Section
(D.A.P.S.)
(D.A.P.S.)
H.D.A.
NO
Building Technical Review
Medium and High Risk
(D.A.P.S.)
Inspection Team
D.A.I.T.
YES
Development Area Head of
D.A.H.I.S.
Inspection Section
(D.A.P.S.)
(6b) Participate
Engineer
Head of Development
Drainage and Sewer
H.D.A.
(5d) Inspection (6b) Participate CL-001-A and (6b) Participate
(D.A.)
CS-001
A A
Area
on site and fill the meeting CL-001-B the meeting
the check-list with applicant with applicant
(Y.C.D.C.)
R.B.S.
(6b) Participate (6b) Participate
Section
(5e) Scrutinize CL-001-B (5i) Inspection CS-001
A the project
the meeting
with applicant
A on site
the meeting
with applicant
Y.B.C.A.S.
Building Construction
Control of High Risk
Authority Secretary
C.Q.H.P.
(Y.C.D.C.)
(6b) Participate (6b) Participate
Projects
Y.B.C.A.D.C.E.
Building Control Authority
Deputy Chief Engineer
F.S.D.
(6b) Participate
(D.A.)
(D.A.P.S.)
Redact the
(12) Redact the Redact the
Engineer
Notification of
Approval in
Principle (AP-001)
Modification (NM-
Notification of
Refusal (NR-001)
D
001)
Development Area Permit
Section Assistant
(D.A.P.S.)
C Technical
Report (TR-001)
YES
Development Area head of
D.A.H.P.S.
Permit Section
(D.A.P.S.)
NO
(8) Review and
comment on the
TR-001
Head of Development Area
H.D.A.
YES
Professional
Certified
NO
Yangon City Development
Yangon Regional
Y.C.D.C.
Y.R.G.
Government
Commitee
NO
High-Rise and public
H.P.B.C.
YES
D.A.P.S.A.E. M.H.R.B.T.R.E.
Building Technical Review
Medium and High Risk
(D.A.P.S.)
(D.A.P.S.)
Technical
Report (TR-001)
YES
Development Area head of
D.A.H.P.S.
Permit Section
(D.A.P.S.)
Notification of
(19) Review and
submission to
comment on the
HPBC
TR-001
Head of Development Area
(D.A.P.S.)
H.D.A.
D.A.P.S.
D
NO
Building Technical Review
Medium and High Risk
(D.A.P.S.)
Inspection Team
D.A.I.T.
Send
and fill the check- irregular action CL-001-A
notification NO
list and the CS- being
NSB-001
001-A undertaken ?
YES
Development Area Head of
D.A.H.I.S.
Inspection Section
(5b)
Task Force
(D.A.P.S.)
(6b) Participate
Engineer
(Y.C.D.C.)
R.B.S.
(5e) Scrutinize CL-001-B
A the meeting
A (5h) Inspection CS-001
Section
the project the meeting
with applicant on site
with applicant
Fire Services Department
(Y.C.D.C.)
(6b) Participate Letter of
U.P.S.
(5f) Scrutinize (6b) Participate
A the project
the meeting
with applicant
suggestion
A the meeting
CS-001
with applicant
Head of Development Area
(Y.C.D.C.)
(D.A.)
CS-001 CS-001
A the meeting
with applicant
A the meeting
with applicant
Land Management Section
(6b) Participate
(D.A.)
site
with applicant
7. OBTAINING THE BUILDING PERMIT (for High-Risk Buildings lower than 12 Storeys and BAP of less than 500 occ. ) (To Be)
Procedure Code: Page 3/5 _ Activities Number : 20 _ Time in days : to def. _ Cost: to def.
D.A.P.S.A.E. M.H.R.B.T.R.E.
Building Technical Review
Medium and High Risk
(D.A.P.S.)
Redact the
(12) Redact the Redact the
Engineer
Notification of
Approval in
Principle (AP-001)
Modification (NM-
Notification of
Refusal (NR-001)
D
001)
Development Area Permit
Section Assistant
(D.A.P.S.)
C Technical
Report (TR-001)
YES
Development Area head of
D.A.H.P.S.
Permit Section
(D.A.P.S.)
NO
Head of Development Area
H.D.A.
YES
Yangon City Development
Y.C.D.C.
Yangon Regional
Y.R.G.
Government
Commitee
Is the project 9
(10) Approve (11) Approve
storeys and
the project the project
above?
7. OBTAINING THE BUILDING PERMIT (for High-Risk Buildings lower than 12 Storeys and BAP of less than 500 occ. ) (To Be)
Procedure Code: Page 4/5 _ Activities Number : 20 _ Time in days : to def. _ Cost: to def.
