You are on page 1of 18

DISTRICT / CITY / MUNICIPALITY

LAND USE & ZONING

LINE & GRADE

ARCHITECTURAL

STRUCTURAL

SANITARY

P E R S P E C T I V E
SCALE NDTS

T A B L E O F C O N T E N T S ELECTRICAL
G E N E R A L D R A W I N G S ARCHITECTURAL DRAWINGS STRUCTURAL DRAWINGS ELECTRICAL DRAWINGS PLUMBING DRAWINGS

G-1 PERSPECTIVE A-1 GROUND FLOOR PLAN P-1 GROUNDFLOOR WATER SUPPLY LAYOUT
G-2 SITE DEVELOPMENT PLAN A-2 2ND TO 5TH FLOORPLAN P-2 2ND TO 5TH FLOOR WATER SUPPLY LAYOUT
A-3 BLOW-UP FLOORPLAN FOR ONE P-3 GROUNDFLOOR SANITARY LAYOUT
SECTION P-4 2ND TO 5TH FLOOR SANITARY LAYOUT
P-5 STORM DRAINAGE LAYOUT
CATCH BASIN PLAN MECHANICAL
CATCH BASIN SECTION
P-6 WATER SUPPLY ISOMETRIC LAYOUT
P-7 GROUNDFLOOR WATER SUPPLY ISOMETRIC
LAYOUT
P-8 2ND TO 5TH FLOOR WATER SUPPLY ISOMETRIC
LAYOUT
P-9 SANITARY ISOMETRIC LAYOUT
P-10 GROUNDFLOOR SANITARY ISOMETRIC LAYOUT
P-11 2ND TO 5TH FLOOR SANITARY ISOMETRIC
LAYOUT
P-12 FLOOR CLEANOUTS, DRAIN-VENT DETAILS FIRE SAFETY
SEPTIC VAULT DETAILS

SUBMITTED BY: PROJECT TITLE: SUBMITTED TO: SHEET CONTENT:

ANGELA NICOLE DOLLETE


CYREEN ANN MADERSE
JHAN MARK LALISAN
MARIA LYNETTE MAIZA
PROPOSED 5 STOREY- PERSPECTIVE G
TABLE OF CONTENTS
ED ALDRIN JARIOL
ELOI MAH LIRA
NINO MANOS
NOREEN MANAY
DORMITORY "THE HIVE" ENGR. CLEIFFORD S. ALFARERO 1 18

2021
PROFESSOR
GRETA GAIRAN RICHARD MATTHEW GAAMIL
CENTRAL MINDANAO UNIVERSITY
COLLEGE OF ENGINEERING
DEPARTMENT OF CIVIL ENGINEERING

ME 30 MECHANICAL ENGINEERING UTILITIES

INTRODUCTION PLUMBING CONSIDERATIONS


Dormitories are essential facilities of any large institution such as a school, or university. As such, Each mini-hive features three toilet and bathrooms, a kitchen sink, and two bathroom sinks, all to
providing not only a place for students to stay at during their stay at the institution, is not the only objective provide the students with the utilities that they need in order to comfortably habit the dormitory. A critical
of this project. The project aims to design and bring to life a dormitory for students that will make their time design factor would be the wastewater and sewage disposal and treatment, of which the team has provided
in university not only comfortable, but also memorable and fulfilling. triple-chambered septic tank systems, which consists of a digestive chamber and a double-leaching
chamber. Having a triple-chambered septic tank system ensures efficient and reliable treatment of the
As such, this project, entitled “The Hive”, is a proposed five (5) story building that not only seeks to sewage and wastewater produced by the building. This design allows for the septic tank system to trap solid
provide a comfortable living space and shelter for students, but also equip them with the tools they require waste and allow the liquids to travel into the second and third leaching chambers for maximum treatment of
in order to survive University. More specifically, the design of the dormitory takes into account the following the water.
aspects:
The building is also equipped with catch basins and storm drainages, as well as roof gutters and
drains in order to sufficiently handle rainwater runoff and other debris, minimizing risks of flooding and other
rain-related effects.
BUILDING LAYOUT, AESTHETICS AND DESIGN
Several designs for the building were drafted, but none lived up to the student’s visions, and so the
building was redesigned. The final design was inspired by the organization of bees and their hives, hence SAFETY AND SECURITY DESIGN
the honeycomb layout of the structure.
The hive also takes into account the safety and security of the inhabitants when considering the
The ground floor is intended as a main common area for all of the residents of the building, equipped designs of the structure. This ensures that the structure is compliant with local building codes and
with a cafeteria, a library study space, and a common computer room for those who do not have such regulations, thereby guaranteeing that the building is safe for occupancy. In addition, the design takes into
personal equipment. The ground floor is also equipped with greenery and large windows, thereby allowing account fire safety measures. For instance, as part of the building’s passive fire suppression system, each
large amounts of natural light and ventilation. mini-hive is separated by thick walls designed to restrict the spread fire and endure its effects for long periods
of time with a high fire rating. Secondly, emergency fire exits are provided at every floor, for use in case of
The second to fifth floors are intended as the main living spaces for the residents, with each floor emergencies hand-in-hand with the regular wide staircases, ensures sufficient time for inhabitants to
containing five (5) mini-hives that each house 16 residents, for a total of 80 residents per floor, and a grand evacuate should there be a need for it.
total of 320 residents for the entire dormitory. The mini-hive designs intend to build socializations and small
communities, as each mini-hive is basically a smaller communal living for 16 people. Each mini-hive¬
contains 4 bedrooms, each housing 4 residents, equipped with closets, desks, seats, and excellent natural
lighting brought to life by windows, allowing for natural light and ventilation.

