Slope Mass Rating SMR1 Chainage K0+100

Parmeters Amount For Plane Failure


dip direction of Slope 274 F1=|αj-αs|
Dip amount of slope 71 F1 for each joints Rating
Dip direction of J1 24 J1 250 r1 0.15
Dip amount of J1 31 J2 134 r2 0.15
Dip direction of J2 140 J3 0 r3 1
Dip amount of J2 59 F2=βj
Dip direction of J3 274 F2 for each joints Rating
Dip amount of J3 62 J1 31 r1 0.70
Geological Strength Index (GSI) 43 J2 59 r2 1
RMRb 38 J3 62 r3 1
F3=βj- βs
F3 for each joints Rating
Trend J1 -40 r1 -60
J1*J2 65 J2 -12 r2 -60
J1*J3 349 J3 -9 r3 -50
J2*J3 205 F4 (excavation Method)
Plunge Presplitting 10 Blasting or mechanical
J1*J2 24 Smooth Blasting 8 Natural Slope
J1*J3 26
J2*J3 34

For Toppling Failure


F1=|αj-αs-180|
F1 for each joints Rating
J1 430 r1 0.15
J2 314 r2 0.15
J3 180 r3 0.15
F2=βj
F2 for each joints Rating
J1 31 r1 1
J2 59 r2 1
J3 62 r3 1
F3=βj+βs
F3 for each joints Rating
J1 102 r1 0
J2 130 r2 -25
J3 133 r3 -25
F4 (excavation Method)
Presplitting 10 Blasting or mechanical
Smooth Blasting 8 Natural Slope
For Wedge Failure
SMR F1=|αj-αs|
Average Rating F1 for each joints Rating Average Rating
0.433 J1 209 r1 0.15 0.150
J2 75 r2 0.15
J3 69 r3 0.15
F2=βj
Average Rating F2 for each joints Rating Average Rating
0.9 J1 24 r1 0.40 0.5
30.9 J2 26 r2 0.40
J3 34 r3 0.70
F3=βj- βs
Average Rating F3 for each joints Rating Average Rating
-56.67 J1 -47 r1 -60 -60.00
J2 -45 r2 -60
J3 -37 r3 -60
F4 (excavation Method)
Blasting or mechanical 0 Presplitting 10 Blasting or mechanical
Natural Slope 15 Smooth Blasting 8 Natural Slope

