PRELIMINARIES
The General Requirements are applicable to the whole of the works.
All Requirements specified in the contract conditions and technical
specifications.
General Requirements or otherwise indicated in the Contract
Documents, are not necessarily listed in the Bill of Quantities, the cost
of General Requirements shall be deemed to be included in the unit
rates of the BOQ items and will not be paid separately.
The Contractor is deemed to include in his prices, all costs to comply
with the instructions, rules and specifications stipulated or observed by
the Local Government Authorities, insurances, guarantees, testing &
commission, permits, bonds, .. Etc.
The Contractor shall perform all works required in this section.
Including, but not limited to coordination, related works, occupancy
requirements, and all other requirements; as per the specifications.
Page 1 of
PROJECT NAME: Dhamar General Hospital - Dhamar DATE: July /2023 Division 02: Site Construction
* The contractor should be aware that the proposed work will be carried out for an existing
functioning building and that the renovation activities should not interrupt other ongoing daily
activities. The Contractor is held responsible on the following: (a) Removing the demolished
material out of the site to an approved dump location within a maximum of three days. (b) the
dismantled material (including but limited to: doors, windows, lighting fixtures, mechanical fixtures,
etc.) is the sole property of the end user (Hospital Administration) and should be dismantled,
moved & stored as per Statement of Method approved by the Engineer. (c) Coordinate his daily
activities and the work schedule throughout the renovation period with the Client and the
Employer’s Representative. (d) Protect and safeguard the existing facilities, mechanical fixtures,
and building finishes, including paint, floor tiles, existing fixtures, doors, windows and structural
elements, etc even if these are our side of construction area but has direct or indirect interference
by the Contractor, his equipment, his staff or his operations. (e) Responsible for the method of
demolitions and any damage or subsequent damage to the existing or adjoining structures. (f) Take
all necessary measures to protect and minimize environmental hazards including pollution, noise,
dust, etc. (g) Noise and dust from the works shall be kept to the minimum possible. To reduce dust
supply of clean water shall be used to dampen the site. (h) Take all necessary precautions to
prevent anything emanating from or associated with the works from being deposited on areas
outside the contractor’s site areas. (i) Aware that the boundary wall which forms part of the wall to
be demolished extension is to be left untouched and in a safe a stable manner following demolition
works.
* The Rate includes the following works: (a) Provision for hindrance due to current situations. (b)
Safety provisions. (c) All the requirement to complete the work in accordance with Engineers'
instructions. (d) All direct, indirect works and expenses required for the completion of the coming
items. (e) All required tests by an approved laboratory for the defected and damaged concrete
element specified by the engineer. (f) All necessary scaffolding, tarpaulins and dust sheets,
protecting existing work from damage by workmen or the weather and removing all temporary
coverings and screens on completion.
* All dismantled materials must be stored in a place related to the contractor until to be reinstalled
(the needed materials) at the new locations according to Engineers' instructions. All above items
must be approved from Engineer to determine the time and location. The price includes repairing
any demolishing works Observing not to delay the normal function of all hospital departments
during the work. Cart away the depressed materials and all required as per engineering
instructions.
* If the owner wishes to take any of the materials/items from the existing site before demolishing,
the Contractor shall hand over the selected material/item to the owner and deliver them to the
approved location.
* Dismantle: includes manage cutting of services feed sources based on statement of method
approved by the Engineer, dismantling with care, storing the dismantled parts in a secured and
adequate storage area. All abiding approved safety plan measures.
* Handing to Client: includes handing to the client or any other party the Client names in writing, in a
tidy manner all of the dismantled parts and devices which are in acceptable condition and are not
intended to be reinstalled.
* Dispose: includes dispose and remove out of Site the damaged and broken out parts and debris, as
per Statement of Method approved by the Engineer that includes, but not limited to, disposal
working hours, movement paths, staff & equipment, separation between project's staff & hospital
users, gender safeguard, protection against pollution.
Carried forward
* The contractor to check any damages that maybe occured during dismantling any MEP installation
* that are connected
The contractor shallto the out
submit fullofworkshop
scope rehabilitation zone, and
drawings showing the itexisting
is his own responsibilty
levels and clarify to
therepair
any damages
connection tooccur
the to this utilities
existing conncetions
and to make sure
manholes to thesite
the continuity
engineer offor
theapproval.
hospital's operation.
* Before starting the execution of the roofing layer, the Contractor shall justify the existing slopes for
the water drain and perform water tests to ensure the slopes are as per the Engineer's instruction.
1 SECTION 02220 - Demolition
Carefully dismantling, removing the existing following items,including handling to the client with
1.1 proper sorting and packaging and packing system with tags to all items as client and engineer's
a. instructions
All electrical,and all necessary
mechanical works according
and medical engineer's
fixtures and approvals.
equipment to be carefully dismantled and
b. handed over to Hospital Management for maintenance, storage
All movable furniture shall be removed and handed over to Hospital and Management
possible reusefor
LS 1
c. maintenance, storage
All fixed furniture to beand possible reuse
dismantled and handed over to Hospital Management for maintenance,
storage and possible reuse
Carried forward
Item No. Dismantling Existing Aluminum Partitions: Description Unit Quantity Rate (USD)
Dismantle and remove of the aluminum Brought forward from previous
glass partition includingpagedoors and to be handed to
1.2 service/storage department at the hospital. The rate shall include making good (after
removal/dismantling) existing structure with all necessary related materials and equipment to m2 65
1.3 Dismantle
receive theand
Dismantling new remove
Existing
finish, of Aluminum
Block Partitions:
including windows
all related works such as sanding down and putty works, complete m2 405
Dismantle
Demolition
as shown on and
and remove
removal
drawings, of the
of aluminum
existing
specifications andwindows
walls and without
partitions
as per frames
whatever
Engineer's and
it is to
instructions. be handed
( stone, block,to
etc. ) with
service/storage
their finish above department
(like tiling) at
asthe hospital.
directed Theengineer,
by the rate shallininclude making
order to removegood (after or create
partitions
1.4 removal/dismantling) existing structure
openings (doors and windows), demolition with all necessary
process has to related materials and
be in a appropriate equipment
technical wayto to No. 28
receive the new
avoid causing anyfinish,
damage including
to theall related works
structural suchand
elements as sanding downincludes
walls . Work and putty works, and
providing complete
as shown on drawings, specifications and as per Engineer's instructions.
