30-11-2018

Muscat municipality
General Directorate
of Technical Affairs
Building Permits Department
Approved as per the issued permit
Building facade to be painted in white colour only

- The project contractor and the supervision


consultant must construct the project as
per the approved drawings and comply with
conditional approvals, local and internation-
al approved regulations during construc-
tion.
- The design consultant, the supervision
consultant and the project contractor takes
full responsibility, each on their scope,
towards the safety of the building, the data
provided in this approval, the attachment of
correct documents, the compliance of the
A B C D E F G H I J K L attached designs with the local order
number 23/92, laws, regulations, circulars,
and krooki requirements, and the provision
of other authorities approvals, specifica-
tions and guidelines without conflict with
the approved drawings from this directo-
C3 /F2 C3 /F2 C1/F1 rate.
1 1 - The project contractor and the supervision
2 C5/F5 C3 2 consultant are committed to provide the
C3 /F3
CF4 required safety of the buildings, the neigh-
3 3 boring services as well as considering the
C3 C4 /F3 soil nature and the structural effects on the
surrounding environment.
4 4 - If the plot is nearby a mountain (Jabal) or a
5 5 valley (Wadi), the supervision consultant
C5 /F3 C4/F4 must provide a detailed study on the Jabal
6 6 cutting or the required protection towards
12mm thk
the Wadi side prior to construction.
flex.sheet
CF7 - The project contractor and the supervision
C5 C4 /F5 consultant must return to this directorate
C3
C4 SCHEDULE OF COLUMNS prior to construction in case of a technical
7 CF2 C4 7 issue is occurred which constrain construc-
GROUND FLOOR STIRRUPS tion and when the approved drawings does
TYPE SIZE STEEL
CF5 not match with other approved drawings or
C1 20X50 6Y14 Y8@15C/C
8 8 with the existing plot conditions.
C3 C3 C2 20X50 8Y14 Y8@15C/C
C4
C3 20X60 10Y14 Y8@15C/C
C4 20X60 12Y14 Y8@15C/C
9 C3 9
C6 /F6 C5 20X70 12Y16 Y8@15C/C
C3/F3 CF3
C6 20X70 14Y16 Y8@15C/C
10 10 C7 30X50 10Y16 Y8@15C/C
11 11
C6 /F7 C3

12 C5 12

C4 /F5
C6 /F6 CF6 SCHEDULE OF FOOTINGS
By Eng.Amal Said AlBahri at 10:09 am, Dec 17, 2018
P. C. C. R. C. C.
13 13 TYPE SHORT BARS LONG BARS REMARKS
C6 B L D B L D
F1 170 220 10 150 200 45 Y14@ 15C/C Y14@ 15C/C ---

F2 190 240 10 170 220 50 Y14@ 15C/C Y14@ 15C/C ---

F3 210 260 10 190 240 55 Y14@ 15C/C Y14@ 15C/C ---


C2 /F2 F4 ---
C3 /F4 290 340 10 210 260 60 Y14@ 15C/C Y14@ 15C/C
14 14
CF1 F5 270 320 10 230 280 60 Y14@ 15C/C Y14@ 15C/C ---
15 15 F6 290 340 10 250 300 65 Y14@ 15C/C Y14@ 15C/C ---
C3 /F4
16 16 F7 270 320 10 290 340 65 Y14@ 15C/C Y14@ 15C/C ---
C3 /F1 C2 C2
17 17 CF1 265 280 10 245 260 60 Y14@ 15C/C Y14@ 15C/C T&B

18 18 CF2 210 440 10 190 420 60 Y14@ 15C/C Y14@ 15C/C T&B

CF3 230 450 10 210 430 65 Y14@ 15C/C Y14@ 15C/C T&B

CF4 245 395 10 225 375 65 Y14@ 15C/C Y14@ 15C/C T&B

CF5 265 420 10 245 400 65 Y14@ 15C/C Y14@ 15C/C T&B

CF6 325 425 10 305 405 65 Y14@ 15C/C Y14@ 15C/C T&B

CF7 see plan 10 see plan 65 Y14@ 15C/C Y14@ 15C/C T&B
A B C D E F G H I J K L

INTERNATIONAL CENTER
FOR INVESTMENT &ENGINEERING CONSULTANCY

FOUNDATION PLAN
CLIENT

PROJECT TITLE

LOCATION

SHEET CONTAIN FLOOR AREA TOTAL BUILT AREA

SCALE DATE

PROJECT No.
PLOT No. AREA No. No. OF FLOOR

G+1+P
SHEET No.
DEALT ENG. KHERVIN ABILASH
ST-01
DESIGNED ENG. FARES MOHAMMAD
Muscat municipality
General Directorate
of Technical Affairs
Building Permits Department
Approved as per the issued permit
Building facade to be painted in white colour only

