Proposed Wanjero Residence

Construction Drawings

Fredrick Wanjero C/O Isaac Wanjero

Riverside Studios
Riverside Lane, Off Riverside Drive
Kubuni Studio Limited 27 July 2021
GSPublisherVersion 0.0.100.100
GENERAL NOTES
N 1. All work is to be done in accordance with the National
Construction Authority Regulations.

2. All materials and workmanship are to comply with the


relevant Kenya Bureau of Standards codes and or the
specified international codes where applicable in the
Architectural specifications. Where relevant Kenya Bureau
of Standards, British Standards, BS codes of practice, or
Agrément Certificates applicable to the design exists, the

1,800
recommendations and requirements of such documents to
be considered a minimum standard for the works.

3. The contractor shall in all aspects of the works comply


with the provisions of the Occupational Health and Safety

7,600
Act, 2007 (Act No 15 of 2007) and any regulations

10,600
promulgated in terms of that Act or the Factories
4M WIDE PLINTH PATH Machinery and Building Works Act.

7,050 8,150 9,300 7,500 4. The contractor shall set up, document and maintain a
quality assurance and quality control system, in
accordance with ISO 9001, able to be checked to the
satisfaction of the Architect, that all materials and
workmanship, whatever their sources, meet the
requirements of the Specification.

5. This drawing must be read in conjunction with all the


GT IC
relevant drawings, schedules and specifications from
kubuni studio and all other consultants related to the
project.

6. All portions of the works related to any service or

11,800
IC
2 consultant’s information is to be done in accordance with
163.20 m the National Construction Building Regulations.

8,800
7. This drawing is not to be scaled. Figured dimensions to be
used. All dimensions are in millimeters unless otherwise

9M ROAD 7,050 17,450 7,500 stated.

8. All dimensions and levels must be checked on site by the


13 x 54 = 700
contractor before putting work in hand.

GT
9. All work to be executed by competent persons qualified
for the specific trade.
IC
IC IC
IC

10. This drawings is copyright reserved and remains the


property of Kubuni Studio Limited
4M WIDE PLINTH PATH

IC

9,800
9,000 24,025 3,800 4,175
REV. DATE DESCRIPTION BY

54,200
GT

L.R. No. SOUTH


IC

26.20 m2
GT

UGENYA/RANG'ALA/94

6,900
29,025
70,000
IC

SITE SLOPE

GATE
02
9,000 9,075 6,000 16,925

LIVE HEDGE

KEY:
PROPOSED NEW WORKS
7,500

GATE

33,900
DEMOLITIONS
01
LIVE HEDGE POSITION OF EXISTING WORKS
SEPTIC TANK For and on behalf of:
Architect: Kubuni Studio Limited
Reg. No. : 357A

Signature: ____________________________

Client:
Fredrick Wanjero C/O Isaac Wanjero
EUCALYPTUS
14,075
14,000

P.O. Box: 66139 - 00800

Project Title:
TREES Proposed Wanjero Residence

Plot No.: Road:


SOUTH UGENYA/RANG'ALA/94 Kisumu-Busia Road

Location: Town:
Sidindi, Ugunja Siaya
Project Status:
Construction Drawings
Drawing Title: Scale:
Setting Out Plan 1:150

32,000 Drawing No: Project No: Rev. No.:


0301 #Pln CD06

Drawn By: Checked By: Date:


F.O Arch. A. Ombati 27 July 2021

CAD File:
9,000

9,000

9,000

9,000

811UGN_Wanjero Residence CD07.pln

9M ROAD kubuni studio


architecture . interiors . project Management

Riverside Studios
Riverside Lane, Off Riverside Drive
Site Plan 1:150 P.O.BOX 30446 - 00100, Nairobi, Kenya

GSPublisherVersion 0.0.100.100
GENERAL NOTES

1. All work is to be done in accordance with the National


L(-1)14 L(-1)22 L(-1)12 Construction Authority Regulations.
02.2 02.3 02.2
2. All materials and workmanship are to comply with the
L(-1)13 relevant Kenya Bureau of Standards codes and or the
02.2 specified international codes where applicable in the
200 3,300 200 4,450 200 5,100 200 3,600 200
Architectural specifications. Where relevant Kenya Bureau
of Standards, British Standards, BS codes of practice, or
200 Agrément Certificates applicable to the design exists, the
1,100 1,500 2,850 1,500 1,200 200 750 3,600 750 200 900 450 1,800 250 200 recommendations and requirements of such documents to
be considered a minimum standard for the works.

3. The contractor shall in all aspects of the works comply

600
with the provisions of the Occupational Health and Safety

150
Act, 2007 (Act No 15 of 2007) and any regulations
promulgated in terms of that Act or the Factories

300
Machinery and Building Works Act.
200 500 150 4,450 200 3,600 200
5,000 Litre -50 -50 4. The contractor shall set up, document and maintain a

300
3,000

1,800
quality assurance and quality control system, in
Above ground Terrace Dhobi Area accordance with ISO 9001, able to be checked to the

2,850

300
Rainwater storage 600x600mm pcc 600x600mm pcc satisfaction of the Architect, that all materials and
paving slabs

300
paving slabs workmanship, whatever their sources, meet the
tank
requirements of the Specification.

300
5. This drawing must be read in conjunction with all the
D01

600

600
GT
relevant drawings, schedules and specifications from
W05 W05 IC

1,650
2 2 2
200 kubuni studio and all other consultants related to the

200
project.
D05
W04
200

200

200

200

200

200
2 2 2 2
2
6. All portions of the works related to any service or
consultant’s information is to be done in accordance with
the National Construction Building Regulations.

1,200
2

1,550
Bedroom 01 7. This drawing is not to be scaled. Figured dimensions to be
600x300mm used. All dimensions are in millimeters unless otherwise

1,800
ceramic tiles stated.
3,600

Master
1,200

3,600
8. All dimensions and levels must be checked on site by the

600
3,600

3,600
2
Bedroom 2 contractor before putting work in hand.

4,300
2 Lounge W04
600x300mm
600x300mm
Kitchen 9. All work to be executed by competent persons qualified
ceramic tiles 600x300mm IC for the specific trade.
ceramic tiles

900
ceramic tiles Position of
cooker 10. This drawings is copyright reserved and remains the
1,200

property of Kubuni Studio Limited


0
2
200

200

2
D03

900

2,600
D03 Position of
200

200
0 2
8,800

900 150

900 350
fridge
1,200
8,400

D03 Corridor D03 D03


1,200

1,200
L(-1)21
600x300mm

200
02.3
200

ceramic tiles
Pantry

2,050
Entrance Lobby 2
W06

1,150
600x300mm REV. DATE DESCRIPTION BY
D03 D03

600

1,500
600x300mm ceramic tiles ceramic tiles
200

200
1,450

200 3,300 200 1,800 200 1,200 200 1,050 200 1,950 1,800 1,350 200 3,600 200

650
2 2

D04
2,200

2,200

8.51 %
200

200

200
Walk-in D03 Shower
2
W06 W06
Cloakroom
900

Closet Master 600x300mm Entrance


2
ceramic tiles 600x300mm
Bathroom ceramic tiles Ramp 13 x 54 = 700

1,900
600x300mm
200

ceramic tiles 600x300mm


ceramic tiles
1,200

800 200
3,200

GT 200 4,150 8,001


W08 W11 W08 IC
1,000

W05 W01
4,000

2
IC

200
IC
Front Porch IC
200

200

200

200

600x600mm pcc
W10 IC
paving slabs L(-1)23

1,900
#LayID
1,800

-100 -250 -400 -550 -700 -700


600

200

5,700 2,450 1,150 200 3,400 200 3,000

1,100 1,500 1,100 1,500 800 600 650 600 500 1,950 1,800 2,000 600 1,500 600 650 L(-1)16 L(-1)16
600x600mm pcc paving slabs 02.2 02.2
200 3,300 200 1,800 200 1,200 200 1,050 200 5,100 200 3,600 200
3,800
200 1,200 200 2,200
200 1,200 1,000 900 500
L(-1)11
02.2

KEY:

650
IC
PROPOSED NEW WORKS
W09 GT

200
850
DEMOLITIONS
Toilet EXISTING WORKS
Entrance

900

1,800
600x300mm For and on behalf of:

900
600x300mm ceramic Architect: Kubuni Studio Limited
IC

3,200
ceramic D03 tiles Reg. No. : 357A
tiles W09

450

850
GT

4,600
-450

1,000 200
Signature: ____________________________

900

6,900
L(-1)22

600
02.3 W06
D02 D03
Key: L(-1)16 L(-1)16
Client:

6,900

100
02.2 02.2
Rainwater Line Fredrick Wanjero C/O Isaac Wanjero

200

200
Sewer Line 3,800
P.O. Box: 66139 - 00800

Water Line Project Title:


200 1,200 200 2,200
Proposed Wanjero Residence
200 1,200 1,000 900 500
Plot No.: Road:

3,900
SOUTH UGENYA/RANG'ALA/94 Kisumu-Busia Road
Bedroom

3,300

3,700

3,300
600x300mm Location: Town:

1,500
650

Sidindi, Ugunja Siaya


ceramic tiles
W09 GT Project Status:

200
850

W05 Construction Drawings


Toilet Drawing Title: Scale:
Entrance 2 2 Ground Floor Plan 1:50
900

600x300mm 1,800 W07 W07

800
900

600x300mm ceramic Drawing No: Project No: Rev. No.:


IC
3,200

0302 #Pln CD06


ceramic D03 tiles
tiles W09 Drawn By: Checked By: Date:

200

200
450

850

GT 500 600 1,600 600 500 F.O Arch. A. Ombati 27 July 2021
4,600

-450 CAD File:


1,000 200

200 3,400 200


811UGN_Wanjero Residence CD07.pln
900

6,900

IC
3,800
600

W06
D02 D03 L(-1)15 L(-1)15
kubuni studio
6,900

100

02.2 02.2
200

200

architecture . interiors . project Management


To Septic
Tank Riverside Studios
Riverside Lane, Off Riverside Drive
P.O.BOX 30446 - 00100, Nairobi, Kenya

GSPublisherVersion 0.0.100.100
Proposed Wanjero Residence
Rendered Floor Plan

Rear Terrace Dhobi Area

Bedroom 01
Master Lounge
Kitchen
Bedroom

Corridor

Pantry
Cloakroom
Walk-in Entrance
Closet Shower
Master
Bathroom
Ramp

Front Porch

GSPublisherVersion 0.0.100.100
GENERAL NOTES

1. All work is to be done in accordance with the National


Construction Authority Regulations.

2. All materials and workmanship are to comply with the


relevant Kenya Bureau of Standards codes and or the
specified international codes where applicable in the
Architectural specifications. Where relevant Kenya Bureau
of Standards, British Standards, BS codes of practice, or
Agrément Certificates applicable to the design exists, the
recommendations and requirements of such documents to
be considered a minimum standard for the works.
18,650
3. The contractor shall in all aspects of the works comply
with the provisions of the Occupational Health and Safety
8,850 500 600 600 600 600 600 600 600 600 4,500
Act, 2007 (Act No 15 of 2007) and any regulations
promulgated in terms of that Act or the Factories
Machinery and Building Works Act.

300

300
4. The contractor shall set up, document and maintain a
quality assurance and quality control system, in

2,400
Mild Steel Pergola accordance with ISO 9001, able to be checked to the

3,000
above rear terrace satisfaction of the Architect, that all materials and

2,700

2,700
workmanship, whatever their sources, meet the
100x140mm mild steel box gutter 100x140mm mild steel box gutter
140

1,025 1,200 1,200 1,200 1,200 1,025 1,325 1,325 975 1,200 1,200 1,200 1,200 1,200 1,200 925 requirements of the Specification.

500

500
5. This drawing must be read in conjunction with all the
600

relevant drawings, schedules and specifications from

500

500
kubuni studio and all other consultants related to the
project.

500

500
6. All portions of the works related to any service or

500

500
consultant’s information is to be done in accordance with
the National Construction Building Regulations.

500

500
150x50mm timber rafters at 7. This drawing is not to be scaled. Figured dimensions to be

500

500
1,200mm c/c on 150x50mm used. All dimensions are in millimeters unless otherwise

500

500
timber wall plate and stated.
75x50mm cypress purlins at

6,400

7,599

500

500
8. All dimensions and levels must be checked on site by the
500mm c/c contractor before putting work in hand.

500

500
9. All work to be executed by competent persons qualified

500

500
10,000

8,800

Box Profile Roofing Sheets Box Profile Roofing Sheets for the specific trade.

500

500
10. This drawings is copyright reserved and remains the

500

500
property of Kubuni Studio Limited
10,700

500

500
500

500
500

600
500
2 no. 1,000L cylindrical tanks

21,300

500
500
REV. DATE DESCRIPTION BY

4,300

500
Mild Steel Pergola
600

500
above front terrace

400

8,850 550 600 600 600 600 600 600 600 5,050

9,550 9,100

18,650

4,850
300 500 500 500 500 500 500 500 500 500

950 375
150x50mm timber rafters at
1,200mm c/c on 150x50mm
KEY:

1,200
timber wall plate and
75x50mm cypress purlins at PROPOSED NEW WORKS
500mm c/c
DEMOLITIONS

1,200
EXISTING WORKS
7,500

7,500

Box Profile For and on behalf of:


Roofing Sheets Architect: Kubuni Studio Limited

1,200
Reg. No. : 357A

1,200
Signature: ____________________________

100x140mm mild steel box gutter

950
Client:
Fredrick Wanjero C/O Isaac Wanjero

375
P.O. Box: 66139 - 00800
4,850 140
Project Title:
Proposed Wanjero Residence

Plot No.: Road:


SOUTH UGENYA/RANG'ALA/94 Kisumu-Busia Road

Location: Town:
Sidindi, Ugunja Siaya
Project Status:
Construction Drawings
Roof Plan 1:75 Roof Plan (With Structure) 1:75 Drawing Title: Scale:
Roof Plan 1:75

Drawing No: Project No: Rev. No.:


0304 #Pln CD06

Drawn By: Checked By: Date:


F.O Arch. A. Ombati 27 July 2021

CAD File:
811UGN_Wanjero Residence CD07.pln

kubuni studio
architecture . interiors . project Management

Riverside Studios
Riverside Lane, Off Riverside Drive
P.O.BOX 30446 - 00100, Nairobi, Kenya

GSPublisherVersion 0.0.100.100
GENERAL NOTES
N L(-1)14
02.2
L(-1)22
02.3
L(-1)12
02.2
1. All work is to be done in accordance with the National
L(-1)13 L(-1)13 Construction Authority Regulations.
02.2 02.2
200 3,300 200 4,450 200 5,100 200 3,600 200

2. All materials and workmanship are to comply with the


200
1,100 1,500 2,850 1,500 1,200 200 750 3,600 750 200 900 450 1,800 250 200
relevant Kenya Bureau of Standards codes and or the
specified international codes where applicable in the
Architectural specifications. Where relevant Kenya Bureau

600

150
of Standards, British Standards, BS codes of practice, or

300
200 500 150 4,450 200 3,600 200
Agrément Certificates applicable to the design exists, the

1,800
5,000 Litre -50 -50

300
recommendations and requirements of such documents to

3,000

1,800
Above ground Terrace Dhobi Area

2,850

300
Rainwater storage 600x600mm pcc 600x600mm pcc
paving slabs be considered a minimum standard for the works.

300
paving slabs
tank

300
D01
3. The contractor shall in all aspects of the works comply

600

600
GT
W05 W05 IC
with the provisions of the Occupational Health and Safety

1,650
2 2 2

7,600

200

200
D05
W04 Act, 2007 (Act No 15 of 2007) and any regulations

10,600

200

200

200

200

200

200
2 2 2 2
2
promulgated in terms of that Act or the Factories
4M WIDE PLINTH PATH

1,200
2

Machinery and Building Works Act.

1,550
Bedroom 01
600x300mm

1,800
7,050 8,150 9,300 7,500 ceramic tiles
4. The contractor shall set up, document and maintain a

3,600
Master

1,200

3,600

600
3,600

3,600
quality assurance and quality control system, in
2
Bedroom 2

4,300
2 Lounge W04
Kitchen
600x300mm
ceramic tiles
600x300mm
600x300mm IC accordance with ISO 9001, able to be checked to the
ceramic tiles

900
ceramic tiles Position of satisfaction of the Architect, that all materials and
cooker

1,200
0 workmanship, whatever their sources, meet the
2
requirements of the Specification.

200

200
2
D03

900

2,600
D03 Position of

200

200
0 2
5. This drawing must be read in conjunction with all the

8,800

900 150

900 350
fridge

1,200
8,400
GT IC D03 Corridor D03 D03

1,200

1,200
L(-1)21
600x300mm
L(-1)21 relevant drawings, schedules and specifications from

200
02.3 02.3

200
ceramic tiles
Pantry kubuni studio and all other consultants related to the

2,050
Entrance Lobby 2
W06

1,150
600x300mm
D03 D03 project.

600

1,500
600x300mm ceramic tiles ceramic tiles

200

200
1,450
2

200 3,300 200 1,800 200 1,200 200 1,050 200 1,950 1,800 1,350 200 3,600 200

650
2 2

D04 6. All portions of the works related to any service or

2,200

2,200
11,800

8.51 %
IC
2 consultant’s information is to be done in accordance with
163.20 m

200

200

200
Walk-in D03 Shower
2
W06 W06
Cloakroom the National Construction Building Regulations.

900
Closet Master 600x300mm Entrance
2
ceramic tiles 600x300mm
Bathroom ceramic tiles Ramp 13 x 54 = 700

1,900
600x300mm
8,800

200
600x300mm
ceramic tiles
ceramic tiles 7. This drawing is not to be scaled. Figured dimensions to be

1,200
used. All dimensions are in millimeters unless otherwise

800 200
3,200
200 4,150 8,001

9M ROAD
GT
W08 W11 W08

1,000
7,050 17,450 7,500 W05 W01 stated.

