You are on page 1of 4

1 2 3 4 5 6 7 8

Foundation
Type of equipment
identification B
Gantries, Lightning
A1, A2, A3 .....
Towers etc.
A Circuit Breakers B1, B2, B3 ..... A
Disconnectors,
C1, C2, C3 .....
Grounding Switches
Current C C
Transformers,
Voltage Transformers D1, D2, D3 .....
Pockets for foundation bolts
and other Measuring
Devices
Key Plan
Surge Arresters E1, E2, E3 .....
Reactors F1, F2, F3 .....
B B
Slabs for AC Filter
G1, G2, G3 .....
equipm. etc.
A411
Converter/Power
Transformers, Shunt
H1, H2, H3 ..... Trench for +500kv cables
Reactors and oil filled
Smoothing reactors
Valve/Cooling K413
communication of its contents to others without express authorization are prohibited.

J1, J2, J3 ..... Station (0,0)


enclosures
The reproduction, distribution and utilization of this document as well as the

Post Insulators, Bus


K1, K2, K3 ..... K412 K412 K412 K412
Supports etc.
Offenders will be held liable for the payment of damages.

Cooling equipment L1, L2, L3 ..... K415 C413


C K411 K411 E411 C411 C
Capacitors M1, M2, M3 .....
All rights reserved in the event of the grant

K414

3
of a patent, utility model or design.

Resistors N1, N2, N3 .....


32
16

Trench for DMR cables

6
5
Cable Terminations R1, R2, R3 ..... C412
Junction Boxes S1, S2, S3 ..... K414
Other equipment T1, T2, T3 ..... K415 K411 K411 E411 C411 C413
3 3 4 3 6

K412 K412 K412 K412

10 10 10 9
D Trench for -500kv cables
K413 D
Notes:
1) All dimensions are in meter.
2) The local regulations to be followed wherever applicable. A411 28.2
3) Door dimensions are specified as minimum clear spacing
4) Floor shall withstand the movement of heavy 
    equipment and lifting machines.
5) Lightning protection shall be designed by the Civil designer 
    as per the Lightning protection demands report for buildings.
6) Bonding Ring conductor shall be designed by the Civil designer
     as per the Station grounding demand report. Pockets for foundation bolts
E 7) Equipments position and height are shown indicative.
E
8) Sharp edges shall be avoided.
9) Roof Pattern to be decided by civil designer. NOTE:
10)Emergency exit shall be proposed by partner as per local regulations. DETAIL A, SEE SHEET NO.2
11)Pockets are provided to accomodate foundation bolts, which shall not  Y SECTION B-B SEE SHEET NO.3
     be projected above the finished floor level (+0.350m). SECTION C-C SEE SHEET NO.3
12)Pockets shall be closed with temporary arrangement to facilitate 
     Prysmian installation and testing of cable termination activities.  B
X PRELIMINARY
     However, the same shall be closed permanently with Chequered plate.
-
13)This is Internal Document, not to be shared with Customer. A Based on

Prepared Kanolla, Saikiran 2022-10-25


Project name

Saudi-Egypt ± 500 kV HVDC Interconnection
Approved
This document is issued by means of a computerized

approved. The approved document has a name and

GRAPHIC SCALE: Taba2 Transition Station


system. The digitally stored original is electronically

References: 0 1 2 3 4 5 10 20m
Doc. Kind
Foundation drawing
F 1JNL1201961 - Transition Station Layout and sections. SCALE : 1 : 200
Title
Transition Station
Status Item designation
F
=S4
A manual signature is not required.
date entered in the approved-field.

