You are on page 1of 1

11 12

12 Check front reflector is


on the right and bell is
Locate bike in the warehouse on the left of the handle 11
11
and take to build area. bars and make sure the
rear reflector is also Inflate front and rear tyres
secure. to recommended pressure
on tyre wall.

22

10
10
Open bike box upsidedown. Grease and install seat post
tight enough to take weight
This ensures that the frame of bike in the stand, insterted
number is easily visible
Pre Build to minimum insertion point

ke ing
straight out of the box. (use carbon grease on carbon

Bi frames and posts).

Tools you will


need: 13
13 99
Remove remaining
- Safety gloves
33
packaging leaving the
- Mottez stand saddle covering informs
- Track pump a PDI colleague that this Grease and install pedals,
- Grease gun bike is pre built only and finger tight ensuring L and R
- Phillips not PDI’d. Put PDI form
screwdriver in manual holder, turn markings are followed.
- Side cutters handle bars to 90
Record frame number, bike - Multitool degrees and hang in
designated area in your
details, order number and - 15 and 13
store
customer name on PDI ratchet spanners

form.
88
Install handlebars ensuring
Sarah

hoses and cables are correctly


routed, bolts finger tight.
44
Use step and roll to unbox.

Make sure you lean the bike


towards you, and lift the box
slowly to prevent the bike 77
falling. Install front wheel, finger
tight.

55 66 Make sure the wheel is


positioned centrally
Use side cutters to remove between the forks.
Place rear wheel in Mottez ties, strings and packaging.
stand.
Take care not to scratch the
frame.

You might also like