SMR
Average Rating
0.150

Average Rating
1.00
50.50

Average Rating
-16.67

Blasting or mechanical 0
Natural Slope 15
SMR

48.5

0
15
For Plane Failure
Description of SMR classes (Romana, 1985)
Chainage Classes SMR Description Stability Failures
KO + 100 IV 30.9 Bad Unstable Planar or big wedges
KO + 110 IIl 50.2 Normal Partially stable Some joints or many wedges
KO + 120 IV 37 Bad Unstable Planar or big wedges
KO + 130 IV 29.04 Bad Unstable Planar or big wedges
KO + 140 IV 28.67 Bad Unstable Planar or big wedges
KO + 150 IIl 45.5 Normal Partially stable Some joints or many wedges
KO + 160 IIl 51.3 Normal Partially stable Some joints or many wedges
KO + 170 IV 34 Bad Unstable Planar or big wedges
KO + 180 IV 39.44 Bad Unstable Planar or big wedges
KO +190 IIl 42.98 Normal Partially stable Some joints or many wedges
KO + 200 IV 32.62 Bad Unstable Planar or big wedges
K0 + 220 IIl 55.1 Normal Partially stable Some joints or many wedges
K0 + 240 IIl 42.4 Normal Partially stable Some joints or many wedges
K0 + 250 IIl 47 Normal Partially stable Some joints or many wedges
K0 + 260 IIl 58.13 Normal Partially stable Some joints or many wedges
K0 + 270 IIl 51.2 Normal Partially stable Some joints or many wedges
K0 + 280 IIl 57.38 Normal Partially stable Some joints or many wedges
K0 + 290 IIl 58.12 Normal Partially stable Some joints or many wedges
K0 + 300 IIl 56.36 Normal Partially stable Some joints or many wedges
K0 + 310 IIl 50.72 Normal Partially stable Some joints or many wedges
K0 + 320 IIl 42.67 Normal Partially stable Some joints or many wedges
K0 + 330 IIl 53.03 Normal Partially stable Some joints or many wedges
K0 + 340 IV 34.92 Bad Unstable Planar or big wedges
K0 + 350 IV 34.6 Bad Unstable Planar or big wedges
K0 + 360 IIl 47.94 Normal Partially stable Some joints or many wedges
K0 + 370 IV 36.2 Bad Unstable Planar or big wedges
K0 + 380 IIl 46.34 Normal Partially stable Some joints or many wedges
K0 + 390 IIl 41.67 Normal Partially stable Some joints or many wedges
K0 + 400 IIl 50.98 Normal Partially stable Some joints or many wedges
K0 + 410 IIl 51.98 Normal Partially stable Some joints or many wedges
K0 + 420 IIl 54.68 Normal Partially stable Some joints or many wedges
K0 + 430 IIl 51.08 Normal Partially stable Some joints or many wedges
K0 + 440 IIl 50.39 Normal Partially stable Some joints or many wedges
K0 + 450 IIl 56.8 Normal Partially stable Some joints or many wedges
K0 + 460 IIl 54.49 Normal Partially stable Some joints or many wedges
K0 + 470 IIl 46.76 Normal Partially stable Some joints or many wedges
K0 + 480 IIl 48.33 Normal Partially stable Some joints or many wedges
K0 + 490 IIl 52.69 Normal Partially stable Some joints or many wedges
K0 + 500 IIl 44.03 Normal Partially stable Some joints or many wedges
K0 + 590 IIl 56.03 Normal Partially stable Some joints or many wedges
K0 + 600 IIl 51.34 Normal Partially stable Some joints or many wedges
K0 + 650 IIl 53.58 Normal Partially stable Some joints or many wedges
K0 + 690 IIl 53.17 Normal Partially stable Some joints or many wedges
K0 + 700 IIl 44 Normal Partially stable Some joints or many wedges
K0 + 730 IV 22.9 Bad Unstable Planar or big wedges
K0 + 740 IV 35.4 Bad Unstable Planar or big wedges
K0 + 760 IIl 46.25 Normal Partially stable Some joints or many wedges
K0 + 770 IIl 41.25 Normal Partially stable Some joints or many wedges
K0 + 780 IV 40.39 Bad Unstable Some joints or many wedges
K0 + 820 IIl 53.86 Normal Partially stable Some joints or many wedges
K0 + 840 IIl 50.57 Normal Partially stable Some joints or many wedges
K0 + 860 IIl 50.94 Normal Partially stable Some joints or many wedges
K0 + 870 IIl 49.76 Normal Partially stable Some joints or many wedges
K0 + 890 IIl 44.11 Normal Partially stable Some joints or many wedges
K0 + 900 IIl 41 Normal Partially stable Some joints or many wedges