1.5 Dismantling Existing Doors: No. 68
1.6 Dismantle and
Expanding the remove
existing of theopening
door existing doors and architraves and to be handed to service/storage
department at the hospital. The rate shall No. 10
Expand the existing door opening,work to include
include making
supportgood (after removal/dismantling)
the existing door opening, demolish existing
the
structure with all necessary related
existing wall that includes the door opening,materialsconstruct
and equipment to receive the
a new reinforced new finish,
concrete including
stiffener beam all
related works such as sanding down and putty works, complete as shown on
and columns to create a new opening, support the existing slab above the new door opening with drawings,
steel beam, and fill the gap with a new block, Support before demolition which shall be kept in the
Carried forward
3 SECTIONlevel,
Supply, 02720-
andAggregate
apply wellBase Course
compact crushed aggregate base course, 200mm thickness for
3.1 required locations after compaction to 100% modified AASHTO density, CBR ≥ 80%, all as per
drawings, specifications and the Engineer's instructions.
a. 200 mm thick, base course layer for service building slab on grade m3 40
b. 200 mm thick, base course layer for grade beams under new block and new rooms m3 17
Carried to Summary
Page 3 of
PROJECT NAME: Dhamar General Hospital - Dhamar DATE: July /2023 Division 02: Site Construction
Amount (USD)
Amount (USD)
Page 4 of
PROJECT NAME: Dhamar General Hospital - Dhamar DATE: July /2023 Division 02: Site Construction
Amount (USD)
0
0
0
0
0
Amount (USD)
0
0
0
0
0
Sum Check
0 0.00
Page 5 of
PROJECT NAME: Dhamar General Hospital - Dhamar DATE: July /2023 Division 03: Concrete Works
*Note:
The Contractor is responsible to conduct a survey to inspect all existing concrete works (floors,
stairs,ceilings and amps) to be maintaned and report the engineer about the condition per area
with a schedule of work after site assessment to achive the proposed design intent prior
executing.
1.2 Supply and install mastic sealant including backing rod, including all necessary preparation and
fixing works as per drawings, specifications and Engineer's instructions.
a. for new rooms L.M 10
Carried forward
Page 6 of
PROJECT NAME: Dhamar General Hospital - Dhamar DATE: July /2023 Division 03: Concrete Works
Carried to Summary
Page 7 of
PROJECT NAME: Dhamar General Hospital - Dhamar DATE: July /2023 Division 03: Concrete Works
Amount (USD)
0
0
0
0
0
0
0
0
0
0
0
0
Amount (USD)
0
Page 8 of
PROJECT NAME: Dhamar General Hospital - Dhamar DATE: July /2023 Division 03: Concrete Works
0
0
Sum Check
0 0.00
Page 9 of
PROJECT NAME: Dhamar General Hospital - Dhamar DATE: July /2023 Division 04: Masonry Works
Rates shall include: (1) Preparation of surfaces of floor slab, columns (steel or RCC) and wall
surfaces for proper bonding and for control joint details as given in drawings. (2) All labor,
scaffolding, safety nets, working platforms, and other necessary requirements to execute the work
to the given standards and to complete the work as per specification. (3) Supplying hollow or solid
cement block from good and approved factory in perfect dimension and build it in good manner.
(4) Laying out the block units, spreading 2.5cm thick mortar under the blocks, also the work
includes: (Lifting, handling, placing, buttering the "ears" of the blocks with mortar, wiping any
excess mortar off, keeping the work level and plumb). (5) Jointing and sealing the gaps between
masonry and other structural members, i.e., Columns, beams, slabs etc., provide openings as
required, finish around the same. (6) Installing reinforced concrete lintels above doors and
windows, lintels should extend beyond the opening at each end by at least 15 cm and Reinforced
concrete bond beams and stiffener columns in walls as detailed in structural drawings. (7) Curing
with water properly for not less than seven days. (8) Movements, Expansion joints. (9) Work must
be true to horizontal lines and perfect plumb. Vertical joints are required to be truly vertical and
align vertically with those of alternate courses. (10) Cement mortars, reinforced concrete infill
(B250) between columns and block walls (10-20 cm wide) with 2ø8mm/40cm horizontally and
2ø10mm vertically according to drawings, pipes encasement, false columns 20x20 cm/4.0m among
the parapet wall with 4ø12mm and bituminous paper between block work and drop beams and all
requirements needed to finish the works according to the drawings, specification and to the
Engineers' instructions. (11) Supplying and installing bituminous paper between block work and
drop beams and testing as well as all requirements needed to finish the works.
1.5 Cavity wall, hollow block 200mm thick, acoustical rockwool insulation 50mm thick, hollow block
100mm thick
a For service building and roof electrical room m2 120
Carried forward
Page 10 of
PROJECT NAME: Dhamar General Hospital - Dhamar DATE: July /2023 Division 04: Masonry Works