1JNL1203823- Civil Design Instruction. Building Requirements Resp dept


PGDC/TPM Rev ind A Language -
1JNL1210546 - Station Grounding Demands Report. Kanolla, Document number

1JNL1225162- Lightning protection for Outdoor yards. A Saikiran 1JNL1200795


© Hitachi Energy All Rights Reserved
Rev Revision Prepared Approved Date Sheet/of 1/4
(A2)
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

HV Cable Hall Clear space  Door Reserved for Hitachi Energy Main Entrance


provided for air clearance Key interlocking (Door Reserved for Hitachi Energy
Key interlocking)
A A
32.5
0.2 *

10
1 * 7.5 5.5 6.32

K401 C401 C403

5
E401

10
6.2
B HV Cable Hall Pole 1 B
K401 C402 C403

40

min. 0.5m
D401

10

5
K401 C402 C403
communication of its contents to others without express authorization are prohibited.
The reproduction, distribution and utilization of this document as well as the

Station (0,0)
min. 0.5m

min. 0.5m
Offenders will be held liable for the payment of damages.

10
C C
Towards DMR Area
All rights reserved in the event of the grant
of a patent, utility model or design.

1 *
10

K401 C401 C403


D
D
5

E401
10

6.2
HV Cable Hall Pole 2
K401 C402 C403
40

D401
10

E K401 C402 C403


E

Y
7.5 5.5 6.32

HV Cable Hall Clear space 
X 32.5 provided for air clearance

Note:- PRELIMINARY
*1) Civil designer has to provide final dimensions. Hitachi Energy assumed Based on - Project name

 indicative space provided for the super structure steel column Door Reserved for Hitachi Energy Prepared Kanolla, Saikiran 2022-10-25 Saudi-Egypt ± 500 kV HVDC Interconnection


Approved
This document is issued by means of a computerized

Key interlocking Main Entrance
approved. The approved document has a name and

Taba2 Transition Station


system. The digitally stored original is electronically

 as 1m and wall thickness 0.2m.
Detail A Foundation drawing
Doc. Kind
(Door Reserved for Hitachi Energy Title Status Item designation
F Floor Section Transition Station F
Key interlocking) =S4
A manual signature is not required.
date entered in the approved-field.

GRAPHIC SCALE: Building Requirements


0 1 2 3 4 5
Resp dept
PGDC/TPM Rev ind A Language -
10 20m
Document number
Kanolla,
SCALE : 1 : 200
A Saikiran © Hitachi Energy All Rights Reserved 1JNL1200795
Rev Revision Prepared Approved Date Sheet/of 2/4
(A2)
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

32
A A
Lightning Shield wire
HV Cable Hall Clear space  Fixing point
provided for air clearance
E
Pole bushing 
5 String insulator Anchoring points  cutout
on HV hall
K413 K413

0.8
23.5
25
B T401 T401 B

18
10.7

10.7
0.8

1.1
FFL (+0.350m)
D402 D402
E
communication of its contents to others without express authorization are prohibited.

Road Level(+0.000m) 10 10 Detail D
The reproduction, distribution and utilization of this document as well as the

Scale 1:50
40 40 Refer respective bushing drawings
Offenders will be held liable for the payment of damages.

for adapter plate hole details.
C Section B-B C
All rights reserved in the event of the grant
of a patent, utility model or design.

HV Cable Hall Clear space 
provided for air clearance

D Adapter plate
Non-magnetic D
Door Reserved for
Hitachi Energy

◻ 1.15
�1.7�
◻ 0.8
Key interlocking


23.5

Main Entrance
(Door Reserved for Hitachi Energy
Key interlocking) min. 0.03
5
1 HV Hall
Yard side
2

side
E FFL (+0.350m)
5

Road Level(+0.000m) 5 1 Section E-E


Scale 1:50
32.5

Section C-C
PRELIMINARY
Based on - Project name
Note: Prepared Kanolla, Saikiran 2022-10-25 Saudi-Egypt ± 500 kV HVDC Interconnection
Adapter plate for wall busing shall be shared once we receive final  Approved
This document is issued by means of a computerized

approved. The approved document has a name and

Taba2 Transition Station


system. The digitally stored original is electronically

dimension drawing for detail design by civil designer. Doc. Kind


Foundation drawing
Title Status Item designation
F Transition Station F
=S4
A manual signature is not required.
date entered in the approved-field.