- The project contractor and the supervision


consultant must construct the project as
per the approved drawings and comply with
conditional approvals, local and internation-
al approved regulations during construc-
tion.
- The design consultant, the supervision
consultant and the project contractor takes
full responsibility, each on their scope,
towards the safety of the building, the data
provided in this approval, the attachment of
A B C D E F G H I J K L correct documents, the compliance of the
attached designs with the local order
number 23/92, laws, regulations, circulars,
and krooki requirements, and the provision
of other authorities approvals, specifica-
X X tions and guidelines without conflict with
PB3 PB7 PB3 the approved drawings from this directo-
1 1
rate.
2 2

PB1
X X
PB1 - The project contractor and the supervision

PB4
PB7 PB3

PB2
3 3 consultant are committed to provide the
required safety of the buildings, the neigh-
PB1

PB1 PB4

PB6

PB6
boring services as well as considering the
PB1

4 PB2
PB4
4 soil nature and the structural effects on the
PB6
PB4
PB6

5 5 surrounding environment.
PB6

6 PB1 6 - If the plot is nearby a mountain (Jabal) or a

PB4
PB4
valley (Wadi), the supervision consultant
PB7

PB6

PB5 PB4 must provide a detailed study on the Jabal


PB4 PB5 PB5 cutting or the required protection towards
the Wadi side prior to construction.
PB3 PB5
PB5

7 7
- The project contractor and the supervision

PB4
consultant must return to this directorate
S S prior to construction in case of a technical
PB4

8 8
PB6

PB4 issue is occurred which constrain construc-

PB7
STARTER
PB
6
S S STAIR tion and when the approved drawings does
PB4
not match with other approved drawings or
PB5

9 9
PB6

STARTER
with the existing plot conditions.

PB1
STAIR

PB5
10 PB4 10
PB6

SCHEDULE OF PLINTH BEAMS


11 11
PB4 BOTTOM REINF. TOP REINF.
PB1

TYPE SIZE EXTRA AT EXTRA AT STIRRUPS REMARKS


STRAIGHT CURTAIL STRAIGHT
PB6

END. SUPP CONT.SUPPORT


PB6

PB1 20X40 2Y14 --- 2Y14 - - Y8 @ 20C/C -


12 12
PB4 PB2 20X50 2Y14 --- 2Y14 - - Y8 @ 15C/C -
PB3 20X60 2Y14 --- 2Y14 - 2Y14 Y8 @ 15C/C -
PB6
PB4 20X60 3Y14 2Y14 2Y14 2Y14 - Y8 @ 15C/C -

PB6 PB5 20X60 2Y14 --- 4Y14 - - Y8 @ 15C/C -


13 13
PB4 PB4 PB6 20X60 4Y14 2Y14 2Y14 - 2Y14 Y8 @ 15C/C -
PB4

PB7 20X70 4Y14 2Y14 4Y14 2Y14 Y8 @ 15C/C 2Y14F.B. By Eng.Amal Said AlBahri at 10:10 am, Dec 17, 2018
PB4

-
PB3
PB4

20
PB4

1 Y 8 AT EACH CORNER
30
14 14 MESH A-193

15 PB4 15 F.F.L.
Y 12 @ 15 c/c
X x Y 14 @ 15 c/c
16 PB6 16 GROUND LVL.
X F.G.L. OR N.G.L.

17 PB6 17 WHICH EVER IS LOWER


SOLID BLOCK WORK (TYP.)
X

50
18 PB4 18 Y 12 @ 20 c/c
X

DEPENDS ON SITE SOIL


CONDITIONS

150 MIN.
Y 14 @ 15 c/c P C C 1:3:6

30
TWO COATS OF
BITUMIN PAINT
(TYPICAL) 20 20 20
2.00 6Y16 60
A

40
SECTION X X

10
10 45 30 45 10
WELL COMPACTED SCALE 1 :20
A B C D E F G H I J K L EARTH

SECTION. M - M

INTERNATIONAL CENTER
FOR INVESTMENT &ENGINEERING CONSULTANCY
PLINTHBEAM LAYOUT
CLIENT

PROJECT TITLE

LOCATION

SHEET CONTAIN FLOOR AREA TOTAL BUILT AREA

SCALE DATE

PROJECT No.
PLOT No. AREA No. No. OF FLOOR

G+1+P
SHEET No.
DEALT ENG. KHERVIN ABILASH
ST-02
DESIGNED ENG. FARES MOHAMMAD
A B C D E F G H I J K L

B3 B8 B3
1 1
2 2

B1
S1 S1

3Y12(T&B)
B8 B9

B6
S2

B2
3 S1 S1 3
B4 3Y12(T&B)
B1

S1 S1

B7
3Y12(T&B)