Carried to Summary
Page 11 of
PROJECT NAME: Dhamar General Hospital - Dhamar DATE: July /2023 Division 04: Masonry Works
Amount (USD)
0
0
Amount (USD)
0
0
0
Page 12 of
PROJECT NAME: Dhamar General Hospital - Dhamar DATE: July /2023 Division 04: Masonry Works
Sum Check
0 0.00
Page 13 of
PROJECT NAME: Dhamar General Hospital - Dhamar DATE: July /2023 Division 05: Metal Works
Carried to Summary
Page 14 of
PROJECT NAME: Dhamar General Hospital - Dhamar DATE: July /2023 Division 05: Metal Works
Amount (USD)
Sum Check
0 0.00
Page 15 of
PROJECT NAME: Dhamar General Hospital - Dhamar DATE: July /2023 Division 06: Wood and Plastic
a DIRTY UTILITY ROOM COUNTER- 12mm aclyric solid surface countertop with 12X100mm ACRYLIC
SOLID SURFACE BACK-SPLASH, WITH (450X450)mm SINK,MIXER, AND DRAIN CONNECTION NO. 1
L=0.9m,W=0.6m,H=1.0m
b DIRTY UTILITY ROOM wall mounted cabinets TYPE 2 L=0.9m,W=0.3m, H=0.6m -CABINET
BOTTOM,TOP & SIDES: 18mm THICK PLYWOOD PANELS WITH 0.8mm THICK HPL ON BOTH SIDES &
0.8mm THICK PVC EDGING,CABINET BOTTOM,TOP & SIDES: 18mm THICK PLYWOOD ADJUSTABLE NO. 1
SHELVES: 18mm THICK PLYWOOD 0.8mm THICK PVC EDGING,BACK OF CABINET: 3mm THICK MDF
PANELS
c NURSES LOUNGE ROOM COUNTER- 12mm aclyric solid surface countertop with 12X100mm
ACRYLIC SOLID SURFACE BACK-SPLASH WITH (450X450)mm SINK,MIXER, AND DRAIN CONNECTION NO. 1
L=1.5m,W=0.6m,H=1.0m
d NURSES LOUNGE ROOM wall mounted cabinets TYPE 2 L=1.5m,W=0.3m, H=0.6m -CABINET
BOTTOM,TOP & SIDES: 18mm THICK PLYWOOD PANELS WITH 0.8mm THICK HPL ON BOTH SIDES &
0.8mm THICK PVC EDGING,CABINET BOTTOM,TOP & SIDES: 18mm THICK PLYWOOD ADJUSTABLE NO. 1
SHELVES: 18mm THICK PLYWOOD 0.8mm THICK PVC EDGING,BACK OF CABINET: 3mm THICK MDF
PANELS
e STAFF LOUNGE ROOM COUNTER- 12mm aclyric solid surface countertop with 12X100mm ACRYLIC
SOLID SURFACE BACK-SPLASH WITH (450X450)mm SINK,MIXER, AND DRAIN CONNECTION NO. 1
L=1.5m,W=0.6m,H=1.0m
f STAFF LOUNGE ROOM wall mounted cabinets TYPE 2 L=1.5m,W=0.3m, H=0.6m -CABINET
BOTTOM,TOP & SIDES: 18mm THICK PLYWOOD PANELS WITH 0.8mm THICK HPL ON BOTH SIDES &
0.8mm THICK PVC EDGING,CABINET BOTTOM,TOP & SIDES: 18mm THICK PLYWOOD ADJUSTABLE NO. 1
SHELVES: 18mm THICK PLYWOOD 0.8mm THICK PVC EDGING,BACK OF CABINET: 3mm THICK MDF
PANELS
g TREATMENT ROOM COUNTER- 12mm aclyric solid surface countertop with 12X100mm ACRYLIC
SOLID SURFACE BACK-SPLASH, WITH (450X450)mm SINK,MIXER, AND DRAIN CONNECTION NO. 1
L=1.8m,W=0.6m,H=1.0m
h TREATMRNT ROOM wall mounted cabinets TYPE 2 L=1.8m,W=0.3m, H=0.6m -CABINET
BOTTOM,TOP & SIDES: 18mm THICK PLYWOOD PANELS WITH 0.8mm THICK HPL ON BOTH SIDES &
0.8mm THICK PVC EDGING,CABINET BOTTOM,TOP & SIDES: 18mm THICK PLYWOOD ADJUSTABLE NO. 1
SHELVES: 18mm THICK PLYWOOD 0.8mm THICK PVC EDGING,BACK OF CABINET: 3mm THICK MDF
PANELS
i DOCTOR LOUNGE ROOM COUNTER- 12mm aclyric solid surface countertop with 12X100mm NO. 1
j ACRYLIC
DOCTOR SOLID SURFACE
LOUNGE ROOMBACK-SPLASH
wall mountedwith sink L=1.5m,W=0.6m,H=1.0m
cabinets TYPE 2 L=1.5m,W=0.3m, H=0.6m -CABINET NO. 1
BOTTOM,TOP & SIDES: 18mm THICK PLYWOOD PANELS WITH 0.8mm THICK HPL ON BOTH SIDES &
0.8mm THICK PVC EDGING,CABINET BOTTOM,TOP & SIDES: 18mm THICK PLYWOOD ADJUSTABLE
k STERILIZATION
SHELVES: 18mmCOUNTER- 12mm aclyric
THICK PLYWOOD 0.8mmsolid surface
THICK countertop with
PVC EDGING,BACK OF12X100mm ACRYLIC
CABINET: 3mm THICKSOLID
MDF NO. 1
l SURFACE BACK-SPLASH,
STERILIZATION WITHcabinets
wall mounted (450X450)mm
TYPE 2SINK,MIXER, AND DRAIN
L=2.3m,W=0.3m, H=0.6mCONNECTION
-CABINET BOTTOM,TOP &
L=3.2m,W=0.6m,H=1.0m NO. 1
SIDES: 18mm THICK PLYWOOD PANELS WITH 0.8mm THICK HPL ON BOTH SIDES & 0.8mm THICK
PVC EDGING,CABINET BOTTOM,TOP & SIDES: 18mm THICK PLYWOOD ADJUSTABLE SHELVES:
18mm THICK PLYWOOD 0.8mm THICK PVC EDGING,BACK OF CABINET: 3mm THICK MDF PANELS
Carried forward
m CORRIDOR COUNTER- 12mm aclyric solid surface countertop with 12X100mm ACRYLIC SOLID NO. 1
n SURFACE BACK-SPLASH,
CORRIDOR wall mountedWITH (450X450)mm
cabinets SINK,MIXER, AND
TYPE 2 L=1.8m,W=0.3m, DRAIN-CABINET
H=0.6m CONNECTION
BOTTOM,TOP &
L=1.8m,W=0.6m,H=1.0m NO. 1
SIDES: 18mm THICK PLYWOOD PANELS WITH 0.8mm THICK HPL ON BOTH SIDES & 0.8mm THICK
PVC EDGING,CABINET BOTTOM,TOP & SIDES: 18mm THICK PLYWOOD ADJUSTABLE SHELVES:
o CORRIDOR
18mm THICKCOUNTER-
PLYWOOD12mm0.8mm aclyric
THICKsolid
PVCsurface countertop
EDGING,BACK with 12X100mm
OF CABINET: ACRYLIC
3mm THICK MDFSOLID
PANELS NO. 1
p SURFACE
CORRIDORBACK-SPLASH,
wall mountedWITH (450X450)mm
cabinets SINK,MIXER, AND
TYPE 2 L=1.4m,W=0.3m, DRAIN-CABINET
H=0.6m CONNECTION
BOTTOM,TOP &
L=1.4m,W=0.6m,H=1.0m NO. 1
SIDES: 18mm THICK PLYWOOD PANELS WITH 0.8mm THICK HPL ON BOTH SIDES & 0.8mm THICK
PVC EDGING,CABINET BOTTOM,TOP & SIDES: 18mm THICK PLYWOOD ADJUSTABLE SHELVES:
q SLUICE ROOMPLYWOOD
18mm THICK COUNTER-0.8mm
12mmTHICKaclyricPVC
solid surface countertop
EDGING,BACK with 12X100mm
OF CABINET: 3mm THICKACRYLIC SOLID
MDF PANELS NO. 1
r SURFACE BACK-SPLASH,
SLUICE ROOM WITHcabinets
