Professional Documents
Culture Documents
POR:
ING. CARLOS GUTIERREZ SOTO
PROJECT MANAGER
ACTION TAKEN
A. APROVED
B. APROVED AS NOTED
C. REJECTED
NOTES:_
SHIPPING TIME: 3 WEEKS
STAMP / SIGNATURE
BY:
DATE:
TRAP PRIMER VALVES Prime-Time Trap Priming Assembly
It’ s P R I M E - T I M E t o m e e t y o u r fl o o r d r ai n tr a p p ri m i n g n e e d s . T h i s u n i q u e tr a p p ri m i n g a s s e m b l y A u t o m a t i c all y m a i n -
t ai n s a c o n s t a n t w a t e r s e a l i n fl o o r d r ai n tr a p s a n d i s a v a il a bl e i n 4 t h r o u g h 3 0 o p e n i n g c o n fi g u r a ti o n s a n d all t h e
c o n t r a c t o r n e e d s t o d o i s si m p l y s u p pl y t h e p o t a bl e w a t e r a n d p o w e r , P r e c i si o n s u p p li e s t h e r e s t...
The PRIME-TIME PRIMING ASSEMBLY will supply a minimum of 2 oz. of potable water at 20 PSIG at
a preset factory setting of 6 seconds every 24 hours. The entire unit is pre-assembled in a steel cabinet
ready to be flush wall mounted.
TRAP PRIMER VALVES Prime-Time Trap Priming Assembly
SPECIFICATIONS
2 Amp. Circuit
COMPRESSION FITTINGS: ELECTRICAL Atmospheric 24 Hour Timer
Breaker
1/2” Comp. for 3/8” ID Copper Line SPECIFICATIONS: Vacuum Manual Over Ride
5/8” Comp. for 1/2” ID Copper Line. Breaker
This line is the floor drain trap make-up water line. 120 VOLT PT
1/2” PEX 120/60 6. Watts
1/2” ProPEX Uponor 110/50 16 VA Holding
CABINET: 16 Gauge Steel 34 VA In Rush
Dry Wall, Flush Mount (In Wall)
Cabinet Depth 4”, Mounting Anchor Provided 240 VOLT PT
Fire Rated, Flush Mount (In Wall)
240/60 6. Watts
Cabinet Depth 6”, Mounting Anchors Provided
ACCESS DOOR: Dry Wall
220/50 16 VA Holding
Prime Coat
34 VA In Rush
Stainless Steel
ACCESS DOOR LATCH:
Galvanized
Steel
Screw Driver - Standard
Cabinet
Allen Key
Cylinder Lock
ACCESS DOOR: Fire Rated -1 1/2”-
Special Calibrated Manifold Tube Connection for Routing to Water On/Off Valve 3/4”
Prime Coat Traps 1/2” / 5/8” Compression FNPT Water Source
for Equal Water Distribution to
Stainless Steel Connection
Floor Drains
ACCESS DOOR LATCH:
Ring Pull - Standard
CABINET DIMENSIONS:
Cylinder Lock
MODEL # PT-4 - PT-12 ID Width 14” x Height 16”
VOLTAGE: MODEL # PT-1320 ID Width 20 1/2” x Height 16 1/2”
120 Volt 60 Hz./110 Volt 50 Hz. MODEL # PT-2130 ID Width 30 1/2” x Height 20 1/2”
240 Volts 60 Hz./220 Volts 50 Hz. DEPTH OF CABINET:
Standard 3-3/8”, Fire Rated 6”
MODEL # PT- ____________ INLET:
PT-1320 - # of drains served: ____________ 3/4” inch NPT female. ANSI/ASME BI.20.1.
PT-2130 - # of drains served: ____________ OUTLET:
5/8” or 1/2” inch compression fitting. SAEJ512.
MANIFOLD:
(Please refer to list on the right for dimensions of cabinet models).
3/4” Type “L” copper tubing. ASTM B88.
Unit must be installed plumb and must be installed with access. SOLDERED JOINTS:
Must be installed above finished floor. Allow one foot of elevation 95-5 lead free containing lead not in excess of 0.2%.
for every 20 feet of distance ran for floor drain make up line. ELECTRICAL COMPONENTS:
Circuit Breaker, Test Switch, Timer, Solenoid Valve marked as UL listed.
Electronic assembly tested and certified per UL #73.
BACKFLOW PREVENTION:
P R OJE C T SU B MITT AL
Anti-Siphon atmospheric vacuum breaker meets Los Angeles code,
P r oj e ct: IAPMO, New York Board of Standards, ASSE 1001 and CSA.
METAL CABINET:
16 gauge steel, galvanized.
C o n tr a ct or: ACCESS DOOR:
Optional: Prime Coat, Stainless Steel, and Fire Rated.
E n gi n e er: TEMPERATURE/PRESSURE:
32˚F - 125˚F, 20 PSI - 150 PSI.
D a t e S u b m itt e d: NOTE: UNIT MUST BE INSTALLED PLUMB.
- MUST BE INSTALLED WITH ACCESS.
- All PRIME-TIME FLUSH MOUNT UNITS ARE AVAILABLE IN
P r e p ar e d B y: FIRE RATED CABINETS - 6” IN DEPTH.
