You are on page 1of 12

ABDUL MOHSEN A.H.

ALTAMIMI GROUP
RO3-CO2CO2 TURTLE BAY-PKG 05
JOB SAFETY ANALSYIS
TRS-HS-FRM-0001

TRSDC

Instructions for completing Job Safety Analysis (JSA) form

Section I -Enter general information about the site and job task.
Section II - Determine whether any of these operations apply to the job task to be performed. Make note of any special training, permit, certification, and risk
assessment requirements.
Section III - Identify any human/organizational factors that could impact the ability to perform the work safely.

1. Break the job down into steps - Be as specific as possible. Write each job step in a new row of column A (Activity/Step). It’s a good idea to leave an extra row
between steps in case you need them later. Add additional rows to the table as needed, or if completing the JSA on paper, print additional copies of the
sheet to accommodate all job steps.
2. Determine the hazards associated with each job step and write them in column B (Hazards). Use the examples of hazards provided below to trigger your
thinking about different types of hazards and energy sources.
3. List any control measures that will be taken to ensure that step is done safely in column C (Control Measures). Use the control measure examples and
hierarchy provided to trigger your thinking about different types of controls and their effectiveness at reducing risk. Controls toward the top of the table
tend to be more effective at minimizing the severity and/or likelihood of an event than the controls toward the bottom of the table. If this job involves a Life
Crucial Operation, continue to step 4. Otherwise, repeat steps 2-3 for each of the job steps identified, then proceed to step 8.
4. Considering the hazards involved and the control measures that will be in place, determine the worst credible severity of an incident that could result from
this job step. Use the severity table provided. Write the severity number in column D (Severity).
5. Considering the hazards involved and the control measures that will be in place, determine the likelihood that an incident will result from this job step. Use
the likelihood table provided. Write the likelihood number in column E (Likelihood).
6. Multiply the severity number by the likelihood number and enter the product in column F (Risk).
7. Consider the risk rating against the thresholds provided in the Overall Risk Ratings.
i. Very low and low risk ratings of 1-2. This level is generally considered acceptable provided that all control measures are applied.
ii. Medium risk ratings of 3-9. Medium risk requires a planned approach to control the hazard and applies additional controls if required. Action taken must
be documented on the risk assessment form.
iii. High and Very High-Risk ratings of 10-25. For all high and very high risk, Column G (Additional control measures) must be implemented to further reduce
the risk to a medium or low level. Such activities shall not be proceeded until applying additional control measures. The Construction Director/Manager or
facility Manager must personally review the activities with a High or Very High residual risk score and approve additional control measures by signing off
the JSA.
8. Repeat steps 2-7 for each of the job steps identified.

Section IV - Provide the name, company, and title of those who prepared and reviewed/approved this form in the signature box provided. The Construction
Director/Manager or facility Manager must review and approve the additional control measures that have a High or Very High-Risk rating before proceeding the task.
Additional space is also provided for crew members to sign the JSA if desired.

