for the Development of North Oman Solar PV Plant with Battery Energy Storage System Independent Power Project at Saih Rawl, J-7723, Nov’2022
1.0 69.394
2.0 63.428
15.0 9.420
The subgrade should achieve a 4 day Soaked CBR value of no less than 25% at 100%
modified proctor as per MOTC. Fill material are as per specification of PDO.
19
Soil Inv. for the Development of North Oman Solar PV Plant with Battery Energy Storage System Independent Power Project at Saih Rawl, J-7723, Nov’2022
The Chemical Analysis carried out on the soil samples collected from this site shows the
following range:
CONSTITUENTS Contents
Maximum Minimum
pH : 7.7 7.4
The Chemical Analysis carried out on the water sample collected from the Borehole
shows the following results:
CONSTITUENTS Contents
Maximum Minimum
pH 7.5 7.4
Taking into consideration the sulphate contents, the recommendations for mix design for
sub-surface concrete contained in BRE Digest No. 363: 1991 may be used for guidance
(Ref. Annexure VIII). For choosing cement type, content and water:cement ratio, the
Class 2 condition specified in Table No. 1 of the above literature may be followed.
For protection against chloride, the recommendations given in CIRIA Special Publication
31 of 1984 for reinforced concrete in an extreme environment may be used. Copy of the
relevant part of this publication is attached in the Annexure VIII.
20
Soil Inv. for the Development of North Oman Solar PV Plant with Battery Energy Storage System Independent Power Project at Saih Rawl, J-7723, Nov’2022
Considering the sulphate and chloride content of the subsoil and prevailing exposure
conditions, the following concrete criteria is recommended for the foundation:
7.0 CONCLUSION:
The interpretation and recommendations contained in this report are based on result of
Trial Pit, Borehole and Laboratory Test conducted at the time of the investigation. The
sub-surface conditions inferred from the data are indicative for the test locations and the
site as a whole, the accuracy of which cannot be assured for locations and time other
than those investigated.
B. R. MANJUNATH
Geotechnical Engineer
21
ANNEXURE-1
SITE PLAN
SITE PLAN SHOWING LOCATIONS OF BOREHOLE, TRIAL PIT, ERT AND TRT
BH-6
♦
"""TP-6
I SOLAR PV PLANT I
BH-5
1401 BH-4
♦
♦ " " " TP-5
TRT-1
♦•
Ill ERT-1
TP-3 " " "
BH-3
BH-2
♦
1408·
0
TP-2
BH-1
♦
·1404
0
TP-1
CLIENT