THE HIVE
NARRATIVE REPORT

SUBMITTED BY: PROJECT TITLE: SUBMITTED TO: SHEET CONTENT:

ANGELA NICOLE DOLLETE JHAN MARK LALISAN


PROPOSED 5 STOREY- G
CYREEN ANN MADERSE MARIA LYNETTE MAIZA NARRATIVE REPORT
ED ALDRIN JARIOL
ELOI MAH LIRA
NINO MANOS
NOREEN MANAY DORMITORY "THE HIVE" ENGR. CLEIFFORD S. ALFARERO 2 18

2021
PROFESSOR
GRETA GAIRAN RICHARD MATTHEW GAAMIL
PARKING

PARKING
SITE DEVELOPMENT PLAN
SCALE NDTS

SUBMITTED BY: PROJECT TITLE: SUBMITTED TO: SHEET CONTENT:

ANGELA NICOLE DOLLETE


CYREEN ANN MADERSE
JHAN MARK LALISAN
MARIA LYNETTE MAIZA PROPOSED 5 STOREY- SITE DEVELOPMENT
G
ED ALDRIN JARIOL
ELOI MAH LIRA
NINO MANOS
NOREEN MANAY DORMITORY "THE HIVE"
ENGR. CLEIFFORD S. ALFARERO 3 18

2021
PROFESSOR
GRETA GAIRAN RICHARD MATTHEW GAAMIL
LIBRARY

TO
SE
CO
ND
FL
OO
R
GROUND FLOOR PLAN

TO
SCALE 1:200

SE
CO
ND
FL
OO
R
COMPUTER STATION

RECEIVING
AREA

SUBMITTED BY: PROJECT TITLE: SUBMITTED TO: SHEET CONTENT:

ANGELA NICOLE DOLLETE


CYREEN ANN MADERSE
JHAN MARK LALISAN
MARIA LYNETTE MAIZA
PROPOSED 5 STOREY- A
GROUND FLOORPLAN
ED ALDRIN JARIOL
ELOI MAH LIRA
NINO MANOS
NOREEN MANAY
DORMITORY "THE HIVE" ENGR. CLEIFFORD S. ALFARERO 1 18
13

2021
PROFESSOR
GRETA GAIRAN RICHARD MATTHEW GAAMIL
TO
GR
R
OO

OU
FL

N
D
IRD

FL
TH

OO
TO

R
2ND TO 5TH FLOOR PLAN

TO
GR

R
SCALE 1:100

OO
OUN

FL
D

IRD
FL

TH
OO

TO
R
3.45

8.00

5.36

1.45

SUBMITTED BY: PROJECT TITLE: SUBMITTED TO: SHEET CONTENT:

ANGELA NICOLE DOLLETE


CYREEN ANN MADERSE
JHAN MARK LALISAN
MARIA LYNETTE MAIZA
PROPOSED 5 STOREY- 2ND TO 5TH FLOORPLAN
A
ED ALDRIN JARIOL
ELOI MAH LIRA
NINO MANOS
NOREEN MANAY
DORMITORY "THE HIVE" ENGR. CLEIFFORD S. ALFARERO 2 18