For Topple Failure


Description of SMR classes (Romana, 1985)
Chainage Classes SMR Description Stability Failures
KO + 100 IIl 50.5 Normal Partially stable Some joints or many wedges
KO + 110 IIl 55.45 Normal Partially stable Some joints or many wedges
KO + 120 IIl 50.5 Normal Partially stable Some joints or many wedges
KO + 130 IIl 50.4 Normal Partially stable Some joints or many wedges
KO + 140 IIl 47 Normal Partially stable Some joints or many wedges
KO + 150 IIl 55.4 Normal Partially stable Some joints or many wedges
KO + 160 IIl 51.22 Normal Partially stable Some joints or many wedges
KO + 170 IIl 48.45 Normal Partially stable Some joints or many wedges
KO + 180 IIl 48.25 Normal Partially stable Some joints or many wedges
KO +190 IIl 48.5 Normal Partially stable Some joints or many wedges
KO + 200 IIl 49.7 Normal Partially stable Some joints or many wedges
K0 + 220 II 62 Good Stable Some blocks
K0 + 240 IIl 56.45 Normal Partially stable Some joints or many wedges
K0 + 250 II 61.45 Good Stable Some blocks
K0 + 260 II 62.45 Good Stable Some blocks
K0 + 270 II 63.45 Good Stable Some blocks
K0 + 280 IIl 60.45 Normal Partially stable Some joints or many wedges
K0 + 290 IIl 60.5 Normal Partially stable Some joints or many wedges
K0 + 300 IIl 56.5 Normal Partially stable Some joints or many wedges
K0 + 310 IIl 56.5 Normal Partially stable Some joints or many wedges
K0 + 320 IIl 46.5 Normal Partially stable Some joints or many wedges
K0 + 330 IIl 57.5 Normal Partially stable Some joints or many wedges
K0 + 340 IIl 45 Normal Partially stable Some joints or many wedges
K0 + 350 IIl 46.75 Normal Partially stable Some joints or many wedges
K0 + 360 IIl 54.5 Normal Partially stable Some joints or many wedges
K0 + 370 IIl 54.5 Normal Partially stable Some joints or many wedges
K0 + 380 IIl 48.7 Normal Partially stable Some joints or many wedges
K0 + 390 IIl 47.4 Normal Partially stable Some joints or many wedges
K0 + 400 IIl 56.5 Normal Partially stable Some joints or many wedges
K0 + 410 IIl 57.5 Normal Partially stable Some joints or many wedges
K0 + 420 II 63.45 Good Stable Some blocks
K0 + 430 II 64.5 Good Stable Some blocks
K0 + 440 IIl 59.5 Normal Partially stable Some joints or many wedges
K0 + 450 IIl 59.45 Normal Partially stable Some joints or many wedges
K0 + 460 IIl 57.5 Normal Partially stable Some joints or many wedges
K0 + 470 IIl 57.45 Normal Partially stable Some joints or many wedges
K0 + 480 IIl 59.45 Normal Partially stable Some joints or many wedges
K0 + 490 IIl 59.5 Normal Partially stable Some joints or many wedges
K0 + 500 IIl 48.5 Normal Partially stable Some joints or many wedges
K0 + 590 II 61.45 Good Stable Some blocks
K0 + 600 IIl 60.5 Normal Partially stable Some joints or many wedges
K0 + 650 IIl 54.5 Normal Partially stable Some joints or many wedges
K0 + 690 IIl 60.9 Normal Partially stable Some joints or many wedges
K0 + 700 II 61.15 Good Stable Some blocks
K0 + 730 IIl 50.24 Normal Partially stable Some joints or many wedges
K0 + 740 IIl 46.24 Normal Partially stable Some joints or many wedges
K0 + 760 IIl 50 Normal Partially stable Some joints or many wedges
K0 + 770 IIl 45 Normal Partially stable Some joints or many wedges
K0 + 780 IIl 50.75 Normal Partially stable Some joints or many wedges
K0 + 820 IIl 55.75 Normal Partially stable Some joints or many wedges
K0 + 840 IIl 53.25 Normal Partially stable Some joints or many wedges
K0 + 860 IIl 58.45 Normal Partially stable Some joints or many wedges
K0 + 870 IIl 59.5 Normal Partially stable Some joints or many wedges
K0 + 890 IIl 59.25 Normal Partially stable Some joints or many wedges