wall mounted (450X450)mm
TYPE 2 SINK,MIXER, AND DRAIN
L=1.2m,W=0.3m, H=0.6mCONNECTION
-CABINET BOTTOM,TOP &
L=1.2m,W=0.6m,H=1.0m NO. 1
SIDES: 18mm THICK PLYWOOD PANELS WITH 0.8mm THICK HPL ON BOTH SIDES & 0.8mm THICK
PVC EDGING,CABINET BOTTOM,TOP & SIDES: 18mm THICK PLYWOOD ADJUSTABLE SHELVES:
s NURSES DESK-12mm
18mm THICK PLYWOOD aclyric
0.8mmsolidTHICK
surface
PVCcountertop withOF
EDGING,BACK wooden and 3mm
CABINET: metalTHICK
subframe
MDF PANELS NO. 1
t L=1.2m,W=0.6m,H=1.15m
NURSES DESK-12mm aclyric solid surface countertop with wooden and metal subframe NO. 1
u L=1.5m,W=0.6m,H=1.15m
NURSES DESK-12mm aclyric solid surface countertop with wooden and metal subframe NO. 1
v L=1.8m,W=0.6m,H=1.15m
NURSES DESK-12mm aclyric solid surface countertop with wooden and metal subframe NO. 1
w L=2.4m,W=0.6m,H=1.15m
MEDS STORE DESK-12mm aclyric solid surface countertop with wooden and metal subframe NO. 1
L=2.4m,W=0.6m,H=1.15m
Page 16 of
PROJECT NAME: Dhamar General Hospital - Dhamar DATE: July /2023 Division 06: Wood and Plastic
Carried to Summary
Page 17 of
PROJECT NAME: Dhamar General Hospital - Dhamar DATE: July /2023 Division 06: Wood and Plastic
Amount (USD)
0
0
0
0
Amount (USD)
0
0
0
0
0
0
0
0
0
0
0
0
Page 18 of
PROJECT NAME: Dhamar General Hospital - Dhamar DATE: July /2023 Division 06: Wood and Plastic
0
0
0
0
0
Sum Check
0 0.00
Page 19 of
PROJECT NAME: Dhamar General Hospital - Dhamar DATE: July /2023 Division 07: Thermal and Moisture Protection
1.2 Supply and apply 4mm thick torch applied bituminous waterproofing sheet, with Min. 10 cm
overlap on top of hot liquid asphalt layer complete as per drawings and specifications and approval
of the Engineer.
for wet areas
a. For Main building m2 185
1.3 Supply and install two layers of felt insulation including all necessary works, for all sub-structural,
all as per structural drawings, manufacturer'e instructions, the Contractor shall submit a catalouges
and samples for Engineer's approval
a. For service building m2 385
b. for Grade beams under new block and new rooms foundation m 2 145
Carried to Summary
Page 20 of
PROJECT NAME: Dhamar General Hospital - Dhamar DATE: July /2023 Division 07: Thermal and Moisture Protection
Amount (USD)
0
0
0
0
0
0
0
0
0
Sum Check
0 0.00
Page 21 of
PROJECT NAME: Dhamar General Hospital - Dhamar DATE: July /2023 Division 07: Thermal and Moisture Protection
Page 22 of
PROJECT NAME: Dhamar General Hospital - Dhamar DATE: July /2023 Division 08: Openings
Item No.
1
1.1
a.
1.2
a.
Page 23 of
PROJECT NAME: Dhamar General Hospital - Dhamar DATE: July /2023 Division 08: Openings
1.3
a.
1.4
a.
Page 24 of
PROJECT NAME: Dhamar General Hospital - Dhamar DATE: July /2023 Division 08: Openings
Item No.
2
2.1
a.
2.2
a.
Page 25 of
PROJECT NAME: Dhamar General Hospital - Dhamar DATE: July /2023 Division 08: Openings
Item No.
3
3.1
a.
4
4.1
a.
4.2
Page 26 of
PROJECT NAME: Dhamar General Hospital - Dhamar DATE: July /2023 Division 08: Openings
Description Unit
Rates shall include: (1) Supply, fabricate and installation of doors, windows, made out of approved
quality timber Jak or equivalent to be finish as per the respective specification and drawings. (2)
Hoisting, fixing in position and drilling. (3) Cutting and fitting around obstructions, Bedding and
painting. (3) Nails, screws, glue, etc. (4) Flushed doors and frames shall be primed with sanding
seller, two coats of putty. (5) Pressure impregnating, termite protecting, seasoning and planning all
timber and sand papering to receive final finish. (6) Final Finish (7) All necessary ironmongery union
/ Yale or approved equivalent supplied by authorized dealer appointed by the manufacturer and
approved by the Engineer and as per schedules. Samples of ironmongery should be submitted for
approval prior to purchase. (8) Supplying and fixing steel frame and all the necessary installation
and completion of the work duly instructed the engineer. The width of frame taking into account
the thickness of the wall and thickness of the plastering or ceramic on both sides. (9) Fixing brass
fixing screws, lock sets with 3 keys match with master key system. (10) Preservative treatment for
back of door and door frame in contact with masonry or concrete. (11) All external windows and
doors to be fully surrounded and bonded to adjacent structure with EPDM membranes to agreed
details.
Supply and install flush steel louver doors, including welding, fixing, fittings, accessories, hardware
sets , painting with epoxy primer and epoxy paint finish and all required as per drawings and
specifications, and per the engineer 's approval.
For service building and roof electrical room m2
Page 27 of
PROJECT NAME: Dhamar General Hospital - Dhamar DATE: July /2023 Division 08: Openings
Supply and install steel louver windows 3mm steel plate for louvers, including welding, fixing,
fittings, accessories, hardware sets,painting with epoxy primer and epoxy paint finish and all
required as per drawings and specifications.