4,000
2
IC

200
IC
Front Porch IC

200

200

200

200
L(-1)23 W10 IC 600x600mm pcc
L(-1)23
8. All dimensions and levels must be checked on site by the
paving slabs
contractor before putting work in hand.

1,900
#LayID #LayID

1,800
13 x 54 = 700

-100 -250 -400 -550 -700 -700


GT
9. All work to be executed by competent persons qualified
for the specific trade.
IC
IC IC

600

200
5,700 2,450 1,150 200 3,400 200 3,000
IC
1,100 1,500 1,100 1,500 800 600 650 600 500 1,950 1,800 2,000 600 1,500 600 650
600x600mm pcc paving slabs 10. This drawings is copyright reserved and remains the
property of Kubuni Studio Limited
4M WIDE PLINTH PATH
200 3,300 200 1,800 200 1,200 200 1,050 200 5,100 200 3,600 200

L(-1)11 L(-1)11
02.2 02.2

IC
IC

9,800
9,000 24,025 3,800 4,175
L(-1)22 REV. DATE DESCRIPTION BY
02.3

Key: L(-1)16 L(-1)16


54,200

02.2 02.2
Rainwater Line
Sewer Line 3,800
GT
Water Line
200 1,200 200 2,200
200 1,200 1,000 900 500

L.R. No. SOUTH


IC

26.20 m2
GT

650
W09 GT

UGENYA/RANG'ALA/94

200
850
6,900
Toilet
Entrance

900

1,800
600x300mm

900
600x300mm ceramic
IC

3,200
ceramic D03 tiles
tiles W09

450

850
GT
29,025
70,000

4,600
-450

1,000 200
900

6,900
600
W06
D02 D03

6,900

100
200

200
IC

3,900
Bedroom

3,300

3,700

3,300
600x300mm

1,500
ceramic tiles

W05

SITE SLOPE 2
W07 W07
2

800
200

200
500 600 1,600 600 500

200 3,400 200

GATE
IC
L(-1)14 3,800 L(-1)12
02.2 02.2
L(-1)15 L(-1)15

02
02.2 02.2

To Septic
Tank

9,000 9,075 6,000 16,925

Ground floor 1:100


LIVE HEDGE

21,300
18,650 KEY:

4,300
PROPOSED NEW WORKS
7,500

Mild Steel Pergola


GATE 8,850 500 600 600 600 600 600 600 600 600 4,500
above front terrace
33,900

DEMOLITIONS
01
LIVE HEDGE

300

300
POSITION OF EXISTING WORKS

2,400
SEPTIC TANK Mild Steel Pergola
For and on behalf of:

400
3,000
above rear terrace

2,700

2,700
100x140mm mild steel box gutter 100x140mm mild steel box gutter
Architect: Kubuni Studio Limited
140

600 600 5,050 Reg. No. : 357A


600

9,100

Signature: ____________________________

Client:
Fredrick Wanjero C/O Isaac Wanjero

7,599
6,400
EUCALYPTUS
14,075
14,000

P.O. Box: 66139 - 00800

Project Title:
TREES
10,000

8,800

Box Profile Roofing Sheets Box Profile Roofing Sheets


Proposed Wanjero Residence
10,700

4,850
Plot No.: Road:
SOUTH UGENYA/RANG'ALA/94 Kisumu-Busia Road

Location: Town:
Sidindi, Ugunja Siaya
2 no. 1,000L cylindrical tanks Project Status:
Construction Drawings

21,300
Drawing Title: Scale:
Ground Floor 1:100, 1:150

4,300
32,000 Mild Steel Pergola
Drawing No: Project No: Rev. No.:
600

above front terrace

7,500

7,500
Box Profile 0305 #Pln CD06
Roofing Sheets
Drawn By: Checked By: Date:
F.O Arch. A. Ombati 27 July 2021
400

CAD File:
9,000

9,000

9,000

9,000

811UGN_Wanjero Residence CD07.pln


8,850 550 600 600 600 600 600 600 600 5,050

9M ROAD
100x140mm mild steel box gutter

kubuni studio
9,550 9,100

18,650

4,850 140
architecture . interiors . project Management

Riverside Studios
Roof Plan 1:100 Roof Plan 1:100 Riverside Lane, Off Riverside Drive
Site Plan 1:150 P.O.BOX 30446 - 00100, Nairobi, Kenya

GSPublisherVersion 0.0.100.100
GENERAL NOTES

1. All work is to be done in accordance with the National


Construction Authority Regulations.

2. All materials and workmanship are to comply with the


relevant Kenya Bureau of Standards codes and or the
specified international codes where applicable in the
Architectural specifications. Where relevant Kenya Bureau
of Standards, British Standards, BS codes of practice, or
Agrément Certificates applicable to the design exists, the
recommendations and requirements of such documents to
be considered a minimum standard for the works.

3. The contractor shall in all aspects of the works comply


with the provisions of the Occupational Health and Safety
L(-1)14 L(-1)22 Act, 2007 (Act No 15 of 2007) and any regulations
promulgated in terms of that Act or the Factories
02.2 02.3 Machinery and Building Works Act.

4. The contractor shall set up, document and maintain a


quality assurance and quality control system, in
200 3,300 200 4,450 200 5,100 200 3,600 200 accordance with ISO 9001, able to be checked to the
satisfaction of the Architect, that all materials and
workmanship, whatever their sources, meet the
requirements of the Specification.
200
1,100 1,500 2,850 1,500 1,200 200 750 3,600 750 200 900 450 1,800 250 200 5. This drawing must be read in conjunction with all the
relevant drawings, schedules and specifications from
kubuni studio and all other consultants related to the
project.

6. All portions of the works related to any service or

600

150
consultant’s information is to be done in accordance with
the National Construction Building Regulations.

300
7. This drawing is not to be scaled. Figured dimensions to be
200 500 150 4,450 200 3,600 200 used. All dimensions are in millimeters unless otherwise
stated.
5,000 Litre -50 -50

300
8. All dimensions and levels must be checked on site by the
3,000

1,800
Above ground Terrace Dhobi Area contractor before putting work in hand.

2,850

300
Rainwater storage 600x600mm pcc 600x600mm pcc 9. All work to be executed by competent persons qualified
for the specific trade.
paving slabs

300
paving slabs
tank 10. This drawings is copyright reserved and remains the

300
property of Kubuni Studio Limited

D01

600

600
GT
W05 W05 IC

1,650
2 2 2
200

200
D05
W04
200

200

200

200

200

200
2 2 2 2
2

1,200
2 REV. DATE DESCRIPTION BY

1,550
Bedroom 01
600x300mm

1,800
ceramic tiles
3,600

Master
1,200

3,600

600
3,600

3,600
2
Bedroom 2

4,300
2 Lounge W04
600x300mm
600x300mm
Kitchen
ceramic tiles 600x300mm IC
ceramic tiles

900
ceramic tiles Position of
cooker
1,200

0
2
200

200

2
D03

900

2,600
D03 Position of
200

200 0 2
8,800

900 150

900 350
fridge
1,200
8,400

D03 Corridor D03 D03


1,200

1,200

L(-1)21
600x300mm

200
02.3
200

ceramic tiles
Pantry

2,050
Entrance Lobby 2
W06
1,150
600x300mm
D03 D03

600

1,500
600x300mm ceramic tiles ceramic tiles
200

200
1,450

200 3,300 200 1,800 200 1,200 200 1,050 200 1,950 1,800 1,350 200 3,600 200

650
2 2

D04
2,200

2,200

8.51 %
200

200

200
Walk-in D03 Shower
2
W06 W06 KEY:

Cloakroom
900

PROPOSED NEW WORKS


Closet Master 600x300mm Entrance
2
ceramic tiles 600x300mm DEMOLITIONS
Bathroom ceramic tiles Ramp 13 x 54 = 700

1,900
600x300mm EXISTING WORKS
200

ceramic tiles 600x300mm


For and on behalf of:
ceramic tiles Architect: Kubuni Studio Limited
1,200

800 200
3,200

GT 200 4,150 8,001 Reg. No. : 357A


W08 W11 W08
1,000

W05 W01
4,000

2
IC
Signature: ____________________________

200
IC
Front Porch IC
200

200

200

200

600x600mm pcc
W10 IC
paving slabs L(-1)23 Client:
Fredrick Wanjero C/O Isaac Wanjero
1,900 #LayID
1,800

P.O. Box: 66139 - 00800

-100 -250 -400 -550 -700 -700 Project Title:


Proposed Wanjero Residence

Plot No.: Road:


SOUTH UGENYA/RANG'ALA/94 Kisumu-Busia Road

Location: Town:
600

200

Sidindi, Ugunja Siaya


5,700 2,450 1,150 200 3,400 200 3,000
Project Status:
Construction Drawings
1,100 1,500 1,100 1,500 800 600 650 600 500 1,950 1,800 2,000 600 1,500 600 650 Drawing Title: Scale:
600x600mm pcc paving slabs Ground Floor Plan 1:75

Drawing No: Project No: Rev. No.:


200 3,300 200 1,800 200 1,200 200 1,050 200 5,100 200 3,600 200 0306 #Pln CD06

Drawn By: Checked By: Date:


F.O Arch. A. Ombati 27 July 2021

CAD File:
811UGN_Wanjero Residence CD07.pln

kubuni studio
architecture . interiors . project Management

Ground floor 1:75 Riverside Studios


Riverside Lane, Off Riverside Drive
P.O.BOX 30446 - 00100, Nairobi, Kenya

GSPublisherVersion 0.0.100.100
GENERAL NOTES

1. All work is to be done in accordance with the National


Construction Authority Regulations.

2. All materials and workmanship are to comply with the


relevant Kenya Bureau of Standards codes and or the
specified international codes where applicable in the
Architectural specifications. Where relevant Kenya Bureau
of Standards, British Standards, BS codes of practice, or
Agrément Certificates applicable to the design exists, the
recommendations and requirements of such documents to
be considered a minimum standard for the works.

L(-1)16 L(-1)16 3. The contractor shall in all aspects of the works comply
with the provisions of the Occupational Health and Safety
Act, 2007 (Act No 15 of 2007) and any regulations
02.2 02.2 promulgated in terms of that Act or the Factories
Machinery and Building Works Act.

4. The contractor shall set up, document and maintain a


quality assurance and quality control system, in
3,800 accordance with ISO 9001, able to be checked to the
satisfaction of the Architect, that all materials and
workmanship, whatever their sources, meet the

200 1,200 200 2,200 requirements of the Specification.

5. This drawing must be read in conjunction with all the

200 1,200 1,000 900 500 relevant drawings, schedules and specifications from
kubuni studio and all other consultants related to the
project.

300
6. All portions of the works related to any service or
consultant’s information is to be done in accordance with
the National Construction Building Regulations.

7. This drawing is not to be scaled. Figured dimensions to be


used. All dimensions are in millimeters unless otherwise

650
stated.

8. All dimensions and levels must be checked on site by the

W09 GT

200

900 200
contractor before putting work in hand.

850
9. All work to be executed by competent persons qualified

1,900
for the specific trade.

Toilet 10. This drawings is copyright reserved and remains the

Entrance
property of Kubuni Studio Limited

900

1,800
900 600x300mm
600x300mm ceramic 1,400 600 200 1,000 1,000 200 450

200 900
IC
3,200

ceramic D03 tiles


tiles W09
450

850
REV. DATE DESCRIPTION BY
GT
4,600

1,600
-450

1,000 200

500
900

6,900
600
W06

500
D02 D03
6,900

100

Box Profile
200

200

200

200
Roofing Sheets

1,650

1,650
3,900

Bedroom
3,300

3,700

3,300
600x300mm
1,500

ceramic tiles
600 200 1,700 1,700 200 450

1,650
W05 KEY:
PROPOSED NEW WORKS

2,150
2 2 100x140mm mild steel box gutter DEMOLITIONS
EXISTING WORKS
W07 W07
800

200
For and on behalf of:
Architect: Kubuni Studio Limited
Reg. No. : 357A
200

200

Signature: ____________________________

500 600 1,600 600 500

300
Client:
200 3,400 200 Fredrick Wanjero C/O Isaac Wanjero
P.O. Box: 66139 - 00800

IC Project Title:
3,800 L(-1)12
Proposed Wanjero Residence

Plot No.: Road:


SOUTH UGENYA/RANG'ALA/94 Kisumu-Busia Road

L(-1)15 L(-1)15 Location:


Sidindi, Ugunja
Town:
Siaya

02.2 02.2 Project Status:


Construction Drawings
Drawing Title: Scale:
Ground Floor Outhouse Plan 1:50

To Septic Drawing No:


0307
Project No:
#Pln
Rev. No.:
CD06

Tank Drawn By:


F.O
Checked By:
Arch. A. Ombati
Date:
27 July 2021

CAD File:
811UGN_Wanjero Residence CD07.pln

Ground floor 1:50 Roof Plan Power 1:50


kubuni studio
architecture . interiors . project Management

Riverside Studios
Riverside Lane, Off Riverside Drive
P.O.BOX 30446 - 00100, Nairobi, Kenya

GSPublisherVersion 0.0.100.100
GENERAL NOTES

1. All work is to be done in accordance with the National


Construction Authority Regulations.

2. All materials and workmanship are to comply with the


relevant Kenya Bureau of Standards codes and or the
specified international codes where applicable in the
Architectural specifications. Where relevant Kenya Bureau
of Standards, British Standards, BS codes of practice, or
Agrément Certificates applicable to the design exists, the
recommendations and requirements of such documents to
be considered a minimum standard for the works.

3. The contractor shall in all aspects of the works comply


with the provisions of the Occupational Health and Safety
Act, 2007 (Act No 15 of 2007) and any regulations
promulgated in terms of that Act or the Factories
Machinery and Building Works Act.

4. The contractor shall set up, document and maintain a


quality assurance and quality control system, in
accordance with ISO 9001, able to be checked to the
satisfaction of the Architect, that all materials and
workmanship, whatever their sources, meet the
requirements of the Specification.

5. This drawing must be read in conjunction with all the

4,850
relevant drawings, schedules and specifications from
kubuni studio and all other consultants related to the
project.

6. All portions of the works related to any service or


consultant’s information is to be done in accordance with
the National Construction Building Regulations.

7. This drawing is not to be scaled. Figured dimensions to be


used. All dimensions are in millimeters unless otherwise
stated.

8. All dimensions and levels must be checked on site by the


contractor before putting work in hand.

9. All work to be executed by competent persons qualified


for the specific trade.

10. This drawings is copyright reserved and remains the


property of Kubuni Studio Limited

REV. DATE DESCRIPTION BY

7,500

7,500
Box Profile
Roofing Sheets

KEY:
PROPOSED NEW WORKS

100x140mm mild steel box gutter DEMOLITIONS


EXISTING WORKS

For and on behalf of:


Architect: Kubuni Studio Limited
Reg. No. : 357A

Signature: ____________________________

Client:
4,850 140 Fredrick Wanjero C/O Isaac Wanjero
P.O. Box: 66139 - 00800

Project Title:
Proposed Wanjero Residence

Plot No.: Road:


SOUTH UGENYA/RANG'ALA/94 Kisumu-Busia Road

Location: Town:
Sidindi, Ugunja Siaya
Project Status:
Construction Drawings
Drawing Title: Scale:
Ground Floor Outhouse Roof Plan 1:50

Drawing No: Project No: Rev. No.:


0308 #Pln CD06

Drawn By: Checked By: Date:


F.O Arch. A. Ombati 27 July 2021

CAD File:
811UGN_Wanjero Residence CD07.pln

Roof Plan 1:50


kubuni studio
architecture . interiors . project Management

Riverside Studios
Riverside Lane, Off Riverside Drive
P.O.BOX 30446 - 00100, Nairobi, Kenya

GSPublisherVersion 0.0.100.100
GENERAL NOTES

1. All work is to be done in accordance with the National


Construction Authority Regulations.

2. All materials and workmanship are to comply with the


relevant Kenya Bureau of Standards codes and or the
specified international codes where applicable in the
Architectural specifications. Where relevant Kenya Bureau
of Standards, British Standards, BS codes of practice, or
Agrément Certificates applicable to the design exists, the
recommendations and requirements of such documents to
be considered a minimum standard for the works.

3. The contractor shall in all aspects of the works comply


with the provisions of the Occupational Health and Safety
Act, 2007 (Act No 15 of 2007) and any regulations
promulgated in terms of that Act or the Factories
Machinery and Building Works Act.

4. The contractor shall set up, document and maintain a


quality assurance and quality control system, in
accordance with ISO 9001, able to be checked to the
satisfaction of the Architect, that all materials and
workmanship, whatever their sources, meet the
requirements of the Specification.

5. This drawing must be read in conjunction with all the


relevant drawings, schedules and specifications from
kubuni studio and all other consultants related to the
project.

6. All portions of the works related to any service or


consultant’s information is to be done in accordance with
the National Construction Building Regulations.

7. This drawing is not to be scaled. Figured dimensions to be


used. All dimensions are in millimeters unless otherwise

1,750
stated.

8. All dimensions and levels must be checked on site by the


contractor before putting work in hand.

L 9. All work to be executed by competent persons qualified


for the specific trade.

