Daily Operation Report Date :02/11/2023 Project : EXXON MOBIL Location : WQ-146 Country : Iraq
Rig: IDC - 30 Well No.:WQ1-146 Conductor : RT - GL : Activity: Workover Spud Date11/10/2023 Obj :NEW WELL Planned Depth: Planned Days: GL Elev :
POB:** Start of Moving Date : 5/10/2023 End Of Moving Date :7/10/2023 Report No :22 Days Of Acc:
MD (m) TVD (m) Bit current previous BHA Amount OD (in) ID (in) Length(m)
DAMMAM IADC
RUS Depth in
SHIRANISH
HARTHA
SADI O . CROWN
TANUMA
KHASIB
MISHRIF
06 AM situation
R/U Kelly: T.D K.D
pre.
Current
Mud Type: FWB Density In : 1.12 gm/cc Density Out: 1.12 gm/cc Temp. In : degC Formation Tests Material tons Stock
Gel 0: 6 Ibs/100ft2 ECD : gm/cc Ca= 650 mg/L Temp. Out: degC EMW Test g/cm3 Camp fuel(L)
Gel 10= 9 Ibs/100ft2 API Cake: 1 mm Choride: 8200 mg/L Sand :1 % PP EMW g/cm3 Rig Fuel M3/Current
600 / 300 = 50/33 API Vol. cm3 AV = Water: 89 % FP EMW g/cm3 Rig Fuel M3/Recieved
Viscosity =50 sec/qt PV = 19 c.p YP = 14 Ibs/100ft2 oil : 4 % Test Date Rig Fuel M3/Spent M3
Stand pipe Pressure = 1350 psi Liner Size2: 6.5 Well Kill Drill Date: Time:
KADIM
Wt. of string: 200000 Ib Annular Velocity: Rental Crane 24
TON MILE =251 ABAD
pump press. = 1350 psi ForkLifit Mohaned 24
Time
From To
H CODE 11/2/2023
Suspended Operation :
11:00 13:30 2:30 20
- Shut-down the operation due to IDC management not providing sufficient staff team work in rig-floor..
Waiting on IDC:
15:00 17:30 2:30 20
Waiting on fishing tools to be on location
Waiting on IDC:
17:30 22:00 4:30 20
Waiting on IDC to provide manual tong to tighting the BHA from other rigs
Remark:
24
: H CODE 6: AM @03/11/2023
RIH with IDC 8-3/8 concave mill BHA #5
0:00 5:00 5:00 22.2
-RIH 8' flat mill BHA by 3.5" DP double by double to 955 m depth
R/U Kelly:
5:00 6:00 1:00 22.2
###
-R/U Kelly with L/U rotary hose.
Cover Gasket
Seat Valve
Valve
Liner
NPT Total IDC Service Client F.Majeure+ Climate Components and Aux. Equipments
Supplies Needed:
TOOL PUSHER :hussain DRILLER : Muhamed riza & ashref NIGHT PUSHER:Murtadh Chief Eect. :haider Chief Mech. :abdullah
AILY REPORT
IDCWI-1-F5)
ry : Iraq
Total (m)
O . CROWN
DRILLER NIGHT :
Severity (deg/30m)
Camp fuel(L)
32
1,5
30,5
Driver
Driver
saeed
muntaser
ali
hafiz ghadban
basem