For service building and roof electrical room m2
Carried forwa
Page 28 of
PROJECT NAME: Dhamar General Hospital - Dhamar DATE: July /2023 Division 08: Openings
Description Unit
Brought forward from previous page
Page 29 of
PROJECT NAME: Dhamar General Hospital - Dhamar DATE: July /2023 Division 08: Openings
Carried forwa
Description Unit
Brought forward from previous page
Page 30 of
PROJECT NAME: Dhamar General Hospital - Dhamar DATE: July /2023 Division 08: Openings
12 0
25 0
Page 31 of
PROJECT NAME: Dhamar General Hospital - Dhamar DATE: July /2023 Division 08: Openings
5 0
4 0
Carried forward 0
Page 32 of
PROJECT NAME: Dhamar General Hospital - Dhamar DATE: July /2023 Division 08: Openings
260 0
2 0
Page 33 of
PROJECT NAME: Dhamar General Hospital - Dhamar DATE: July /2023 Division 08: Openings
Carried forward 0
50 0
30 0
43 0
Page 34 of
PROJECT NAME: Dhamar General Hospital - Dhamar DATE: July /2023 Division 08: Openings
Page 35 of
PROJECT NAME: Dhamar General Hospital - Dhamar DATE: July /2023 Division 09: Finishes
DIVISION 9 - FINISHING
1 SECTION 09220- Portland Cement Plaster
All works must be according to drawings, specification and Engineers' instructions. Rates shall
include: (1) Supply of all needed materials, including (cement, sand, expanded metal lath,
corners from galvanized steel mesh, galvanized angles for the corners, windows and external
decoration as well as the use of galvanized wire mesh between concrete and block work,
beads and strips at joints of different backgrounds edges) and workmanship (installation of
scaffolding and dismantling, working platforms, safety nets, etc.). (2) Preparation works by
covering all conduits of electricity, water supplies, etc., with a galvanized wire mesh at least
20cm width coated by mortar (1:1) cement: sand and the work includes removal of wires and
nails and cleaning of surfaces to be ready for plastering. (3) Contractor shall take into
consideration that all – direct and indirect works and expenses required for the completion of
the coming items are included in the unit price. (4) Trimming of concrete chippings, removing
the wires and etc. And cleaning of existing surfaces to be ready for plastering. (5) Checking
out all of the preliminary installation in ceilings and walls such as electrical, water supply and
waste water pipes and repairing the damages if any. (6) The work includes closing all opening
in existing walls, as opening around existing (plumbing, electrical) and between existing walls
and slabs by using Galvanized mesh and mortar cement. (7) Curing with water for at least
three days for each coat. (8) Any cracks between the columns should be treated with Sikaflex.
(9) The first layer of the plastering should be in one direction and should be leveled. (10) This
should be done prior to commencement of plastering and after obtaining a written approval
from the Engineer. Contractor is required to protect existing finishing (tiles, stones, walls) by
covering it. Therefore, contractor is responsible for any damage or dirt occurs in the site as a
result of his work. Payment will be according to the engineering measurement quantities.
Supply, laying and finishing internal plastering 15 mm thick for the damaged areas of walls
and ceilings and where it needs. The work includes removing and peeling the damaged and
feeble areas properly using electrical grinder and wire brush, Repair of cracks in walls by
chipping and remove 30mm wide plaster strip along the crack, fix 20Gauge 12x12mm GI wire
mesh (Chicken mesh) on chipped wall using concrete nails, apply 4mm thick repair grout to
cover the mesh, providing all materials of high quality. Also, the work includes rough primer
nail rendering to form a key with (mix 1:1) cement sand, second layer 13mm: Base-Coat
"Rendering" with (1:3) cement: sand and third layer: Finishing Coat with (1:1) cement: sand.
Works include all materials needed to finish the works according to specifications, drawings
and Engineers' instructions, Price include removal of the existing plaster according to
Engineers' instructions.
a. For service building, roof electrical room and new rooms m2 400 0
Carried forward 0
Carried forward 0
Carried forward 0
Page 36 of
PROJECT NAME: Dhamar General Hospital - Dhamar DATE: July /2023 Division 09: Finishes
Carried forward 0
Carried forward 0
Sum Check
Carried to Summary 0 0.00
Page 37 of
PROJECT NAME: Dhamar General Hospital - Dhamar DATE: July /2023 Division 10: Specialties
Carried to Summary
Page 38 of
PROJECT NAME: Dhamar General Hospital - Dhamar DATE: July /2023 Division 10: Specialties
Amount (USD)
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Sum Check
0 0.00
Page 39 of
PROJECT NAME: Dhamar General Hospital - Dhamar DATE: July /2023 Division 11: Equipment
Eclampsia
a. Bedhead Units, Horizontal, ER- Treatment/ Observation (M-B-042) No. 3 0
ICU
b. Bedhead Units, Horizontal, ICU (Local Custom-Made) (M-B-030) No. 2 0
Internal medicine
c. Bedhead Units, Horizontal, Inpatient, Procedure (Local Custom-Made) (M-B-021) No. 4 0
Surgery
d. Bedhead Units, Horizontal, PACU (M-B-035) No. 4 0
e. Bedhead Units, Horizontal, Procedure (M-B-055) No. 2 0
Carried to Summary 0
Page 40 of
PROJECT NAME: Dhamar General Hospital - Dhamar DATE: July /2023 Division 11: Equipment
Sum Check
0.00
Page 41 of
PROJECT NAME: Dhamar General Hospital - Dhamar DATE: July /2023 Division 16: Electrical Works
a MDB-Hospital No. 1
b EMDB No. 1
Carried forward
Page 42 of
PROJECT NAME: Dhamar General Hospital - Dhamar DATE: July /2023 Division 16: Electrical Works
Supply ,Test, connect grounding system for the Generator and the body of the Generator where
the price shall include all required materials, cables, earth pits and earth bars in order to meet the
b desired and accepted grounding resistance in the drawings , specifications and engineer's L.S 1
instruction.
c Supply ,Test, connect grounding system for all low current systems where the price shall include all L.S 1
required materials,
Supply ,Test, cables,
connect earth
earthing pits
grid and earth
system bars in order
for operation roomtowhere
meet the
the desired andinclude
price shall accepted
all
d groundingmaterials,
resistance in theearth
drawings , specifications and engineer's L.S 5
required cables, pits and earth bars in order to meetconstruction
the desired and accepted
grounding resistance in the drawings , specifications and engineer's construction.