Professional
Certified
Application
(13) Enter the
file for BP
YDPS E
M.H.R.B.T.R.E. M.H.R.B.T.R.E.
NO
Building Technical Review
Medium and High Risk
(D.A.P.S.)
(D.A.S.S.)
D.A.P.S.A.E.
Development Area Permit
D.A.H.P.S.
Section Assistant
Permit Section
(D.A.P.S.)
(D.A.P.S.)
F comment on the
TR-001
Technical Report
(TR-001)
7. OBTAINING THE BUILDING PERMIT (for High-Risk Buildings lower than 12 Storeys and BAP of less than 500 occ. ) (To Be)
Procedure Code: Page 5/5 _ Activities Number : 20 _ Time in days : to def. _ Cost: to def.
Head of Development Area
(D.A.P.S.)
H.D.A.
NO
D.A.P.S.A.E. M.H.R.B.T.R.E.
Building Technical Review
Medium and High Risk
(D.A.P.S.)
(D.A.P.S.)
Professional
Sent
Certified
Owner)
Section Assistant Engineer
M.H.R.B.T.R.E. D.A.P.S.A.E.
Development Area Permit
D.A.P.S.
(D.A.P.S.)
NO
Development Area
Inspection Team
D.A.I.T.
Send
site and fill the irregular action CL-001-A
notification NO
check-list CS-001- being
NSB-001
A undertaken ?
YES
Development Area Head of
D.A.H.I.S.
Inspection Section
(D.A.P.S.)
W.W.S.T.F.
Drainage and Sewer
(5c) (5d)
Task Force
CL-001-B CL-001-B
Scrutinize
the project
A Scrutinize
the project
A
D.A.P.S.A.E. M.H.R.B.T.R.E.
Building Technical Review
Medium and High Risk
(D.A.P.S.)
Notification of Notification of
C E 003, the GDI-001
and the OSPI-001
G Modification Refusal (NR- D
(NM-001) 001)
Development Area Permit
Section Assistant
(D.A.P.S.)
B Technical
Report (TR-001)
NO
YES
Development Area head of
D.A.H.P.S.
Permit Section
(D.A.P.S.)
YES
YES YES
Y.B.C.A.D.C.E.
Yangon Building Control
Y.B.C.A.S.
Authority Secretary
(Y.C.D.C.)
(Y.C.D.C.)
(11) Review and
Engineer
Level
Is the project a
Inspection Team
high-risk of 12
application and building, fill de
storeys and above NO
plan an inspection CL-001-C and
BAP of more than
on site the Log-Book
500 occ ?
Building Project Committee
High-Rise and public
H.P.B.C.
Assistant Engineer
Development Area
Inspection Section
D.A.I.S.
YES
NO
Development Area Head of
D.A.H.I.S.
Inspection Section
The offences
(D.A.I.S.)
D.A.I.S.
(D.A.)
D.A.I.S.
Engineer
(D.A.I.S.)
NFA-002
END
10. OBTAINING THE BUILDING COMPLETION CERTIFICATE (To Be)
Procedure Code: Page 1/2 _ Activities Number : 10 _ Time in days : to def. _ Cost: to be defined
Professional
automatically
by the YDPS
Certified
Sent
File rejected to to the user
and fill the BCC-001 SF Invoice
START be completed
adding the required (Land
documents Owner)
NO
Development Area Inspection
D.A.I.S.
D.A.I.S.
site and
M.H.A.
Fire
issue the
certificate
Fire Safety
Certificate
Water and Water Supply
W.W.S.T.F.
Y.C.D.C.
Task Force
Y.C.D.C.
Final Inspection
D.A.I.S.
(7) Redact and Report (09a) Redact the (9b) Redact the (NFA-002)
A comment the
FIR-001
(FIR-001) YES BCC-002 NFA-002
Development Area Head of
D.A.H.I.S.
Inspection Section
(D.A.I.S.)
Declaration of
Certified
« New »
responsability of
(1) Fill the DRP- the professional
START
001 (DRP-001)
Applicant / Land
Modify the
YDPS, fill the NRT-002 NM-001
END NRT-001 and
NRT-001 and add
re-apply
the DRP-001
Section Assistant Engineer
D.A.P.S.A.E.
Development Area Permit
NO
« Previous »
Professional
Certified
Authorization for
(7) Proceed
the reimbursement
with
of the Guarantee
reimbursement
Deposit
procedure
Budget Section Head
B.S.H.
Copy of the
E.D.
NLCR-002
13. OBTAINING THE DEMOLITION PERMIT (without reconstruction) (To Be)
Procedure Code: Page 1/2 _ Activities Number : 10 _ Time in days : to def. _ Cost: to def.
Professional
Certified
Application
NSB-001 (4) Pay the
START file
SF Invoice
Development Area
Inspection Team
D.A.I.T.