NOT ES:
NOT AS:
1. SEE STRUCTURAL DRAWINGS FOR PROPOSED TANK FOUNDATION CONSTRUCTION... REVERSE OSMOSIS EQUIPMENT SCHEDULE
2. TANK SHALL BE RATED FOR 120 DEG F MAXIMUM FLUID TEMPERATURE.
3. TANK TO BE DESIGNED FOR ATMOSPHERIC PRESSURE.
TABLA EQUIPOS OSMÓSIS INVERSA
4. TANK MANUFACTURER TO PROVIDE SEISMIC CALCULATIONS FOR TANK CONSTRUCTION AND ANCHORAGE, SPECIFIC TO THE INSTALLATION LOCATION. UNIT T AG / PHASE / MANUFACTURER / MODEL / MODELO LOCATION / UBICACIÓN TREATED WATER MINIMUM INLET PRESSURE / MAXIMUM INLET PRESSURE / ELECTRICAL / ELÉCTRICO NOTES /
5. MINIMUM USABLE WATER VOLUME SHALL BE DEFINED AS THE WATER VOLUME HELD BETWEEN THE OVERFLOW ELEVATION AND THE TOP OF THE ANTI-VORTEX PLATE. REFERENCIA FASE FABRICANTE DESIGN FLOW / CAUDAL PRESIÓN MÍNIMA ENTRADA MÁXIMA PRESIÓN ENTRADA VOLT AGE / PH HZ POWER / NOT AS
6. DRAIN CONNECTION TO HAVE INTERNAL SIPHON EXTENSION WITH ELBOW DOWN TO 1-1/2" MAXIMUM ABOVE BOTTOM OF TANK. AGUA TRATADA (GPM) (FT H2O) (FT H2O) POTENCIA...
7. PROVIDE COMMON TANK SUCTION/PRIMARY FILL LINE WITH ANTI-VORTEX PLATE WITH MINIMUM 2 1/2"" CLEARANCE BELOW THE PLATE. RO-1 PHASE 01 CULLIGAN AQUASENTIAL RO RESTROOM - 01.544 0,42 35 276 120 / 1 60 20 1
8. PROVIDE CHLORATION EQUIPMENT FOR THE WATER TREATMENT. RO-2 PHASE 01 CULLIGAN AQUASENTIAL RO MEDICAL - 01.646 0,42 35 276 120 / 1 60 20 1
9. PROVIDE WEIR INLET ON OVERFLOW AND 3/4" SS BIRD SCREEN ON OVERFLOW OUTLET. RO-3 PHASE 01 CULLIGAN AQUASENTIAL RO LACTATION - 01.647 0,42 35 276 120 / 1 60 20 1
10. PROVIDE MINIMUM 24"x24" HINGED, LOCKABLE ROOF ACCESS HATCH. RO-4 PHASE 01 CULLIGAN AQUASENTIAL RO BREAKROOM - 01.579 0,42 35 276 120 / 1 60 20 1
11. PROVIDE EXTERNAL TANK LEVEL INDICATOR. RO-5 PHASE 01 CULLIGAN AQUASENTIAL RO RESTROOM W - 01.577 0,42 35 276 120 / 1 60 20 1
RO-6 PHASE 01 CULLIGAN AQUASENTIAL RO RESTROOM W - 01.577 0,42 35 276 120 / 1 60 20 1
RO-7 PHASE 01 CULLIGAN AQUASENTIAL RO RESTROOM W - 01.577 0,42 35 276 120 / 1 60 20 1
RO-8 PHASE 01 CULLIGAN AQUASENTIAL RO RESTROOM M - 01.578 0,42 35 276 120 / 1 60 20 1
RO-9 PHASE 01 CULLIGAN AQUASENTIAL RO RESTROOM M - 01.578 0,42 35 276 120 / 1 60 20 1
RO-10 PHASE 01 CULLIGAN AQUASENTIAL RO RESTROOM M - 01.578 0,42 35 276 120 / 1 60 20 1
NOT ES:
NOT AS:
1. A DRAINAGE HAS TO BE PREVENT FOR EACH REVERSE OSMOSIS EQUIPMENT.
MA RK DATE DESCRIPTION
UNIT ID / MANUFACTUR MODEL LOCATION ELECTRICAL / ELÉCTRICO WATER CHLORATION EQUIPMENT SCHEDULE
REFERENCIA PHASE / ER / NO. / / VOLTS- NOTES /
FASE FABRICANTE MODELO UBICACIÓN PHASE / AMPS (A) DESCRIPTION / DESCRIPCIÓN NOTAS TABLA EQUIPO DE CLORACIÓN
TREATED WATER MINIMUM INLET MAXIMUM PRESSURE CHLORATION ELECTRICAL / ELÉCTRICOS C ON FID EN TIA L IN FOR M A TION . This drawing/document and all designs, details, inventions or
VOLTAJE- developments covered or derived thereby are confidential and the exclusive property of the owner (or
UNIT T AG / PHASE / MANUFACTURER MODEL / LOCAT ION / DESIGN FLOW / PRESSURE / MÍNIMA DROP / MÁX IMA CAPACITY / VOLUMEN VOLT AGE / NOTES / its affiliates), which reserve all rights in this drawing/docume nt. Copying, reproduction, duplication, or
FASE CAUDAL AGUA PRESIÓN DE ENTRADA (FT CAÍDA DE PRESIÓN distribution to a third party, i n whole or i n part, is forbidden unless expressly authorized i n writing.