750
L 10. This drawings is copyright reserved and remains the
property of Kubuni Studio Limited

1,050
L
200

200
2 2 2

200
200

200
200 3,300 200 3,550 900 200 450 2 4,050 150 450 200 1,175 775 1,650 200

200

200
2 2 2
600

2way 2way 2

300
2way
2 REV. DATE DESCRIPTION BY
1,800

1,800

1,900

2,850
2way

2,875
3,600

2
2,700

2
2
300

300
1,800
2way
2way

1,450
200 2way
2
3,300 200 1,950 1,600 2 900 200 5,100 200 3,600 200

825
2,800
200
975 1way
200

200 3,300 200 150 4,300 200 200 5,100 200 2,625 2

200

300
2way
3,500

1,200

1,200

1way

200
instant shower

450
2
2way

1,050

1,500
550
5,100

1,000 200

200

3way
200 2 2way
200 3,300 instant shower 1,800 200 1,200 200 1,050 200 1,650 3,000 450 200 1,800 1,800 200
450

2 2
1,299
250

1way
L L
200

200

200
200 1,450 2,800 4,850 KEY:
2
750

PROPOSED NEW WORKS


900

1,400

2 DEMOLITIONS
2,550

13 x 54 = 700

1,900
EXISTING WORKS
1,450

For and on behalf of:


Architect: Kubuni Studio Limited
200

Reg. No. : 357A


L
200 1,650 1,650 200 1,800 200 6,800 1,800 6,201
2
L Signature: ____________________________

200
200

200

200

Client:
Fredrick Wanjero C/O Isaac Wanjero
P.O. Box: 66139 - 00800

Project Title:
Proposed Wanjero Residence

Plot No.: Road:


SOUTH UGENYA/RANG'ALA/94 Kisumu-Busia Road

Location: Town:

200
Sidindi, Ugunja Siaya
Project Status:
Construction Drawings
Drawing Title: Scale:
Ground Floor Power Plan 1:75

Drawing No: Project No: Rev. No.:


0309 #Pln CD06

Drawn By: Checked By: Date:


F.O Arch. A. Ombati 27 July 2021

CAD File:
811UGN_Wanjero Residence CD07.pln

kubuni studio
architecture . interiors . project Management

Ground Floor Power 1:75 Riverside Studios


Riverside Lane, Off Riverside Drive
P.O.BOX 30446 - 00100, Nairobi, Kenya

GSPublisherVersion 0.0.100.100
GENERAL NOTES

1. All work is to be done in accordance with the National


Construction Authority Regulations.

2. All materials and workmanship are to comply with the


relevant Kenya Bureau of Standards codes and or the
specified international codes where applicable in the
Architectural specifications. Where relevant Kenya Bureau
of Standards, British Standards, BS codes of practice, or
Agrément Certificates applicable to the design exists, the
recommendations and requirements of such documents to
be considered a minimum standard for the works.

3. The contractor shall in all aspects of the works comply


with the provisions of the Occupational Health and Safety
Act, 2007 (Act No 15 of 2007) and any regulations
promulgated in terms of that Act or the Factories
Machinery and Building Works Act.

300
4. The contractor shall set up, document and maintain a
quality assurance and quality control system, in
accordance with ISO 9001, able to be checked to the
satisfaction of the Architect, that all materials and
Mild Steel Pergola workmanship, whatever their sources, meet the
requirements of the Specification.

2,100
above rear terrace 5. This drawing must be read in conjunction with all the
relevant drawings, schedules and specifications from
kubuni studio and all other consultants related to the
100x140mm mild steel box gutter 100x140mm mild steel box gutter project.

150
6. All portions of the works related to any service or
consultant’s information is to be done in accordance with

600
the National Construction Building Regulations.

600

600

600
9,660 C 1,800 C 1,800 C 790 200 4,400

450
7. This drawing is not to be scaled. Figured dimensions to be
used. All dimensions are in millimeters unless otherwise
stated.
200

200

200

200

200
8. All dimensions and levels must be checked on site by the
contractor before putting work in hand.

9. All work to be executed by competent persons qualified


for the specific trade.

600 200 1,600 1,700 200 2,050 2,400 200 1,950 1,200 1,950 200 1,800 1,800 200 600 10. This drawings is copyright reserved and remains the

2,050
property of Kubuni Studio Limited

2,050
1,800
1,800

3,600

1,800
REV. DATE DESCRIPTION BY

2,250
2,350
200
200

600 200 3,300 200 2,050 2,400 200 2,550 2,550 200 3,600 200 600

200
Box Profile Roofing Sheets Box Profile Roofing Sheets

600
4,800

1,200

600

750
1,600
200

1,100 200

750
600 200 1,600 1,700 200 750 1,050 200 600 1,375 475 200 5,100 200 1,800 1,800 200 600
1,600

200

200
1,100

2 no. 1,000L cylindrical tanks

600
600 200 3,300 200 1,800 200 2,450 200 9,700
1,800

1,600

1,000 200

4,300
KEY:

Mild Steel Pergola


200

200

PROPOSED NEW WORKS


600

DEMOLITIONS
above front terrace EXISTING WORKS
600

For and on behalf of:


Architect: Kubuni Studio Limited
Reg. No. : 357A

Signature: ____________________________

400
Client:
Fredrick Wanjero C/O Isaac Wanjero
P.O. Box: 66139 - 00800

Project Title:
Proposed Wanjero Residence

Plot No.: Road:


SOUTH UGENYA/RANG'ALA/94 Kisumu-Busia Road

11,300
Location: Town:
Sidindi, Ugunja Siaya
Project Status:
Construction Drawings
Drawing Title: Scale:
Main House Ceiling Plan 1:75

Drawing No: Project No: Rev. No.:


0310 #Pln CD06

Drawn By: Checked By: Date:


F.O Arch. A. Ombati 27 July 2021

CAD File:
811UGN_Wanjero Residence CD07.pln

kubuni studio
architecture . interiors . project Management

Riverside Studios

Roof Plan Power 1:75 Riverside Lane, Off Riverside Drive


P.O.BOX 30446 - 00100, Nairobi, Kenya

GSPublisherVersion 0.0.100.100
GENERAL NOTES

1. All work is to be done in accordance with the National


Construction Authority Regulations.

2. All materials and workmanship are to comply with the


relevant Kenya Bureau of Standards codes and or the
specified international codes where applicable in the
Architectural specifications. Where relevant Kenya Bureau
of Standards, British Standards, BS codes of practice, or
Agrément Certificates applicable to the design exists, the
recommendations and requirements of such documents to
be considered a minimum standard for the works.

3. The contractor shall in all aspects of the works comply


with the provisions of the Occupational Health and Safety
Act, 2007 (Act No 15 of 2007) and any regulations
promulgated in terms of that Act or the Factories
Machinery and Building Works Act.

4. The contractor shall set up, document and maintain a


quality assurance and quality control system, in
18,650 accordance with ISO 9001, able to be checked to the
satisfaction of the Architect, that all materials and
workmanship, whatever their sources, meet the
requirements of the Specification.

8,850 500 600 600 600 600 600 600 600 600 4,500 5. This drawing must be read in conjunction with all the
relevant drawings, schedules and specifications from
kubuni studio and all other consultants related to the
project.

6. All portions of the works related to any service or


consultant’s information is to be done in accordance with

300

300
the National Construction Building Regulations.

7. This drawing is not to be scaled. Figured dimensions to be


used. All dimensions are in millimeters unless otherwise
stated.

2,400
Mild Steel Pergola 8. All dimensions and levels must be checked on site by the

3,000
above rear terrace contractor before putting work in hand.

2,700

2,700
9. All work to be executed by competent persons qualified
for the specific trade.
100x140mm mild steel box gutter 100x140mm mild steel box gutter
140

10. This drawings is copyright reserved and remains the


property of Kubuni Studio Limited
600

REV. DATE DESCRIPTION BY

6,400

7,599
10,000

8,800

Box Profile Roofing Sheets Box Profile Roofing Sheets


10,700

KEY:
PROPOSED NEW WORKS
2 no. 1,000L cylindrical tanks DEMOLITIONS
EXISTING WORKS

21,300
For and on behalf of:
Architect: Kubuni Studio Limited
Reg. No. : 357A

4,300
Signature: ____________________________

Mild Steel Pergola


600

above front terrace Client:


Fredrick Wanjero C/O Isaac Wanjero
P.O. Box: 66139 - 00800

Project Title:
Proposed Wanjero Residence

Plot No.: Road:


SOUTH UGENYA/RANG'ALA/94 Kisumu-Busia Road

Location: Town:
Sidindi, Ugunja Siaya
400

Project Status:
Construction Drawings
Drawing Title: Scale:
Main House Roof Plan 1:75

Drawing No: Project No: Rev. No.:


8,850 550 600 600 600 600 600 600 600 5,050 0311 #Pln CD06

Drawn By: Checked By: Date:


F.O Arch. A. Ombati 27 July 2021
9,550 9,100
CAD File:
811UGN_Wanjero Residence CD07.pln

18,650

kubuni studio
architecture . interiors . project Management

Roof Plan 1:75 Riverside Studios


Riverside Lane, Off Riverside Drive
P.O.BOX 30446 - 00100, Nairobi, Kenya

GSPublisherVersion 0.0.100.100
GENERAL NOTES

1. All work is to be done in accordance with the National


Construction Authority Regulations.

2. All materials and workmanship are to comply with the


relevant Kenya Bureau of Standards codes and or the
specified international codes where applicable in the
Architectural specifications. Where relevant Kenya Bureau
of Standards, British Standards, BS codes of practice, or
Agrément Certificates applicable to the design exists, the
recommendations and requirements of such documents to
be considered a minimum standard for the works.

3. The contractor shall in all aspects of the works comply


with the provisions of the Occupational Health and Safety
Act, 2007 (Act No 15 of 2007) and any regulations
promulgated in terms of that Act or the Factories
Machinery and Building Works Act.

4. The contractor shall set up, document and maintain a


Mild steel window to schedule; Opening with concrete Mild steel window to schedule; RHS beam on pergola to quality assurance and quality control system, in
accordance with ISO 9001, able to be checked to the
painted brown to match casing; textured paint to painted brown to match timber S.E detail; painted to satisfaction of the Architect, that all materials and
timber truss surface colour and approval and insect mesh truss surface colour and 8mm schedule and creeping workmanship, whatever their sources, meet the
8mm laminated glass infill infill laminated glass infill plant to approval requirements of the Specification.

5. This drawing must be read in conjunction with all the


relevant drawings, schedules and specifications from
kubuni studio and all other consultants related to the
Box profile

100 827
project.

827

208
galvanised iron

555

555
sheets at 10° pitch 6. All portions of the works related to any service or
consultant’s information is to be done in accordance with
on cypress timber
the National Construction Building Regulations.
trusses; moisture
1,565

resistant gypsum 7. This drawing is not to be scaled. Figured dimensions to be

750

750

750

750

750
800

600
used. All dimensions are in millimeters unless otherwise
ceiling parallel to W02 W03 stated.
roof structure

100
W10 W11
8. All dimensions and levels must be checked on site by the
contractor before putting work in hand.

710
750

660

660
9. All work to be executed by competent persons qualified
Mild steel window to for the specific trade.
schedule; painted
10. This drawings is copyright reserved and remains the
brown to match property of Kubuni Studio Limited

900
timber truss surface W06 W06

1,200

2,650

1,200
colour and 6mm
W01

3,150
clear float glass infill
1,800
2,890

W05
W08 W08

2,440
3,900
200mm concrete

1,540
masonry column;
block wall; external

1,200
plastered and painted
textured paint to to approval REV. DATE DESCRIPTION BY
approval

50
1,200
750

750

750

750
Elevation 01 1:75

Box profile galvanised iron


sheets at 10° pitch on cypress
timber trusses; painted
chipboard ceiling parallel to
roof structure

Box profile galvanised iron sheets at

831
10° pitch on cypress timber trusses;
painted chipboard ceiling parallel
RHS beam on pergola to RHS beam on pergola to
to roof structure
S.E detail; painted to S.E detail; painted to
KEY:
schedule and creeping schedule and creeping
plant to approval PROPOSED NEW WORKS
800

plant to approval
2,041

DEMOLITIONS
EXISTING WORKS

150
For and on behalf of:
1,325

450
Architect: Kubuni Studio Limited
Reg. No. : 357A
100

150
200mm concrete block
1,950

wall; external textured

1,200

375
200mm concrete block

1,240
paint to approval Signature: ____________________________
wall; external textured Masonry wall;
Mild steel window to paint to approval external textured
1,200

2,240

schedule; painted

2,125
paint to approval

1,800

2,925
brown to match timber Client:
Short wall; plaster to
truss surface colour and Fredrick Wanjero C/O Isaac Wanjero
W06 W09 approval and 50mm W06 W04
6mm frosted glass infill P.O. Box: 66139 - 00800
precast concrete coping
850

1,240
Project Title:

300
Proposed Wanjero Residence
Ceramic wash hand
1,950

basin Plot No.: Road:


50

50
1,500

SOUTH UGENYA/RANG'ALA/94 Kisumu-Busia Road


1,050

Location: Town:
1,050

561
Sidindi, Ugunja Siaya
Project Status:

300

600
Construction Drawings
Drawing Title: Scale:
Elevations 1:75

Drawing No: Project No: Rev. No.:


0401 #Pln CD06

Elevation 02 1:75 Elevation 02 1:75 Drawn By:


F.O
Checked By:
Arch. A. Ombati
Date:
27 July 2021

CAD File:
811UGN_Wanjero Residence CD07.pln

kubuni studio
architecture . interiors . project Management

Riverside Studios
Riverside Lane, Off Riverside Drive
P.O.BOX 30446 - 00100, Nairobi, Kenya

GSPublisherVersion 0.0.100.100
GENERAL NOTES

1. All work is to be done in accordance with the National


Construction Authority Regulations.

2. All materials and workmanship are to comply with the


relevant Kenya Bureau of Standards codes and or the
specified international codes where applicable in the
Architectural specifications. Where relevant Kenya Bureau
of Standards, British Standards, BS codes of practice, or
Agrément Certificates applicable to the design exists, the
recommendations and requirements of such documents to
Mild steel door to schedule; RHS beam on pergola to Mild steel window to schedule; be considered a minimum standard for the works.

painted brown to match S.E detail; painted to painted brown to match 3. The contractor shall in all aspects of the works comply
timber truss surface colour schedule and creeping timber truss surface colour and with the provisions of the Occupational Health and Safety
and 8mm tinted glass infill plant to approval 6mm clear glass infill Act, 2007 (Act No 15 of 2007) and any regulations
promulgated in terms of that Act or the Factories
Machinery and Building Works Act.

417
4. The contractor shall set up, document and maintain a
quality assurance and quality control system, in
Box profile galvanised iron sheets at accordance with ISO 9001, able to be checked to the
10° pitch on cypress timber trusses; satisfaction of the Architect, that all materials and
Box profile galvanised
workmanship, whatever their sources, meet the

2,106
painted chipboard ceiling parallel iron sheets at 10° pitch requirements of the Specification.

2,256

2,256

2,291

2,291
2,331
to roof structure on cypress timber trusses;
5. This drawing must be read in conjunction with all the

1,874

1,874
painted chipboard
relevant drawings, schedules and specifications from
ceiling parallel to roof kubuni studio and all other consultants related to the
structure project.

6. All portions of the works related to any service or

3,314

50
consultant’s information is to be done in accordance with
the National Construction Building Regulations.
Rectangular

100
Masonry wall; profile galvanised 7. This drawing is not to be scaled. Figured dimensions to be

plastered to approval steel downpipe used. All dimensions are in millimeters unless otherwise
stated.

1,200

5,631
8. All dimensions and levels must be checked on site by the

1,800

1,800
2,440
200mm concrete block contractor before putting work in hand.

2,125
1,200

wall; external textured

2,400
9. All work to be executed by competent persons qualified
W09 paint to approval

2,775
for the specific trade.

2,625
W04
Concrete dhobi sink Mild steel window to 10. This drawings is copyright reserved and remains the

450
schedule; painted property of Kubuni Studio Limited
1,240 brown to match timber

50
W05 W05 truss surface colour and

550
1,200

Masonry planter wall; 6mm clear float glass

940

940
plastered to approval infill

600
and 50mm precast
concrete coping

REV. DATE DESCRIPTION BY

Elevation 03 1:75

Box profile galvanised iron sheets at


10° pitch on cypress timber trusses;
painted chipboard ceiling parallel to
roof structure

Box profile galvanised iron sheets at


10° pitch on cypress timber trusses;
painted chipboard ceiling parallel
RHS beam on pergola to to roof structure
RHS beam on pergola to
S.E detail; painted to S.E detail; painted to
KEY:
schedule and creeping schedule and creeping
plant to approval PROPOSED NEW WORKS
plant to approval
DEMOLITIONS
EXISTING WORKS

100
100

For and on behalf of:

1,385

1,385
4,268
215

Architect: Kubuni Studio Limited


Reg. No. : 357A

65
50

5,518

200mm concrete block Signature: ____________________________

Masonry wall; wall; external textured


plastered to paint to approval

4,085
approval Ceramic wash
200mm concrete Client:

1,800
hand basin
2,775

Fredrick Wanjero C/O Isaac Wanjero


3,600

block wall; external


3,275

P.O. Box: 66139 - 00800


textured paint to

2,700
approval W05 Project Title:
Rectangular Masonry planter wall; Proposed Wanjero Residence
profile galvanised plastered to approval
50

steel downpipe and 50mm precast Plot No.: Road:


SOUTH UGENYA/RANG'ALA/94 Kisumu-Busia Road
concrete coping
Location: Town:
1,200

900
Sidindi, Ugunja Siaya
Project Status:
Construction Drawings
Drawing Title: Scale:
Elevations 1:75

Drawing No: Project No: Rev. No.:


0402 #Pln CD06

Elevation 04 1:75 Elevation 04 1:75


Drawn By: Checked By: Date:
F.O Arch. A. Ombati 27 July 2021

CAD File:
811UGN_Wanjero Residence CD07.pln

kubuni studio
architecture . interiors . project Management

Riverside Studios
Riverside Lane, Off Riverside Drive
P.O.BOX 30446 - 00100, Nairobi, Kenya

GSPublisherVersion 0.0.100.100
GENERAL NOTES

1. All work is to be done in accordance with the National


Construction Authority Regulations.

