The document provides maintenance procedures and intervals for the Alcyon analyzer, including daily, weekly, bi-weekly, and monthly checklists. It details tasks such as cleaning various components, replacing reagents, checking temperatures, and priming probes. The daily checklist involves starting pumps, checking for condensation, verifying temperatures, and loading samples and reagents. Weekly maintenance includes cleaning carousels and sensors. Monthly maintenance such as cleaning drive racks and lubricating screws is also outlined. An installation checklist is provided at the end.
The document provides maintenance procedures and intervals for the Alcyon analyzer, including daily, weekly, bi-weekly, and monthly checklists. It details tasks such as cleaning various components, replacing reagents, checking temperatures, and priming probes. The daily checklist involves starting pumps, checking for condensation, verifying temperatures, and loading samples and reagents. Weekly maintenance includes cleaning carousels and sensors. Monthly maintenance such as cleaning drive racks and lubricating screws is also outlined. An installation checklist is provided at the end.
The document provides maintenance procedures and intervals for the Alcyon analyzer, including daily, weekly, bi-weekly, and monthly checklists. It details tasks such as cleaning various components, replacing reagents, checking temperatures, and priming probes. The daily checklist involves starting pumps, checking for condensation, verifying temperatures, and loading samples and reagents. Weekly maintenance includes cleaning carousels and sensors. Monthly maintenance such as cleaning drive racks and lubricating screws is also outlined. An installation checklist is provided at the end.
Training Day 2 Alcyon Maintenance Alcyon Maintenance
Maintenance Procedures Intervals 0p. 9:
Daily Checklist (at the beginning of a working day)
Daily Maintenance Weekly Biweekly Monthly As Needed Alcyon Maintenance
Daily Checklist 0p. 9-9:
FOR ISE MODULES ONLY: Start Wash Pump, Start Reference Pump turn the lamp on (initialize the Analyzer) remove condensation from cooled reagent segments verify that the cooled positions are cooled by touching the segments verify that the Reagent Preheater is warm to the touch verify and record the temp of the Reaction Cuvette Temp Control (30/37 +/- 0.30C) load new Cuvettes / unload used Cuvettes fill the Water Container. Properly re-install the Water Gauge empty the Waste Container inspect the reagent Containers for leaks/cracks prior verify sufficient reagent volume in the Containers mix the reagents by gently inverting place reagent Containers / verify correct placement remove plugs from reagent Containers FOR ISE MODULES ONLY: verify sufficient ISE Reference Solution & ISE Stabilizing Solution FOR ISE MODULES ONLY: mix the ISE Stabilizing Solution by maually rocking the bottle FOR ISE MODULES ONLY: check for dried salt deposits on Ref Solution Bottle, Waste Cup and tubing. Alcyon Maintenance
Daily Maintenance Op. 9-11:
Probe Priming / Washing Procedure
FOR ISE MODULES ONLY: ISE Conditioning Cycle (before processing samples) FOR ISE MODULES ONLY: Adjust Electrode Offset FOR ISE MODULES ONLY: ISE Deproteinizing Cycle (after processing samples) FOR ISE MODULES ONLY: check ISE Waste Cup for Salt Build up (clean if necessary) Alcyon Maintenance
Weekly Maintenance Op. 9-23:
cleaning of the Sample / Reagent Carousels & Adapters
cleaning of the Water Container cleaning of the Automatic Cuvette Load/Unload Module Optical Sensors and Rails FOR ISE MODULE ONLY: Chloride Electrode Cleaning FOR ISE MODULE ONLY: ISE Cleaning Cycle Alcyon Maintenance
Biweekly Maintenance Op. 9-35:
FOR ISE MODULES ONLY: cleaning of the Reference Electrode Housing
Alcyon Maintenance
Monthly Maintenance Op. 9-39:
cleaning of the Sample & Reagent Probe Drive Racks cleaning and lubrication of Horizontal Guide Rods FOR ISE MODULES ONLY: replacing of the ISE Pump Tubing cleaning and lubricating of the Sample Syringe Drive Screw cleaning and lubricating of the Reagent Syringe Drive Screw Maintenance of Syringes / Pistons (checking, replacing) washing the Hydraulic Circuit (12 hrs. pause required) Alcyon Maintenance
As Needed Maintenance Op. 9-61:
Lamp replacement (2000 hrs) Probe replacement Sample Syringe to Valve Tubing replacement FOR ISE MODULES ONLY: ISE Reference Electrode & Reference Electrode Housing replacement FOR ISE MODULES ONLY: ISE Electrode replacement FOR ISE MODULES ONLY: ISE Probe replacement FOR ISE MODULES ONLY: o-rings replacement Start Wash Pump procedure Start Reference Pump procedure Purge Wash Pump procedure Keyboard replacement changing the Main Power Switch Fuses Alcyon Installation
Installation Checklist:
Unpack the Instrument Instrument Set-Up
check packing list for all accessories remove shipping tape un-box Analyzer install keyboard attach handles unlock horizontal guides place on level surface set-up rear panel fluidics remove handles install probes connect tubings to circle-T-fittings - set-up ISE Tubing (rear) - set-up ISE tubing (ISE module) set-up printer power analyzer ON verify fluidics - set-up ISE Module perform chemistry runs