You are on page 1of 9

Alcyon Field Service

Training
Day 2
Alcyon Maintenance
Alcyon Maintenance

Maintenance Procedures Intervals 0p. 9:

Daily Checklist (at the beginning of a working day)


Daily Maintenance
Weekly
Biweekly
Monthly
As Needed
Alcyon Maintenance

Daily Checklist 0p. 9-9:


FOR ISE MODULES ONLY: Start Wash Pump, Start Reference Pump
turn the lamp on (initialize the Analyzer)
remove condensation from cooled reagent segments
verify that the cooled positions are cooled by touching the segments
verify that the Reagent Preheater is warm to the touch
verify and record the temp of the Reaction Cuvette Temp Control (30/37 +/- 0.30C)
load new Cuvettes / unload used Cuvettes
fill the Water Container. Properly re-install the Water Gauge
empty the Waste Container
inspect the reagent Containers for leaks/cracks prior
verify sufficient reagent volume in the Containers
mix the reagents by gently inverting
place reagent Containers / verify correct placement
remove plugs from reagent Containers
FOR ISE MODULES ONLY: verify sufficient ISE Reference Solution & ISE Stabilizing Solution
FOR ISE MODULES ONLY: mix the ISE Stabilizing Solution by maually rocking the bottle
FOR ISE MODULES ONLY: check for dried salt deposits on Ref Solution Bottle, Waste Cup and tubing.
Alcyon Maintenance

Daily Maintenance Op. 9-11:

Probe Priming / Washing Procedure


FOR ISE MODULES ONLY: ISE Conditioning Cycle (before processing samples)
FOR ISE MODULES ONLY: Adjust Electrode Offset
FOR ISE MODULES ONLY: ISE Deproteinizing Cycle (after processing samples)
FOR ISE MODULES ONLY: check ISE Waste Cup for Salt Build up (clean if
necessary)
Alcyon Maintenance

Weekly Maintenance Op. 9-23:

cleaning of the Sample / Reagent Carousels & Adapters


cleaning of the Water Container
cleaning of the Automatic Cuvette Load/Unload Module
Optical Sensors and Rails
FOR ISE MODULE ONLY: Chloride Electrode Cleaning
FOR ISE MODULE ONLY: ISE Cleaning Cycle
Alcyon Maintenance

Biweekly Maintenance Op. 9-35:

FOR ISE MODULES ONLY: cleaning of the Reference Electrode Housing


Alcyon Maintenance

Monthly Maintenance Op. 9-39:


cleaning of the Sample & Reagent Probe Drive Racks
cleaning and lubrication of Horizontal Guide Rods
FOR ISE MODULES ONLY: replacing of the ISE Pump Tubing
cleaning and lubricating of the Sample Syringe Drive Screw
cleaning and lubricating of the Reagent Syringe Drive Screw
Maintenance of Syringes / Pistons (checking, replacing)
washing the Hydraulic Circuit (12 hrs. pause required)
Alcyon Maintenance

As Needed Maintenance Op. 9-61:


Lamp replacement (2000 hrs)
Probe replacement
Sample Syringe to Valve Tubing replacement
FOR ISE MODULES ONLY: ISE Reference Electrode & Reference Electrode
Housing replacement
FOR ISE MODULES ONLY: ISE Electrode replacement
FOR ISE MODULES ONLY: ISE Probe replacement
FOR ISE MODULES ONLY: o-rings replacement
Start Wash Pump procedure
Start Reference Pump procedure
Purge Wash Pump procedure
Keyboard replacement
changing the Main Power Switch Fuses
Alcyon Installation

Installation Checklist:

Unpack the Instrument Instrument Set-Up


check packing list for all accessories remove shipping tape
un-box Analyzer install keyboard
attach handles unlock horizontal guides
place on level surface set-up rear panel fluidics
remove handles install probes
connect tubings to circle-T-fittings
- set-up ISE Tubing (rear)
- set-up ISE tubing (ISE module)
set-up printer
power analyzer ON
verify fluidics
- set-up ISE Module
perform chemistry runs

You might also like