2. All materials and workmanship are to comply with the


relevant Kenya Bureau of Standards codes and or the
specified international codes where applicable in the
Architectural specifications. Where relevant Kenya Bureau
of Standards, British Standards, BS codes of practice, or
Agrément Certificates applicable to the design exists, the
recommendations and requirements of such documents to
be considered a minimum standard for the works.

Box profile galvanised 3. The contractor shall in all aspects of the works comply
with the provisions of the Occupational Health and Safety
iron sheets at 10° pitch Act, 2007 (Act No 15 of 2007) and any regulations
promulgated in terms of that Act or the Factories
on cypress timber Machinery and Building Works Act.

trusses; painted 4. The contractor shall set up, document and maintain a
quality assurance and quality control system, in
chipboard ceiling accordance with ISO 9001, able to be checked to the
satisfaction of the Architect, that all materials and
parallel to roof structure workmanship, whatever their sources, meet the

1,325
requirements of the Specification.

5. This drawing must be read in conjunction with all the


relevant drawings, schedules and specifications from
kubuni studio and all other consultants related to the
project.

6. All portions of the works related to any service or


consultant’s information is to be done in accordance with
the National Construction Building Regulations.

7. This drawing is not to be scaled. Figured dimensions to be

Mild steel window to used. All dimensions are in millimeters unless otherwise
stated.
200mm concrete schedule; painted

4,025
8. All dimensions and levels must be checked on site by the
block wall; external brown to match timber contractor before putting work in hand.

1,800
textured paint to truss surface colour and 9. All work to be executed by competent persons qualified
for the specific trade.
approval 6mm clear float glass 10. This drawings is copyright reserved and remains the

W07 W07 infill property of Kubuni Studio Limited

900
REV. DATE DESCRIPTION BY

Elevation 05 1:50

Box profile galvanised


iron sheets at 10° pitch
on cypress timber
trusses; painted
chipboard ceiling KEY:

parallel to roof structure PROPOSED NEW WORKS

DEMOLITIONS
1,215

1,215
EXISTING WORKS

For and on behalf of:


Architect: Kubuni Studio Limited
Reg. No. : 357A

Mild steel window to


Signature: ____________________________
schedule; painted
brown to match timber
truss surface colour and
1,200

Client:
Solid timber

3,915
Fredrick Wanjero C/O Isaac Wanjero
6mm frosted glass infill P.O. Box: 66139 - 00800
door with Project Title:
fanlight to Proposed Wanjero Residence
2,400

schedule Plot No.: Road:


200mm concrete SOUTH UGENYA/RANG'ALA/94 Kisumu-Busia Road

block wall; external W09 Location: Town:


Sidindi, Ugunja Siaya

textured paint to Project Status:


Construction Drawings
approval
1,500

Drawing Title: Scale:


Elevations 1:50

Drawing No: Project No: Rev. No.:


0403 #Pln CD06

Drawn By: Checked By: Date:


F.O Arch. A. Ombati 27 July 2021

CAD File:
811UGN_Wanjero Residence CD07.pln
300

kubuni studio
architecture . interiors . project Management

Riverside Studios
Riverside Lane, Off Riverside Drive
Elevation 06 1:50 P.O.BOX 30446 - 00100, Nairobi, Kenya

GSPublisherVersion 0.0.100.100
GENERAL NOTES

1. All work is to be done in accordance with the National


Construction Authority Regulations.

2. All materials and workmanship are to comply with the


relevant Kenya Bureau of Standards codes and or the
specified international codes where applicable in the
Architectural specifications. Where relevant Kenya Bureau
of Standards, British Standards, BS codes of practice, or
Agrément Certificates applicable to the design exists, the
recommendations and requirements of such documents to
Mild steel door to be considered a minimum standard for the works.
schedule; painted
brown to match timber 3. The contractor shall in all aspects of the works comply
with the provisions of the Occupational Health and Safety
Semi-solid flush door truss surface colour and Act, 2007 (Act No 15 of 2007) and any regulations
with fanlight to schedule 8mm tinted glass infill promulgated in terms of that Act or the Factories
Machinery and Building Works Act.
Box profile galvanised 4. The contractor shall set up, document and maintain a
iron sheets at 10° pitch quality assurance and quality control system, in
on cypress timber trusses; accordance with ISO 9001, able to be checked to the

1,367

1,360
satisfaction of the Architect, that all materials and

1,667

1,660
moisture resistant workmanship, whatever their sources, meet the
gypsum ceiling parallel requirements of the Specification.
to roof structure
5. This drawing must be read in conjunction with all the
relevant drawings, schedules and specifications from
kubuni studio and all other consultants related to the
300x200mm R.C beam to S.E
project.
Mild steel window to details; externally plastered

300

300
schedule; painted to schedule 6. All portions of the works related to any service or
consultant’s information is to be done in accordance with
brown to match timber the National Construction Building Regulations.
truss surface colour and
5,000

1,800
7. This drawing is not to be scaled. Figured dimensions to be
6mm clear float glass
200mm concrete block used. All dimensions are in millimeters unless otherwise
infill stated.

2,400
wall; external textured

2,400

2,400
paint to approval 8. All dimensions and levels must be checked on site by the
contractor before putting work in hand.

150mm RC slab to S.E details 9. All work to be executed by competent persons qualified
200mm concrete block for the specific trade.
on 50mm blinding and well-
600
wall; external textured compacted hardcore; depth 10. This drawings is copyright reserved and remains the

40
paint to approval property of Kubuni Studio Limited
of layers and overall hardcore
40

depth to be determined on

900 40

900 40
150

150
RC footings to S.E details site by S.E

750
REV. DATE DESCRIPTION BY

Section 01 1:75

Mild steel window to Box profile galvanised iron


schedule; painted brown sheets at 10° pitch on
to match timber truss cypress timber trusses;
surface colour and 8mm moisture resistant gypsum
laminated glass infill ceiling parallel to roof
structure
310

300x200mm R.C RHS beam on pergola to


RHS beam on pergola to beam to S.E S.E detail; painted to
S.E detail; painted to details; externally schedule and creeping
schedule and creeping plastered to plant to approval
schedule
750

plant to approval

240
1,100
KEY:
200mm concrete block wall;

150
PROPOSED NEW WORKS
710

external textured paint to approval

460
DEMOLITIONS
EXISTING WORKS

For and on behalf of:


200mm concrete block Architect: Kubuni Studio Limited
Reg. No. : 357A
wall; external textured
200mm concrete block

375
Mild steel door to paint to approval
2,190

wall; external textured schedule; painted Signature: ____________________________

2,400
2,440

paint to approval brown to match timber Semi-solid


flush door Mild steel door to
truss surface colour and
2,400

with fanlight schedule; painted Client:


8mm tinted glass infill Fredrick Wanjero C/O Isaac Wanjero
to schedule 150mm RC slab to S.E details on 50mm blinding and brown to match timber
3,440

P.O. Box: 66139 - 00800

2,100
well-compacted hardcore; depth of layers and overall truss surface colour and Project Title:
Proposed Wanjero Residence
8mm tinted glass infill
R.C ramp to S.E details; hardcore depth to be determined on site by S.E
50

Plot No.: Road:


SOUTH UGENYA/RANG'ALA/94 Kisumu-Busia Road
finished to schedule Masonry planter wall; Location: Town:

Short wall; plaster to external textured paint to Sidindi, Ugunja Siaya


600

Project Status:
approval and 50mm approval and 50mm Construction Drawings

precast concrete coping precast concrete coping Drawing Title: Scale:


40

40 Sections 1:50, 1:75

Drawing No: Project No: Rev. No.:


RC footings to S.E
600

0501 #Pln CD06

Drawn By: Checked By: Date:


details F.O Arch. A. Ombati 27 July 2021

CAD File:
811UGN_Wanjero Residence CD07.pln

kubuni studio
architecture . interiors . project Management

Riverside Studios
Riverside Lane, Off Riverside Drive

Section 02 1:50
P.O.BOX 30446 - 00100, Nairobi, Kenya

GSPublisherVersion 0.0.100.100
GENERAL NOTES

1. All work is to be done in accordance with the National


Construction Authority Regulations.

2. All materials and workmanship are to comply with the


relevant Kenya Bureau of Standards codes and or the
specified international codes where applicable in the
Architectural specifications. Where relevant Kenya Bureau
of Standards, British Standards, BS codes of practice, or
Agrément Certificates applicable to the design exists, the
recommendations and requirements of such documents to
be considered a minimum standard for the works.

3. The contractor shall in all aspects of the works comply


with the provisions of the Occupational Health and Safety
Act, 2007 (Act No 15 of 2007) and any regulations
promulgated in terms of that Act or the Factories

L(73)22 L(73)24 Machinery and Building Works Act.

4. The contractor shall set up, document and maintain a


0603 0605 quality assurance and quality control system, in
accordance with ISO 9001, able to be checked to the
satisfaction of the Architect, that all materials and
workmanship, whatever their sources, meet the
requirements of the Specification.

5. This drawing must be read in conjunction with all the


relevant drawings, schedules and specifications from
kubuni studio and all other consultants related to the
project.

200

200

200

200

550 200
6. All portions of the works related to any service or
consultant’s information is to be done in accordance with
the National Construction Building Regulations.

200 200 900 450 1,800 250 200


7. This drawing is not to be scaled. Figured dimensions to be
used. All dimensions are in millimeters unless otherwise

600
stated.

8. All dimensions and levels must be checked on site by the


contractor before putting work in hand.

9. All work to be executed by competent persons qualified


for the specific trade.

200 1,150 1,800 50 600 200 10. This drawings is copyright reserved and remains the

FT
property of Kubuni Studio Limited

1,550
200 3,000 600 200

200 3,600 200


REV. DATE DESCRIPTION BY

1,650

1,800
L(73)23 L(73)23
0604 0604

600

4,300

4,300
600x300mm non slip
ceramic tile ff in a
900

staggered pattern

850
200 3,000 600 200
L(73)21 L(73)21
0602 0602 KEY:

1,950
PROPOSED NEW WORKS

600
DEMOLITIONS
900

EXISTING WORKS

200 2,700 900 200 For and on behalf of:


Architect: Kubuni Studio Limited
Reg. No. : 357A

Signature: ____________________________

600
350

Client:
200 1,050 900 1,650 200 Fredrick Wanjero C/O Isaac Wanjero
P.O. Box: 66139 - 00800

Project Title:
Proposed Wanjero Residence

Plot No.: Road:


SOUTH UGENYA/RANG'ALA/94 Kisumu-Busia Road

Location: Town:
200

200

200

200

200
Sidindi, Ugunja Siaya
Project Status:
Construction Drawings
Drawing Title: Scale:
Kitchen Plan 1:25
L(73)22 L(73)24 Drawing No: Project No: Rev. No.:

0603 0605 0601 #Pln CD06

Drawn By: Checked By: Date:


F.O Arch. A. Ombati 27 July 2021

CAD File:
811UGN_Wanjero Residence CD07.pln

kubuni studio
Kitchen Part Plan 1:25 architecture . interiors . project Management

Riverside Studios
Riverside Lane, Off Riverside Drive
P.O.BOX 30446 - 00100, Nairobi, Kenya

GSPublisherVersion 0.0.100.100
GENERAL NOTES

1. All work is to be done in accordance with the National


Construction Authority Regulations.

2. All materials and workmanship are to comply with the


relevant Kenya Bureau of Standards codes and or the
specified international codes where applicable in the
Architectural specifications. Where relevant Kenya Bureau
of Standards, British Standards, BS codes of practice, or
Agrément Certificates applicable to the design exists, the
recommendations and requirements of such documents to
be considered a minimum standard for the works.

3. The contractor shall in all aspects of the works comply


with the provisions of the Occupational Health and Safety
Act, 2007 (Act No 15 of 2007) and any regulations
promulgated in terms of that Act or the Factories
Machinery and Building Works Act.

4. The contractor shall set up, document and maintain a


quality assurance and quality control system, in
accordance with ISO 9001, able to be checked to the
satisfaction of the Architect, that all materials and
workmanship, whatever their sources, meet the
requirements of the Specification.

5. This drawing must be read in conjunction with all the


relevant drawings, schedules and specifications from
kubuni studio and all other consultants related to the
project.

6. All portions of the works related to any service or


consultant’s information is to be done in accordance with
the National Construction Building Regulations.

7. This drawing is not to be scaled. Figured dimensions to be


used. All dimensions are in millimeters unless otherwise
stated.

8. All dimensions and levels must be checked on site by the


contractor before putting work in hand.

9. All work to be executed by competent persons qualified


for the specific trade.

10. This drawings is copyright reserved and remains the

Box profile galvanised iron property of Kubuni Studio Limited

sheets at 10° pitch on


cypress timber trusses

REV. DATE DESCRIPTION BY

310

310

310
310
853

1,193
Painted chipboard ceiling

542
parallel to roof structure

2,053
300

300
1,742
2,342

200mm thick concrete


block wall
3,282

KEY:
PROPOSED NEW WORKS

2,400
2,400

DEMOLITIONS

300
EXISTING WORKS

2,400
For and on behalf of:
Architect: Kubuni Studio Limited

Semi solid flush door


Reg. No. : 357A

300
Floor mounted particle Signature: ____________________________
1,500

board cabinet; granite

300
countertop to approval Client:
Fredrick Wanjero C/O Isaac Wanjero
P.O. Box: 66139 - 00800
900

Project Title:

300
600x300mm ceramic wall
Proposed Wanjero Residence

Plot No.: Road:

tiles to approval SOUTH UGENYA/RANG'ALA/94

Location:
Kisumu-Busia Road

Town:
Sidindi, Ugunja Siaya

300
Project Status:
Construction Drawings
40

40

40

40
Drawing Title: Scale:

40
Kitchen Sections 1:25

Drawing No: Project No: Rev. No.:


0602 #Pln CD06

Drawn By: Checked By: Date:


F.O Arch. A. Ombati 27 July 2021

Kitchen Section 01 1:25 CAD File:


811UGN_Wanjero Residence CD07.pln

kubuni studio
architecture . interiors . project Management

Riverside Studios
Riverside Lane, Off Riverside Drive
P.O.BOX 30446 - 00100, Nairobi, Kenya

GSPublisherVersion 0.0.100.100
GENERAL NOTES

1. All work is to be done in accordance with the National


Construction Authority Regulations.

2. All materials and workmanship are to comply with the


relevant Kenya Bureau of Standards codes and or the
specified international codes where applicable in the
Architectural specifications. Where relevant Kenya Bureau
of Standards, British Standards, BS codes of practice, or
Agrément Certificates applicable to the design exists, the
recommendations and requirements of such documents to
be considered a minimum standard for the works.

3. The contractor shall in all aspects of the works comply


with the provisions of the Occupational Health and Safety
Act, 2007 (Act No 15 of 2007) and any regulations
promulgated in terms of that Act or the Factories
Machinery and Building Works Act.

4. The contractor shall set up, document and maintain a


quality assurance and quality control system, in
accordance with ISO 9001, able to be checked to the
satisfaction of the Architect, that all materials and
workmanship, whatever their sources, meet the
requirements of the Specification.

5. This drawing must be read in conjunction with all the


relevant drawings, schedules and specifications from
kubuni studio and all other consultants related to the
project.

6. All portions of the works related to any service or


consultant’s information is to be done in accordance with
the National Construction Building Regulations.

7. This drawing is not to be scaled. Figured dimensions to be


used. All dimensions are in millimeters unless otherwise
stated.

Box profile galvanised iron 8. All dimensions and levels must be checked on site by the
contractor before putting work in hand.

sheets at 10° pitch on 9. All work to be executed by competent persons qualified


for the specific trade.

cypress timber trusses 1,058 10. This drawings is copyright reserved and remains the
property of Kubuni Studio Limited

1,167
REV. DATE DESCRIPTION BY

110
Painted chipboard ceiling
parallel to roof structure
2,258
300

300
1,325

1,310
3,798

200mm thick concrete


block wall

600

300
2,400

2,400
2,400

Semi solid flush door

300
KEY:
PROPOSED NEW WORKS

DEMOLITIONS
1,540

EXISTING WORKS

300
For and on behalf of:
Architect: Kubuni Studio Limited
1,050 Reg. No. : 357A

600x300mm ceramic wall

300
Signature: ____________________________

tiles to approval

300
Client:
Fredrick Wanjero C/O Isaac Wanjero
40

40

40

40
P.O. Box: 66139 - 00800

Project Title:

40
Proposed Wanjero Residence

Plot No.: Road:


SOUTH UGENYA/RANG'ALA/94 Kisumu-Busia Road

Location: Town:

Kitchen Section 02 1:25


Sidindi, Ugunja Siaya
Project Status:
Construction Drawings
Drawing Title: Scale:
Kitchen Sections 1:25

Drawing No: Project No: Rev. No.:


0603 #Pln CD06

Drawn By: Checked By: Date:


F.O Arch. A. Ombati 27 July 2021

CAD File:
811UGN_Wanjero Residence CD07.pln

kubuni studio
architecture . interiors . project Management

Riverside Studios
Riverside Lane, Off Riverside Drive
P.O.BOX 30446 - 00100, Nairobi, Kenya

GSPublisherVersion 0.0.100.100
GENERAL NOTES

1. All work is to be done in accordance with the National


Construction Authority Regulations.

2. All materials and workmanship are to comply with the


relevant Kenya Bureau of Standards codes and or the
specified international codes where applicable in the
Architectural specifications. Where relevant Kenya Bureau
of Standards, British Standards, BS codes of practice, or
Agrément Certificates applicable to the design exists, the
recommendations and requirements of such documents to
be considered a minimum standard for the works.

3. The contractor shall in all aspects of the works comply


with the provisions of the Occupational Health and Safety
Act, 2007 (Act No 15 of 2007) and any regulations
promulgated in terms of that Act or the Factories
Machinery and Building Works Act.

