Professional Documents
Culture Documents
Circulation Road
SAFETY
Manlift Communication
Alimak Lift Pre-Task Planning
HOTEL TOWER FC 6200
Elevation 112. S Site Weekly Stand-Down Meeting
S Slab-on-Grade Organized/Established Staging Areas
Neither this document nor the information herein is to be reproduced, distributed, used or disclosed either
QUALITY
This document contains confidential or proprietary information of Architectural Design Consultants, Inc.
Mock-Ups
Circulation Road
Bunker Area Staging
Areas
CA
LOBBY, CONFERENCE ROOMS, Building Dry-In
Backfill BOH, Laundry, Kitchens, Food Service Parking Structure
RESTAURANTS, KITCHEN,
Material MEP Equipment Start-up
BACK OF HOUSE, ARCADE Property Line
Staging Theme Contractor
SITE PLAN
Crane Stair Fire Life Safety Sequence Plan
Pick Access FFE & OSE
S Concrete System
Point Start-up & Commissioning TC Trash Chute
Area Pump Pump Staff Training!
Crane Team Safety
Crane Stand-Down Area
SWPPP Erosion Control Station
Tilt-Up Panel Access Porte Access Subcontractor COMMUNICATION
Crane Access Ramp cochere
Phase 1 Storage Key to Project Success
Circulation Road
GARDEN GROVE
Containers Only)
Material + Access + Clear Direction + Workforce = SUCCESS
Subcontractors
Nauman Inspectors
Access
Concrete Pump
Medical
N
Neutral Crane Access Area Project Utility Tie-In Locations Trailer
Gate 2
Eye Wash Station
Primary
Main Delivery Access Main Delivery Access Gate 1
Drawn By: J.PHANEUF
Traffic
Control
Pedestrian Access Traffic
Date: 5-14-10
SITE PLAN HARBOR BLVD. HARBOR BLVD. Temp Export Gate Job Number: 10-015
C1.0