IRAQI DRILLING COMPANY DAILY REPORT

INTEGRATED MANGEMENT SYSTEM (IDCWI-1-F5)

Daily Operation Report Date :02/11/2023 Project : EXXON MOBIL Location : WQ-146 Country : Iraq

Rig: IDC - 30 Well No.:WQ1-146 Conductor : RT - GL : Activity: Workover Spud Date11/10/2023 Obj :NEW WELL Planned Depth: Planned Days: GL Elev :
POB:** Start of Moving Date : 5/10/2023 End Of Moving Date :7/10/2023 Report No :22 Days Of Acc:

MD (m) TVD (m) Bit current previous BHA Amount OD (in) ID (in) Length(m)

00:00 hrs Make


18:00 hrs Serial #
24:00 hrs Run #
Meterage Diameter(in)
Lithology Bottom(m) Model

Dibdibba Nozzles (in)

Lower fars Mts Drilled

GHAR Oper. hrs

DAMMAM IADC

RUS Depth in

Umm Er radhuma DULL Grading

TAYARAT BIT NO.

SHIRANISH

HARTHA

SADI O . CROWN
TANUMA

KHASIB

MISHRIF

RIH with IDC 8-3/8 concave mill BHA #5


24 PM situation -P/U & M/U 8' flat mill BHA ( 8' flat mill+ X.O.S+7" junk to depth DRILLER DAY : DRILLER NIGHT :

84.07m. SITUATION SITUATION

06 AM situation
R/U Kelly: T.D K.D

-R/U Kelly with L/U rotary hose.


Angle Azimuth
Casing Depth ( F -SHOE ) D.V TVD (m) Closure (m) Severity (deg/30m)

pre.

Current

Mud Type: FWB Density In : 1.12 gm/cc Density Out: 1.12 gm/cc Temp. In : degC Formation Tests Material tons Stock

Gel 0: 6 Ibs/100ft2 ECD : gm/cc Ca= 650 mg/L Temp. Out: degC EMW Test g/cm3 Camp fuel(L)

Gel 10= 9 Ibs/100ft2 API Cake: 1 mm Choride: 8200 mg/L Sand :1 % PP EMW g/cm3 Rig Fuel M3/Current

600 / 300 = 50/33 API Vol. cm3 AV = Water: 89 % FP EMW g/cm3 Rig Fuel M3/Recieved

Viscosity =50 sec/qt PV = 19 c.p YP = 14 Ibs/100ft2 oil : 4 % Test Date Rig Fuel M3/Spent M3

PH =10 filter = 6 ml/30min CL : Solids : 7 % Rig Fuel M3/Remained M3

Weight on Bit : 8-10 ton SPM1 =40 SPM2 = 40

R.P.M = 70 (Revelution/minte) Liner Size1: 6.5

Stand pipe Pressure = 1350 psi Liner Size2: 6.5 Well Kill Drill Date: Time:

Koomey: Manifold: 1500 psi Accumulator:3000 psi Annular:1000 psi


Torque: 1-2 Ib.ft/1000 Flow Rate: 1115 l/min

KADIM
Wt. of string: 200000 Ib Annular Velocity: Rental Crane 24
TON MILE =251 ABAD
pump press. = 1350 psi ForkLifit Mohaned 24

Summary of Previous Day:

Time
From To
H CODE 11/2/2023

IDC Milling operationBHA #4 :


At first record free parameters as the following: No pump, No rotation W/up & WS/O = 25 ton, w/ 500 lpm (500 psi) W/up & WS/O = 25 tons, Rotate
40 RPM (Free torque = 1500 ft/lb).
0:00 6:30 6:30 22.2 -start the operation by tag @957.15 , started the milling with slack-off 05-1 tons , 60-70SPM, 50 RPM , pressure 600 psi , after ROP 78cm observing
high torque between 4000~6000lb.ft without InProgress.
-Total milling 78cm milling.
- Pumping 5mᶾ Hi-vis.
Waiting order:
6:30 7:30 1:00 24.1
-Discussed with well work management about trip situation the decision was POOH.

7:30 8:00 0:30 22.2 N/D & L/D Kelly.

POOH with IDC 8-3/8 concave mill BHA #4


8:00 11:00 3:00 22.2
- Cont. POOH IDC 8-3/8 concave mill & R/B 3.5" DP as a double to depth 141.55 m

Suspended Operation :
11:00 13:30 2:30 20
- Shut-down the operation due to IDC management not providing sufficient staff team work in rig-floor..

POOH with IDC 8-3/8 concave mill BHA #4


13:30 15:00 1:30 22.2 -Resumed POOH IDC 8-3/8 concave mill & R/B 3.5" DP as a double to depth 83.64m
-Completed POOH & R/B 3 double 4-3/4" DC then L/D concavemill.

Waiting on IDC:
15:00 17:30 2:30 20
Waiting on fishing tools to be on location

Waiting on IDC:
17:30 22:00 4:30 20
Waiting on IDC to provide manual tong to tighting the BHA from other rigs

RIH with IDC 8-3/8 concave mill BHA #5


22:00 0:00 2:00 22.2 -P/U & M/U 8' flat mill BHA ( 8' flat mill+ X.O.S+7" junk mill+X.O.S+3 double DC + Fishing Jar + 2 joint DC ) to depth
84.07m.

Remark:
24
: H CODE 6: AM @03/11/2023
RIH with IDC 8-3/8 concave mill BHA #5
0:00 5:00 5:00 22.2
-RIH 8' flat mill BHA by 3.5" DP double by double to 955 m depth

R/U Kelly:
5:00 6:00 1:00 22.2
###
-R/U Kelly with L/U rotary hose.
Cover Gasket
Seat Valve
Valve
Liner

NPT Total IDC Service Client F.Majeure+ Climate Components and Aux. Equipments

Daily NPT (hrs) Shale Shaker#1

Well Total NPT (hrs) Well Eng. saeed


Medic muntaser

Item Received per day m3 Accu. per mounthm m3 Mud Eng.


ali
JAR Hrs KADIM ABADI &Mohaned Mohamed
gas oil Crain and forklift Operator

water R.O WSS


SH. OB. Hrs
industrial water Rig Manager: hafiz ghadban

Day Summary Cont. RIH Safety Officer basem

Forecast : IDC Milling operationBHA #5 : Client Geologist


Comments:

Supplies Needed:

TOOL PUSHER :hussain DRILLER : Muhamed riza & ashref NIGHT PUSHER:Murtadh Chief Eect. :haider Chief Mech. :abdullah
AILY REPORT

IDCWI-1-F5)

ry : Iraq

Planned Days: GL Elev :

Total (m)

O . CROWN

DRILLER NIGHT :

Severity (deg/30m)

Material tons Stock

Camp fuel(L)

32

1,5

30,5

Driver

Driver

00 psi) W/up & WS/O = 25 tons, Rotate

re 600 psi , after ROP 78cm observing

Jar + 2 joint DC ) to depth


Components and Aux. Equipments

saeed
muntaser
ali

KADIM ABADI &Mohaned Mohamed

hafiz ghadban

basem

Chief Mech. :abdullah