4. The contractor shall set up, document and maintain a


quality assurance and quality control system, in
accordance with ISO 9001, able to be checked to the
satisfaction of the Architect, that all materials and
workmanship, whatever their sources, meet the
requirements of the Specification.

5. This drawing must be read in conjunction with all the


relevant drawings, schedules and specifications from
kubuni studio and all other consultants related to the
project.

6. All portions of the works related to any service or


consultant’s information is to be done in accordance with
the National Construction Building Regulations.

7. This drawing is not to be scaled. Figured dimensions to be


used. All dimensions are in millimeters unless otherwise
stated.

8. All dimensions and levels must be checked on site by the


contractor before putting work in hand.

9. All work to be executed by competent persons qualified


for the specific trade.

10. This drawings is copyright reserved and remains the

Box profile galvanised iron


property of Kubuni Studio Limited
281

sheets at 10° pitch on


cypress timber trusses

844
290
563

1,144
REV. DATE DESCRIPTION BY

Painted chipboard ceiling


573
1,894

parallel to roof structure

2,644
2,044
300

300
Mild steel door to
schedule

Mild steel window to


1,200

1,200
schedule
600
2,400

2,400

600x300mm ceramic wall


tiles to approval KEY:
PROPOSED NEW WORKS

DEMOLITIONS
1,500

200mm thick concrete


1,200

EXISTING WORKS

1,200
1,050

For and on behalf of:


block wall Architect: Kubuni Studio Limited

900
Reg. No. : 357A

Floor mounted particle Signature: ____________________________

board cabinet; granite


countertop to approval
Client:
40
40

40

40

40

40
40
Fredrick Wanjero C/O Isaac Wanjero
P.O. Box: 66139 - 00800

Project Title:
Proposed Wanjero Residence

Plot No.: Road:


SOUTH UGENYA/RANG'ALA/94 Kisumu-Busia Road

Kitchen Section 03 1:25 Location:


Sidindi, Ugunja
Project Status:
Town:
Siaya

Construction Drawings
Drawing Title: Scale:
Kitchen Sections 1:25

Drawing No: Project No: Rev. No.:


0604 #Pln CD06

Drawn By: Checked By: Date:


F.O Arch. A. Ombati 27 July 2021

CAD File:
811UGN_Wanjero Residence CD07.pln

kubuni studio
architecture . interiors . project Management

Riverside Studios
Riverside Lane, Off Riverside Drive
P.O.BOX 30446 - 00100, Nairobi, Kenya

GSPublisherVersion 0.0.100.100
GENERAL NOTES

1. All work is to be done in accordance with the National


Construction Authority Regulations.

2. All materials and workmanship are to comply with the


relevant Kenya Bureau of Standards codes and or the
specified international codes where applicable in the
Architectural specifications. Where relevant Kenya Bureau
of Standards, British Standards, BS codes of practice, or
Agrément Certificates applicable to the design exists, the
recommendations and requirements of such documents to
be considered a minimum standard for the works.

3. The contractor shall in all aspects of the works comply


with the provisions of the Occupational Health and Safety
Act, 2007 (Act No 15 of 2007) and any regulations
promulgated in terms of that Act or the Factories
Machinery and Building Works Act.

4. The contractor shall set up, document and maintain a


quality assurance and quality control system, in
accordance with ISO 9001, able to be checked to the
satisfaction of the Architect, that all materials and
workmanship, whatever their sources, meet the
requirements of the Specification.

5. This drawing must be read in conjunction with all the


relevant drawings, schedules and specifications from
kubuni studio and all other consultants related to the
project.

6. All portions of the works related to any service or


consultant’s information is to be done in accordance with
the National Construction Building Regulations.

7. This drawing is not to be scaled. Figured dimensions to be


used. All dimensions are in millimeters unless otherwise
stated.
Box profile galvanised iron 8. All dimensions and levels must be checked on site by the
contractor before putting work in hand.
sheets at 10° pitch on 9. All work to be executed by competent persons qualified

cypress timber trusses


for the specific trade.

10. This drawings is copyright reserved and remains the


property of Kubuni Studio Limited

743
110 REV. DATE DESCRIPTION BY

200mm thick concrete

410

410

2,119

2,119

2,119
block wall
300

300
Painted chipboard ceiling
parallel to roof structure
1,200

Mild steel window to


schedule
2,440

600
2,400

2,400
600
600x300mm ceramic wall
tiles to approval KEY:

1,500
PROPOSED NEW WORKS
1,200

DEMOLITIONS
EXISTING WORKS

900

900
For and on behalf of:
Floor mounted particle Architect: Kubuni Studio Limited
Reg. No. : 357A

board cabinet; granite


countertop to approval
Signature: ____________________________
40

40

40

40

40

40
Client:
Fredrick Wanjero C/O Isaac Wanjero
P.O. Box: 66139 - 00800

Project Title:
Proposed Wanjero Residence

Kitchen Section 04 1:25


Plot No.: Road:
SOUTH UGENYA/RANG'ALA/94 Kisumu-Busia Road

Location: Town:
Sidindi, Ugunja Siaya
Project Status:
Construction Drawings
Drawing Title: Scale:
Kitchen Sections 1:25

Drawing No: Project No: Rev. No.:


0605 #Pln CD06

Drawn By: Checked By: Date:


F.O Arch. A. Ombati 27 July 2021

CAD File:
811UGN_Wanjero Residence CD07.pln

kubuni studio
architecture . interiors . project Management

Riverside Studios
Riverside Lane, Off Riverside Drive
P.O.BOX 30446 - 00100, Nairobi, Kenya

GSPublisherVersion 0.0.100.100
GENERAL NOTES

1. All work is to be done in accordance with the National


Construction Authority Regulations.

2. All materials and workmanship are to comply with the


relevant Kenya Bureau of Standards codes and or the
specified international codes where applicable in the
Architectural specifications. Where relevant Kenya Bureau
of Standards, British Standards, BS codes of practice, or
Agrément Certificates applicable to the design exists, the
recommendations and requirements of such documents to
be considered a minimum standard for the works.

3. The contractor shall in all aspects of the works comply


with the provisions of the Occupational Health and Safety
Act, 2007 (Act No 15 of 2007) and any regulations
promulgated in terms of that Act or the Factories
Machinery and Building Works Act.

4. The contractor shall set up, document and maintain a


quality assurance and quality control system, in
accordance with ISO 9001, able to be checked to the
satisfaction of the Architect, that all materials and
workmanship, whatever their sources, meet the
requirements of the Specification.

5. This drawing must be read in conjunction with all the


relevant drawings, schedules and specifications from
kubuni studio and all other consultants related to the
project.

6. All portions of the works related to any service or


consultant’s information is to be done in accordance with
the National Construction Building Regulations.

7. This drawing is not to be scaled. Figured dimensions to be


used. All dimensions are in millimeters unless otherwise
stated.

8. All dimensions and levels must be checked on site by the


contractor before putting work in hand.

L(74)22 L(74)24 9. All work to be executed by competent persons qualified


for the specific trade.
0608 0610 10. This drawings is copyright reserved and remains the
property of Kubuni Studio Limited

200

200

200

200
REV. DATE DESCRIPTION BY

700
L(74)23 L(74)23
300

0609 0609

2,100
200x200x25mm clay
300

tile ff in a grid layout

2,800

2,800
300
300

L(74)21 L(74)21
0607 200 3,600 200 0607
300

1,800
FT 400
KEY:

200 1,400 200 PROPOSED NEW WORKS

700
600

DEMOLITIONS

200 200 900 2,500 200 For and on behalf of:


EXISTING WORKS

Architect: Kubuni Studio Limited


Reg. No. : 357A

Signature: ____________________________
200

200

200

200
Client:

L(74)22 L(74)24 Fredrick Wanjero C/O Isaac Wanjero


P.O. Box: 66139 - 00800

0608 0610 Project Title:


Proposed Wanjero Residence

Plot No.: Road:


SOUTH UGENYA/RANG'ALA/94 Kisumu-Busia Road

Location: Town:
Sidindi, Ugunja Siaya

Dhobi Area Part Plan 1:25 Project Status:


Construction Drawings
Drawing Title: Scale:
Dhobi Area Part Plan 1:25

Drawing No: Project No: Rev. No.:


0606 #Pln CD06

Drawn By: Checked By: Date:


F.O Arch. A. Ombati 27 July 2021

CAD File:
811UGN_Wanjero Residence CD07.pln

kubuni studio
architecture . interiors . project Management

Riverside Studios
Riverside Lane, Off Riverside Drive
P.O.BOX 30446 - 00100, Nairobi, Kenya

GSPublisherVersion 0.0.100.100
GENERAL NOTES

1. All work is to be done in accordance with the National


Construction Authority Regulations.

2. All materials and workmanship are to comply with the


relevant Kenya Bureau of Standards codes and or the
specified international codes where applicable in the
Architectural specifications. Where relevant Kenya Bureau
of Standards, British Standards, BS codes of practice, or
Agrément Certificates applicable to the design exists, the
recommendations and requirements of such documents to
be considered a minimum standard for the works.

3. The contractor shall in all aspects of the works comply


with the provisions of the Occupational Health and Safety
Act, 2007 (Act No 15 of 2007) and any regulations
promulgated in terms of that Act or the Factories
Machinery and Building Works Act.

4. The contractor shall set up, document and maintain a


quality assurance and quality control system, in
accordance with ISO 9001, able to be checked to the
satisfaction of the Architect, that all materials and
workmanship, whatever their sources, meet the
requirements of the Specification.

5. This drawing must be read in conjunction with all the


relevant drawings, schedules and specifications from
kubuni studio and all other consultants related to the
project.

6. All portions of the works related to any service or


consultant’s information is to be done in accordance with
the National Construction Building Regulations.

7. This drawing is not to be scaled. Figured dimensions to be


used. All dimensions are in millimeters unless otherwise
stated.

8. All dimensions and levels must be checked on site by the


contractor before putting work in hand.

9. All work to be executed by competent persons qualified


for the specific trade.

10. This drawings is copyright reserved and remains the


property of Kubuni Studio Limited

Box profile galvanised iron REV. DATE DESCRIPTION BY

sheets at 10° pitch on


cypress timber trusses;
painted chipboard ceiling
parallel to roof structure

165
350
350

350

100
50
Mild steel door to
1,200
1,200

schedule

KEY:
PROPOSED NEW WORKS
Mild steel window to DEMOLITIONS

schedule

2,400
EXISTING WORKS

2,475
For and on behalf of:
Architect: Kubuni Studio Limited
240

Reg. No. : 357A

200mm thick concrete Signature: ____________________________

block wall
450
1,240

Client:
Fredrick Wanjero C/O Isaac Wanjero
RC double dhobi sink to P.O. Box: 66139 - 00800

Project Title:

schedule Proposed Wanjero Residence

Plot No.: Road:


550

SOUTH UGENYA/RANG'ALA/94 Kisumu-Busia Road

Location: Town:
Sidindi, Ugunja Siaya
Project Status:
Construction Drawings
Drawing Title: Scale:
Dhobi Area Sections 1:25

Drawing No: Project No: Rev. No.:


0607 #Pln CD06

Drawn By: Checked By: Date:

Dhobi Area Section 01 1:25 F.O

CAD File:
Arch. A. Ombati 27 July 2021

811UGN_Wanjero Residence CD07.pln

kubuni studio
architecture . interiors . project Management

Riverside Studios
Riverside Lane, Off Riverside Drive
P.O.BOX 30446 - 00100, Nairobi, Kenya

GSPublisherVersion 0.0.100.100
GENERAL NOTES

1. All work is to be done in accordance with the National


Construction Authority Regulations.

2. All materials and workmanship are to comply with the


relevant Kenya Bureau of Standards codes and or the
specified international codes where applicable in the
Architectural specifications. Where relevant Kenya Bureau
of Standards, British Standards, BS codes of practice, or
Agrément Certificates applicable to the design exists, the
recommendations and requirements of such documents to
be considered a minimum standard for the works.

3. The contractor shall in all aspects of the works comply


with the provisions of the Occupational Health and Safety
Act, 2007 (Act No 15 of 2007) and any regulations
promulgated in terms of that Act or the Factories
Machinery and Building Works Act.

4. The contractor shall set up, document and maintain a


quality assurance and quality control system, in
accordance with ISO 9001, able to be checked to the
satisfaction of the Architect, that all materials and
workmanship, whatever their sources, meet the
requirements of the Specification.

5. This drawing must be read in conjunction with all the


relevant drawings, schedules and specifications from
kubuni studio and all other consultants related to the
project.

6. All portions of the works related to any service or


consultant’s information is to be done in accordance with
the National Construction Building Regulations.

7. This drawing is not to be scaled. Figured dimensions to be


used. All dimensions are in millimeters unless otherwise
stated.

8. All dimensions and levels must be checked on site by the


contractor before putting work in hand.

Box profile galvanised iron 9. All work to be executed by competent persons qualified
for the specific trade.

sheets at 10° pitch on 10. This drawings is copyright reserved and remains the
property of Kubuni Studio Limited

cypress timber trusses

110
Water resistant gypsum

100

100
124
ceiling parallel to roof REV. DATE DESCRIPTION BY

300
structure

50

50
375
Mild steel pergola to
detail

2,686

1,750
2,400
Mild steel door to

2,500
schedule

200mm thick concrete KEY:


PROPOSED NEW WORKS
block wall DEMOLITIONS
EXISTING WORKS

50
For and on behalf of:
Architect: Kubuni Studio Limited
Reg. No. : 357A

350
Signature: ____________________________
65

65

Client:
Fredrick Wanjero C/O Isaac Wanjero
P.O. Box: 66139 - 00800

Project Title:
Proposed Wanjero Residence

Dhobi Area Section 02 1:25 Plot No.:


SOUTH UGENYA/RANG'ALA/94
Road:
Kisumu-Busia Road

Location: Town:
Sidindi, Ugunja Siaya
Project Status:
Construction Drawings
Drawing Title: Scale:
Dhobi Area Sections 1:25

Drawing No: Project No: Rev. No.:


0608 #Pln CD06

Drawn By: Checked By: Date:


F.O Arch. A. Ombati 27 July 2021

CAD File:
811UGN_Wanjero Residence CD07.pln

kubuni studio
architecture . interiors . project Management

Riverside Studios
Riverside Lane, Off Riverside Drive
P.O.BOX 30446 - 00100, Nairobi, Kenya

GSPublisherVersion 0.0.100.100
GENERAL NOTES

1. All work is to be done in accordance with the National


Construction Authority Regulations.

2. All materials and workmanship are to comply with the


relevant Kenya Bureau of Standards codes and or the
specified international codes where applicable in the
Architectural specifications. Where relevant Kenya Bureau
of Standards, British Standards, BS codes of practice, or
Agrément Certificates applicable to the design exists, the
recommendations and requirements of such documents to
be considered a minimum standard for the works.

3. The contractor shall in all aspects of the works comply


with the provisions of the Occupational Health and Safety
Act, 2007 (Act No 15 of 2007) and any regulations
promulgated in terms of that Act or the Factories
Machinery and Building Works Act.

4. The contractor shall set up, document and maintain a


quality assurance and quality control system, in
accordance with ISO 9001, able to be checked to the
satisfaction of the Architect, that all materials and
workmanship, whatever their sources, meet the
requirements of the Specification.

5. This drawing must be read in conjunction with all the


relevant drawings, schedules and specifications from
kubuni studio and all other consultants related to the
project.

6. All portions of the works related to any service or


consultant’s information is to be done in accordance with
the National Construction Building Regulations.

7. This drawing is not to be scaled. Figured dimensions to be


used. All dimensions are in millimeters unless otherwise
stated.

8. All dimensions and levels must be checked on site by the


contractor before putting work in hand.

9. All work to be executed by competent persons qualified


for the specific trade.

10. This drawings is copyright reserved and remains the


property of Kubuni Studio Limited

REV. DATE DESCRIPTION BY

50
100
100

375

Mild steel pergola to


detail
1,750
2,525

KEY:

50mm thick precast


PROPOSED NEW WORKS

DEMOLITIONS

concrete coping EXISTING WORKS

For and on behalf of:


Architect: Kubuni Studio Limited
50

Reg. No. : 357A

200mm thick concrete Signature: ____________________________


350

block wall
Client:
Fredrick Wanjero C/O Isaac Wanjero
P.O. Box: 66139 - 00800

Project Title:

Dhobi Area Section 03 1:25


Proposed Wanjero Residence

Plot No.: Road:


SOUTH UGENYA/RANG'ALA/94 Kisumu-Busia Road

Location: Town:
Sidindi, Ugunja Siaya
Project Status:
Construction Drawings
Drawing Title: Scale:
Dhobi Area Sections 1:25

Drawing No: Project No: Rev. No.:


0609 #Pln CD06

Drawn By: Checked By: Date:


F.O Arch. A. Ombati 27 July 2021

CAD File:
811UGN_Wanjero Residence CD07.pln

kubuni studio
architecture . interiors . project Management

Riverside Studios
Riverside Lane, Off Riverside Drive
P.O.BOX 30446 - 00100, Nairobi, Kenya

GSPublisherVersion 0.0.100.100
GENERAL NOTES

1. All work is to be done in accordance with the National


Construction Authority Regulations.

2. All materials and workmanship are to comply with the


relevant Kenya Bureau of Standards codes and or the
specified international codes where applicable in the
Architectural specifications. Where relevant Kenya Bureau
of Standards, British Standards, BS codes of practice, or
Agrément Certificates applicable to the design exists, the
recommendations and requirements of such documents to
be considered a minimum standard for the works.

3. The contractor shall in all aspects of the works comply


with the provisions of the Occupational Health and Safety
Act, 2007 (Act No 15 of 2007) and any regulations
promulgated in terms of that Act or the Factories
Machinery and Building Works Act.