2021
PROFESSOR
GRETA GAIRAN RICHARD MATTHEW GAAMIL
3.75

7.50

3.74

1.40
4.88

7.50

BLOW-UP UNIT FLOORPLAN


SCALE 1:100

SUBMITTED BY: PROJECT TITLE: SUBMITTED TO: SHEET CONTENT:

ANGELA NICOLE DOLLETE


CYREEN ANN MADERSE
JHAN MARK LALISAN
MARIA LYNETTE MAIZA
PROPOSED 5 STOREY- A
BLOW-UP UNIT FLOORPLAN
ED ALDRIN JARIOL
ELOI MAH LIRA
NINO MANOS
NOREEN MANAY
DORMITORY "THE HIVE" ENGR. CLEIFFORD S. ALFARERO 3 18

2021
PROFESSOR
GRETA GAIRAN RICHARD MATTHEW GAAMIL
150 mm Ø PPR MAINLINE

25 mm Ø PPR CWR

4.00 1.50

0.95
2.00

75 mm Ø PPR PIPE
25 mm Ø PPR CWR

LIBRARY

75 mm Ø PPR PIPE

75 mm Ø PPR PIPE

TO
SE
CO
ND
FL
OO
R
25 mm Ø PPR CWR 25 mm Ø PPR CWR

TO
SE
CO
ND
FL
OO
R
COMPUTER STATION

RECEIVING
AREA

25 mm Ø PPR CWR 25 mm Ø PPR CWR


75 mm Ø PPR PIPE
GROUNDFLOOR WATER
SUPPLY LAYOUT 1.05

2.20

SCALE 1:200

2.00 4.40

SUBMITTED BY: PROJECT TITLE: SUBMITTED TO: SHEET CONTENT:

ANGELA NICOLE DOLLETE


CYREEN ANN MADERSE
JHAN MARK LALISAN
MARIA LYNETTE MAIZA
PROPOSED 5 STOREY- GROUNDFLOOR WATER
P
ED ALDRIN JARIOL
ELOI MAH LIRA
NINO MANOS
NOREEN MANAY
DORMITORY "THE HIVE" ENGR. CLEIFFORD S. ALFARERO SUPPLY LAYOUT 1 18

2021
PROFESSOR
GRETA GAIRAN RICHARD MATTHEW GAAMIL
25 mm Ø PPR CWR

GV

CW

CW
20 mm Ø PPR CWL

CW

CW

CW
CW

CW

CW
CW

CW CW

CW

CW
CW

CW CW
25 mm Ø PPR CWR

CV CV CV
HB HB HB
WC WC WC
20 mm Ø PPR CWL

LAV

LAV LAV

LA
V
WC

LA
HB CV

V
WC
HB CV

TO
WC

GR
HB CV

R
OO

OU
FL

N DF
D
20

IR
mm
25

LO
Ø

TH
mm

PP
R
Ø

OR
CW
PP

TO
R

L
LAV

CW
R

TO
LAV

25
20

mm
mm
GR

Ø
R

PP
PP
OO

R
R

CW
OU

CW

R
L
FL
N D

D
IR
FL

CV HB
TH
OO

TO
R

WC

CV HB
WC

CV HB
LA
V

WC
LA
V
LAV LAV

LAV

LA
V
20 mm Ø PPR CWL
WC WC WC
HB HB HB
CV CV CV

20
mm
Ø
PP
25 mm Ø PPR CWR

25
CW

mm
L

Ø
PP
2ND TO 5TH FLOOR

RC
WR
LA
V

CV
LA

HB
V
WATER SUPPLY LAYOUT

WC
CV
HB
SCALE 1:200

WC
CV
HB
WC
SUBMITTED BY: PROJECT TITLE: SUBMITTED TO: SHEET CONTENT:

ANGELA NICOLE DOLLETE


CYREEN ANN MADERSE
JHAN MARK LALISAN
MARIA LYNETTE MAIZA
PROPOSED 5 STOREY- 2ND TO 5TH FLOOR WATER
P
ED ALDRIN JARIOL
ELOI MAH LIRA
NINO MANOS
NOREEN MANAY
DORMITORY "THE HIVE" ENGR. CLEIFFORD S. ALFARERO SUPPLY LAYOUT 2 18