Reference Table in completing Section III – Job Safety Analysis (Column B – Hazard)
Biological & Electrical Chemical Gravity/Height Mechanical & Motion
Environmental Arc Flash Air Emissions Equipment Being Thrown Off/Under
Altitude Buried Utilities Chemical Products Tipping/Collapsing Equipment
Animal Bite/Sting Damage to Leads/Cables  Carcinogenic Excavation/Trench Disintegration of Moving
Blood-Borne Pathogens Damage to Switches  Combustible/Flammable Falling Objects Components
Contaminated Food/Water Energized Circuits/Conductors  Explosive Floor Openings/Edges Driving/Vehicle Traffic
Insect-Borne Disease Inadvertent Energization  Toxic Grating Removed Ejection of Workpiece/Debris
Pests Lack of Isolation/Grounding  Corrosive Inadequate Support Entanglement
Poisonous Plants Missing/Damaged Insulation  Reactive Lack of Access Ladders/Stairs Friction
Precipitation Overhead Lines Client/Process Chemicals Suspended Load Movement/Shifting
Temperature/Humidity Overload of Circuits Lack of Containment Unstable/Insecure Materials Moving Parts
Unsanitary Conditions Stored Energy Leakage/Spills Work Above/Below Others Pinch/Crush Points
Weather (Batteries/Capacitors) Material Incompatibility Work at Height/Fall Hazards Projectiles
Wind/Turbulence Water Near Electrical Produced/Disturbed by Work Walking/Working Surface Rotating Equipment
Pressure Conductors  Asbestos  Slippery Sharp Edges, Corners, or Points
Abrasive Blasting Work Environment  Lead  Uneven Shearing
Compressed Gases Cluttered  Silica  Obstructed Stored Energy
High Pressure Fluid Confined Space  Welding Fumes  Steep (Springs/Accumulators)
Pressure Testing Damaged Tools/Equipment  Dust  Moving/Swaying/Pitching Striking
Pressure Washing/Blasting Entrapment Water Discharges  Insufficient/Unstable Trapped Between Equipment
Radiation Erosion Wastes Generated Ergonomic and Fixed Structures
Intense Light Hazardous Atmosphere  Hazardous Awkward Unexpected/Uncontrolled
Lasers  Oxygen Rich/Deficient  Non-Hazardous Postures/Movement Movement
Microwaves  Contaminants Sound Excessive Force/ Exertion
Naturally Occurring Ignition Sources Continuous Noise Heavy/Awkward Load
Radioactivity Radioactive Inadequate Ventilation Intermittent Noise Repetitive Motion
Material Poor Lighting/Glare Extreme Noise Same Position
X-Rays Restricted Access/Egress Impact Noise Vibration
Runoff

Job Safety Analysis( TRS-HS-FRM-0001)


Revision 03, Rev. Date 25-Oct-2021 Page 1 of 12
ABDUL MOHSEN A.H. ALTAMIMI GROUP
RO3-CO2CO2 TURTLE BAY-PKG 05
JOB SAFETY ANALSYIS
TRS-HS-FRM-0001

Reference Table in completing Section III – Job Safety Analysis (Column C – Control Measure)
Most Effective Controls Examples
Elimination  Make connections at ground level before  Remove a dangerous machine from service
(Remove the hazard altogether) erecting a structure to eliminate work at height  Provide power outlets to avoid trailing cords
Substitution  Use latex rather than oil-based paints
(Replace the material/process  Reduce energy, such as speed, force, amperage, pressure, and temperature
with a less hazardous one)  Use water-based detergents instead of organic solvents
 Isolate hazardous energy
Engineering/Isolation  Ventilation
sources  Secondary containment
(Design effective control  Machine guarding
 Interlocks  Barriers
measures to protect people  Enclosures
 Platforms and guardrails  Improve lighting
and the environment)  Circuit breakers
 Exclusion zones
Warning  Signs  Horns  Labels
 High visibility paint
(Alert people to the hazards)  Backup alarms  Beepers  Tags
Administrative  Work rotation to minimize exposure
(Provide training, procedures,  Inspect safety equipment  Training and supervision
etc.)  Good housekeeping practices
PPE
 Safety glasses  Fall harness and lanyards  Respiratory protection
Least Effective (Personal protective
 Hearing protection  Gloves  High visibility vests
equipment)