S3 S1 B6
4 B2 4

B8
5 3Y12(T&B) B4 5
B7

S5 S3
B8
6 B1 S3 6
B7

B6
B8

B6
HB1
B8

HB1
S3 S1

3Y12(T&B)
3Y12(T&B)
S3
S5 S3
HB1 B2 B2
B4 HB1 HB1
3Y12(T&B)

7 S5 7

B7
B5

S3
ST ST
HB1 B4 S3
8 HB1 8

B12
B7

ST ST
HB1

S5 B4
3Y14(T&B)
B3

B7/*B4

9 S3 9
S5 ST
S1 SCHEDULE OF ROOF BEAMS
B7/*B4

B1

B5
S1
HB1

10
FC ST 10 BOTTOM REINF. TOP REINF.
TYPE SIZE STIRRUPS REMARKS
11 B12 11 STRAIGHT CURTAIL STRAIGHT EXTRA AT
END. SUPPRT
EXTRA AT
CON. SUPPRT
B4
B1 20X40 2Y14 --- 2Y14 --- --- Y8 @ 15C/C ---
S4 B2 20X50 3Y16 --- 2Y16 --- --- Y8 @ 15C/C ---
B8

HB3
B3

12 S5 12 B3 20X60 3Y16 --- 2Y16 --- 2Y16 Y8 @ 15C/C ---


B4 20X60 3Y16 2Y16 2Y16 2Y16 --- Y8 @ 15C/C ---
HB1
B5 20X60 2Y16 --- 4Y16 --- 2Y16 Y8 @ 15C/C ---
HB3
B6 20X60 4Y16 2Y16 2Y16 --- 2Y16 Y8 @ 15C/C ---
B7
HB1
13 13 B7 20X70 4Y16 2Y16 4Y16 2Y16 --- Y8 @ 15C/C 2Y14F.B.
HB1

B8 20X80 4Y20 2Y20 2Y20 --- 2Y20 Y8 @ 15C/C 4Y14F.B.


3Y14(T&B) S5 S4
B8

S5 B9 20X80 2Y20 --- 4Y20 --- --- Y8 @ 15C/C 4Y14F.B.


B6

By Eng.Amal Said AlBahri at 10:10 am, Dec 17, 2018


B4

S5 B10 20X80 4Y20 + 2Y20 2Y20 2Y20 2Y20 2Y20 Y8 @ 15C/C 4Y14F.B.
HB1

S5 3Y14(T&B)
B11 30X80 4Y25 + 3Y20 2Y20 3Y20 2Y20 2Y20 Y8 @ 15C/C 4Y14F.B.
S5
B8
B4

B12 20X100 4Y25 + 2Y20 2Y25 4Y20 2Y20 2Y20 Y8 @ 15C/C 4Y14F.B.
14 14 HB1 80X35 10Y16 --- 10Y14 --- --- Y8 @ 13C/C 4LEGGED
15 B4 15 HB2 120X45 14Y20 8Y20 14Y16 --- --- Y10 @ 15C/C 8LEGGED

16 B7 16
17 B7 17
18 B4 18
SCHEDULE OF SLABS

TYPE THK. SHORT BARS LONG BARS. REMARKS

S1 13 Y10 @ 15C/C Y10 @ 17 C/C ---


S2 14 Y10 @ 15C/C Y10 @ 16 C/C ---
S3 15 Y10 @ 15C/C Y10 @ 15 C/C ---
S4 18 Y12 @ 15C/C Y12 @ 15C/C ---
A B C D E F G H I J K L
S5 20 Y12 @ 13C/C Y12 @ 15C/C T&B

*BEAM CRANKED ST 20 Y14 @ 15C/C Y14 @ 15C/C T&B

FC = 20X20
4Y20
Y8@15C/C

GROUND FLOOR ROOF LAYOUT INTERNATIONAL CENTER


FOR INVESTMENT &ENGINEERING CONSULTANCY

CLIENT

PROJECT TITLE

LOCATION

SHEET CONTAIN FLOOR AREA TOTAL BUILT AREA

SCALE DATE

PROJECT No.
PLOT No. AREA No. No. OF FLOOR

G+1+P
SHEET No.
DEALT ENG. KHERVIN ABILASH
ST-03
DESIGNED ENG. FARES MOHAMMAD
A B C D E F G H I J K L

B3 B6 B3
1 1
2 2

B1
B7 B4
S1 S1

B6
3 3
B4 3Y12(T&B)

