A non-conformity report was issued for system S96029 during an inspection where several work items were found not to conform to project requirements. Upon re-inspection, those non-conforming work items were found to have been rectified according to project standards, as indicated by signatures and dates. The one-page report documents the identified issues and their resolution.
A non-conformity report was issued for system S96029 during an inspection where several work items were found not to conform to project requirements. Upon re-inspection, those non-conforming work items were found to have been rectified according to project standards, as indicated by signatures and dates. The one-page report documents the identified issues and their resolution.
A non-conformity report was issued for system S96029 during an inspection where several work items were found not to conform to project requirements. Upon re-inspection, those non-conforming work items were found to have been rectified according to project standards, as indicated by signatures and dates. The one-page report documents the identified issues and their resolution.
Upon Re-Inspection the following Work items were Upon Inspection the following Work items were found not to found to have been rectified in conform to Project requirements accordance with Project requirements Identification Nature of Non-Conformity / reason for rejection Signature Date Number
Non-Conformity Report Issued All Items on this sheet cleared
Signature Signature
Date Date
S96029 3 CON 8749 REC 50 – Non-Conformity Report
Prepared By: Amalina Kamal Revision Date: 16-Mar-2020 Page 1 of 1 Create Date: 22-Dec-2011 Revision: 2