Tengizchevroil Background
3,200+ employees
10,000+ contractors
© Tengizchevroil 2011 2
TCO Strategic Intents
© Tengizchevroil 2011 3
Tengizchevroil Operations
© Tengizchevroil 2011 4
Tengiz and Korolev Reservoirs
Tengiz
Deepest developed super - giant
oil field
Reservoir is 12 miles x 13 miles
Oil column is 1 mile thick
26 billion barrels oil in place
Korolev
2 billion barrels oil in place
Production started in 2001
15 % hydrogen sulfide crude
© Tengizchevroil 2011 5
Tengiz Location
ATYRAU
KAZAKHSTAN
RUSSIA
Tengiz
UZBEKISTAN
TURKMENISTAN
TENGIZ
CASPIAN SEA
© Tengizchevroil 2011 6
Safety Performance
Industrial Days Away from Work
1.60
Worldwide Oil & Gas Extraction Industry*
Incident Rate per 200,000 Manhours
1.40
1.20
1.00
0.80
0.60
0.40
Total Workforce = TCO + Contractors
0.20
0.00
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010
* Industry Data from the U.S. Dept. of Labor, Bureau of Labor Statistics
© Tengizchevroil 2011 7
Motor Vehicle Safety Performance
Recordable MVCR
5 Year Trend
1.2
MVC Rate per MM miles
0.97
1.0
0.86
0.8
0.58
0.6
0.38
0.4
0.2 0.35
0
0.0
2005 2006 2007 2008 2009 2010
© Tengizchevroil 2011 8
Environmental Performance
Air Emissions Reductions
9
From 2000 to 2010, TCO has achieved:
Total Emissions per Tonne of Oil
0
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010
© Tengizchevroil 2011 9
Environmental Performance
Gas Flaring Reduction
2,000,000
1,600,000
1,400,000
1,200,000
1,000,000
800,000
600,000
400,000
200,000
0
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010
© Tengizchevroil 2011 10
Superior Operational Performance
■ 15% year-on-year production growth in
2010 (25.9 million tonnes) vs. 2009
(22.5 million tonnes)
■ World-class equipment reliability and
production efficiency
Crude Production
Million tonnes per year
26
24
22
Train 5 Program 12 SGI-SGP Start-up
20
$1 billion $7.4 billion
18
16 KTL 1 & 2
Debottlenecking
14
$150 million
12
10 KTL 2 Start-up
8 $187 million
6 KTL 1
4 Operation
2
0
1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011
Mar
© Tengizchevroil 2011 11
Total Payments to the Republic of Kazakhstan
14,000 60,000
Annual Payments to Kazakhstan - $MM
© Tengizchevroil 2011 12
Kazakhstani Goods and Services
Accomplishments: Current Focus:
■ $1.35 billion in 2010 ■ Kazakhstani Content Team
■ $9.97 billion cumulative spend since 1995 ■ FGP Kazakhstani Content
■ Contracting Strategy
■ Manufacturing Capability
Kazakhstani Goods and Services (KG&S)
Millions of Dollars per year
1,600
1,400
1,200
1,000
800
600
400
200
0
1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011
Mar
© Tengizchevroil 2011 13
Sulfur Production, Sales & Inventory
4.0
4,000 10
10,000
9.2
3.6
3,600 Pad Inventory
3.6 9
3.2 9,000
Million Tonnes per Year
3,200
© Tengizchevroil 2011 14
Corporate Social Responsibility
Egilik Program
■ Social infrastructure program
■ $165 million invested
■ Recipient of 2008 Silver Paryz
Award for Best Social Project
■ Recent projects:
● Vocational school in Kulsary
● Renovation of entire water
system in Kulsary
● Continued gasification, Egilik Spending
electrification and water system 25
upgrades in Atyrau 20
■ Historical projects: $ Millions
● Kulsary hospital 15
© Tengizchevroil 2011 15
Workforce Development
100%
90% 85%
TCO Employees
80%
% Kazakhstani
68% 76%
70%
60%
60% TCO Supervisor and Managers
50%
1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 20102011 Mar
© Tengizchevroil 2011 16
© Tengizchevroil 2011 17