4. The contractor shall set up, document and maintain a


quality assurance and quality control system, in
accordance with ISO 9001, able to be checked to the
satisfaction of the Architect, that all materials and
workmanship, whatever their sources, meet the
requirements of the Specification.

5. This drawing must be read in conjunction with all the


relevant drawings, schedules and specifications from
kubuni studio and all other consultants related to the
project.

6. All portions of the works related to any service or


consultant’s information is to be done in accordance with
the National Construction Building Regulations.

7. This drawing is not to be scaled. Figured dimensions to be


used. All dimensions are in millimeters unless otherwise

Box profile galvanised iron


stated.

8. All dimensions and levels must be checked on site by the

sheets at 10° pitch on


contractor before putting work in hand.

9. All work to be executed by competent persons qualified

cypress timber trusses


for the specific trade.

10. This drawings is copyright reserved and remains the


property of Kubuni Studio Limited

110
REV. DATE DESCRIPTION BY

300
Water resistant gypsum
ceiling parallel to roof
structure

1,200

2,850
Mild steel window to
schedule

2,475
KEY:

1,240
PROPOSED NEW WORKS

DEMOLITIONS

200mm thick concrete EXISTING WORKS

For and on behalf of:


block wall Architect: Kubuni Studio Limited
Reg. No. : 357A

Signature: ____________________________

Client:
Fredrick Wanjero C/O Isaac Wanjero
P.O. Box: 66139 - 00800

Dhobi Area Section 04 1:25 Project Title:


Proposed Wanjero Residence

Plot No.: Road:


SOUTH UGENYA/RANG'ALA/94 Kisumu-Busia Road

Location: Town:
Sidindi, Ugunja Siaya
Project Status:
Construction Drawings
Drawing Title: Scale:
Dhobi Area Sections 1:25

Drawing No: Project No: Rev. No.:


0610 #Pln CD06

Drawn By: Checked By: Date:


F.O Arch. A. Ombati 27 July 2021

CAD File:
811UGN_Wanjero Residence CD07.pln

kubuni studio
architecture . interiors . project Management

Riverside Studios
Riverside Lane, Off Riverside Drive
P.O.BOX 30446 - 00100, Nairobi, Kenya

GSPublisherVersion 0.0.100.100
GENERAL NOTES

1. All work is to be done in accordance with the National


Construction Authority Regulations.

2. All materials and workmanship are to comply with the


relevant Kenya Bureau of Standards codes and or the
specified international codes where applicable in the
Architectural specifications. Where relevant Kenya Bureau
of Standards, British Standards, BS codes of practice, or
Agrément Certificates applicable to the design exists, the
recommendations and requirements of such documents to
be considered a minimum standard for the works.

3. The contractor shall in all aspects of the works comply


with the provisions of the Occupational Health and Safety
Act, 2007 (Act No 15 of 2007) and any regulations
promulgated in terms of that Act or the Factories
Machinery and Building Works Act.

4. The contractor shall set up, document and maintain a


quality assurance and quality control system, in
accordance with ISO 9001, able to be checked to the
satisfaction of the Architect, that all materials and
workmanship, whatever their sources, meet the
requirements of the Specification.

5. This drawing must be read in conjunction with all the


relevant drawings, schedules and specifications from
kubuni studio and all other consultants related to the
project.

L(74)27 L(74)28 L(74)25 L(74)26 L(74)22 L(74)24 6. All portions of the works related to any service or
consultant’s information is to be done in accordance with

200
the National Construction Building Regulations.
0618 0619 0616 0617 0613 0615 7. This drawing is not to be scaled. Figured dimensions to be
used. All dimensions are in millimeters unless otherwise
stated.

8. All dimensions and levels must be checked on site by the


contractor before putting work in hand.

200

200

200

200

200

200

200
9. All work to be executed by competent persons qualified
for the specific trade.

200 10. This drawings is copyright reserved and remains the

200 1,800 200 150 900 150 150 900 200


property of Kubuni Studio Limited

L(74)23 L(74)23

699
900
0614 600x300mm non slip 0614

1,200
1,050
1,100
ceramic tile ff in a
FT staggered pattern
REV. DATE DESCRIPTION BY

200 1,800 200 1,200 200 1,050 200


FT

100
100

600
2,200

2,200
600x300mm non slip
ceramic tile ff in a 600x300mm non slip

680
L(74)21 staggered pattern ceramic tile ff in a L(74)21
900

0612 staggered pattern 0612

900
3,200

900
200 1,800 200 FT 1,200 200 525 525 200
200 1,800 200 300 600 300
200
150 600 FT 200
2,200

300
1,470

200

200

200

200
1,200

200 200
200 1,800 200 100 1,850 100 200 KEY:

L(74)25 L(74)26 L(74)22 L(74)24 PROPOSED NEW WORKS

DEMOLITIONS
0616 0617 0613 0615
200 1,388 412 200 2,450 200 EXISTING WORKS

FT
For and on behalf of:
Architect: Kubuni Studio Limited
Reg. No. : 357A

Signature: ____________________________
200

200
200

200

Client:
Fredrick Wanjero C/O Isaac Wanjero
100 100 1,500 100 400 2,450 200 P.O. Box: 66139 - 00800

Project Title:
Proposed Wanjero Residence
L(74)27 L(74)28 Plot No.: Road:

0618 0619
SOUTH UGENYA/RANG'ALA/94 Kisumu-Busia Road

Location: Town:
Sidindi, Ugunja Siaya
Project Status:
Construction Drawings
Drawing Title: Scale:

Master Bathroom, Shower & Cloakroom Part Plan 1:25


Master Bathroom, Shower & Cloakroom Part Plan 1:25

Drawing No: Project No: Rev. No.:


0611 #Pln CD06

Drawn By: Checked By: Date:


F.O Arch. A. Ombati 27 July 2021

CAD File:
811UGN_Wanjero Residence CD07.pln

kubuni studio
architecture . interiors . project Management

Riverside Studios
Riverside Lane, Off Riverside Drive
P.O.BOX 30446 - 00100, Nairobi, Kenya

GSPublisherVersion 0.0.100.100
GENERAL NOTES

1. All work is to be done in accordance with the National


Construction Authority Regulations.

2. All materials and workmanship are to comply with the


relevant Kenya Bureau of Standards codes and or the
specified international codes where applicable in the
Architectural specifications. Where relevant Kenya Bureau
of Standards, British Standards, BS codes of practice, or
Agrément Certificates applicable to the design exists, the
recommendations and requirements of such documents to
be considered a minimum standard for the works.

3. The contractor shall in all aspects of the works comply


with the provisions of the Occupational Health and Safety
Act, 2007 (Act No 15 of 2007) and any regulations
promulgated in terms of that Act or the Factories
Machinery and Building Works Act.

4. The contractor shall set up, document and maintain a


quality assurance and quality control system, in
accordance with ISO 9001, able to be checked to the
satisfaction of the Architect, that all materials and
workmanship, whatever their sources, meet the
requirements of the Specification.

Box profile galvanised iron 5. This drawing must be read in conjunction with all the
relevant drawings, schedules and specifications from
kubuni studio and all other consultants related to the

sheets at 10° pitch on project.

6. All portions of the works related to any service or

cypress timber trusses consultant’s information is to be done in accordance with


the National Construction Building Regulations.

7. This drawing is not to be scaled. Figured dimensions to be


used. All dimensions are in millimeters unless otherwise
stated.

8. All dimensions and levels must be checked on site by the


contractor before putting work in hand.

9. All work to be executed by competent persons qualified


for the specific trade.

10. This drawings is copyright reserved and remains the

230
property of Kubuni Studio Limited

Painted chipboard ceiling


parallel to roof structure

1,240

600
1,275

Opening with insect mesh


1,180

1,180

1,290
REV. DATE DESCRIPTION BY

to schedule

Overhead water storage

1,590
tanks on support to SE
110

50
details

760
110

110

300
300

300
uPVC ceiling
900

900

1,200
Semi solid flush door

KEY:
2,700

PROPOSED NEW WORKS


Mild steel window to
2,400

2,400
DEMOLITIONS

2,400
schedule For and on behalf of:
EXISTING WORKS

Architect: Kubuni Studio Limited


1,200
1,800

Reg. No. : 357A


1,500

Signature: ____________________________

600x300mm ceramic wall Client:

tiles to approval Fredrick Wanjero C/O Isaac Wanjero


P.O. Box: 66139 - 00800

Project Title:
Proposed Wanjero Residence

Plot No.: Road:

200mm thick concrete SOUTH UGENYA/RANG'ALA/94

Location:
Kisumu-Busia Road

Town:
40

40

40

40

40

40

40
block wall
Sidindi, Ugunja Siaya
Project Status:
Construction Drawings
Drawing Title: Scale:
Master Bathroom, Shower & Cloakroom Section 1:25

Drawing No: Project No: Rev. No.:


0612 #Pln CD06

Master Bathroom, Shower & Cloakroom Section 01 1:25 Drawn By:


F.O
Checked By:
Arch. A. Ombati
Date:
27 July 2021

CAD File:
811UGN_Wanjero Residence CD07.pln

kubuni studio
architecture . interiors . project Management

Riverside Studios
Riverside Lane, Off Riverside Drive
P.O.BOX 30446 - 00100, Nairobi, Kenya

GSPublisherVersion 0.0.100.100
GENERAL NOTES

1. All work is to be done in accordance with the National


Construction Authority Regulations.

2. All materials and workmanship are to comply with the


relevant Kenya Bureau of Standards codes and or the
specified international codes where applicable in the
Architectural specifications. Where relevant Kenya Bureau
of Standards, British Standards, BS codes of practice, or
Agrément Certificates applicable to the design exists, the
recommendations and requirements of such documents to
be considered a minimum standard for the works.

3. The contractor shall in all aspects of the works comply


with the provisions of the Occupational Health and Safety
Act, 2007 (Act No 15 of 2007) and any regulations
promulgated in terms of that Act or the Factories
Machinery and Building Works Act.

4. The contractor shall set up, document and maintain a


quality assurance and quality control system, in
accordance with ISO 9001, able to be checked to the
satisfaction of the Architect, that all materials and
workmanship, whatever their sources, meet the
requirements of the Specification.

5. This drawing must be read in conjunction with all the

Box profile galvanised iron relevant drawings, schedules and specifications from
kubuni studio and all other consultants related to the
project.

sheets at 10° pitch on 6. All portions of the works related to any service or
consultant’s information is to be done in accordance with

cypress timber trusses the National Construction Building Regulations.

7. This drawing is not to be scaled. Figured dimensions to be


used. All dimensions are in millimeters unless otherwise
stated.

450
8. All dimensions and levels must be checked on site by the
contractor before putting work in hand.
Painted chipboard ceiling 9. All work to be executed by competent persons qualified
for the specific trade.
parallel to roof structure 10. This drawings is copyright reserved and remains the
property of Kubuni Studio Limited

1,560
1,610
Opening with insect mesh

800
to schedule

1,010
REV. DATE DESCRIPTION BY

992
1,360
Overhead water storage
tanks on support to SE
details

660

50

50
300

300
uPVC ceiling

900
Mild steel window to
schedule 900

2,700 KEY:

Semi solid flush door

2,400

2,400
PROPOSED NEW WORKS
2,440

DEMOLITIONS
EXISTING WORKS

For and on behalf of:

1,800
Architect: Kubuni Studio Limited

200mm thick concrete


Reg. No. : 357A

block wall
1,540

Signature: ____________________________

Client:
Fredrick Wanjero C/O Isaac Wanjero
600x300mm ceramic wall P.O. Box: 66139 - 00800

Project Title:

tiles to approval Proposed Wanjero Residence

Plot No.: Road:


SOUTH UGENYA/RANG'ALA/94 Kisumu-Busia Road
40

40
40

40
Location: Town:
Sidindi, Ugunja Siaya
Project Status:
Construction Drawings
Drawing Title: Scale:
Cloakroom Section 1:25

Drawing No: Project No: Rev. No.:

Cloakroom Section 01 1:25


0613 #Pln CD06

Drawn By: Checked By: Date:


F.O Arch. A. Ombati 27 July 2021

CAD File:
811UGN_Wanjero Residence CD07.pln

kubuni studio
architecture . interiors . project Management

Riverside Studios
Riverside Lane, Off Riverside Drive
P.O.BOX 30446 - 00100, Nairobi, Kenya

GSPublisherVersion 0.0.100.100
GENERAL NOTES

1. All work is to be done in accordance with the National


Construction Authority Regulations.

2. All materials and workmanship are to comply with the


relevant Kenya Bureau of Standards codes and or the
specified international codes where applicable in the
Architectural specifications. Where relevant Kenya Bureau
of Standards, British Standards, BS codes of practice, or
Agrément Certificates applicable to the design exists, the
recommendations and requirements of such documents to
be considered a minimum standard for the works.

3. The contractor shall in all aspects of the works comply


with the provisions of the Occupational Health and Safety
Act, 2007 (Act No 15 of 2007) and any regulations
promulgated in terms of that Act or the Factories
Machinery and Building Works Act.

4. The contractor shall set up, document and maintain a


quality assurance and quality control system, in
accordance with ISO 9001, able to be checked to the
satisfaction of the Architect, that all materials and
workmanship, whatever their sources, meet the
requirements of the Specification.

5. This drawing must be read in conjunction with all the


relevant drawings, schedules and specifications from
kubuni studio and all other consultants related to the
project.

6. All portions of the works related to any service or


consultant’s information is to be done in accordance with
the National Construction Building Regulations.

7. This drawing is not to be scaled. Figured dimensions to be


used. All dimensions are in millimeters unless otherwise
stated.

Box profile galvanised iron


8. All dimensions and levels must be checked on site by the
contractor before putting work in hand.

sheets at 10° pitch on


9. All work to be executed by competent persons qualified
for the specific trade.

cypress timber trusses


10. This drawings is copyright reserved and remains the
property of Kubuni Studio Limited

1,074

1,074
1,074
1,124
REV. DATE DESCRIPTION BY

Painted chipboard ceiling


parallel to roof structure 1,424

2,024

50

50
50
300

300

300
uPVC ceiling

3,824
200mm thick concrete
block wall

2,700
KEY:

Semi solid flush door


2,400

2,400

2,400

2,400
PROPOSED NEW WORKS

DEMOLITIONS
EXISTING WORKS

For and on behalf of:


1,800

Architect: Kubuni Studio Limited


Reg. No. : 357A

Signature: ____________________________

600x300mm ceramic wall


tiles to approval Client:
Fredrick Wanjero C/O Isaac Wanjero
P.O. Box: 66139 - 00800

Project Title:
Proposed Wanjero Residence

Plot No.: Road:


SOUTH UGENYA/RANG'ALA/94 Kisumu-Busia Road
40

40

40

40

40

40

40
Location: Town:
Sidindi, Ugunja Siaya
Project Status:
Construction Drawings
Drawing Title: Scale:
Master Bathroom, Shower & Cloakroom Section 1:25

Drawing No: Project No: Rev. No.:


#Pln

Master Bathroom, Shower & Cloakroom Section 01 1:25


0614 CD06

Drawn By: Checked By: Date:


F.O Arch. A. Ombati 27 July 2021

CAD File:
811UGN_Wanjero Residence CD07.pln

kubuni studio
architecture . interiors . project Management

Riverside Studios
Riverside Lane, Off Riverside Drive
P.O.BOX 30446 - 00100, Nairobi, Kenya

GSPublisherVersion 0.0.100.100
GENERAL NOTES

1. All work is to be done in accordance with the National


Construction Authority Regulations.

2. All materials and workmanship are to comply with the


relevant Kenya Bureau of Standards codes and or the
specified international codes where applicable in the
Architectural specifications. Where relevant Kenya Bureau
of Standards, British Standards, BS codes of practice, or
Agrément Certificates applicable to the design exists, the
recommendations and requirements of such documents to
be considered a minimum standard for the works.

3. The contractor shall in all aspects of the works comply


with the provisions of the Occupational Health and Safety
Act, 2007 (Act No 15 of 2007) and any regulations
promulgated in terms of that Act or the Factories
Machinery and Building Works Act.

4. The contractor shall set up, document and maintain a


quality assurance and quality control system, in
accordance with ISO 9001, able to be checked to the
satisfaction of the Architect, that all materials and
workmanship, whatever their sources, meet the
requirements of the Specification.

5. This drawing must be read in conjunction with all the


relevant drawings, schedules and specifications from

Box profile galvanised iron


kubuni studio and all other consultants related to the
project.

sheets at 10° pitch on


6. All portions of the works related to any service or
consultant’s information is to be done in accordance with
the National Construction Building Regulations.

cypress timber trusses 7. This drawing is not to be scaled. Figured dimensions to be


used. All dimensions are in millimeters unless otherwise
stated.

8. All dimensions and levels must be checked on site by the


contractor before putting work in hand.

450
Painted chipboard ceiling
9. All work to be executed by competent persons qualified

550
for the specific trade.

parallel to roof structure


10. This drawings is copyright reserved and remains the
property of Kubuni Studio Limited

100
Concrete surround to
opening with insect mesh

600

600
to schedule REV. DATE DESCRIPTION BY

1,010

1,010
992

1,360

Overhead water storage

410

100
tanks on support to SE
details

50
50

50
300

300
uPVC ceiling

4,350
900

Mild steel window to


3,760

900
schedule

Semi solid flush door

3,100
2,700

KEY:
2,400

2,400

PROPOSED NEW WORKS

DEMOLITIONS
EXISTING WORKS

For and on behalf of:


1,800

Architect: Kubuni Studio Limited

600x300mm ceramic wall Reg. No. : 357A


1,500

tiles to approval Signature: ____________________________

Client:
Fredrick Wanjero C/O Isaac Wanjero
P.O. Box: 66139 - 00800

Project Title:
Proposed Wanjero Residence

200mm thick concrete Plot No.:


SOUTH UGENYA/RANG'ALA/94
Road:
Kisumu-Busia Road

block wall
40

40

40

40
40

40

Location: Town:
Sidindi, Ugunja Siaya
Project Status:
Construction Drawings
Drawing Title: Scale:
Cloakroom Section 1:25

Drawing No: Project No: Rev. No.:

Cloakroom Section 02 1:25


0615 #Pln CD06

Drawn By: Checked By: Date:


F.O Arch. A. Ombati 27 July 2021

CAD File:
811UGN_Wanjero Residence CD07.pln

kubuni studio
architecture . interiors . project Management

Riverside Studios
Riverside Lane, Off Riverside Drive
P.O.BOX 30446 - 00100, Nairobi, Kenya

GSPublisherVersion 0.0.100.100
GENERAL NOTES

1. All work is to be done in accordance with the National


Construction Authority Regulations.