GRAPHIC SCALE: Building Requirements Resp dept


PGDC/TPM Rev ind A Language -
0 1 2 3 4 5 10 20m Document number
Kanolla,
SCALE : 1 : 200
A Saikiran © Hitachi Energy All Rights Reserved 1JNL1200795
Rev Revision Prepared Approved Date Sheet/of 3/4
(A2)
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Mounting Support Equip.
Item Item Designation Qty. Mass Kg Equipment description Dimension Drawing Number
Status Qty./Eq.
A411 - 2 F - - DC Gantry
E401 =WA(1,2)-FA1 2 F 2 4050 DC pole bus arrester
A A
D401 =WA(1,2)-BA1 2 F - 800 Voltage divider, pole

D402 =WA(1,2)-BC7 2 W - 150 Line fault locator tuning unit


Chequered Plate C401 =WA(1,2)-QB1 2 F 2 880 DC disconnector with two earthing switches,pole
(Refer Note.11) C402 =WA(1,2)-QB(2,3) 4 F 2 880 DC disconnector with one earthing switch,pole
C403 =WA(1,2)-XB(1,2,3) 6 F - - DC cable termination 500kv
Foundation Bolt
T401 =WA(1,2)-WB(1,2) 2 w - 1620 Wall bushing, pole

FFL(+0.350m) K401 PI 6 F - 915 Post Insulator


Base Plate of Steel
C411 =WE(1,2)-QB(1,2) 2 F - 300 DC disconnector, neutral
Structure/Equipment
C412 =WE(1,2)-QB2 1 F - 400 DC tie disconnector
B B

0.05 m
C413 =WE(1,2)-XB(1,2) 2 F - - DC cable termination, DMR
0.2 m

E411 =WE(1,2)-FA1 2 F - 110 Neutral bus arrester

K411 PI 4 F - 100 Post Insulator

K412 PI 8 F - 900 Post Insulator


( +0.150m)
K413 - 2 W - - String insulator (Mounted on HV Hall wall)
K414 - 2 - - - String insulator (Mounted on DC Gantry)
communication of its contents to others without express authorization are prohibited.

K415 - 2 - - - String insulator (Mounted on DC Gantry)


The reproduction, distribution and utilization of this document as well as the

(Typical arrangement for foundation bolt
fixing details inside HV cable hall) Description Note:
Offenders will be held liable for the payment of damages.

W: Wall Mounted. Equipment mass are based on the tender input, which shall be updated


C C
F: Floor Mounted. once we get project specific dimension drawing / mass from vendor.
All rights reserved in the event of the grant

Mass details shall be shared in next revision.
of a patent, utility model or design.

Foundation Bolt

Base Plate of Steel


Structure/Equipment
0.05 m

D
D
Top of Foundation( +0.150m)

Mounting of equipment should be


minimum 0.05m above top of foundation
(Typical arrangement for foundation bolt
fixing details of outdoor equipment)

E Foundation bolts with 2 nuts and 2 washers.
E
Minimum dimensions for washers for foundation bolts.
Bolt Min. Min. outer
Dimension thickness dimension
M20 5mm 60x60mm
M24 6mm 80x80mm
M30 6mm 90x90mm
PRELIMINARY
Based on - Project name

Prepared Kanolla, Saikiran 2022-10-25 Saudi-Egypt ± 500 kV HVDC Interconnection


Approved
This document is issued by means of a computerized

approved. The approved document has a name and

Taba2 Transition Station


system. The digitally stored original is electronically

Doc. Kind
Foundation drawing
Title Status Item designation
F Transition Station F
=S4
A manual signature is not required.
date entered in the approved-field.

Building Requirements Resp dept


PGDC/TPM Rev ind A Language -
Document number
Kanolla,
A Saikiran © Hitachi Energy All Rights Reserved 1JNL1200795
Rev Revision Prepared Approved Date Sheet/of 4/4
(A2)
1 2 3 4 5 6 7 8

You might also like