Reference Table in completing Section III – Job Safety


Reference Table in completing Section III – Job Safety Analysis (Column D –Severity)
Analysis (Column E – Likelihood)
Impact On Chances of
Severity Level Likelihood Level Probability
People Equipment / Property Occurrence
 Extensive losses of high value
Likely to occur within the
equipment/property
Almost next 1 year.
Major 5 Single / Multiple fatalities  Loses exceeding SAR 3,750,000; or 5 1 in 100
Certain More than 80% chance of
Major unplanned impact on budget
occurrence
and schedule
 Losses of equipment/property that Likely to occur within the
Injury or illness resulting in cannot be readily replaced; or next 2 years.
Significant 4 permanent total or partial  Losses exceeding SAR 375,000; or Likely 4 More than 60% and less 1 in 1,000
disability Significant unplanned impact on than 80% chance of
project budget occurrence
Likely to occur and may do
Injury or illness resulting in  Loss of equipment that can be readily
so within the next 3 years.
medical treatment or replaced; or
Moderate 3 Possible 3 More than 40% and less 1 in 10,000
temporary disability/loss of  Losses exceeding SAR 37,500; or
than 60% chance of
function Minor impact on the budget
occurrence
Unlikely to occur and may
do so within the next 5
 Loss of equipment that can be readily
Injury or illness requiring years. 1 in
Minor 2 replaced, or Rare 2
first-aid treatment only More than 20% and less 100,000
Losses less than SAR 37,500
than 40% chance of
occurrence
Extremely unlikely to occur
 Near Miss/no impact or damage to within the next 5 years. 1 in
Negligible 1 Near Miss/no harm Unlikely 1
equipment or property Less than 20% chance of 1,000,000
occurrence
Reference Table in completing Section III – Job Safety Analysis (Column F – Risk)
Risk Matrix Overall Risk Ratings
Severity Very Low Low Medium High Very High
Likelihood
1-Negligible 2-Minor 3–Moderate 4-Significant 5-Major 1 2 3-9 10-16 20-25

5 – Almost Medium High High Very High Very High


Certain (5) (10) (15) (20) (25) High and Very High-Risk ratings of 10-25.
Medium Medium High High Very High Additional control measures must be implemented to further reduce
4 – Likely the High and very high risk to acceptable level.
(4) (8) (12) (16) (20)
Medium Medium Medium High High
3 – Possible Note: The Construction Director/Manager or Facility Manager must
(3) (6) (9) (12) (15)
personally review the activities with a High or Very High residual risk
Low Medium Medium Medium High
2- Rare score and approve suitable additional control measures by signing
(2) (4) (6) (8) (10) the JSA.
Very Low Low Medium Medium Medium
1 – Unlikely
(1) (2) (3) (4) (5)

Job Safety Analysis( TRS-HS-FRM-0001)


Revision 03, Rev. Date 25-Oct-2021 Page 2 of 12
ABDUL MOHSEN A.H. ALTAMIMI GROUP
RO3-CO2CO2 TURTLE BAY-PKG 05
JOB SAFETY ANALSYIS
TRS-HS-FRM-0001

Section I – General Information


Emergency Procedures
Emergency Contact Name Emergency Contact Phone Number
Primary Contact Mahmoud Hagag Primary Contact +966 55 081 7360

Secondary Contact Syed Saddam Secondary Contact +966 54 582 3228

Details
Program Number. R03 Company Name ABDUL MOHSEN A.H. ALTAMIMI GROUP
Project Name C02C02-Turtle Bay - Village center & Neighborhood Centers - Package05 Date 11/12/2023
JSA /Risk Assessment Title SBS Membrane Waterproofing Category ☒ New ☐ Revised
Specific Location Turtle Bay, Red Sea Building Site Facilities
Hand & Power Tools, LPG cylinder & flame torch, Fire Extinguisher, Cutting Knife and
Plant Tools & Equipment Required Area CO2CO2-Turtle Bay
scissors, Steel scalper, etc.
Work Scope/Description Application of SBS Membrane for Waterproofing for TBV Mixed Use which includes Village Centre, Professional Neighborhood Centre, Non-Professional Neighborhood Centre

Section II – Does this job require any of the following operations?

 = Requires formal/special training  = Requires certification or Competent/Qualified Person designations


 = Requires a permit/form/report ∆ = Life Crucial Operations = Requires full Risk Assessment

Description Yes Description Yes


Aerial Lifts  ∆ ☐ Cranes - Critical lift    ∆ ☐
Confined Space    ∆ ☐ Hot Work   ☒
Dismantling and Demolition  ☐ Loading/Unloading Material ∆ ☒
Electrical Hazards    ∆ ☒ Noise Exposure  ☒
Excavation/Trenching    ∆ ☐ Powered Industrial Trucks   ∆ ☐
First Line Breaks    ∆ ☐ Radiation Area Work    ☐
Grating/Floor Plate/ Guardrail Removal  ∆ ☐ Respiratory Hazards  ☒
Hazardous Energy Control    ∆ ☐ Roof Work    ∆ ☐
Hazardous Materials
   ☐ Scaffolding   ∆ ☐
Asbestos & Lead Work
Hazardous Materials
  ☐ Site/Vehicle Traffic ∆ ☒
Crystalline Silica & Cadmium