2021
PROFESSOR
GRETA GAIRAN RICHARD MATTHEW GAAMIL
LIBRARY

COMPUTER STATION

RECEIVING
AREA

GROUNDFLOOR
SANITARY LAYOUT
SCALE 1:200

SUBMITTED BY: PROJECT TITLE: SUBMITTED TO: SHEET CONTENT:

ANGELA NICOLE DOLLETE


CYREEN ANN MADERSE
JHAN MARK LALISAN
MARIA LYNETTE MAIZA
PROPOSED 5 STOREY- GROUNDFLOOR SANITARY P
ED ALDRIN JARIOL
ELOI MAH LIRA
NINO MANOS
NOREEN MANAY
DORMITORY "THE HIVE" ENGR. CLEIFFORD S. ALFARERO LAYOUT 3 18

2021
PROFESSOR
GRETA GAIRAN RICHARD MATTHEW GAAMIL
TO
GR
R
OO

OU
FL

N
D
IRD

FL
TH

OO
TO

R
TO
GR

R
OO
OU

FL
DN

IRD
FL

TH
OO

TO
R
2ND TO 5TH FLOOR
SANITARY LAYOUT
SCALE 1:200

SUBMITTED BY: PROJECT TITLE: SUBMITTED TO: SHEET CONTENT:

ANGELA NICOLE DOLLETE


CYREEN ANN MADERSE
JHAN MARK LALISAN
MARIA LYNETTE MAIZA
2ND TO 5TH FLOOR SANITARY P
LAYOUT
ED ALDRIN JARIOL
ELOI MAH LIRA
NINO MANOS
NOREEN MANAY
ENGR. CLEIFFORD S. ALFARERO 4 18

2021
PROFESSOR
GRETA GAIRAN RICHARD MATTHEW GAAMIL
600

100
TO NEAREST CANAL TO NEAREST CANAL
400

100
CB CB
100mmØ DOWNSPOUT RD RD 15
100mmØ DOWNSPOUT
DS
DS 0m 600 400

m
P IPE Ø
PV
C C
PV PIP
mØ E
0m
15

100
CB CB

RD RD RD

DS DS

15
PIP

0m
C

m
PV

Ø
PV
Ø

CATCH BASIN PLAN


m

C
0m

PI P
15

SCALE 1:30

E
RD
DS RD
CB CB
DS

100mmØ DOWNSPOUT
3-10MM DIA.
BARS BOTHWAYS
10MM DIA. BAR
LIFTING HANDLE
RD RD
100mmØ DOWNSPOUT

150mmØ PVC PIPE


150mmØ PVC PIPE

600

100 400
100

100
RD
RD
CB CB
DS DS

600 400
15

PE
0m

PI

C
PV
PV

100
C

0m
PI

DS
PE

15
RD DS RD RD

CB CB
200MM DIA.
CONC. PIPE
15
0m
mØ IPE
CP
PV
CP PV
IPE mØ
0m
15
CB
DS DS
CB CATCH BASIN SECTION
100mmØ DOWNSPOUT RD RD
100mmØ DOWNSPOUT SCALE 1:200

STORM DRAINAGE LAYOUT


SCALE 1:250

SUBMITTED BY: PROJECT TITLE: SUBMITTED TO: SHEET CONTENT:

ANGELA NICOLE DOLLETE


CYREEN ANN MADERSE
JHAN MARK LALISAN
MARIA LYNETTE MAIZA
PROPOSED 5 STOREY- STORM DRAINAGE LAYOUT P
CATCH BASIN PLAN
ED ALDRIN JARIOL
ELOI MAH LIRA
NINO MANOS
NOREEN MANAY
DORMITORY "THE HIVE" ENGR. CLEIFFORD S. ALFARERO
CATCH BASIN SECTION 5 18