HB1

B4
B1

S1 S1 S4
4 S4 4
S4 3Y12(T&B) B4
B8
B4

HB1

5 5
S3
S4
6 6
B8

B7
B7
B8

S3

B1

B1
B10 B9 S1 S1 S1
B9
7 S5 7

B10
B5

B10
B1

S1 S1
ST ST
HB1 B4
8 8
B6
B7

ST ST
HB1

S5
B7/*B4
B3

9 9
ST B8 S5
SCHEDULE OF ROOF BEAMS
B7/*B4

B5
S5
HB1

10 ST 10 BOTTOM REINF. TOP REINF.


S5 TYPE SIZE STIRRUPS REMARKS
11 11 STRAIGHT CURTAIL STRAIGHT EXTRA AT
END. SUPPRT
EXTRA AT
CON. SUPPRT

B1 20X40 2Y14 --- 2Y14 --- --- Y8 @ 15C/C ---


B2 20X50 3Y16 --- 2Y16 --- --- Y8 @ 15C/C ---
B7

HB2
B3

12 12 B3 20X60 3Y16 --- 2Y16 --- 2Y16 Y8 @ 15C/C ---


S5 B4 20X60 3Y16 2Y16 2Y16 2Y16 --- Y8 @ 15C/C ---
B7 B7 B5 20X60 2Y16 --- 4Y16 --- 2Y16 Y8 @ 15C/C ---

B7
HB2
S2 B6 20X60 4Y16 2Y16 2Y16 --- 2Y16 Y8 @ 15C/C ---
13 13 B7 20X70 4Y16 2Y16 4Y16 2Y16 --- Y8 @ 15C/C 2Y14F.B.
B11 B11
B6

4Y12(T&B)

B8 20X80 4Y20 2Y20 2Y20 --- 2Y20 Y8 @ 15C/C 4Y14F.B.


FC = 20X20 S5
B6

4Y20 S1 B2 B9 20X80 2Y20 --- 4Y20 --- --- Y8 @ 15C/C 4Y14F.B.


Y8@15C/C
By Eng.Amal Said AlBahri at 10:11 am, Dec 17, 2018
B4

B10 20X80 4Y20 + 2Y20 2Y20 2Y20 2Y20 2Y20 Y8 @ 15C/C 4Y14F.B.
FC STARTS ON G.F. ROOF B2
B4

B11 30X80 4Y25 + 3Y20 2Y20 3Y20 2Y20 2Y20 Y8 @ 15C/C 4Y14F.B.
4Y12(T&B)
B4

REFER SHEET ST-02 S5 S2


B12 20X100 4Y25 + 2Y20 2Y25 4Y20 2Y20 2Y20 Y8 @ 15C/C 4Y14F.B.
14 S1 14 HB1 80X35 10Y16 --- 10Y14 --- --- Y8 @ 13C/C 4LEGGED
15 B4 15 HB2 120X45 14Y20 8Y20 14Y16 --- --- Y10 @ 15C/C 8LEGGED

16 B7 16
17 B7 17
18 B4 18
SCHEDULE OF SLABS

TYPE THK. SHORT BARS LONG BARS. REMARKS

S1 13 Y10 @ 15C/C Y10 @ 17 C/C ---


S2 14 Y10 @ 15C/C Y10 @ 16 C/C ---
S3 15 Y10 @ 15C/C Y10 @ 15 C/C ---
S4 18 Y12 @ 15C/C Y12 @ 15C/C ---
A B C D E F G H I J K L
S5 20 Y12 @ 13C/C Y12 @ 15C/C T&B
ST 20 Y14 @ 15C/C Y14 @ 15C/C T&B
*BEAM CRANKED

FIRST FLOOR ROOF LAYOUT INTERNATIONAL CENTER


FOR INVESTMENT &ENGINEERING CONSULTANCY

CLIENT

PROJECT TITLE

LOCATION

SHEET CONTAIN FLOOR AREA TOTAL BUILT AREA

SCALE DATE

PROJECT No.
PLOT No. AREA No. No. OF FLOOR

G+1+P
SHEET No.
DEALT ENG. KHERVIN ABILASH
ST-04
DESIGNED ENG. FARES MOHAMMAD
Muscat municipality
General Directorate
of Technical Affairs
Building Permits Department
Approved as per the issued permit
Building facade to be painted in white colour only

- The project contractor and the supervision


consultant must construct the project as
per the approved drawings and comply with
conditional approvals, local and internation-
al approved regulations during construc-
tion.
- The design consultant, the supervision
consultant and the project contractor takes
full responsibility, each on their scope,
towards the safety of the building, the data
A B C D E F G H I J K L
provided in this approval, the attachment of
correct documents, the compliance of the
attached designs with the local order
number 23/92, laws, regulations, circulars,
and krooki requirements, and the provision
B3 B3 B3
1 1 of other authorities approvals, specifica-
2
S1
2
tions and guidelines without conflict with
the approved drawings from this directo-
B7 B3
3 3
rate.