Carried forward
Page 43 of
PROJECT NAME: Dhamar General Hospital - Dhamar DATE: July /2023 Division 16: Electrical Works
a 13A, 230V single phase, 3-PIN socket outlet with switch. No. 83
b 13A, 230V single phase, 3-PIN socket outlet with switch, weatherproof. No. 1
c 13A, 230V single phase, 3-PIN double socket outlet with switch. No. 62
d 13A, 230V single phase, 3-PIN double socket outlet with switch, weatherproof. No. 6
e 13A, 230V single phase, 3-PIN double socket outlet with switch desk/counter mounted. No. 4
f 30A, 230V single phase, 3-PIN clean, anti-germs, Industrial socket outlet. No. 3
g 13A Fused, switched spur with flex outlet, shuttered No. 4
h Connection unit with flex outlet wall mounted for medical equipment No. 15
i Connection unit with flex outlet ceiling mounted for medical equipment No. 3
j 20A, 230V single phase, 3-PIN fused connection unit with double pole switch for FCU,IU, E.H &CSU No. 29
k 16A, 230V single phase, 3-PIN socket outlet with switch. No. 8
Carried Forward
Page 44 of
PROJECT NAME: Dhamar General Hospital - Dhamar DATE: July /2023 Division 16: Electrical Works
Carried Forward
Carried Forward
Page 45 of
PROJECT NAME: Dhamar General Hospital - Dhamar DATE: July /2023 Division 16: Electrical Works
Note; Outlets face plate color, material shape and type of finishes shall be as per the Engineer
approval,
Telephoneback boxes
and/or Dataof Outlets
the outlets
shallshall be coordinated
be measured with the
in Number approved type /model of the
(No.).
outlets
Note : intended
New Data to be used
System on this
which will project,
be and must
connected from be included in the
rehabilitation areaprice of the
to the point.area shall
existing
Note; where telephone or data socket outlets installed in a multi-compartments trunks or in floor
be the same brand for proper integrity, contractor shall investegate and check
box; the outlets, conduits and cabling to the nearest distribution floor patch panel shall brand of be
existing
included
Data system before submiting below system item.
in this item, multi-comportments trunks and floor box shall be priced under separate item
Note; The rack size include the patch panels & switches needed for all IP systems
a 1 x RJ45 wall mounted Voice/Data outlet complete with 1x4P UTP CAT6 cables and conduits from No. 35
b outlet
ditto astoabove
relatedbutpatching connectivity.
desk mounted. No. 2
b Single RJ45 for CCTV camera and door control panel ceiling/wall mounted (outlet, cabling and No. 22
c patching
Data/Voice arePoints
includeforinBHU's,
the structure
PNDT's,cable
WAC'ssystem Job).with 1x4P UTP CAT6 cable
& S.C.Ps No. 68
d 1 x RJ45 wall mounted Voice/Data outlet complete with 1x4P SFTP CAT6 cables and conduits from No. 13
e outlet to related
Data/Voice Pointspatching connectivity.
for BHU's, PNDT's, WAC's & S.C.Ps with 1x4P SFTP CAT6 cable No. 42
f 1.0m UTP Cat6 Patch cord No. 175
g 48 port UTP CAT6 patch panel No. 5
h 12 port universal LC SMOF/MMOF connector ( as needed , where the contractor shall investigate No. 2
the existing condition and supply the correct type) fiber patch panel. The works includes pigtails
fusion: New
Note , cassette and tray.
structure cabling systemSystem
which will be connected from rehabilitation area to the
16.15 Section 16690 - Structure Cabling
existing area shall be the same brand for proper integrity, contractor shall investegate and check
brand of existing structure cabling system before submiting below system item.
a IP-PABX: supply, install, terminate , test and commission Hybrid PABX and telephone set . The job No. 1
b shall include
30U free butdata
stand not cabinet
limited to the set with
complete , MDFaccessories
, batteries , internal wiring and all required work to
complete the job according to section 16740-of specifications, drawings and engineer instruction. No. 1
c 12U wall mounted data cabinet complete with accessories No. 3
d 48 port UTP CAT6 switch panel No. 3
e 48 port UTP CAT6 switch panel No. 1
f 24 port UTP CAT6 switch panel No. 1
g 24 port UTP CAT6 POE switch panel No. 1
Carried Forward
Page 46 of
PROJECT NAME: Dhamar General Hospital - Dhamar DATE: July /2023 Division 16: Electrical Works
Carried Forward
Page 47 of
PROJECT NAME: Dhamar General Hospital - Dhamar DATE: July /2023 Division 16: Electrical Works
Amount (USD)
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Amount (USD)
0
0
0
0
0
0
0
0
0
0
0
0
0
Page 48 of
PROJECT NAME: Dhamar General Hospital - Dhamar DATE: July /2023 Division 16: Electrical Works
0
0
0
0
0
0
0
Amount (USD)
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Page 49 of
PROJECT NAME: Dhamar General Hospital - Dhamar DATE: July /2023 Division 16: Electrical Works
0
0
0
0
0
0
0
Amount (USD)
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Page 50 of
PROJECT NAME: Dhamar General Hospital - Dhamar DATE: July /2023 Division 16: Electrical Works
Amount (USD)
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Amount (USD)
0
Page 51 of
PROJECT NAME: Dhamar General Hospital - Dhamar DATE: July /2023 Division 16: Electrical Works
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Amount (USD)
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Page 52 of
PROJECT NAME: Dhamar General Hospital - Dhamar DATE: July /2023 Division 16: Electrical Works
Amount (USD)
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Sum Check
0 0
Page 53 of
PROJECT NAME: Dhamar General Hospital - Dhamar DATE: July /2023 Division 15: Mechanical Works
0
Supply, install, test and commission thermal insulation for duct work of rigid glass fiber, with a
thickness of 24 mm and density of 24 Kg/m3, including aluminium vapor barrier thickness and all
1.1.2 necessary accessories to complete the job in perfect running order, in accordance with drawings, m2 740 0
specifications, and the approval of the engineer.
0
Supply, install, test and commission thermal insulation for duct work of rigid glass fiber, with a
thickness of 40 mm and density of 48 Kg/m3, and 0.7mm thick aluminum steel sheet cladding,
1.1.3 including aluminium vapor barrier thickness and all necessary accessories to complete the job in m2 281 0
perfect running order, in accordance with drawings, specifications, and the approval of the
engineer.
0
1.2 Section 15850 0
Supply, install, test and commission air distribution terminals, made of extruded aluminum
1.2.1 complete with frame, fixing trim, air directional vanes, dampers, the plenum box and insulated 0
flexible ducts etc.… as specified and shown on drawings
1.2.1.1 4-Way Square Ceiling Diffusers (Supply) 0
a SD-1, (150x150)mm No. 2 0
b SD-2, (230x230)mm No. 6 0
c SD-3, (300x300)mm No. 7 0
d SD-4, (380x380)mm No. 2 0
e SD-5, (450x450)mm No. 1 0
0
1.2.1.2 4-Way Square Ceiling Diffusers (Return) 0
a RD-2, (230x230)mm No. 4 0
b RD-3, (300x300)mm No. 7 0
c RD-4, (380x380)mm No. 1 0
d RD-5, (450x450)mm No. 3 0
0
0
0
Carried Forward 0
Page 54 of
PROJECT NAME: Dhamar General Hospital - Dhamar DATE: July /2023 Division 15: Mechanical Works
b (800x600)mm, Fresh air louver with primary filter & sand trap No. 1 0
c (950x500)mm, Fresh air louver with primary filter & sand trap No. 1 0
d (500x300)mm, Fresh air louver with primary filter & sand trap No. 1 0
e (500x350)mm, Fresh air louver with primary filter & sand trap No. 3 0
f (1000x600)mm, Fresh air louver with primary filter & sand trap No. 1 0
0
1.2.4 Supply, install, test and commission perforated supply diffuser with (HEPA) filter, including all 0
a structural support, fitting, painting as per specifications, and engineer instruction
(1200x600)mm No. 18 0
0
Carried Forward 0
d AHU-04 No. 1 0
- Calculated Total Cooling Capacity: 12.70 kW.
e AHU-05 No. 1 0
- Calculated Total Cooling Capacity: 37.20 kW.
f AHU-06 No. 1 0
- Calculated Total Cooling Capacity: 28.30 kW.