2. All materials and workmanship are to comply with the


relevant Kenya Bureau of Standards codes and or the
specified international codes where applicable in the
Architectural specifications. Where relevant Kenya Bureau
of Standards, British Standards, BS codes of practice, or
Agrément Certificates applicable to the design exists, the
recommendations and requirements of such documents to
be considered a minimum standard for the works.

3. The contractor shall in all aspects of the works comply


with the provisions of the Occupational Health and Safety
Act, 2007 (Act No 15 of 2007) and any regulations
promulgated in terms of that Act or the Factories

Box profile galvanised iron Machinery and Building Works Act.

4. The contractor shall set up, document and maintain a

sheets at 10° pitch on quality assurance and quality control system, in


accordance with ISO 9001, able to be checked to the
satisfaction of the Architect, that all materials and

cypress timber trusses workmanship, whatever their sources, meet the


requirements of the Specification.

5. This drawing must be read in conjunction with all the


relevant drawings, schedules and specifications from
kubuni studio and all other consultants related to the
project.

6. All portions of the works related to any service or


consultant’s information is to be done in accordance with
the National Construction Building Regulations.
Moisture resistant gypsum

450
7. This drawing is not to be scaled. Figured dimensions to be
used. All dimensions are in millimeters unless otherwise
ceiling parallel to roof stated.

550
structure
8. All dimensions and levels must be checked on site by the
contractor before putting work in hand.

9. All work to be executed by competent persons qualified


for the specific trade.

10. This drawings is copyright reserved and remains the

100
property of Kubuni Studio Limited

Concrete surround to

1,610
opening with insect mesh

600
600
to schedule

1,010
1,010
1,010

1,360
REV. DATE DESCRIPTION BY

Overhead water storage

100
tanks on support to SE

50
details

50
50
300

300
uPVC ceiling

4,250

900
Mild steel window to

3,760
900
schedule

3,160
3,100

2,700
2,400

2,400
KEY:
200mm thick concrete PROPOSED NEW WORKS

block wall DEMOLITIONS

1,800
EXISTING WORKS

For and on behalf of:


Architect: Kubuni Studio Limited
1,540

Reg. No. : 357A

Signature: ____________________________

600x300mm ceramic wall


tiles to approval Client:
Fredrick Wanjero C/O Isaac Wanjero
P.O. Box: 66139 - 00800

100
Project Title:
Proposed Wanjero Residence
40

40

40
40
40

40
Plot No.: Road:
SOUTH UGENYA/RANG'ALA/94 Kisumu-Busia Road

Location: Town:
Sidindi, Ugunja Siaya
Project Status:
Construction Drawings

Shower Section 01 1:25


Drawing Title: Scale:
Shower Section 1:25

Drawing No: Project No: Rev. No.:


0616 #Pln CD06

Drawn By: Checked By: Date:


F.O Arch. A. Ombati 27 July 2021

CAD File:
811UGN_Wanjero Residence CD07.pln

kubuni studio
architecture . interiors . project Management

Riverside Studios
Riverside Lane, Off Riverside Drive
P.O.BOX 30446 - 00100, Nairobi, Kenya

GSPublisherVersion 0.0.100.100
GENERAL NOTES

1. All work is to be done in accordance with the National


Construction Authority Regulations.

2. All materials and workmanship are to comply with the


relevant Kenya Bureau of Standards codes and or the
specified international codes where applicable in the
Architectural specifications. Where relevant Kenya Bureau
of Standards, British Standards, BS codes of practice, or
Agrément Certificates applicable to the design exists, the
recommendations and requirements of such documents to
be considered a minimum standard for the works.

3. The contractor shall in all aspects of the works comply


with the provisions of the Occupational Health and Safety
Act, 2007 (Act No 15 of 2007) and any regulations
promulgated in terms of that Act or the Factories

Box profile galvanised iron


Machinery and Building Works Act.

4. The contractor shall set up, document and maintain a

sheets at 10° pitch on


quality assurance and quality control system, in
accordance with ISO 9001, able to be checked to the
satisfaction of the Architect, that all materials and

cypress timber trusses workmanship, whatever their sources, meet the


requirements of the Specification.

5. This drawing must be read in conjunction with all the


relevant drawings, schedules and specifications from
kubuni studio and all other consultants related to the
project.

6. All portions of the works related to any service or


consultant’s information is to be done in accordance with
the National Construction Building Regulations.

Moisture resistant gypsum 7. This drawing is not to be scaled. Figured dimensions to be


used. All dimensions are in millimeters unless otherwise

ceiling parallel to roof stated.

450
550
8. All dimensions and levels must be checked on site by the

structure contractor before putting work in hand.

9. All work to be executed by competent persons qualified


for the specific trade.

Concrete surround to
10. This drawings is copyright reserved and remains the

600 100
property of Kubuni Studio Limited

opening with insect mesh

1,610
600
to schedule

1,010

1,010
992

REV. DATE DESCRIPTION BY

Overhead water storage

100
tanks on support to SE
details
50

50
300

300
uPVC ceiling

4,250
900

4,350
3,760

3,160
200mm thick concrete
block wall

3,100
2,700
2,400

2,400
KEY:
PROPOSED NEW WORKS

DEMOLITIONS
1,800

600x300mm ceramic wall For and on behalf of:


EXISTING WORKS

tiles to approval Architect: Kubuni Studio Limited


Reg. No. : 357A

Signature: ____________________________

Client:
Fredrick Wanjero C/O Isaac Wanjero
P.O. Box: 66139 - 00800
100

Project Title:
Proposed Wanjero Residence
40

40
40

40

40
40

Plot No.: Road:


SOUTH UGENYA/RANG'ALA/94 Kisumu-Busia Road

Location: Town:
Sidindi, Ugunja Siaya
Project Status:
Construction Drawings

Shower Section 02 1:25


Drawing Title: Scale:
Shower Section 1:25

Drawing No: Project No: Rev. No.:


0617 #Pln CD06

Drawn By: Checked By: Date:


F.O Arch. A. Ombati 27 July 2021

CAD File:
811UGN_Wanjero Residence CD07.pln

kubuni studio
architecture . interiors . project Management

Riverside Studios
Riverside Lane, Off Riverside Drive
P.O.BOX 30446 - 00100, Nairobi, Kenya

GSPublisherVersion 0.0.100.100
GENERAL NOTES

1. All work is to be done in accordance with the National


Construction Authority Regulations.

2. All materials and workmanship are to comply with the


relevant Kenya Bureau of Standards codes and or the
specified international codes where applicable in the
Architectural specifications. Where relevant Kenya Bureau
of Standards, British Standards, BS codes of practice, or
Agrément Certificates applicable to the design exists, the
recommendations and requirements of such documents to
be considered a minimum standard for the works.

3. The contractor shall in all aspects of the works comply


with the provisions of the Occupational Health and Safety
Act, 2007 (Act No 15 of 2007) and any regulations
promulgated in terms of that Act or the Factories
Machinery and Building Works Act.

4. The contractor shall set up, document and maintain a


quality assurance and quality control system, in
accordance with ISO 9001, able to be checked to the
satisfaction of the Architect, that all materials and
Box profile galvanised iron workmanship, whatever their sources, meet the
requirements of the Specification.

sheets at 10° pitch on 5. This drawing must be read in conjunction with all the
relevant drawings, schedules and specifications from

cypress timber trusses


kubuni studio and all other consultants related to the
project.

6. All portions of the works related to any service or


consultant’s information is to be done in accordance with
the National Construction Building Regulations.

Moisture resistant gypsum 7. This drawing is not to be scaled. Figured dimensions to be


used. All dimensions are in millimeters unless otherwise

ceiling parallel to roof stated.

8. All dimensions and levels must be checked on site by the

555
structure contractor before putting work in hand.

655
9. All work to be executed by competent persons qualified
for the specific trade.

10. This drawings is copyright reserved and remains the


property of Kubuni Studio Limited

100

1,715
Concrete surround to

600
opening with insect mesh

600
to schedule
REV. DATE DESCRIPTION BY

1,060
2,615

1,360
100

1,960
660

300

300
4,415

3,760
3,700
Mild steel window to
schedule
1,200

3,160

600x300mm ceramic wall

2,400
KEY:
PROPOSED NEW WORKS
tiles to approval
2,400

DEMOLITIONS
EXISTING WORKS

2,400
1,800
1,800

For and on behalf of:


Architect: Kubuni Studio Limited
Reg. No. : 357A

Semi solid flush door Signature: ____________________________


1,240

Client:
Fredrick Wanjero C/O Isaac Wanjero
P.O. Box: 66139 - 00800

Project Title:

200mm thick concrete Proposed Wanjero Residence

Plot No.: Road:

100
block wall SOUTH UGENYA/RANG'ALA/94

Location:
Kisumu-Busia Road

Town:
Sidindi, Ugunja Siaya
Project Status:
Construction Drawings
Drawing Title: Scale:
Master Bathroom Section 1:25

Master Bathroom Section 01 1:25


Drawing No: Project No: Rev. No.:
0618 #Pln CD06

Drawn By: Checked By: Date:


F.O Arch. A. Ombati 27 July 2021

CAD File:
811UGN_Wanjero Residence CD07.pln

kubuni studio
architecture . interiors . project Management

Riverside Studios
Riverside Lane, Off Riverside Drive
P.O.BOX 30446 - 00100, Nairobi, Kenya

GSPublisherVersion 0.0.100.100
GENERAL NOTES

1. All work is to be done in accordance with the National


Construction Authority Regulations.

2. All materials and workmanship are to comply with the


relevant Kenya Bureau of Standards codes and or the
specified international codes where applicable in the
Architectural specifications. Where relevant Kenya Bureau
of Standards, British Standards, BS codes of practice, or
Agrément Certificates applicable to the design exists, the
recommendations and requirements of such documents to
be considered a minimum standard for the works.

3. The contractor shall in all aspects of the works comply


with the provisions of the Occupational Health and Safety
Act, 2007 (Act No 15 of 2007) and any regulations
promulgated in terms of that Act or the Factories
Machinery and Building Works Act.

4. The contractor shall set up, document and maintain a


quality assurance and quality control system, in
accordance with ISO 9001, able to be checked to the
satisfaction of the Architect, that all materials and
workmanship, whatever their sources, meet the
requirements of the Specification.

Box profile galvanised iron 5. This drawing must be read in conjunction with all the
relevant drawings, schedules and specifications from
kubuni studio and all other consultants related to the

sheets at 10° pitch on project.

6. All portions of the works related to any service or

cypress timber trusses consultant’s information is to be done in accordance with


the National Construction Building Regulations.

7. This drawing is not to be scaled. Figured dimensions to be


used. All dimensions are in millimeters unless otherwise
stated.

555
8. All dimensions and levels must be checked on site by the

Moisture resistant gypsum


contractor before putting work in hand.

9. All work to be executed by competent persons qualified

ceiling parallel to roof


for the specific trade.

655
10. This drawings is copyright reserved and remains the

structure

100
property of Kubuni Studio Limited

Concrete surround to

600
600
REV. DATE DESCRIPTION BY

opening with insect mesh


to schedule

100
2,615

460
1,960

660
300
2,860

4,415

4,455
3,760

1,200
Mild steel window to
schedule KEY:
PROPOSED NEW WORKS

2,400
DEMOLITIONS
EXISTING WORKS

For and on behalf of:


Architect: Kubuni Studio Limited
1,800

1,800

Reg. No. : 357A

600x300mm ceramic wall


tiles to approval
Signature: ____________________________
203

1,240 Client:
Fredrick Wanjero C/O Isaac Wanjero
P.O. Box: 66139 - 00800

Project Title:
Proposed Wanjero Residence
637

200mm thick concrete


Plot No.: Road:
SOUTH UGENYA/RANG'ALA/94 Kisumu-Busia Road

Location: Town:
block wall Sidindi, Ugunja
Project Status:
Siaya
100

Construction Drawings
Drawing Title: Scale:
Master Bathroom Section 1:25

Drawing No: Project No: Rev. No.:


0619 #Pln CD06

Drawn By: Checked By: Date:

Master Bathroom Section 02 1:25 F.O

CAD File:
Arch. A. Ombati 27 July 2021

811UGN_Wanjero Residence CD07.pln

kubuni studio
architecture . interiors . project Management

Riverside Studios
Riverside Lane, Off Riverside Drive
P.O.BOX 30446 - 00100, Nairobi, Kenya

GSPublisherVersion 0.0.100.100
GENERAL NOTES

1. All work is to be done in accordance with the National


Construction Authority Regulations.

2. All materials and workmanship are to comply with the


relevant Kenya Bureau of Standards codes and or the
specified international codes where applicable in the
Architectural specifications. Where relevant Kenya Bureau
of Standards, British Standards, BS codes of practice, or
Agrément Certificates applicable to the design exists, the
recommendations and requirements of such documents to
be considered a minimum standard for the works.

3. The contractor shall in all aspects of the works comply


with the provisions of the Occupational Health and Safety
Act, 2007 (Act No 15 of 2007) and any regulations
promulgated in terms of that Act or the Factories
Machinery and Building Works Act.

4. The contractor shall set up, document and maintain a


1,500 quality assurance and quality control system, in
accordance with ISO 9001, able to be checked to the
satisfaction of the Architect, that all materials and
workmanship, whatever their sources, meet the
50 675 50 675 50
requirements of the Specification.

50
5. This drawing must be read in conjunction with all the
relevant drawings, schedules and specifications from
kubuni studio and all other consultants related to the

80
project.
1,500 6. All portions of the works related to any service or
opening top opening top consultant’s information is to be done in accordance with

320
hung hung the National Construction Building Regulations.
725 50 725
7. This drawing is not to be scaled. Figured dimensions to be

50
used. All dimensions are in millimeters unless otherwise
stated.

30
200 50
1,200

8. All dimensions and levels must be checked on site by the

50
contractor before putting work in hand.

9. All work to be executed by competent persons qualified


200 25

for the specific trade.

750
fixed pane fixed pane fixed pane fixed pane 10. This drawings is copyright reserved and remains the

570
property of Kubuni Studio Limited
200 25
50

50
Window ID: W01 Window ID: W02 REV. DATE DESCRIPTION BY

Description: brown painted steel surfaces Description: brown painted steel surfaces
Accessories: Brass handles and stays, hinges to Accessories: insect mesh across top Z-profile
allow 90 degrees external swing to permanent vent in frame
operable top panes 8mm thick bronze tinted
insect mesh across top Z-profile laminated glazing
permanent vent in frame Location: Walk In Closet (1)
6mm thick bronze tinted obscure Elevation: 3,150mm sill elevation from F.F.L
(pinhead type) glazing
Location: Master Bathroom (1)
Elevation: 1,200mm sill elevation from F.F.L

Window Details 1:25

KEY:
PROPOSED NEW WORKS

DEMOLITIONS
4,250
EXISTING WORKS

For and on behalf of:


75 900 50 1,050 100 1,050 50 900 75
Architect: Kubuni Studio Limited
50

Reg. No. : 357A


30
50

Signature: ____________________________
750

fixed pane fixed pane fixed pane fixed pane


Client:
570

Fredrick Wanjero C/O Isaac Wanjero


P.O. Box: 66139 - 00800

Project Title:
Proposed Wanjero Residence

Plot No.: Road:


50

SOUTH UGENYA/RANG'ALA/94 Kisumu-Busia Road

Location: Town:
Sidindi, Ugunja Siaya

Window ID: W03 Project Status:


Construction Drawings
Description: brown painted steel surfaces Drawing Title: Scale:
Accessories: insect mesh across top Z-profile Window Schedule 1:25

permanent vent in frame Drawing No:


0801
Project No:
#Pln
Rev. No.:
CD06
8mm thick bronze tinted Drawn By: Checked By: Date:
laminated glazing F.O Arch. A. Ombati 27 July 2021

CAD File:
Location: Entrance Lobby (1) 811UGN_Wanjero Residence CD07.pln

Elevation: 3,150mm sill elevation from F.F.L

kubuni studio
architecture . interiors . project Management

Riverside Studios
Riverside Lane, Off Riverside Drive

Window Details 1:25 P.O.BOX 30446 - 00100, Nairobi, Kenya

GSPublisherVersion 0.0.100.100
GENERAL NOTES

1. All work is to be done in accordance with the National


1,500 Construction Authority Regulations.

2. All materials and workmanship are to comply with the


40 40
40 20 450 20 20 320 20 20 450 60 relevant Kenya Bureau of Standards codes and or the
specified international codes where applicable in the
Architectural specifications. Where relevant Kenya Bureau
of Standards, British Standards, BS codes of practice, or
Agrément Certificates applicable to the design exists, the
recommendations and requirements of such documents to

380
be considered a minimum standard for the works.

fixed fixed fixed 3. The contractor shall in all aspects of the works comply
with the provisions of the Occupational Health and Safety

60
1,800 Act, 2007 (Act No 15 of 2007) and any regulations
600 promulgated in terms of that Act or the Factories
Machinery and Building Works Act.