B6
S1 B2

B4
S5
4 4 - The project contractor and the supervision
consultant are committed to provide the
B4

5 S3 B2 5
B7
6
S3
6 required safety of the buildings, the neigh-

B7
boring services as well as considering the
B8

B7

B6
S3 soil nature and the structural effects on the
B8 B9 S1 surrounding environment.
7 7 - If the plot is nearby a mountain (Jabal) or a
B5

B8
S1 B9 B8
S2
valley (Wadi), the supervision consultant
8 8 must provide a detailed study on the Jabal
B2
cutting or the required protection towards
**B2
B4
B7

3Y14(T&B)
(typical) the Wadi side prior to construction.
B3

9 9
S5
- The project contractor and the supervision
B7 S5
B7

B9
SCHEDULE OF ROOF BEAMS
consultant must return to this directorate
B7

10 10 BOTTOM REINF. TOP REINF.


TYPE SIZE STIRRUPS REMARKS
11 S5 S5 11
prior to construction in case of a technical
EXTRA AT EXTRA AT
STRAIGHT CURTAIL STRAIGHT END. SUPPRT CON. SUPPRT

issue is occurred which constrain construc-


B1 20X40 2Y14 --- 2Y14 --- --- Y8 @ 15C/C ---
B2 20X50 3Y16 --- 2Y16 --- --- Y8 @ 15C/C ---
tion and when the approved drawings does

B9
B3

12 12 B3 20X60 3Y16 --- 2Y16 --- 2Y16 Y8 @ 15C/C ---


B4

B6 B6 B4 20X60 3Y16 2Y16 2Y16 2Y16 --- Y8 @ 15C/C --- not match with other approved drawings or
B5 20X60 2Y16 --- 4Y16 --- 2Y16 Y8 @ 15C/C ---
with the existing plot conditions.
B6 20X60 4Y16 2Y16 2Y16 --- 2Y16 Y8 @ 15C/C ---
B7 B7
13 13 B7 20X70 4Y16 2Y16 4Y16 2Y16 --- Y8 @ 15C/C 2Y14F.B.
B8 20X80 4Y20 2Y20 2Y20 --- 2Y20 Y8 @ 15C/C 4Y14F.B.
B9 20X80 2Y20 --- 4Y20 --- --- Y8 @ 15C/C 4Y14F.B.
B10 20X80 4Y20 + 2Y20 2Y20 2Y20 2Y20 2Y20 Y8 @ 15C/C 4Y14F.B.
By Eng.Amal Said AlBahri at 10:11 am, Dec 17, 2018
B11 30X80 4Y25 + 3Y20 2Y20 3Y20 2Y20 2Y20 Y8 @ 15C/C 4Y14F.B.
B12 20X100 4Y25 + 2Y20 2Y25 4Y20 2Y20 2Y20 Y8 @ 15C/C 4Y14F.B.
14 14 HB1 80X35 10Y16 --- 10Y14 --- --- Y8 @ 13C/C 4LEGGED
15 15 HB2 120X45 14Y20 8Y20 14Y16 --- --- Y10 @ 15C/C 8LEGGED

16 16
17 17
18 18
SCHEDULE OF SLABS

TYPE THK. SHORT BARS LONG BARS. REMARKS

S1 13 Y10 @ 15C/C Y10 @ 17 C/C ---


S2 14 Y10 @ 15C/C Y10 @ 16 C/C ---
S3 15 Y10 @ 15C/C Y10 @ 15 C/C ---
S4 18 Y12 @ 15C/C Y12 @ 15C/C ---
A B C D E F G H I J K L
S5 20 Y12 @ 13C/C Y12 @ 15C/C T&B

**BEAM INVERTED ST 20 Y14 @ 15C/C Y14 @ 15C/C T&B

PENTHOUSE ROOF LAYOUT INTERNATIONAL CENTER


FOR INVESTMENT &ENGINEERING CONSULTANCY

CLIENT

PROJECT TITLE

LOCATION

SHEET CONTAIN FLOOR AREA TOTAL BUILT AREA

SCALE DATE

PROJECT No.
PLOT No. AREA No. No. OF FLOOR

G+1+P
SHEET No.
DEALT ENG. KHERVIN ABILASH
ST-05
DESIGNED ENG. FARES MOHAMMAD
Y 12 @ 15 C/C
LONG SPAN (DISTRIBUTION) 1/4 OF L1 1/4 OF L2 SHORT SPAN (MAIN REINF.) 1/4 OF L2 1/4 OF L3
ALTERNATE BENT UP ALTERNATE BENT UP

THICKNES
DIST. REINF.