2021
PROFESSOR
GRETA GAIRAN RICHARD MATTHEW GAAMIL
WC
CV HB

B WC
CV H

B WC
CV H
R
CW
Ø V
25 LA
L B WC
CW CV H V
0Ø LA
2

B WC
CV H

B WC
CV H

R R
CW CW CW
Ø Ø V
25 GV 25 LA
V L
L CW LA CW WC V
CW
Ø
CV HB LA
Ø 20
20 CW
25 Ø CW
R
CW
CW WC
CV HB
CW CW 20 Ø CWL CV
HB
WC CV
CW CW CV HB WC HB
R WC CV
CW CW R HB
Ø W CW
25 GV C Ø WC
25 V
CW L AV LA
WWL L V
CC CW WC V LA
0Ø Ø
CV HB LA
2 CW 20
25 Ø CW
CW CW R
CW
WC
CW CW CV HB
CW 20 Ø CWL CV
HB LAV
CW WC LAV CV
CW CW WC HB
CV HB WC CV
HB
R
CW CW
CW CW R WC
2 5Ø GV Ø
CW
CW 25 V LA
V V
CW L CW LA L LA
CW CW V
Ø 0Ø LA
20 CW CW 2
25 Ø CWR
CW
CW CW

CW CW
CW
20 Ø CW
L CV LAV LAV
HB
WC CV
CW CW HB
CW WC CV
R HB
CW CW CW WC
Ø CW
25 GV
R V V
CW L CW CW LA LA
Ø
CW 25
Ø
20 CW CW
25 Ø CW
R
CW
CW
CW
CW CW 20 Ø CW LAV
CW L CV LAV
HB
WC CV
CW CW HB
CW WC CV
HB
CW WC
R CW
CW V
25
Ø CW LA
CWR
Ø
CW 25

LAV
CW
LAV
CW LAV

25
ØC
20
CW

ØC

WR
WL
CW
LAV
LAV

CV
LAV

HB WC
V
LA

25
CVHB CWCR
Ø W
20
WC

ØC
HB WC
CV

WL
HB WC
CV LAV

CH
LAV HB

VB
CV 20 Ø CWL

CV

WC
HB WC
LA
V
25 Ø CW
R
V
LA

CV
V

HB C WR
LA

25
WC

20

Ø
W
HB

ØC
CV WC
HB

WL
CV WC

CV
LAV HB 20 Ø CWL

HB
LAV CV

WC
CV
HB WC
LAV
25 Ø CW
R
L
V CW
V LA Ø V
LA 20 LA

CH
VB
V

25
LA R
WC CW

Ø
20

WC
Ø
HB 25

ØC
WC

WR
CV
HB V

WL
CV WC HB C
WC

CV
LAV HB

HB
CV 20 Ø CW
LAV L

WC
CV
V
HB C

HB
WC R
25 Ø CWR CW

WC
L Ø
V CW 25
LA V Ø
HB C 20
LA
V V WC LA
V

CV
LA R
CW

HB
Ø
WC 25

WC
ING
HB WC
CV V
HB C
HB
CV WC WC

CV
HB

HB
CV 20 Ø CWL

HB C
V

I V

WC
WC

CE EA
25 Ø CWR
L

RE AR
V HB CV CW
LA WC
Ø
20
V V
LA LA R
CW
Ø
25

HBCV
WC

R HB CV
CW WC
Ø
25
L
V HB CV CW
LA WC Ø
20
V
LA R
CW
Ø
25
V
HB C
WC

WC HB CV
R
CW
Ø
V 25
HB C
WC

WATER SUPPLY
ISOMETRIC LAYOUT
SCALE 1:200

SUBMITTED BY: PROJECT TITLE: SUBMITTED TO: SHEET CONTENT:

ANGELA NICOLE DOLLETE


CYREEN ANN MADERSE
JHAN MARK LALISAN
MARIA LYNETTE MAIZA
PROPOSED 5 STOREY- WATER SUPPLY ISOMETRIC
P
ED ALDRIN JARIOL
ELOI MAH LIRA
NINO MANOS
NOREEN MANAY
DORMITORY "THE HIVE" ENGR. CLEIFFORD S. ALFARERO LAYOUT 6 18

2021
PROFESSOR
GRETA GAIRAN RICHARD MATTHEW GAAMIL
R
CW
Ø
25

R
CW
Ø
25 R
CW
Ø
25

R
CW
Ø
25

NG
E IVI A
C E
RE AR
R
CW
Ø
25

R
CW
Ø
25

GROUNDFLOOR WATER
SUPPLY ISOMETRIC LAYOUT
SCALE 1:200

SUBMITTED BY: PROJECT TITLE: SUBMITTED TO: SHEET CONTENT:

ANGELA NICOLE DOLLETE


CYREEN ANN MADERSE
JHAN MARK LALISAN
MARIA LYNETTE MAIZA
PROPOSED 5 STOREY- GROUNDFLOOR WATER
P
ED ALDRIN JARIOL
ELOI MAH LIRA
NINO MANOS
NOREEN MANAY
DORMITORY "THE HIVE" ENGR. CLEIFFORD S. ALFARERO SUPPLY ISOMETRIC LAYOUT 7 18

2021
PROFESSOR
GRETA GAIRAN RICHARD MATTHEW GAAMIL
B WC
CV H

WC
CV HB

WC
CV HB
R
CW
Ø V
25 LA
L
CW V
Ø LA
20

R
CW CW
Ø
25 GV
CW V
L LA
CW
Ø
20 CW
25 Ø CWR
CW
CW

CW CW 20 Ø CW
L CV
HB
WC CV
CW CW HB
WC CV
HB
CW WC

V
CW LA

CW

CW
LAV
CW LAV

CW

CW

LA
V

25
20

ØC
ØC

WR
WL
LAV
LAV

CV
HB
WC
V
LA

CV
HB
WC

WC
HB WC
CV
HB WC
CV

CV
HB

HB
CV 20 Ø CW
L

WC
25 Ø CWR

V
LA

L
V CW
LA Ø
20
V
LA R
CW
Ø
25

HBCV
WC

HB CV
WC

HB CV
WC

2ND TO 5TH FLOOR WATER


SUPPLY ISOMETRIC LAYOUT
SCALE 1:200

SUBMITTED BY: PROJECT TITLE: SUBMITTED TO: SHEET CONTENT:

ANGELA NICOLE DOLLETE


CYREEN ANN MADERSE
JHAN MARK LALISAN
MARIA LYNETTE MAIZA
PROPOSED 5 STOREY- 2ND TO 5TH FLOOR WATER P
ED ALDRIN JARIOL
ELOI MAH LIRA
NINO MANOS
NOREEN MANAY
DORMITORY "THE HIVE" ENGR. CLEIFFORD S. ALFARERO SUPPLY ISOMETRIC LAYOUT 8 18

2021
PROFESSOR
GRETA GAIRAN RICHARD MATTHEW GAAMIL
Y
R AR
LI B

N
IO
AT
ST
ER
P UT
M
CO

NG
E IVI A
C E
RE AR

SANITARY ISOMETRIC LAYOUT


SCALE 1:200

SUBMITTED BY: PROJECT TITLE: SUBMITTED TO: SHEET CONTENT:

ANGELA NICOLE DOLLETE


CYREEN ANN MADERSE
JHAN MARK LALISAN
MARIA LYNETTE MAIZA
PROPOSED 5 STOREY- SANITARY ISOMETRIC
P
ED ALDRIN JARIOL
ELOI MAH LIRA
NINO MANOS
NOREEN MANAY
DORMITORY "THE HIVE" ENGR. CLEIFFORD S. ALFARERO LAYOUT 9 18

2021
PROFESSOR
GRETA GAIRAN RICHARD MATTHEW GAAMIL
RY
I BRA
L

N
IO
T AT
E RS
UT
MP
CO

NG
E IVI A
C E
RE AR

GROUNDFLOOR SANITARY
ISOMETRIC LAYOUT
SCALE 1:200

SUBMITTED BY: PROJECT TITLE: SUBMITTED TO: SHEET CONTENT:

ANGELA NICOLE DOLLETE


CYREEN ANN MADERSE
JHAN MARK LALISAN
MARIA LYNETTE MAIZA
PROPOSED 5 STOREY- GROUNDFLOOR SANITARY P
ISOMETRIC LAYOUT
ED ALDRIN JARIOL
ELOI MAH LIRA
NINO MANOS
NOREEN MANAY
DORMITORY "THE HIVE" ENGR. CLEIFFORD S. ALFARERO 10 18

2021
PROFESSOR
GRETA GAIRAN RICHARD MATTHEW GAAMIL
LEGEND SPECIFICATION:

GV GATE VALVE CWR COLD WATER RISER


1. SANITARY LINES - uPVC SERIES 1000
HB HOSE BIBBS CWL COLD WATER LINE 2. DRAINS AND CLEANOUT - CAST IRON BODY WITH
BRONZE/BRASS TOP
CV CHECK VALVE CB CATCH BASIN
3. VENT STACK/PIPES - PVC SERIES 1000
WC FD