20
40 20 500 20 40 560 40 20 500 20 40 50 500 50

100
4. The contractor shall set up, document and maintain a
105

40

50
20
quality assurance and quality control system, in
accordance with ISO 9001, able to be checked to the

20 200
20
satisfaction of the Architect, that all materials and
20

opening top

80
20 170
workmanship, whatever their sources, meet the

hung requirements of the Specification.


135

opening top 5. This drawing must be read in conjunction with all the

20 200
1,800

320
side hung fixed side hung hung relevant drawings, schedules and specifications from
200 20

190 40
kubuni studio and all other consultants related to the
project.

6. All portions of the works related to any service or

20 200
20

consultant’s information is to be done in accordance with

200 20

200 50
20 200
1,200

1,200
the National Construction Building Regulations.
side hung fixed side hung
7. This drawing is not to be scaled. Figured dimensions to be

20 200
used. All dimensions are in millimeters unless otherwise
stated.
200 20

200 25
20 200

fixed pane 8. All dimensions and levels must be checked on site by the
contractor before putting work in hand.

40
220 20

9. All work to be executed by competent persons qualified

200 25
20 200

fixed fixed fixed for the specific trade.

260
10. This drawings is copyright reserved and remains the
property of Kubuni Studio Limited
40

40

40

50
Window ID: W06
Window ID: W04 Window ID: W05 Description: brown painted steel
Description: brown painted steel surfaces Description: brown painted steel surfaces surfaces
Accessories: Brass handles and stays, hinges to allow 90 Accessories: Brass handles and stays, hinges to Accessories: Brass handles and stays,
degrees external swing to operable top allow 90 degrees external swing to hinges to allow 90 degrees REV. DATE DESCRIPTION BY

and side hung panes operable side panes external swing to operable
insect mesh across top Z-profile permanent insect mesh across top Z-profile top pane
vent in frame permanent vent in frame insect mesh across top Z-
6mm thick clear float glass 6mm thick bronze tinted float glass profile permanent vent in
Location: Kitchen (2) Hardwood board frame
Elevation: 1,200mm sill elevation from F.F.L Location: Master Bedroom (1), Walk In 6mm thick bronze tinted
Closet (1), Bedroom 01 (1), obscure (pinhead type)
External Wing Bedroom (1) glazing
Elevation: 600mm sill elevation from F.F.L Location: Pantry (3), External Shower (1)
Elevation: 1,200mm sill elevation from
F.F.L

Window Details 1:25

1,700 2,050 KEY:

100 1,500 100 100 1,850 100 PROPOSED NEW WORKS

DEMOLITIONS
EXISTING WORKS
100

100
For and on behalf of:
Architect: Kubuni Studio Limited
Reg. No. : 357A
800

600

800

600
Signature: ____________________________

Client:
Fredrick Wanjero C/O Isaac Wanjero
100

100

P.O. Box: 66139 - 00800

Project Title:
Proposed Wanjero Residence

Plot No.: Road:


Window ID: W10 Window ID: W11 SOUTH UGENYA/RANG'ALA/94 Kisumu-Busia Road

Description: reinforced concrete casing to opening; Description: reinforced concrete casing to opening; Location:
Sidindi, Ugunja
Town:
Siaya

plastered and painted to approval plastered and painted to approval Project Status:
Construction Drawings
Accessories: insect mesh to opening Accessories: insect mesh to opening Drawing Title: Scale:
Location: Master Bathroom Clerestory (1) Location: Shower & Cloakroom Clerestory (1) Window Schedule 1:25

Elevation: 3,100mm sill elevation from F.F.L Elevation: 3,100mm sill elevation from F.F.L Drawing No:
0802
Project No:
#Pln
Rev. No.:
CD06

Drawn By: Checked By: Date:


F.O Arch. A. Ombati 27 July 2021

CAD File:
811UGN_Wanjero Residence CD07.pln

kubuni studio
architecture . interiors . project Management

Window Details 1:25 Riverside Studios


Riverside Lane, Off Riverside Drive
P.O.BOX 30446 - 00100, Nairobi, Kenya

GSPublisherVersion 0.0.100.100
GENERAL NOTES

1. All work is to be done in accordance with the National


Construction Authority Regulations.

2. All materials and workmanship are to comply with the


relevant Kenya Bureau of Standards codes and or the
specified international codes where applicable in the
Architectural specifications. Where relevant Kenya Bureau
of Standards, British Standards, BS codes of practice, or
Agrément Certificates applicable to the design exists, the
recommendations and requirements of such documents to
be considered a minimum standard for the works.

3. The contractor shall in all aspects of the works comply


with the provisions of the Occupational Health and Safety
Act, 2007 (Act No 15 of 2007) and any regulations
promulgated in terms of that Act or the Factories
Machinery and Building Works Act.

4. The contractor shall set up, document and maintain a


quality assurance and quality control system, in
accordance with ISO 9001, able to be checked to the
satisfaction of the Architect, that all materials and
workmanship, whatever their sources, meet the
requirements of the Specification.

5. This drawing must be read in conjunction with all the


relevant drawings, schedules and specifications from
kubuni studio and all other consultants related to the
project.

6. All portions of the works related to any service or


consultant’s information is to be done in accordance with
the National Construction Building Regulations.

7. This drawing is not to be scaled. Figured dimensions to be


used. All dimensions are in millimeters unless otherwise
600 stated.

50 500 50 8. All dimensions and levels must be checked on site by the


contractor before putting work in hand.
50

9. All work to be executed by competent persons qualified


for the specific trade.
80

10. This drawings is copyright reserved and remains the


property of Kubuni Studio Limited
opening top
320

hung
900
50

50 800 50
25 200

50
600

80
REV. DATE DESCRIPTION BY
50 500 50
25 200

opening top

50
1,800

320
hung

80
25 200

fixed pane

200 50
opening top

320

1,200
hung
25 200

50
900

200 25
fixed pane

25 175
25 200

200 25
fixed pane

150
125
50

50

50
Window ID: W07 Window ID: W08 Window ID: W09
Description: brown painted steel Description: brown painted steel Description: brown painted steel
surfaces surfaces surfaces
Accessories: Brass handles and stays, Accessories: Brass handles and stays, Accessories: Brass handles and stays,
hinges to allow 90 degrees hinges to allow 90 degrees hinges to allow 90 degrees
external swing to operable external swing to operable external swing to operable
top pane top pane top pane
insect mesh across top Z- insect mesh across top Z- insect mesh across top Z-
KEY:
profile permanent vent in profile permanent vent in profile permanent vent in
PROPOSED NEW WORKS
frame frame frame
DEMOLITIONS
6mm thick bronze tinted 6mm thick bronze tinted 6mm thick bronze tinted
EXISTING WORKS
float glass obscure (pinhead type) obscure (pinhead type)
For and on behalf of:
Location: External Wing Bedroom (2) glazing glazing Architect: Kubuni Studio Limited
Reg. No. : 357A
Elevation: 600mm sill elevation from Location: Shower (1), Cloakroom (1) Location: External Toilet (2)
F.F.L Elevation: 1,500mm sill elevation from Elevation: 1,200mm sill elevation from
F.F.L F.F.L Signature: ____________________________

Client:
Fredrick Wanjero C/O Isaac Wanjero
P.O. Box: 66139 - 00800

Project Title:
Proposed Wanjero Residence

Window Details 1:25 Plot No.:


SOUTH UGENYA/RANG'ALA/94
Road:
Kisumu-Busia Road

Location: Town:
Sidindi, Ugunja Siaya
Project Status:
Construction Drawings
Drawing Title: Scale:
Window Schedule 1:25

Drawing No: Project No: Rev. No.:


0803 #Pln CD06

Drawn By: Checked By: Date:


F.O Arch. A. Ombati 27 July 2021

CAD File:
811UGN_Wanjero Residence CD07.pln

kubuni studio
architecture . interiors . project Management

Riverside Studios
Riverside Lane, Off Riverside Drive
P.O.BOX 30446 - 00100, Nairobi, Kenya

GSPublisherVersion 0.0.100.100
GENERAL NOTES

1. All work is to be done in accordance with the National


Construction Authority Regulations.

2. All materials and workmanship are to comply with the


relevant Kenya Bureau of Standards codes and or the
specified international codes where applicable in the
Architectural specifications. Where relevant Kenya Bureau
of Standards, British Standards, BS codes of practice, or
Agrément Certificates applicable to the design exists, the
recommendations and requirements of such documents to
be considered a minimum standard for the works.

3. The contractor shall in all aspects of the works comply


with the provisions of the Occupational Health and Safety
Act, 2007 (Act No 15 of 2007) and any regulations
promulgated in terms of that Act or the Factories
Machinery and Building Works Act.

4. The contractor shall set up, document and maintain a


quality assurance and quality control system, in
accordance with ISO 9001, able to be checked to the
satisfaction of the Architect, that all materials and
workmanship, whatever their sources, meet the
requirements of the Specification.

5. This drawing must be read in conjunction with all the


relevant drawings, schedules and specifications from
kubuni studio and all other consultants related to the
project.

900 6. All portions of the works related to any service or


consultant’s information is to be done in accordance with
the National Construction Building Regulations.
50 5 790 5 50
900 900 7. This drawing is not to be scaled. Figured dimensions to be
5 used. All dimensions are in millimeters unless otherwise
50 800 50 50 5 100 590 100 50 50 800 50 stated.
50

50
8. All dimensions and levels must be checked on site by the
contractor before putting work in hand.
50

250 50
9. All work to be executed by competent persons qualified
for the specific trade.
fixed glass pane
200

10. This drawings is copyright reserved and remains the


property of Kubuni Studio Limited
30

50
200
30
200
30

REV. DATE DESCRIPTION BY


200
30
200
2,400

2,400

2,400
2,350
30
200

2,050
50
900

solid steel panel

Door ID: D01 Door ID: D02 Door ID: D03


Description: brown painted flush steel door Description: 45mm thick solid mahogany door and Description: 45mm thick semi solid flush door and 50x100mm HW
and on 50x50mm RHS frame 50x100mm HW frame. Hardwood slat infills and matt frame to include 300mm high rectangular fanlight
Accessories: Brass lever handle, cylinder lock varnish to approval with 4mm clear float glass infill KEY:
and butt hinges to allow 90 Accessories: 3 Lever mortice sash lock (ASSA ABLOY Code 2277 Accessories: 3 Lever mortice sash lock (ASSA ABLOY Code 2277 PROPOSED NEW WORKS
degrees outward swing polished brass finish), lever handle on plate (ASSA polished brass finish), lever handle on plate (ASSA DEMOLITIONS
insect mesh across top Z-profile ABLOY Code LHP-72-413-SN), "Powerload" 601 Butt ABLOY Code S1-003-85AB), "Powerload" 601 Butt EXISTING WORKS
permanent vent in leaf hinges satin stainless steel finish, floor mounted hinges satin stainless steel finish, floor mounted For and on behalf of:
Architect: Kubuni Studio Limited
6mm bronze tinted float glass doorstop (ASSA ABLOY Code DS-F-077-SSS) doorstop (ASSA ABLOY Code DS-F-006-SSS) Reg. No. : 357A
Location: Dhobi Area (1) Location: External Wing Bedroom (1) Location: Kitchen (1), Pantry (1), Corridor (2), Bedroom 01 (1),
Elevation: 0mm from F.F.L Elevation: 0mm from F.F.L Cloakroom (1), Shower (1), Master Bathroom (1),
Signature: ____________________________
External Toilet (1), External Shower (1)
Elevation: 0mm from F.F.L
Client:
Fredrick Wanjero C/O Isaac Wanjero
P.O. Box: 66139 - 00800

Project Title:
Proposed Wanjero Residence

Plot No.: Road:


SOUTH UGENYA/RANG'ALA/94 Kisumu-Busia Road

Location: Town:
Sidindi, Ugunja Siaya
Project Status:
Construction Drawings
Drawing Title: Scale:
Door Schedule 1:25

Drawing No: Project No: Rev. No.:


0804 #Pln CD06

Drawn By: Checked By: Date:


F.O Arch. A. Ombati 27 July 2021

Door Details 1:25


CAD File:
811UGN_Wanjero Residence CD07.pln

kubuni studio
architecture . interiors . project Management

Riverside Studios
Riverside Lane, Off Riverside Drive
P.O.BOX 30446 - 00100, Nairobi, Kenya

GSPublisherVersion 0.0.100.100
GENERAL NOTES

1. All work is to be done in accordance with the National


Construction Authority Regulations.

2. All materials and workmanship are to comply with the


relevant Kenya Bureau of Standards codes and or the
specified international codes where applicable in the
Architectural specifications. Where relevant Kenya Bureau
of Standards, British Standards, BS codes of practice, or
Agrément Certificates applicable to the design exists, the
recommendations and requirements of such documents to
be considered a minimum standard for the works.

3. The contractor shall in all aspects of the works comply


with the provisions of the Occupational Health and Safety
Act, 2007 (Act No 15 of 2007) and any regulations
promulgated in terms of that Act or the Factories
Machinery and Building Works Act.

4. The contractor shall set up, document and maintain a


quality assurance and quality control system, in
accordance with ISO 9001, able to be checked to the
satisfaction of the Architect, that all materials and
workmanship, whatever their sources, meet the
requirements of the Specification.

5. This drawing must be read in conjunction with all the


relevant drawings, schedules and specifications from
kubuni studio and all other consultants related to the
project.
3,600
1,800 6. All portions of the works related to any service or
consultant’s information is to be done in accordance with
900 1,800 900 the National Construction Building Regulations.
50 1,147 5 597
50 50 7. This drawing is not to be scaled. Figured dimensions to be
105 50 20 760 20 50 800 50 50 800 50 20 480 280 70 used. All dimensions are in millimeters unless otherwise
50 105 942 100 5 100 342 50 stated.
50

50

50

55
8. All dimensions and levels must be checked on site by the

35 50 5
contractor before putting work in hand.

20
9. All work to be executed by competent persons qualified

50
for the specific trade.

335
50
10. This drawings is copyright reserved and remains the

335
property of Kubuni Studio Limited

20
40

25
350

350
1,160
REV. DATE DESCRIPTION BY

25

25
350

350
2,400

2,400
2,350

25

375
350
75

25

25
350

350
900

25

25
385

385
75

50

50
Door ID: D04 Door ID: D05
Description: 45mm thick solid mahogany asymetric double door Description: brown painted steel double door with twin sidelights
on 50x100mm HW frame. 1,200mm wide primary Accessories: Custom stainless steel handle and butt hinges to operable leaves to allow 90 degrees
leaf with hardwood slat infills and matt varnish to outward swing; floor mounted doorstops; top hung sashes to sidelights KEY:
approval; 600mm wide secondary glazed leaf top and bottom deadbolts PROPOSED NEW WORKS
with 8mm thick bronze tinted laminated glass and 8mm thick bronze tinted laminated glazing DEMOLITIONS
insect mesh across top permanent vent in leaf Location: Lounge (1) EXISTING WORKS
Accessories: 5 Lever mortice sash lock (ASSA ABLOY Code 2201 Elevation: 0mm from F.F.L For and on behalf of:
Architect: Kubuni Studio Limited
satin chrome finish), polished brass lever handle, Reg. No. : 357A
"Powerload" HNSA Single Action Spring hinges satin
stainless steel finish, floor mounted doorstop (ASSA
Signature: ____________________________
ABLOY Code DS-F-001-SSS)
Location: Entrance (1)
Elevation: 0mm from F.F.L Client:
Fredrick Wanjero C/O Isaac Wanjero
P.O. Box: 66139 - 00800

Project Title:
Proposed Wanjero Residence

Plot No.: Road:


SOUTH UGENYA/RANG'ALA/94 Kisumu-Busia Road

Location: Town:
Sidindi, Ugunja Siaya
Project Status:
Construction Drawings
Drawing Title: Scale:
Door Schedule 1:25

Drawing No: Project No: Rev. No.:


0805 #Pln CD06

Drawn By: Checked By: Date:


F.O Arch. A. Ombati 27 July 2021

Door Details 1:25


CAD File:
811UGN_Wanjero Residence CD07.pln

kubuni studio
architecture . interiors . project Management

Riverside Studios
Riverside Lane, Off Riverside Drive
P.O.BOX 30446 - 00100, Nairobi, Kenya

GSPublisherVersion 0.0.100.100
Proposed Wanjero Residence
Renders

GSPublisherVersion 0.0.100.100
Proposed Wanjero Residence
Renders

GSPublisherVersion 0.0.100.100
Proposed Wanjero Residence
Renders

GSPublisherVersion 0.0.100.100
Proposed Wanjero Residence
Renders

GSPublisherVersion 0.0.100.100
Proposed Wanjero Residence
Renders

GSPublisherVersion 0.0.100.100
Proposed Wanjero Residence
Renders

GSPublisherVersion 0.0.100.100
Proposed Wanjero Residence
Internal renders

Lounge View 01
GSPublisherVersion 0.0.100.100
Proposed Wanjero Residence
Internal Renders

GSPublisherVersion 0.0.100.100
Lounge View 02
Proposed Wanjero Residence
Internal Renders

Kitchen View 01
GSPublisherVersion 0.0.100.100
Proposed Wanjero Residence
Internal Renders

GSPublisherVersion 0.0.100.100
Kitchen View 02
Proposed Wanjero Residence
Internal Renders

Bedroom 02
GSPublisherVersion 0.0.100.100
Proposed Wanjero Residence
Internal Renders

Master Bedroom View 01


GSPublisherVersion 0.0.100.100
Proposed Wanjero Residence
Internal Renders

Master Bedroom View 02


GSPublisherVersion 0.0.100.100
Proposed Wanjero Residence
Internal Renders

Master bathroom View 01


GSPublisherVersion 0.0.100.100
Proposed Wanjero Residence
Internal Renders

Master bathroom View 02


GSPublisherVersion 0.0.100.100

You might also like