Job Safety Analysis( TRS-HS-FRM-0001)


Revision 03, Rev. Date 25-Oct-2021 Page 3 of 12
ABDUL MOHSEN A.H. ALTAMIMI GROUP
RO3-CO2CO2 TURTLE BAY-PKG 05
JOB SAFETY ANALSYIS
TRS-HS-FRM-0001

Hazardous Waste Operations   ☒ Steel Erection  ∆ ☐


Heavy Equipment   ∆ ☐ Work at Height (> 6 ft)   ∆ ☐
Rigging, & Cranes   ∆ ☐ Other ☐

Section III – Job Safety Analysis Risk Assessment (Post Control Measures)
(A) (B) (C) (D) (E) (F) (G) (H) (I) (J)
Activity/Step Hazards Control Measures Severity Likelihood Risk Additional Control measures Severity Likelihood Risk
 Ensure the Implementation of "No
permit, No work" system.
 Relevant documents (civil &  A competent person & HSE
underground utilities drawing) must Representative shall monitor the
 Lack of communication. be attached with PTW. activities & personnel
 SDS must be available at the site.  Conduct joint site inspection.
 Working without valid  All potential hazards/control  Authorized personnel to be conduct
1. Secure the necessary Permit-to-work. measures must be described to training to workforce prior
Work Permit for workers. performing specific task.
2 2 4 2 1 2
waterproofing (Hot Work  RA must be briefed to whole crew  Conduct toolbox talk meeting to the
 Incompetent and
Permit) and have record with their initials. workforce regarding safe system of
Untrained SBS water  Prior to commence activity HSE work.
proofing installer team will ensure workers has  Use suitable tool/PPE for the right
undergo Safety Induction. job.
Further, all necessary evidence  The job must be carried out by
I.D or certificates must be check competent person.
and verified for record and proper
documentation.
2. Site preparation and  Over speeding (struck by)  All drivers must be trained and a 2 2 4  Warning hazard lights and signs will 2 1 2
mobilization of  Collision with other valid Driving license holder. be
equipment, tools and vehicles / fixed objects &  All vehicles shall be fitted with  installed on any extended parts of the
materials to the site. peoples. audible reverse alarms.  equipment or materials to be
 Collapse and falling of  All drivers shall use the seat belt transported.
load materials. while driving.  Suitable signage to be on display.
 Ergonomics.  Use manual handling aids and  Segregate pedestrian walkways.
 Physical injury. techniques to avoid any WRULD’s &  Trained Flagmen to be available as
 Damage to property. MSD’s. required.
 Un-inspected tools &  Pedestrians shall be at a safe  Always wear appropriate PPE.
equipment’s. distance from moving vehicles.  Always use designated access point.
 Slip, Trip & Fall.  High visibility vests shall be worn by  TBT to conducted on access
 Fire & Explosion. all workers operating close to arrangements for workers and
 Lack of competency of vehicles. visitors.

Job Safety Analysis( TRS-HS-FRM-0001)


Revision 03, Rev. Date 25-Oct-2021 Page 4 of 12
ABDUL MOHSEN A.H. ALTAMIMI GROUP
RO3-CO2CO2 TURTLE BAY-PKG 05
JOB SAFETY ANALSYIS
TRS-HS-FRM-0001