REFERENCIA FASE / FABRICANTE MODELO UBICACIÓN CLORACIÓN GAL VOLT AJE - PH MCA MOCP NOT AS
TRAT ADA (GPM) H2O) (FT H2O) ME C HA NI CA L E N GI NE E R ELE C T RI CA L E N GI NEE R
MECHANIC ELECTRONIC TRAP PRIMER ASSEMBLY. 12 OUTLETS (FIELD VERIFY PGI PGI
CHL - 1 PHASE 01 CULLIGAN S507 PUMPS STORAGE 15,8 12 5 18 220 / 1 2 10 1-9
TP-1 PHASE 01 PPP PT-12 AL 120 / 1 0,28 THE NUMBER OF TRAPS), WALL MOUNTED, MANIFOLD WITH Juan Manu el Hernández Herrera Jesús Antonio López Fernández
CHL - 2 PHASE 01 CULLIGAN S507 PUMPS STORAGE 15,8 12 5 18 220 / 1 2 10 1-9 +52 55 4430 7790 +52 55 4430 7790
CONTROL 1/2" COMPRESSION FITTINGS. Laguna de Términos, 221 – Torre A, Oficina 308 Laguna de Términos, 221 – Torre A, Oficina 308
Col. Granada - Del. Miguel Hidalgo - 11520 Col. Granada - Del. Miguel Hidalgo - 11520
NOT ES / NOT AS: Ciudad de México Ciudad de México
CIVI L E N GI NEE R ST R U CT U R AL E N GI NE E R
1. PROVIDE A SINGLE STEEL SKIDDED SYSTEM TO INCLUDE A CHLORINE TANK, DISPENSING SATATION, DOSING PUMP, FILTER, AND APPURTENANCES FOR A COMPLETE SYSTEM. AECOM AECOM
Ing. Edgar Cruz Castro Ing. Elias Tavera
2. EQUIPMENT VENDOR TO PROVIDE SPARES FOR TWO YEARS OF SERVICE INCLUDING ALL CONSUMABLES BUT SALT. CONTRACTOR TO PROVIDE 300-LB OF EQUIPMENT VENDOR APPROVED SALTS FOR EACH 55 52 03 29 4 9 55 5203 2949
SYSTEM FOR THE FIRST YEAR OF SERVICE
D R A WIN G C R E A TE D U S IN G R E V IT - M OD E L N U M B E R - M E C H A N ICA L M OD E L
1234 CIVIL AVE.Av. Santa Fe 495, P10. Col. Av. Santa Fe 495, P10. Col. Cruz Manca.
3. ALL MONITORING POINT VALUES AND ALARMS TO BE MADE AVAILABLE TO THE BMS THROUGH BACNET IP. Cruz Manca. Cuajimalpa de Morelos 05349. Cuajimalpa de Morelos 05349. CDMX, Mexico
BLACK FLOW PREVENTER SCHEDULE 4. DEFAULT TOTAL CHLORINE LEVE SETPOINT SHOULD BE SET AT 2 PPM AND SHALL BE ADJUSTABLE LOCALLY VIA THE SKID'S USER INTERFACE.
CDMX, Mexico
ARCHITEC T OT H E R E N GI NEE R
UNIT ID PHASE NAME LOCAT ION DESCRIPT ION NOTES 5. PROVIDE VENT PIPE FROM SKID TO EXTERIOR OF BUILDING PER MANUFACTURER'S INSTRUCTIONS. INSTALL VENT PER SKID MANUFACTURER'S REQUIREMENTS AECOM
Arq. Alfredo Juarez Lopez
RPZ 1 PHASE 01 REDUCED PUMPS REDUCED PRESSURE ZONE BACKFLOW PREVENTER, 6. PROVIDE A SINGLE CONTROLLER FOR SKID. 55 5203 2949
PRESSURE ZONE STORAGE HORIZONTAL CONFIGURATION, PROVIDE WITH NRS GATE 7. PROVIDE A SINGLE POINT POWER CONNECTION. Av. Santa Fe 495, P10. Col. Cruz Manca.
Cuajimalpa de Morelos 05349. CDMX, Mexico
BACK FLOW VALVES, CAST IRON STRAINER, AIR GAP FITTING 8. VERIFY THAT UNIT IS CAPABLE OF OPERATION AT THE MINIMUM FLOW RATE ASSOCIATED WITH THE FLOW LIMITING VALVES ON ONE WATER STORAGE TANK. PROJECT.:
PREVENTOR 9. CONSULT WITH DESIGN ENGINEER PRIOR TO PURCHASING. AEROTECH060
TITLE.:
PLUMBING SCHEDULES
19/10/2021 22:15:11
D RA WI N G N O.:
P900
PDF PRINT DATE: