You are on page 1of 1

REVISION:

Site Logistics Plan - 4/11/14


Concrete Washout
Material Delivery
Signage

Circulation Road
SAFETY
Manlift Communication
Alimak Lift Pre-Task Planning
HOTEL TOWER FC 6200
Elevation 112. S Site Weekly Stand-Down Meeting
S Slab-on-Grade Organized/Established Staging Areas

Architectural Design Consultants, Inc.


Correct Sequence of Work Performed
TC

Neither this document nor the information herein is to be reproduced, distributed, used or disclosed either
QUALITY

This document contains confidential or proprietary information of Architectural Design Consultants, Inc.
Mock-Ups

in whole or in part except as specifically authorized by Architectural Design Consultants, Inc.


Fax: (608) 254-2139
Shop & Consultant Reviews
LAUNDRY

30 Wisconsin Dells Parkway • P.O. Box 580


Pre-Planning (layout, blocking, backing & Pre-Subcontractor Approval)
FACILITY Plan-in-Place to Prevent Water Damage
Construction

PRELIMINARY PLANS NOT FOR CONSTRUCTION


Pool Equipment Elevation 98.0
Protection of Work-in-Place

Circulation Road
Bunker Area Staging
Areas

Lake Delton, WI 53940


Nauman RELATIONSHIPS
Structural

Phone: (608) 254-6181


Access Fire Department
Steel Elevator Crane City & Community
Tower Build-up Designers / Consultants
Tilt-Up Panel Pad ADA Consultants
Casting Slab Area Health Department
Cal OSHA

Temp Crane Access


April - August
EARLY START
Access INDOOR WATERPARK Concrete Washout Emphasis on Critical Path Basement Level
Ramp
Elevation 98 to 103 Water Park Roof Line Diaphragm
Pool/Water Feature Contractor Hotel

CA
LOBBY, CONFERENCE ROOMS, Building Dry-In
Backfill BOH, Laundry, Kitchens, Food Service Parking Structure
RESTAURANTS, KITCHEN,
Material MEP Equipment Start-up
BACK OF HOUSE, ARCADE Property Line
Staging Theme Contractor

GREAT WOLF LODGE


Elevation 98 Areas Hardhat Tour Temporary Fence
Tilt-Up Panel 112 at Entry Low Voltage with Screening
Roof Casting Slab Area
Data / MDF / IDF
Structure SWPPP Emergency Generator Test AQMD Porte cochere

SITE PLAN
Crane Stair Fire Life Safety Sequence Plan
Pick Access FFE & OSE
S Concrete System
Point Start-up & Commissioning TC Trash Chute
Area Pump Pump Staff Training!
Crane Team Safety
Crane Stand-Down Area
SWPPP Erosion Control Station
Tilt-Up Panel Access Porte Access Subcontractor COMMUNICATION
Crane Access Ramp cochere
Phase 1 Storage Key to Project Success
Circulation Road

Pool Contractor Area


(Metal

GARDEN GROVE
Containers Only)
Material + Access + Clear Direction + Workforce = SUCCESS
Subcontractors
Nauman Inspectors
Access
Concrete Pump
Medical

N
Neutral Crane Access Area Project Utility Tie-In Locations Trailer
Gate 2
Eye Wash Station

Primary
Main Delivery Access Main Delivery Access Gate 1
Drawn By: J.PHANEUF

Checked By: R.BOLTON

Traffic
Control
Pedestrian Access Traffic
Date: 5-14-10

Control Scale: AS NOTED

SITE PLAN HARBOR BLVD. HARBOR BLVD. Temp Export Gate Job Number: 10-015

SCALE: 1" = 30' 4/1/14 - 6/1/14 SHEET NUMBER

C1.0