 Clear traffic signs shall be provided at


 Speed limit should not increase more
the work site.
than 40km/h at Turtle Bay roads and
Forklift operator.  Operator must have valid driving
20km/h on work site fence boundary.
 Poor visibility. license.
 Pre-use checks of forklift before
 Poor maintenance.  Ensure the reversing under the
starting the job.
 Un-secured load. instruction of Flag man.
 Operator must have 3rd party
 Ensure the stability of forklift during
certification.
the operation.
 Maintain clear visibility during the
 Secure the load before moving one
operation.
place to another.
 Pre-job briefing / TBT must be  Remove any trailing cables to prevent
conducted prior to start the work. tripping hazards.
 Pre-inspection of crane shall be  Use proper PPE (safety glass, safety
conducted by operator prior to shoes, hard hat, hand gloves).
operation.  Cords, cables, etc., shall be positioned
 Portable power tools shall be where they are not likely to be
inspected properly. damaged (e.g., run overhead) or shall
 Cables must be doubly insolated. be otherwise protected from damage
 Ensure the machine guarding before (e.g., running them inside impact
 Entanglement.
starting the job. resistant conduit or using abrasion
 Trapping,
 No loose clothing while using grinder resistant supply leads).
 Friction & Abrasion
to prevent any entanglement.  Use of the electrical cord for hoisting
 Noise
3. Coating and Surface  The operating control on hand-held or lowering power tools is prohibited.
 Vibration
preparation by (Power power tools shall be located to 4 3 12  HSE Team will ensure all portable 2 2 4
 Cut
tools) minimize the possibility of power tool are inspected and tagged
 Burn
inadvertent operation. any damaged/defects prior to use.
 Ejection of disk
 Before they are set down, rotating  Ensure all source of power
 Slip, Trip & Fall
portable power tools shall be connection are meet the power tool
 Ergonomics
switched off and held until the manufacture rated capacity to
rotation has completely stopped. prevent shortage or overrated power.
 They shall not be stopped by  Portable power tools shall be stored
grasping the rotating assembly. in clean and dry conditions.
 Power tools shall be disconnected  Portable power tools shall not be left
from the power source before lying around the work area where
changing bits, blades, cutters or they could be damaged.
wheels.  Ensure that the workers must have
sufficient rest breaks during the job.
4. SBS Membrane  Hazardous Substance:  Conduct toolbox talk prior to. 3 2 6  Use appropriate PPE • Good welfare 2 1 2
application (Manually) Skin irritants  Safety training about chemical arrangements to allow hand washing
Carcinogens handling. Refresher training through etc.
Respiratory sensitizers tool box talks.  Monitor the workplace temperature –

Job Safety Analysis( TRS-HS-FRM-0001)


Revision 03, Rev. Date 25-Oct-2021 Page 5 of 12
ABDUL MOHSEN A.H. ALTAMIMI GROUP
RO3-CO2CO2 TURTLE BAY-PKG 05
JOB SAFETY ANALSYIS
TRS-HS-FRM-0001

Health Hazards
 Acute health effects, the
adverse effects appear
after a single or short-
term exposure to the
agent, and the response
is invariably rapid or
immediate.
 Chronic health effects  Store minimal quantities in the
usually result from workplace.
prolonged or repeated  Replace caps when they are not
exposure to the agent required to be removed.
 Adverse effect on a  Waste materials stored in a lidded increase of vapors potential and
worker’s health as a container and not allowed to maybe flammability.
result of direct contact overspill onto the floor.  Safety Data Sheet (SDS) readily
with / or exposure to the  Spillages to be addressed in a timely available.
chemical through manner.  HSE team will ensure proper disposal
inhalation, skin contact or  Ensure appropriate PPE is used of chemical empty materials.
ingestion, entry through a overall and Gloves, respiratory  Provide suitable Fire extinguishers
cut or wound. protective equipment (RPE), gloves. with each equipment.
 Dizziness-The vapors’, if  Good hygiene practices to be  Use right-tool for right-job.
inhaled, enter the observed.  Local/ Homemade tools shall not be
bloodstream and some  Permit to work system must be used.
can cause short-term followed.
effects (dizziness) and  Ventilation / adequate venting of
Brain damage - Long- confined spaces.
term effects.  No lone working
 Skin burns.
 Toxic- If ingested they
may also have toxic
effects.
 Neurotoxins.
 Organic solvents
(trichloroethylene) are
well-known neurotoxins.
 Sharp edges.  Pre-job briefing must be held before 4 3 9  Use manual handling techniques for 2 2 4
 Ergonomics. handling the loads.
starting the job.
 Lack of competency.  Use manual handling aids to reduce
 Only trained and competent person
 Manual Handling. the muscle stress, muscle strain.
shall commence the activity.
 Fire & Explosion.  Ensure the workers take sufficient
 Hot surfaces.  Ensure barricading in place to
prevent unauthorized persons away.