MAIN REINF.
DEPTH
1 Y 10 IN EACH THREAD

1/5 OF L1
BEAM @ FLOOR LVL. Y 8 @ 15 C/C
( AS/ SCH. )
1/5 OF L1 1/5 OF L2 1/5 OF L2 1/5 OF L3 Y 10 @ 20 C/C
Y 8 @ 20 C/C
TYP. DET. OF SLAB SECTION Y 12 @ 15 C/C
TOP STRAIGHT REINF.
EXTRA TOP REINF. 1/4 OF L1 1/4 OF L2 1/4 OF L2 1/4 OF L3
STIRRUPS TOP REINF. Y 16 @ 15 C/C

10
Y 8 @ 20 C/C
DEPTH

50
BEAM @ M.L.LVL. 5 Y 481
( AS/ SCH. )
CURTAIL REINF. STIRRUPS BOT. REINF.
1/5 OF L1 BOTT. STRAIGHT REINF. WAIST SLAB LANDING SLAB
( AS/ SCH. ) ( AS/ SCH. )
20 40 10
1/5 OF L1 1/5 OF L2 1/5 OF L2 1/5 OF L3 Y 12 @ 15 C/C
TYP. DET. OF CANTILEVER BEAM
TYP. DET. OF ROLING

Rise Rise
Y 10 @ 20 C/C 4
L/
TOP REINF. TYP. DET. OF SHORT BEAM SECTION Y 8 @ 15 C/C SHUTTER PRJCTN.
TOP STRAIGHT REINF.
Y 8 @ 20 C/C Thread Thread Y 8 @ 20 C/C
Y 10 @ 20 C/C EXTRA TOP REINF.
THICKNES

1 Y 10 IN EACH THREAD 4 Y 12
Y 8 @ 20 C/C

DEPTH
Y 16 @ 15 C/C Y 10 @ 20 C/C

Y 16 @ 15 C/C
SLAB AS / SCH. 4
BOTT. STRAIGHT REINF. STIRRUPS L/
20 40 20 40
Y 10 @ 20 C/C
BEAM AS / SCH. 3 Y 481 BOTT. REINF. LIGHT WT HOURDY TYP. DET. OF CHAJJA
BLOCK FLOOR LVL. TYP. DET. OF RCC STAIRCASE AT LINTEL LVL.
TYP. DET. OF RIB SLAB TYP. DET. OF SHORT BEAM IN BTN. LONG BEAM 10 CM THICK HOLLOW BRICK WALL
STAIR CASE STARTER
BEAM ( AS / SCH. ) Y 8 @ 20 C/C 4Y8
1/4 OF L2 1/4 OF L2 20
Z BARS
40 40 40 40 Y 10 @ 20 C/C ( TYP ) FLOOR LVL.
20 4 Y 12
LONG SPAN ( DISTRIBUTION ) Y 8 @ 20 C/C PARAPET
20
1:2:4 PCC SLOPE 1 : 100
20 OVER RCC SLAB.
2 COATS OF EVERFAST
SHORT SPAN ( MAIN REINF.) BITUMEN OVER PCC
SECTION A-A SLOPE. TYP. DET. OF WALL FOOTING
ONE LAYER OF MORTARPLAS
Y 8 @ 20 C/C
OVER BITUMEN COATING FOR 10 CM THICK WALL
( TORCH APPLICATION. )
TYP. DET. OF SUNKEN SLAB TYP. DET. OF LINTEL INSULATION METARIAL
4 Y 481 HOLLOW BLOCK
FOR HEAT RESISTING. WALL
FINAL FINISH WITH WHITE
CEMENT TILE USING TOP REINFRCMNT.
SOLID BLOCK RICH MIX OF WHITE
WORK CEMENT SCREED MIN. 1:3 PLINTH BEAM
MAIN REFMNT. OF AS / SCH.
DEAPTH OF FOUNDATION

DEAPTH OF FOUNDATION

TOP REINF.
MAIN REFMNT. OF COLUMN AS/ SCH.
STIRRUPS

PLINTH HEIGHT
COLUMN AS/ SCH. TYP. FLOOR TREATMENT.

PLINTH HEIGHT
FACE REINF.
LINKS AS/ SCH. APP. TILES FLOOR FINISH
LINKS AS/ SCH.
BOTT. REINF.
VARIES

VARIES

& 10 CM SKIRTING.
LATERAL TIES - Y8 10 CM PCC 1:2:4 MIX WITH
WIRE MESH - A 4812.
By Eng.Amal Said AlBahri at 10:11 am, Dec 17, 2018
POLYTHENE SHEET 1000
SHORT BARS MICRON THICK.
LONG BARS REINFORCMENT
PEST CONTROL TREATENT BOTTOM
APPROVED.

DEPTH ( V )
DEPTH ( V )
15 CM BOULDER PACKING. SOLID BLOCK
4 Y 12 WORK
WELL COMPACTED EARTH
Y 8 @ 20 C/C BACK FILLING WITH
TWO COATS
Y 12 @ 15 C/C MAX. 15 CM LAYERS
SECTION B-B SECTION C-C SECTION D-D ( EACH ) OF BITUMIN
PCC BELOW
FOOTING LVL.
2 Y 10

TYP. DET. OF LOAD TYP. DET. OF PLINTH BEAM


LONG BARS

LONG BARS

BEARING WALL & SOLID BLOCK WORK


SHORT BARS
TOP & BOT.

