Project Management
Chapter 9
Reducing Project Duration
1
12/2/2023
2
12/2/2023
FIGURE 9.1
3
12/2/2023
4
12/2/2023
Activity Graph
FIGURE 9.2
Practical Considerations
5
12/2/2023
FIGURE 9.3
6
12/2/2023
FIGURE 9.5
7
12/2/2023
8
12/2/2023
Example 3
Mohamed and Ali; computer consultants; are considering embracing on a joint project
that will involve development of a relatively small commercial software package for
personal computers. The program involves scientific calculations for a specialized
portion of the engineering market. They have broken down the project into 16
activities. The immediate predecessors, activity times in days, and activity costs in
pounds are given in table below.
a. Develop a network for this project.
b. Find the completion time and total cost using normal times? Identify the critical
path?
c. Suppose that the indirect costs of the project amount to be 3 L.E. per day. Find the.
optimal number of days to perform the project? What is the total project cost at the
optimal solution? What saving have been realized by crashing the project? Be sure
to identify exactly which activity, or activities should be reduced
Activity A B C D E F G H I J K L M N O P
Predecessors - - - - A B C D E F G H K,L I,J M,N O
Normal time 3 5 4 6 12 5 9 7 5 11 7 4 8 7 6 12
Crash time 2 4 3 5 10 4 8 6 4 11 6 4 6 5 6 10
Normal cost 4 2 3 5 11 6 7 5 6 4 4 8 7 11 7 9
Crash cost 4.8 2.7 4.7 5.6 13.6 7.8 8.4 6 6.9 4 5.2 8 10 15 7 12
9
12/2/2023
Example 3 con.
)C
Example 3, con.
Activity A B C D E F G H I J K L M N O P
Crash 0.8 0.7 1.7 0.6 1.3 1.8 1.4 1 0.9 - 1.2 - 1.5 2 - 1.5
cost/day
يتم تخفيض يوم ﻓﻰ ﻛﻞ مرة إذا ﻛﺎﻧﺖ تﻜﻠفﺔ التخفيض أقﻞ مﻦ التﻜﻠفﺔ الغير مﺒﺎﺷرة لﻠيوم الواحد =3
يوجد مسﺎران حرجﺎن ،لذا أى تخفيض ﻷى ﻧشﺎط ﻋﻠﻰ أى منهمﺎ يستتﺒعه تخفيض ﻋﻠﻰ المسﺎر
اﻵخر .أقﻞ تﻜﻠفﺔ ﻋﻠﻰ المسﺎر اﻷول هﻰ لﻠنشﺎط ،0.7 = Bبينمﺎ لﻠمسﺎر الثﺎﻧﻰ هﻰ لﻠنشﺎط K
بتﻜﻠفﺔ ، 1.2أى اذا تم تخفيض ﻛﻼ النشﺎطيﻦ يصﺒح اجمﺎلﻰ التخفيض يوم واحد بتﻜﻠفﺔ = ،1.9
وهﻰ أﻋﻠﻰ مﻦ تﻜﻠفﺔ تخفيض النشﺎط المشترك بينهمﺎ P= 1.5
يتم تخفيض النشﺎط المشترك ” “Pبمقدار يوميﻦ بتﻜﻠفﺔ 1.5لﻠيوم
Total time = 46 - 2 = 44 days
Total cost= 99 -2(3-1.5) = LE 96
يتم تخفيض ﻛﻼ مﻦ النشﺎط Bﻋﻠﻰ المسﺎر اﻷول ،النشﺎط Kﻋﻠﻰ المسﺎر الثﺎﻧﻰ بيوم واحد لﻜﻞ •
منهمﺎ ،ليعطﻰ التخفيض يوم واحد لﻠمشروع.
Total time = 44 - 1= 43 days
Total cost= 96 –(3- 0.7- 1.2) = LE 94.9
December, 2023 Project Management, Chapter 9 20
10
12/2/2023
Example 3, con.
Example 4
Three recent college graduates have formed a partnership and have opened
an advertising firm. Their first project consists of 16 activities. The
activity times in days and activity cost in pounds are given in table
below.
a. Develop the project network for this project?
b. Determine the completion time using normal times? Identify the
critical path?
c. What is the total project cost using the normal times?
d. Assume that the project must be completed in 41 days. Crashing of the
project is necessary. What activities should be crashed, and what are
the critical activities of the crashed network? What is the total project
cost required to meet this crashing?
Activity 1,2 1,3 1,4 1,5 2,6 3,8 4,7 5,9 6,10 7,10 8,11 9,11 10,12 11,12 12,13 13,14
Normal time 4 3 6 5 7 12 7 11 9 6 5 5 7 8 10 6
Crash time 3 2 5 4 6 10 5 11 8 6 4 4 5 6 10 6
Normal cost 3 4 5 2 4 11 5 4 7 8 6 6 11 7 9 7
Crash cost 4.5 4.8 5.6 2.7 5.2 14 7 4 8.4 8 7 8 16 12 9 7
11
12/2/2023
Example 4, Con.
Example 4, con.
12