You are on page 1of 2

Table for PVDF

Foundation: 2208, 2207 Part 15 German association for welding


Use for: Miniplast 2 / 110 OD 20 - 110
Maxiplast / 501 / 900 / 955 OD 50 - 160
Instaweld 160 OD 50 - 160
2000 / 3000 Kombi OD 50 - 250
2500 OD 160 / 250 / 315 OD 50 - 315
ASM 160 / ASM 315 OD 50 - 315
The standard value for heating element temperature is 240° C +/- 8° C.
The smaller the pipe wall the higher temperature.
Additional to the given bead-up force and to the welding force the moving force of the support must be added !
1 kp = 10 N

time to
P (N/mm²) change- reach full
bead-up heat-up over welding cool-dow n time
0,10 (PVDF) time pre ssure pressure in
welding area

Tdesired temperature
in welding area
time

pipe pipe bead-up circular heat-up max. time welding cool-


diameter wall force bead time change- to reach force down
OD (s) [kp] min. [s] over welding [kp] time
[mm] [mm] [daN] [mm] time pressure [daN] [min]
[s] [s]
20 1,9 2 0,5 59 3 3 2 4,5
25 1,9 2 0,5 59 3 3 2 4,5
32 2,4 3 0,5 64 3 3 3 5,0
40 2,4 3 0,5 64 3 3 3 5,0
50 3,0 5 0,5 70 3 4 5 5,5
63 2,0 4 0,5 60 3 3 4 4,5
63 3,0 6 0,5 70 3 4 6 5,5
63 3,8 8 0,5 78 3 4 8 6,5
75 2,3 6 0,5 63 3 3 6 5,0
75 3,6 9 0,5 76 3 4 9 6,5
75 4,5 10 0,5 85 3 5 10 7,5
90 2,8 8 0,5 68 3 4 8 5,5
90 4,3 12 0,5 83 3 4 12 7,0
90 5,4 15 0,5 94 3 5 15 8,5
110 3,4 12 0,5 74 3 4 12 6,0
110 5,3 18 0,5 93 3 5 18 8,5
110 6,6 22 0,6 106 4 5 22 10,0
125 3,9 15 0,5 79 3 4 15 6,5
125 6,0 23 0,6 100 4 5 23 9,0
140 4,3 19 0,5 83 3 4 19 7,0
140 6,7 29 0,6 107 4 6 29 10,0

08.09.2009 Working instructions WIDOS manual machine page 3 / 1


Table for PVDF

Foundation: 2208, 2207 Part 15 German association for welding


Use for: Miniplast 2 / 110 OD 20 - 110
Maxiplast / 501 / 900 / 955 OD 50 - 160
Instaweld 160 OD 50 - 160
2000 / 3000 Kombi OD 50 - 250
2500 OD 160 / 250 / 315 OD 50 - 315
ASM 160 / ASM 315 OD 50 - 315
The standard value for heating element temperature is 240° C +/- 8° C.
The smaller the pipe wall the higher temperature.
Additional to the given bead-up force and to the welding force the moving force of the support must be added !
1 kp = 10 N

time to
P (N/mm²) change- reach full
bead-up heat-up over welding cool-dow n time
0,10 (PVDF) time pre ssure pressure in
welding area

Tdesired temperature
in welding area
time

pipe pipe bead-up circular heat-up max. time welding cool-


diameter wall force bead time change- to reach force down
OD (s) [kp] min. [s] over welding [kp] time
[mm] [mm] [daN] [mm] time pressure [daN] [min]
[s] [s]
160 4,9 24 0,5 89 3 5 24 8,0
160 7,7 37 0,7 117 4 6 37 11,0
180 5,5 31 0,5 95 4 5 31 8,5
180 8,6 47 0,8 126 4 6 47 12,5
200 6,2 38 0,6 102 4 5 38 9,5
200 9,6 58 1,0 136 4 7 58 13,5
225 6,9 48 0,7 109 4 6 48 10,5
225 10,8 73 1,0 148 4 7 73 15,0
250 7,7 59 0,7 117 4 6 59 11,0
250 11,9 90 1,1 159 4 8 90 16,5
280 8,6 74 0,8 126 4 6 74 12,5
315 9,7 94 1,0 137 4 7 94 13,5

08.09.2009 Working instructions WIDOS manual machine page 3 / 2