Job Safety Analysis( TRS-HS-FRM-0001)


Revision 03, Rev. Date 25-Oct-2021 Page 6 of 12
ABDUL MOHSEN A.H. ALTAMIMI GROUP
RO3-CO2CO2 TURTLE BAY-PKG 05
JOB SAFETY ANALSYIS
TRS-HS-FRM-0001

 Avoid awkward positioning (twisting, rest breaks during the job.


bending, over-reaching & stooping)  Manual handling training session
while handling load. must be held with the workers to
5. SBS waterproofing
 Do not direct contact with the sharp improve the competency and reduce
Membrane Installation
edges without hand protection. the rate of injury at workplace.
 Burn.
(Use of Flame torch/ LPG  Remove any combustible materials  Frequent rest breaks during the job.
 Fumes.
flame torch) and maintain proper housekeeping.  Check for any loose connection of
 Skin irritant.
 Ensure the provision of appropriate LPG cylinder and torch.
PPE’s.  Suitable fire extinguisher must be
placed at suitable position.
 A fire watch must be present at site.

 Ensuring that the worker is self-paced


and provide appropriate rest break
for the heat stress condition.
 Provide rest shelter and water on site
 Ensure that required training &
prior of activity at site.
education provided and undertaken
 HSE Representative to monitor on
by supervisors, First aider and
daily basis for the weather condition
employees.
at site.
 Ensuring engineering controls
 HSE Representative to identify the
measures implemented to eliminate
 Heat stress. Heat Index danger category on daily
6. Working in adverse the risk of heat exposure as far as
 Heat exhaustion. 3 2 6 basis. 2 1 2
weather condition reasonably practicable.
 Heat stroke.  A standby qualified first aider/site
 Take appropriate action upon
Nurse and first aid kit must be
developing symptoms of heat
available at site.
cramps, heat exhaustion or heat
 Ensure supply of water daily, to
stroke.
provide abundant supply of water at
 Ensure designated rest shelter have
site.
sufficient drinking water station.
 Ensure site with proper monitoring
and using kestrel equipment heat
stress program.

Exposure to extreme Cold  Ensure all workers follow the use of 3 2 6  Ensure appropriate PPE’S to be use 2 1 2
clothing when temperature working to when temperature working to outside.
outside
Administrative controls like acclimatization,  Ensure site with proper monitoring and
temperature, and humidity monitoring, using kestrel equipment heat stress
flagging system etc. should be in place program.

Job Safety Analysis( TRS-HS-FRM-0001)


Revision 03, Rev. Date 25-Oct-2021 Page 7 of 12
ABDUL MOHSEN A.H. ALTAMIMI GROUP
RO3-CO2CO2 TURTLE BAY-PKG 05
JOB SAFETY ANALSYIS
TRS-HS-FRM-0001