3 Y 8 @ 15 C/C 3 Y 8 @ 15 C/C
CLOSED STIRRUPS 2 Y 12 2 Y 12 Y 8 @ 20 C/C CLOSED STIRRUPS 2 Y 12

INTERNATIONAL CENTER
SHORT BARS SHORT BARS
LONG BARS TOP & BOT.
FOR INVESTMENT &ENGINEERING CONSULTANCY
2 Y 12 2 Y 12
Y 8 @ 20 C/C

R
R
CLIENT

PROJECT TITLE
TYP. DET. OF FOOTING TYP. DET. OF NEIGHBUR TYP. DET. OF COMBAINED TYPE -1
TYP. DET. OF ARCHES LOCATION
& COLUMN COLUMN & FOOTING FOOTING
SHEET CONTAIN FLOOR AREA TOTAL BUILT AREA

SCALE DATE

TYP. DET. OF DUCT TYP. DET. OF COL. PROJECT No.


PLOT No. AREA No. No. OF FLOOR
TYP. DET. OF COL. SEC. OPENING JOINT AT SLAB LVL. G+1+P
SHEET No.
DEALT ENG. KHERVIN ABILASH
ST-06
DESIGNED ENG. FARES MOHAMMAD
Muscat municipality
General Directorate
Y 12 @ 15 C/C
LONG SPAN (DISTRIBUTION) 1/4 OF L1 1/4 OF L2 SHORT SPAN (MAIN REINF.) 1/4 OF L2 1/4 OF L3 of Technical Affairs
ALTERNATE BENT UP ALTERNATE BENT UP Building Permits Department

THICKNES
DIST. REINF.

MAIN REINF. Approved as per the issued permit


DEPTH

1 Y 10 IN EACH THREAD
Building facade to be painted in white colour only
1/5 OF L1
BEAM @ FLOOR LVL. Y 8 @ 15 C/C
( AS/ SCH. ) - The project contractor and the supervision
1/5 OF L1 1/5 OF L2 1/5 OF L2 1/5 OF L3 Y 10 @ 20 C/C consultant must construct the project as
Y 8 @ 20 C/C per the approved drawings and comply with
TYP. DET. OF SLAB SECTION Y 12 @ 15 C/C conditional approvals, local and internation-
TOP STRAIGHT REINF.
1/4 OF L1 1/4 OF L2
al approved regulations during construc-
EXTRA TOP REINF. 1/4 OF L2 1/4 OF L3
STIRRUPS TOP REINF. Y 16 @ 15 C/C

10
Y 8 @ 20 C/C tion.
DEPTH

- The design consultant, the supervision


consultant and the project contractor takes

50
BEAM @ M.L.LVL. 5 Y 481

CURTAIL REINF. STIRRUPS BOT. REINF.


( AS/ SCH. )
full responsibility, each on their scope,
1/5 OF L1 WAIST SLAB LANDING SLAB
towards the safety of the building, the data
BOTT. STRAIGHT REINF.
( AS/ SCH. ) ( AS/ SCH. )
20 40 10 provided in this approval, the attachment of
Y 12 @ 15 C/C
1/5 OF L1 1/5 OF L2 1/5 OF L2 1/5 OF L3
TYP. DET. OF CANTILEVER BEAM correct documents, the compliance of the
TYP. DET. OF ROLING

Rise Rise
Y 10 @ 20 C/C
L/
4 attached designs with the local order
TOP REINF. TYP. DET. OF SHORT BEAM SECTION Y 8 @ 15 C/C SHUTTER PRJCTN. number 23/92, laws, regulations, circulars,
TOP STRAIGHT REINF.
Y 10 @ 20 C/C
Y 8 @ 20 C/C EXTRA TOP REINF. Thread Thread Y 8 @ 20 C/C and krooki requirements, and the provision
of other authorities approvals, specifica-
THICKNES