YES
Section Assistant Engineer
D.A.P.S.A.E.
Development Area Permit
D.A.P.S.
(D.A.P.S.)
(3) Prepare
(2) Review the
Is the file and send the
C composition of the
file
complete ?
YES
SF Invoice
(SFI-001)
NO
Development Area Head of
D.A.H.I.S.
Inspection Section
(D.A.P.S.)
(5b) Scrutinize
CS-002
technically the
application
A
13. OBTAINING THE DEMOLITION PERMIT (without reconstruction) (To Be)
Procedure Code: Page 2/2 _ Activities Number : 10 _ Time in days : to def. _ Cost: to def.
Professional
Certified
DP-001 and
NR-001 NM-001
OSPI-001 END
Low Risk Building Technical
L.R.B.T.R.E.
Review Engineer
(D.A.P.S.)
Redact the
Redact the (10) Redact the
Notification of
Notification of
Refusal (NR-001)
Modification (NM- C DP-001 and the
OSPI-002
001)
Section Assistant Engineer
D.A.P.S.A.E.
Development Area Permit
(D.A.P.S.)
D.A.P.S.
(8) Review
and comment
on the TR-001
YES
Head of Development Area
(D.A.P.S.)
H.D.A.
(9) Review
Severe Is the TR-001
and comment
deficiencies ? satisfactory ?
on the TR-001
NO
14. ACTION TO UNDERTAKE WHEN RECEIVING A NM-001
Procedure Code: Page 1/1 _ Activities Number : 7 _ Time in days : to def. _ Cost: to be defined
Professional
Certified
automatically
(6) Pay the
by the YDPS
(2) Enter the fine (FD-001)
(1) Prepare
Sent
NM-001 NM-001 YDPS and upload (Land
START missing
the corrected Owner)
elements
elements
NO
Technical Review Engineer
(D.A.P.S.)
NO
Section Assistant Engineer
D.A.P.S.A.E.
Development Area Permit
(D.A.P.S.)
(5) Check
the datas of
the FD-001
15. ACTION TO UNDERTAKE WHEN RECEIVING A NFA-001
Procedure Code: Page 1/1 _ Activities Number : 9 _ Time in days : to def. _ Cost: to be defined
Professional
Certified
automatically
(6) Pay the
by the YDPS
(2) Enter the fine (FD-001)
(1) Prepare
Sent
NM-001 NFA-001 YDPS and upload (Land
START missing
additional Owner)
elements
elements
NO
Technical Review Engineer
T.R.E. (L or
NO
Section Assistant Engineer
D.A.P.S.A.E.
Development Area Permit
(D.A.P.S.)
Notification to
Certified
Continue the
Building (NCB-
001)
16. ACTION TO UNDERTAKE WHEN RECEIVING A NFA-002
Procedure Code: Page 1/1 _ Activities Number : 9 _ Time in days : to def. _ Cost: to be defined
Professional
Certified
automatically
(6) Pay the
by the YDPS
(2) Enter the fine (FD-001)
(1) Prepare
Sent
NM-001 NFA-002 YDPS and upload (Land
START missing
additional Owner)
elements
elements
D.A.P.S.A.E. T.R.E. (L or M&H)
NO
Technical Review Engineer
(D.A.P.S.)
NO
Section Assistant Engineer
Development Area Permit
(D.A.P.S.)
(Y.C.D.C.)
B.C.A.
Obtain the
Building
permit
Professional
Notification to
Certified
Continue the
Building
(NCB-001)
17. OBTAINING THE BUILDING PERMIT VALIDITY EXTENSION APPROVAL (To Be)
Procedure Code: Page 1/1 _ Activities Number : 06 _ Time in days : to def. _ Cost: to def.
Professional
Sent
Application form
Certified
(D.A.P.S.)
YES
Development Area head of
D.A.H.P.S.
Permit Section
(D.A.P.S.)
reason for
extension
14. OBTAINING THE DEMOLITION COMPLETION CERTIFICATE (To Be)
Procedure Code: Page 1/1 _ Activities Number : 7 _ Time in days : to def. _ Cost: to be defined
Professional
Certified
Notification
(1) Enter the YDPS File rejected to to the user
START and fill the DCC be completed
Aplication Form
NO
Development Area Inspection
D.A.I.S.
D.A.I.S.
NO
Section Assistant Engineer
D.A.I.S.A.E.
Final Inspection
D.A.I.S.
(5) Redact and Report (07a) Redact the (7b) Redact the (NFA-002)
comment the (FIR-001) DCC-002 NFA-002
FIR-001
YES
Development Area Head of
D.A.H.I.S.
Inspection Section
(D.A.I.S.)
DCC-002 NFA-002
END