 Work is strictly prohibited during


lightning and project personnel are not  Ensure all workers working at site with
allowed to stay outdoor. proper shelter in place.
 If safe building structures are not  Stop work immediately if Lighting
accessible, employers should guide /thunderstorm and notify the transport
workers to hard-topped metal vehicles foreman for the standby of BUS as
Lighting /thunderstorm with rolled up windows. Remain in the 3 2 6 shelter at site. 2 1 2
vehicle for at least 30 minutes after  In any case of emergency, a standby
hearing the last sound of thunder. vehicle at site radio or cell phone to
After hearing thunder, do not use corded contact directly.
phones, except in an emergency. Cell All emergency contact list must provide to
phones and cordless phones may be used all driver/s.
safely.
 Ensure work is strictly prohibited during
heavy rains and project personnel are
 Ensure all workers working at site with
not allowed to work/stay outdoor.
proper shelter in place during the rain.
 If water accumulated or the area is
 Always be vigilant of the flooding in the
flooding due to rain, wait to subside
area, look for the high location if flooded
before resuming the work.
or call for an emergency.
 If water is present in the excavation, de-
Heavy Rain 3 2 6  Ensure on any presence of water in 2 1 2
watering shall be performed by installing
excavated area don’t allow any worker/s
submersible pumps or equivalent
to resume the works.
should land survey work is urgent.
Provide appropriate protection for the
If raining, sandbag shall be positioned on
excavation to prevent erosion of excavated
the surrounding of the excavation to
works.
prevent rainwater flowing in the excavated
area.
Sandstorm  Work is strictly prohibited during 3 2 6  Ensure all workers working at site with 2 1 2
sandstorm and project personnel are proper shelter in place during
not allowed to stay outdoor. sandstorm.
 Wear medical facemasks or use wet  Provide appropriate wearing of face
towel or gauze during sandstorms mask during sandstorm at site otherwise
outdoors. stop the work and wait for further notice
 Wear eyeglasses preferably airtight to proceed.
goggles or face shield to protect your  Provide appropriate use of safety
eyes from blowing dust or sand. glasses, contact lenses are not allowed
 Avoid wearing contact lenses in areas during working at site.
prone to sandstorm.  Ensure all workers to stay indoor (car or
 Avoid rubbing eyes to prevent eye office building) unless it is necessary to
infection. If eyes become irritated, rinse go out.
with water.  Conduct maintenance of office and

Job Safety Analysis( TRS-HS-FRM-0001)


Revision 03, Rev. Date 25-Oct-2021 Page 8 of 12
ABDUL MOHSEN A.H. ALTAMIMI GROUP
RO3-CO2CO2 TURTLE BAY-PKG 05
JOB SAFETY ANALSYIS
TRS-HS-FRM-0001

accommodations to sealed properly and


 Stay indoor (car or office building) unless prevent sands enter inside the
it is necessary to go out. room/office,
 Ensure office and accommodations if  Drive with caution or stop on the
sandstorm proof (properly sealed). shoulder of the road until the sandstorm
 When driving, drive slowly with caution remain calm.
when visibility is very low.  Be vigilant of another vehicle near you
 Pull over completely to a safe place off during the zero visibility on roads at site.
the paved portion of the roadway during  Ensure you parked in right place during
low visibility. this sandstorm to prevent any collision
with other oncoming vehicles.
7. Housekeeping  Remove banding, crate material, nails,
paint bottle, etc. and dispose of
properly.
 Proper planning and look ahead by
Discipline Supervisor/Foreman.
 Prior to commencing work, as part daily
 Ensure all unwanted materials to be
progress, he shall plan for:
disposed properly on designated
 Housekeeping resources - hauling
location skip bins.
equipment (loader / dump truck /
 Prioritize the housekeeping scheduled
Poor Housekeeping. forklift) and dedicated crew.
on or before the activity on daily basis
Lack of proper planning  Regular collection of rubbish, every end 2 2 4 2 1 2
on site.
Lack of resources of shift at minimum
 Construction Team shall be accountable
 Waste skips / covered metal trash bins /
for all the materials and pre-arranged
disposable trash bags, etc.
staging location area to prevent any
 Temporary staging area of scrap
materials scattered on the surroundings.
materials
 Pre-arranged staging area for
construction materials, tools /
equipment
 Access for personnel and equipment
Barricades / signs required
Wet Garbage.  Debris and other unnecessary materials 2 2 4  Ensure all waste materials to be 2 1 2
Accumulation attracts shall be discarded from site. disposed properly on timely manner
disease carrying  Empty drinking bottles and wet garbage especially the hazard materials.
insect and animals from excess food should be properly  A designated garbage bins to be
Not sanitized Toilets disposed at designated bins and hauled provided for segregated waste are to be
Environmental damaged out daily. followed.
 Portable Toilets should be maintained  Assigned Housekeeper to ensure Toilets
on Daily Basis. are maintained with checklist on daily
 Trash and garbage shall only be signed by his supervisor.