1.5 Section 15710
1.5.1 Supply, install, test, and commission heat pump condensing unit, full inverter type, R-410a
a refrigerant, including
CU-01, Cooling refrigerant
Load 10.70 kW pipes, supports, electrical connection, condensate pipe, and all
related works, as shown on drawings, specifications and engineer instruction. No. 1 0
b CU-02, Cooling Load 11.50 kW No. 1 0
c CU-03, Cooling Load 11.60 kW No. 1 0
d CU-04, Cooling Load 12.70 kW No. 1 0
e CU-05, Cooling Load 37.20 kW No. 1 0
f CU-06, Cooling Load 28.30 kW No. 1 0
Page 55 of
PROJECT NAME: Dhamar General Hospital - Dhamar DATE: July /2023 Division 15: Mechanical Works
0
Carried Forward 0
0
1.6.2 Supply, install, test and commission split air-condition unit, full inverter type, R-410, cold and heat
a unit; shall include
ISU-1/OU-1, Total indoor
capacityunit,
7.00outdoor
kW unit, refrigerant pipes, 80mm dia. PVC sleeves for
refrigerant pipes, supports, electrical connection, room thermostat, condensate pipe, electrical No. 2 0
a ISU-2/OU-2,and
connection Totalallcapacity
related 3.50 kWas shown on drawings, specifications and engineer instruction.
works, No. 2 0
0
Carried Forward 0
Page 56 of
PROJECT NAME: Dhamar General Hospital - Dhamar DATE: July /2023 Division 15: Mechanical Works
2.1.1 Supply, install, test and commission PPR-CT pipes class 2 (S-3.2) complying with (EN ISO 15874) or
a SDR
Diam.7.4
20complying
mm with DIN 8077, DIN 8078 for cold water supply for pipes runs in ceiling voids,
shafts, Internally exposed and exposed outside, for exposed pipes to the sun, shall be insulated by Lm 230 0
b Diam. 25
closed cellmm
rubber insulation 6 mm thickness insulation and protected by smooth aluminum Lm 120 0
c Diam. 32 mm Lm 45 0
d Diam. 40 mm Lm 65 0
e Diam. 50 mm Lm 20 0
f Diam. 63 mm Lm 15 0
0
2.1.2 Supply, install, test and commission PPR-CT pipes class 2 (S-3.2) complying with (EN ISO 15874) or 0
a SDR
Diam.7.4
20complying
mm with DIN 8077, DIN 8078) for hot water supply/return with insulation for pipes
runs in ceiling voids, shafts, Internally exposed and exposed outside, for exposed pipes to the sun, Lm 190 0
b Diam. 25 mm
shall be insulated by closed cell rubber insulation 6 mm thickness insulation and protected by Lm 80 0
c Diam. 32 mm Lm 10 0
d Diam. 40 mm Lm 15 0
0
2.2 Section 15420 0
2.2.1 Supply, install, test and commission hot water cylinder (10 bar), including fixings, electric heating 0
element, temperature
Ref.EWH-01(50 L) control system, interconnecting pipe works, valves, vents, temperature
a gauges, control panel, wiring, gauges, sensors, bases, drain valves, angle valves, flexible pipe, all No. 14 0
b Ref.EWH-02(300 L)
safety valves, and any other necessary items to complete the job in perfect condition all as No. 1 0
0
2.3 Section 15430
2.3.1 Supply, install, test and commission plumbing fixtures and related mixers, the price shall include all 0
accessories (angle valves, wall washers, gaskets, screws and inserts, angles, supports, wall
MX1 Toilet seat
a connectors, smell preventers, sealant and consumables), flexible pipes for drain, satinless steel No 11 0
b MX2 Hand
flexible Spray
at all counter sinks, execution of related civil works including material, the installation of No 16 0
c MX3 Shower No 6 0
d MX4 Wash Basin and Basin Mixer for toilets No 17 0
e MX5 Wash Basin and Basin Mixer for H.C toilets No 2 0
f MX6 Wash Basin and Basin Mixer for rooms No 10 0
g MX7 Toilet Squat Pan Seat No 5 0
h Scrub (single station) with Mixer for Opertaion room No 5 0
0
Carried forward 0
3 Drainage System
3.1 Section 15150
Above Ground Drainage
3.1.1 Supply, install, test and commission above ground soil, waste overflow, and venting, solvent weld
UPVC
Diam.50pipe
mmclass 4, for all floors, vent pipe and rain water pipes, complete with fittings, supports,
a brackets, hangers, clips, sleeves, and all necessary accessories to complete the installations as Lm 200 0
b Diam. 80 mm
specified and shown on drawings: Lm 50 0
c Diam. 110 mm Lm 60 0
3.2.5 Supply, install, test and commission sewage manholes. including all necessary civil works,
excavation,
Depth ≤ 1200backfilling, concrete base, reinforcement, plastering of internal and exposed external
mm, (600x600)
a walls, benching with all necessary to hand over in good operating condition also the price including No. 14 0
manhole covers as indicated in drawings and specified. Manholes more than 100cm deep shall be
Page 57 of
PROJECT NAME: Dhamar General Hospital - Dhamar DATE: July /2023 Division 15: Mechanical Works
3.2.6 Supply, install, test and commission trench drain (T.D) with heavy duty ductile iron grating with
110mm
(LxWxD)outlet connection
1500x250x200 mmwith P-trap. Sizes as shown on drawings
a No. 4 0
Carried forward 0
4.1.2 Supply, install, test and commission fire hose cabinets (Stainless steel Doors) recessed in the wall, 0
complete
HRC-01 with swivel bracket, manual hose nozzle, pipe connection, 30 meters long Ø25mm, hose
a in rubber non kickable type with fire extinguisher ABC powder 6kg and all necessary accessories as No. 6 0
specified and shown on drawings. 0
4.2.3 Supply, install, test and commission black seamless steel pipes schedule 40, as specified including
protection
Dia. 40 mmfor pipes which run under ground and above ground inside the building, Jointing
a between pipes and fittings shall be by grooving, including flexible connections, end caps, hangers, Lm 25 0
brackets and automatic air vents all as specified. Price shall include all civil works as specified and
5 Section (4) - Compressed Air System
0
0
5.1 Section 15480 0
5.1.1 Supply , Install and commission air compressor for LABS & CSSD & LAUNDRY screw type stationary , 0
11-bar with 1ºC
Compressed dew point.