WM WATER METER VTR

LAV CO

SH

UR

KS

TO GRO
UND FL

OR
OOR

FLO
OR
FLO

D
HIR
D

OT
HIR

T
OT T
TO GRO
UND FL
OOR

2ND TO 5TH FLOOR SANITARY


ISOMETRIC LAYOUT
SCALE 1:200

SUBMITTED BY: PROJECT TITLE: SUBMITTED TO: SHEET CONTENT:

ANGELA NICOLE DOLLETE


CYREEN ANN MADERSE
JHAN MARK LALISAN
MARIA LYNETTE MAIZA
PROPOSED 5 STOREY- 2ND TO 5TH FLOOR SANITARY P
ISOMETRIC LAYOUT
ED ALDRIN JARIOL
ELOI MAH LIRA
NINO MANOS
NOREEN MANAY
DORMITORY "THE HIVE" ENGR. CLEIFFORD S. ALFARERO 11 18

2021
PROFESSOR
GRETA GAIRAN RICHARD MATTHEW GAAMIL
GENERAL SPECIFICATION
1. ALL WATER PIPE SHALL BE 21 DIAMETER G. I. PIPE SCHEDULE 40.
3.40

0.70 0.70 1.40


2. ALL SOLID WASTE PIPE SHALL BE 4'' DIAMETER PVC PIPE SCHEDULE 40. 150mm THK. R.C. SLAB
w/ 12mmØ CONT.
BARS @ 300mm O.C.
3. ALL SANITARY DRAINAGE SHALL HAVE A MINIMUM SLOPE OF 2%. B.W.

4. ALL PLUMBING WORKS MUST CONFORM TO THE LATEST EDITION OF OUTLET C.O. C.O. C.O. C.O. INLET
THE PLUMBING CODE OF THE PHILIPPINES, LOCAL ORDINANCE

1.20

0.90
MH MH MH
ENFORCED BY THE CITY SANITARY ENGINEER AND REGULATIONS OF
LOCAL WATER COMPANY

5. ALL PLUMBING WORKS HEREIN SHALL BE DONE UNDER THE DIRECT 0.60 0.60 0.60 0.40
SUPERVISION OF A DULY LICENSED SANITARY ENGINEER.
PLAN
C.O. MH C.O. MH C.O. MH C.O.

FROM WATER CLOSET FROM FLOOR DRAIN


POLISHED STAINLESS STEEL CLEANOUT SQUARE FRAME

0.30
W/ CIRCULAR COVER

FINISH FLOOR LINE

INLET
VENT
OUTLET
45° BEND ELBOW DRAIN
150mm THK. CHB w/ 12mmØ

2.10

1.80
REBARS HORZ. BARS @ EVERY
DRAIN
3-LAYERS & VERT. BARS @
P-TRAP
45° BEND ELBOW
STILLING STILLING 800mm O.C.
C
.O

45° BEND ELBOW


DIGESTIVE CHAMBER
.

TANK w/ TANK w/
150mm THK. R.C. SLAB
FILTRATION FILTRATION w/ 12mmØ CONT.
1 1 BARS @ 300mm O.C.

0.25
DRAIN

45° BEND ELBOW


B.W.

FLOOR CLEANOUTS, DRAIN-VENT DETAILS 3-12mmØ CONT. BARS


0.45 0.40 0.45 0.40 0.45 1.10 0.45 w 10mmØ TIES @
SCALE 1:20m
300mm O.C.

SECTION
SEPTIC VAULT DETAILS
SCALE 1:20m

SUBMITTED BY: PROJECT TITLE: SUBMITTED TO: SHEET CONTENT:

ANGELA NICOLE DOLLETE


CYREEN ANN MADERSE
JHAN MARK LALISAN
MARIA LYNETTE MAIZA
PROPOSED 5 STOREY- FLOOR CLEANOUTS,
P
ED ALDRIN JARIOL
ELOI MAH LIRA
NINO MANOS
NOREEN MANAY
DORMITORY "THE HIVE" ENGR. CLEIFFORD S. ALFARERO DRAIN-VENT DETAILS 1218

2021
PROFESSOR SEPTIC VAULT
GRETA GAIRAN RICHARD MATTHEW GAAMIL

You might also like