1 Y 10 IN EACH THREAD 4 Y 12
Y 8 @ 20 C/C

DEPTH
Y 16 @ 15 C/C Y 10 @ 20 C/C tions and guidelines without conflict with
the approved drawings from this directo-
rate.
SLAB AS / SCH. Y 16 @ 15 C/C
4
BOTT. STRAIGHT REINF. STIRRUPS L/
20 40 20 40
Y 10 @ 20 C/C - The project contractor and the supervision
BEAM AS / SCH. 3 Y 481 BOTT. REINF. LIGHT WT HOURDY TYP. DET. OF CHAJJA consultant are committed to provide the
BLOCK FLOOR LVL. TYP. DET. OF RCC STAIRCASE AT LINTEL LVL. required safety of the buildings, the neigh-
TYP. DET. OF RIB SLAB boring services as well as considering the
TYP. DET. OF SHORT BEAM IN BTN. LONG BEAM 10 CM THICK HOLLOW BRICK WALL
STAIR CASE STARTER
BEAM ( AS / SCH. ) 4Y8
soil nature and the structural effects on the
Y 8 @ 20 C/C
1/4 OF L2 1/4 OF L2
Z BARS 20 surrounding environment.
40 40 40 40 Y 10 @ 20 C/C ( TYP ) FLOOR LVL.
20 4 Y 12
- If the plot is nearby a mountain (Jabal) or a
LONG SPAN ( DISTRIBUTION )
20 Y 8 @ 20 C/C PARAPET
1:2:4 PCC SLOPE 1 : 100 valley (Wadi), the supervision consultant
20 OVER RCC SLAB. must provide a detailed study on the Jabal
SHORT SPAN ( MAIN REINF.)
2 COATS OF EVERFAST
BITUMEN OVER PCC
cutting or the required protection towards
SECTION A-A SLOPE. TYP. DET. OF WALL FOOTING the Wadi side prior to construction.
ONE LAYER OF MORTARPLAS
OVER BITUMEN COATING FOR 10 CM THICK WALL - The project contractor and the supervision
Y 8 @ 20 C/C
TYP. DET. OF LINTEL ( TORCH APPLICATION. )
consultant must return to this directorate
TYP. DET. OF SUNKEN SLAB 4 Y 481 INSULATION METARIAL HOLLOW BLOCK prior to construction in case of a technical
FOR HEAT RESISTING. WALL
FINAL FINISH WITH WHITE
TOP REINFRCMNT.
issue is occurred which constrain construc-
SOLID BLOCK
CEMENT TILE USING
RICH MIX OF WHITE tion and when the approved drawings does
WORK CEMENT SCREED MIN. 1:3 PLINTH BEAM not match with other approved drawings or
AS / SCH.
MAIN REFMNT. OF with the existing plot conditions.
DEAPTH OF FOUNDATION

DEAPTH OF FOUNDATION

TOP REINF.
MAIN REFMNT. OF COLUMN AS/ SCH.
STIRRUPS

PLINTH HEIGHT
COLUMN AS/ SCH. TYP. FLOOR TREATMENT.

PLINTH HEIGHT
FACE REINF.
LINKS AS/ SCH. APP. TILES FLOOR FINISH
LINKS AS/ SCH.
BOTT. REINF.
VARIES

VARIES

& 10 CM SKIRTING.
LATERAL TIES - Y8 10 CM PCC 1:2:4 MIX WITH
WIRE MESH - A 4812.
POLYTHENE SHEET 1000
SHORT BARS MICRON THICK.
LONG BARS REINFORCMENT By Eng.Amal Said AlBahri at 10:43 am, Dec 12, 2018
PEST CONTROL TREATENT BOTTOM
APPROVED.

DEPTH ( V )
DEPTH ( V )
15 CM BOULDER PACKING. SOLID BLOCK
4 Y 12 WORK
WELL COMPACTED EARTH
Y 8 @ 20 C/C BACK FILLING WITH
TWO COATS
Y 12 @ 15 C/C MAX. 15 CM LAYERS
SECTION B-B SECTION C-C SECTION D-D ( EACH ) OF BITUMIN
PCC BELOW
FOOTING LVL.
2 Y 10

TYP. DET. OF LOAD TYP. DET. OF PLINTH BEAM


LONG BARS

LONG BARS

BEARING WALL & SOLID BLOCK WORK


SHORT BARS
TOP & BOT.

3 Y 8 @ 15 C/C 3 Y 8 @ 15 C/C
CLOSED STIRRUPS 2 Y 12 2 Y 12 Y 8 @ 20 C/C CLOSED STIRRUPS 2 Y 12

INTERNATIONAL CENTER
SHORT BARS SHORT BARS
LONG BARS TOP & BOT.
FOR INVESTMENT &ENGINEERING CONSULTANCY
2 Y 12 2 Y 12
Y 8 @ 20 C/C

R
R
CLIENT

PROJECT TITLE
TYP. DET. OF FOOTING TYP. DET. OF NEIGHBUR TYP. DET. OF COMBAINED TYPE -1
TYP. DET. OF ARCHES LOCATION
& COLUMN COLUMN & FOOTING FOOTING
SHEET CONTAIN FLOOR AREA TOTAL BUILT AREA

SCALE DATE

TYP. DET. OF DUCT TYP. DET. OF COL. PROJECT No.


PLOT No. AREA No. No. OF FLOOR
TYP. DET. OF COL. SEC. OPENING JOINT AT SLAB LVL. G+1+P
SHEET No.
DEALT ENG. KHERVIN ABILASH
ST-06
DESIGNED ENG. FARES MOHAMMAD