Job Safety Analysis( TRS-HS-FRM-0001)


Revision 03, Rev. Date 25-Oct-2021 Page 9 of 12
ABDUL MOHSEN A.H. ALTAMIMI GROUP
RO3-CO2CO2 TURTLE BAY-PKG 05
JOB SAFETY ANALSYIS
TRS-HS-FRM-0001

disposed of at approved sites as


 Ensure approved third-party garbage
designated by RED SEA or local
collector to be collected on site.
municipality.
Any hazard materials on site especial care
 All unwanted materials at the site should
for the environmental impact and disposed
be disposed of especial hazard
properly.
materials.
8. Emergency Preparedness Lack of proper  Proper planning and look ahead by 2 2 4  Ensure proper planning and look ahead 2 1 2
planning / emergency Discipline Supervisor. Prior to his by construction team of any activity at
readiness / activities he shall: site.
awareness of safe  Familiarize himself and his team with  Ensure to comply with RSG-HS-ADM-
evacuation procedure. the site-specific emergency 0007 (Emergency Preparedness and
Lack of resources procedure. Response) of any emergency protocol.
 Know the actual locations of nearest  Follow the STOP Work or Evacuation
safe assembly areas. Alarm, as an instruction from Site ERT /
 Conduct toolbox talk with his crew on HSE, of any emergency protocol.
emergency procedure.  Conduct emergency training drills in
 See to it that safe access route is coordination with RED SEA/SC for the
available from work area towards the awareness by all workers on site.
nearest safe assembly area.  Ensure emergency contact list to be
 Be familiar with the prevailing wind posted at site and keep up to date the
against the locations of nearest safe contact list.
assembly points. At least 2 safe  Provide training to all workers on how to
assembly points in opposite contact the details in the emergency
directions shall be known to the crew contact list.
from each work location.
 Be familiar with site specific
Emergency Response Plan (ERP) and
requirements of this document.
 Understand / comply with RSG-HS-ADM-
0007 (Emergency Preparedness and
Response).
 Upon hearing site STOP Work or
Evacuation Alarm, or receipt of an
instruction from Site ERT / HSE,
Discipline Supervisor shall lead his crew
to ensure following actions are taken:
 Stop work
 Alarm others
 Shutdown all machines e.g.,
generator, welding machines, etc.
 Check wind direction

Job Safety Analysis( TRS-HS-FRM-0001)


Revision 03, Rev. Date 25-Oct-2021 Page 10 of 12
ABDUL MOHSEN A.H. ALTAMIMI GROUP
RO3-CO2CO2 TURTLE BAY-PKG 05
JOB SAFETY ANALSYIS
TRS-HS-FRM-0001

 Proceed to nearest safe assembly


area in cross wind direction.
 Participate in the headcount, report
missing person (if any)
 Stay at safe assembly area, remain
attentive, do not engage in any
unauthorized activity, wait for further
instruction.
 All site personnel to participate in
training drills. Conduct emergency
training drills in coordination with RED
SEA/SC.
 Maintain emergency contact list in each
work area.
 Call Project Nurse or Site Safety
Manager for medical emergencies,
include 24/7 emergency contact details
in the emergency contact list.

Note: Insert additional rows or print additional sheets as necessary to accommodate all job steps.

Section IV – Approval and Signatures


Prepared by Company Position
Hamza Nazeer Ahmed Abdul Mohsen A.H. Al Tamimi Group Health & Safety Manager

Reviewed and Approved by Company Position


Supervisor/Engineer

H&S Representative

High and Very High residual risk rating (10-25)


Note: All High and Very High residual risk ratings (10-25) require review and approval by Construction Director/Manager or Facility Manager before starting work to ensure that the additional controls are adequate to execute the task safely.
Reviewed and Approved by Company Position
Construction Director/Manager or Facility Manager
Reviewed by Crew Company Position

Job Safety Analysis( TRS-HS-FRM-0001)


Revision 03, Rev. Date 25-Oct-2021 Page 11 of 12
ABDUL MOHSEN A.H. ALTAMIMI GROUP
RO3-CO2CO2 TURTLE BAY-PKG 05
JOB SAFETY ANALSYIS
TRS-HS-FRM-0001

Job Safety Analysis( TRS-HS-FRM-0001)


Revision 03, Rev. Date 25-Oct-2021 Page 12 of 12