air plant The price
COMP-02 include
with air pre filter,
receiver, Airdischarge
free air receiver, valves, pressure
144 L/min reducing
with Pressure
a valves, test line, and all accessories to complete the work. No. 1 0
Required 9 bar
5.1.2 Seamless black steel pipes schedule 40, to compressed air pipe works, including all fittings, 0
threading,
Ø15mm and all accessories as shown on drawings and as per specification
a Lm 35 0
0
5.2.3 Supply, install, test, commission and maintain pressure reducing valve assembly Complete with
black
Ø15mm steel pipes and all required accessories, as specified and shown on drawings.
a No. 1 0
5.2.4 Supply, install, test, commission and maintain Pressure Gauge with isolating valve, complete with
black
Ø15mm steel pipes and all required accessories, as specified and shown on drawings.
a No. 4 0
Carried forward 0
Page 58 of
PROJECT NAME: Dhamar General Hospital - Dhamar DATE: July /2023 Division 15: Mechanical Works
6.1.2 Supply, install, test and commission Emergency isolation valve complying to HTM 0201 and C11,
housed within aOutlet)
AVSU-GR-01(3 Lockable box with “break glass” safety Feature emergency access, including NIST
a Connection ports, secondary alarm and all required accessories, as specified and shown on No. 1 0
b AVSU-GR-02(3
drawings. Outlet) No. 1 0
c AVSU-GR-03(3 Outlet) No. 1 0
d AVSU-GR-04(4 Outlet) No. 1 0
e AVSU-GR-05(4 Outlet) No. 1 0
f AVSU-GR-06(3 Outlet) No. 1 0
g AVSU-GR-07(3 Outlet) No. 1 0
h AVSU-GR-08(3 Outlet) No. 1 0
i AVSU-GR-09(5 Outlet) No. 1 0
j AVSU-GR-10(5 Outlet) No. 1 0
k AVSU-GR-11(5 Outlet) No. 1 0
6.1.3 Supply, install, test and commission Skid mounted, lateral channel, directly driven, AGS pump
assembly.
AGS Pump-1,complete
capacitywith
130control
L/min, panel
duplexassembly incorporating
type, (1 DUTY, pressure switch for alarm signal
1 STAND-BY)
a connections, drip leg drains for exhaust line one vacuum flow regulation valve and pressure switch. Set 5 0
6.1.4 Supply, install, test and commission Vacuum plant must complying Fully with the requirements of
both
Vacuum C11Plant
& HTM 02-01, three
(VACP-01), number,
triplex, free airoil-Flooded
discharge rotary vane,
490 L/min directly-
with driven vacuum
two vacuum receiver Pumps and
each one
a duplex filter assemblies with electrical control panel and Bacterial filter group duplex. Including Set 1 0
500 liter.
vacuum collector Ø108mm. Suitable for 3 phase 400v, 50 Hz electrical supply.
Supply, install, test and commission Medical air plant Complying fully with HTM 02-01. using three
6.1.5 rotary screw type air compressors, Desiccant dryers andpressure
filter assembly
Compressors operate at a nominal 10 bar, with Control sensedand steel
in the Receiver
receiver. vessel(s).
With by-
supplied
pass and complete with actual
test line, duplex Digital
1-st and dew
2-nd point readout. Air pressure reducing set all, Suitable for
a Compressed
3 phase 400V,air50plant (COMP-01)
Hz electrical free
supply. airstage filter
discharge groups.
1200 L/min with two air receiver each one 1000 Set 1 0
liter.
Carried forward 0
6.1.6 Supply, install, test and commission Primary, secondary, and Reserve manifolds Complying to C11
and
2x10HTM 0201,
Primary O2suitable
manifoldforheader
use with the
with manifold
control control
panel, paneltype
Cylinders installed
J and extension headers
a complete with tail pipes, cylinders, isolating valve, check valves and all required accessories as No. 1 0
b 2x5 Primary
specified andO2 manifold
shown header with control panel, Cylinders type J
on drawings. No. 1 0
c 2x2 Secondary O2 manifold header with control panel, Cylinders type J No. 1 0
d 2x2 Primary N2O manifold header with control panel, Cylinders type G No. 1 0
e 2x1 Secondary N2O manifold header with control panel, Cylinders type G No. 1 0
f 2x3 Reserve MA4 manifold header with control panel, Cylinders type J No. 1 0
g 2x4 Reserve SA7 manifold header with control panel, Cylinders type J No. 1 0
h O2 cylinder type J for ICU Dep. (Emergency Case) No. 3 0
i CO2 cylinder for Major Operation room Dep. No. 6 0
j Medical Gases Master Alarm Control Panel with repeater indicator alarm panel No. 1 0
6.1.7 Supply, install, test & commission medical gas terminal units installed, connected, and tested
complete
Oxygen (O2)with plastic fascia plate, 150mm stub pipe and all required accessories, for all types of
Outlet
a the bed head unit referring to the medical BOQ, as specified and shown on drawings. No. 56 0
b Vacuum (V) Outlet No. 56 0
c Nitrous Oxide (N2O) Outlet No. 14 0
d Medical Air (MA4) Outlet No. 54 0
e Surgicl Air (SA7) Outlet No. 6 0
f AGSS Outlet No. 14 0
g CO2 Outlet No. 3 0
Page 59 of
PROJECT NAME: Dhamar General Hospital - Dhamar DATE: July /2023 Division 15: Mechanical Works
Carried to Summary 0
Page 60 of
PROJECT NAME: Dhamar General Hospital - Dhamar DATE: July /2023 Division 15: Mechanical Works
Sum Check
Page 61 of
PROJECT NAME: Dhamar General Hospital - Dhamar DATE: July /2023
Grand Summary
a. Total of Bills
Page 62 of
PROJECT NAME: Dhamar General Hospital - Dhamar DATE: July /2023
Page 63 of