You are on page 1of 1

EQUIPMENT MAINTENANCE SCHEDULE

EQUIPMENT TYPE Large Oven 4 Layers

EQUIPMENT CODE BPP-BA-101

LOCATION Practical Work Area

Schedule for the Month of Nov 2023

ACTIVITIES MANPOWER
Daily Weekly Monthly Remarks

1. Checking for Maintenance √ Repair if


Gas Leak Needed

2. Checking of Maintenance √ Report to


any Trainer
physical
damage

3. Check Maintenance √ Report to


Performance Trainer

4. Cleaning Trainees/ √ With care


Inside the oven Maintenance

4. Clean Trainees √ Use Wet/Dry


Outside the rags
oven
5. Wash Inside Trainees √ Dry and Return
Trays to oven

You might also like