Foundation
Type of equipment
identification B
Gantries, Lightning
A1, A2, A3 .....
Towers etc.
A Circuit Breakers B1, B2, B3 ..... A
Disconnectors,
C1, C2, C3 .....
Grounding Switches
Current C C
Transformers,
Voltage Transformers D1, D2, D3 .....
Pockets for foundation bolts
and other Measuring
Devices
Key Plan
Surge Arresters E1, E2, E3 .....
Reactors F1, F2, F3 .....
B B
Slabs for AC Filter
G1, G2, G3 .....
equipm. etc.
A411
Converter/Power
Transformers, Shunt
H1, H2, H3 ..... Trench for +500kv cables
Reactors and oil filled
Smoothing reactors
Valve/Cooling K413
communication of its contents to others without express authorization are prohibited.
K414
3
of a patent, utility model or design.
6
5
Cable Terminations R1, R2, R3 ..... C412
Junction Boxes S1, S2, S3 ..... K414
Other equipment T1, T2, T3 ..... K415 K411 K411 E411 C411 C413
3 3 4 3 6
10 10 10 9
D Trench for -500kv cables
K413 D
Notes:
1) All dimensions are in meter.
2) The local regulations to be followed wherever applicable. A411 28.2
3) Door dimensions are specified as minimum clear spacing
4) Floor shall withstand the movement of heavy
equipment and lifting machines.
5) Lightning protection shall be designed by the Civil designer
as per the Lightning protection demands report for buildings.
6) Bonding Ring conductor shall be designed by the Civil designer
as per the Station grounding demand report. Pockets for foundation bolts
E 7) Equipments position and height are shown indicative.
E
8) Sharp edges shall be avoided.
9) Roof Pattern to be decided by civil designer. NOTE:
10)Emergency exit shall be proposed by partner as per local regulations. DETAIL A, SEE SHEET NO.2
11)Pockets are provided to accomodate foundation bolts, which shall not Y SECTION B-B SEE SHEET NO.3
be projected above the finished floor level (+0.350m). SECTION C-C SEE SHEET NO.3
12)Pockets shall be closed with temporary arrangement to facilitate
Prysmian installation and testing of cable termination activities. B
X PRELIMINARY
However, the same shall be closed permanently with Chequered plate.
-
13)This is Internal Document, not to be shared with Customer. A Based on
Saudi-Egypt ± 500 kV HVDC Interconnection
Approved
This document is issued by means of a computerized
References: 0 1 2 3 4 5 10 20m
Doc. Kind
Foundation drawing
F 1JNL1201961 - Transition Station Layout and sections. SCALE : 1 : 200
Title
Transition Station
Status Item designation
F
=S4
A manual signature is not required.
date entered in the approved-field.
10
1 * 7.5 5.5 6.32
5
E401
10
6.2
B HV Cable Hall Pole 1 B
K401 C402 C403
40
min. 0.5m
D401
10
5
K401 C402 C403
communication of its contents to others without express authorization are prohibited.
The reproduction, distribution and utilization of this document as well as the
Station (0,0)
min. 0.5m
min. 0.5m
Offenders will be held liable for the payment of damages.
10
C C
Towards DMR Area
All rights reserved in the event of the grant
of a patent, utility model or design.
1 *
10
E401
10
6.2
HV Cable Hall Pole 2
K401 C402 C403
40
D401
10
Y
7.5 5.5 6.32
HV Cable Hall Clear space
X 32.5 provided for air clearance
Note:- PRELIMINARY
*1) Civil designer has to provide final dimensions. Hitachi Energy assumed Based on - Project name
Key interlocking Main Entrance
approved. The approved document has a name and
as 1m and wall thickness 0.2m.
Detail A Foundation drawing
Doc. Kind
(Door Reserved for Hitachi Energy Title Status Item designation
F Floor Section Transition Station F
Key interlocking) =S4
A manual signature is not required.
date entered in the approved-field.
32
A A
Lightning Shield wire
HV Cable Hall Clear space Fixing point
provided for air clearance
E
Pole bushing
5 String insulator Anchoring points cutout
on HV hall
K413 K413
0.8
23.5
25
B T401 T401 B
18
10.7
10.7
0.8
1.1
FFL (+0.350m)
D402 D402
E
communication of its contents to others without express authorization are prohibited.
Road Level(+0.000m) 10 10 Detail D
The reproduction, distribution and utilization of this document as well as the
Scale 1:50
40 40 Refer respective bushing drawings
Offenders will be held liable for the payment of damages.
for adapter plate hole details.
C Section B-B C
All rights reserved in the event of the grant
of a patent, utility model or design.
HV Cable Hall Clear space
provided for air clearance
D Adapter plate
Non-magnetic D
Door Reserved for
Hitachi Energy
◻ 1.15
�1.7�
◻ 0.8
Key interlocking
◻
23.5
Main Entrance
(Door Reserved for Hitachi Energy
Key interlocking) min. 0.03
5
1 HV Hall
Yard side
2
side
E FFL (+0.350m)
5
Section C-C
PRELIMINARY
Based on - Project name
Note: Prepared Kanolla, Saikiran 2022-10-25 Saudi-Egypt ± 500 kV HVDC Interconnection
Adapter plate for wall busing shall be shared once we receive final Approved
This document is issued by means of a computerized
0.05 m
C413 =WE(1,2)-XB(1,2) 2 F - - DC cable termination, DMR
0.2 m
(Typical arrangement for foundation bolt
fixing details inside HV cable hall) Description Note:
Offenders will be held liable for the payment of damages.
Mass details shall be shared in next revision.
of a patent, utility model or design.
Foundation Bolt
D
D
Top of Foundation( +0.150m)
E Foundation bolts with 2 nuts and 2 washers.
E
Minimum dimensions for washers for foundation bolts.
Bolt Min. Min. outer
Dimension thickness dimension
M20 5mm 60x60mm
M24 6mm 80x80mm
M30 6mm 90x90mm
PRELIMINARY
Based on - Project name
Doc. Kind
Foundation drawing
Title Status Item designation
F Transition Station F
=S4
A manual signature is not required.
date entered in the approved-field.