K0 + 900 IIl 55.75 Normal Partially stable Some joints or many wedges
For Wedge Failure
Description of SMR classes (Romana, 1985)
Failure Probability Chainage Classes SMR Description Stability
0.6 KO + 100 IIl 48.5 Normal Partially stable
0.4 KO + 110 IIl 52.8 Normal Partially stable
0.6 KO + 120 IIl 43.7 Normal Partially stable
0.6 KO + 130 IIl 45.9 Normal Partially stable
0.6 KO + 140 IIl 44.3 Normal Partially stable
0.4 KO + 150 IIl 51.6 Normal Partially stable
0.4 KO + 160 IIl 49.5 Normal Partially stable
0.6 KO + 170 IV 38.33 Bad Unstable
0.6 KO + 180 IIl 47.8 Normal Partially stable
0.4 KO +190 IIl 45.9 Normal Partially stable
0.6 KO + 200 IIl 46.55 Normal Partially stable
0.4 K0 + 220 II 62.5 Good Stable
0.4 K0 + 240 IIl 53.05 Normal Partially stable
0.4 K0 + 250 IIl 58.8 Normal Partially stable
0.4 K0 + 260 IIl 59.6 Normal Partially stable
0.4 K0 + 270 IIl 58.17 Normal Partially stable
0.4 K0 + 280 IIl 58.74 Normal Partially stable
0.4 K0 + 290 IIl 60.27 Normal Partially stable
0.4 K0 + 300 IIl 55.25 Normal Partially stable
0.4 K0 + 310 IIl 54.08 Normal Partially stable
0.4 K0 + 320 IIl 45.22 Normal Partially stable
0.4 K0 + 330 IIl 56.75 Normal Partially stable
0.6 K0 + 340 IIl 42.07 Normal Partially stable
0.6 K0 + 350 IIl 44.55 Normal Partially stable
0.4 K0 + 360 IIl 54.27 Normal Partially stable
0.6 K0 + 370 IIl 52.61 Normal Partially stable
0.4 K0 + 380 IV 39.74 Bad Unstable
0.4 K0 + 390 IIl 42.22 Normal Partially stable
0.4 K0 + 400 IIl 52.25 Normal Partially stable
0.4 K0 + 410 IIl 50.67 Normal Partially stable
0.4 K0 + 420 IIl 52.4 Normal Partially stable
0.4 K0 + 430 IIl 57.24 Normal Partially stable
0.4 K0 + 440 IIl 51.67 Normal Partially stable
0.4 K0 + 450 IIl 56.18 Normal Partially stable
0.4 K0 + 460 IIl 54.33 Normal Partially stable
0.4 K0 + 470 IIl 50.33 Normal Partially stable
0.4 K0 + 480 IIl 50.67 Normal Partially stable
0.4 K0 + 490 IIl 50.73 Normal Partially stable
0.4 K0 + 500 IIl 42.37 Normal Partially stable
0.4 K0 + 590 IIl 56.7 Normal Partially stable
0.4 K0 + 600 IIl 57.75 Normal Partially stable
0.4 K0 + 650 IIl 45.77 Normal Partially stable
0.4 K0 + 690 IIl 54.24 Normal Partially stable
0.4 K0 + 700 IIl 56.47 Normal Partially stable
0.6 K0 + 730 IIl 44.3 Normal Partially stable
0.6 K0 + 740 IIl 43.8 Normal Partially stable
0.4 K0 + 760 IIl 46.25 Normal Partially stable
0.4 K0 + 770 IIl 41.25 Normal Partially stable
0.4 K0 + 780 IIl 47.61 Normal Partially stable
0.4 K0 + 820 IIl 52.8 Normal Partially stable
0.4 K0 + 840 IIl 48.25 Normal Partially stable
0.4 K0 + 860 IIl 52.8 Normal Partially stable
0.4 K0 + 870 IIl 57.8 Normal Partially stable
0.4 K0 + 890 IIl 47.45 Normal Partially stable
0.4 K0 + 900 IIl 52.6 Normal Partially stable

Failure Probability
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.2
0.4
0.2
0.2
0.2
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.2
0.2
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.2
0.4
0.4
0.4
0.2
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
r Wedge Failure
f SMR classes (Romana, 1985)
Failures Failure Probability
Some joints or many wedges 0.4
Some joints or many wedges 0.4
Some joints or many wedges 0.4
Some joints or many wedges 0.4
Some joints or many wedges 0.4
Some joints or many wedges 0.4
Some joints or many wedges 0.4
Planar or big wedges 0.6
Some joints or many wedges 0.4
Some joints or many wedges 0.4
Some joints or many wedges 0.4
Some blocks 0.2
Some joints or many wedges 0.4
Some joints or many wedges 0.4
Some joints or many wedges 0.4
Some joints or many wedges 0.4
Some joints or many wedges 0.4
Some joints or many wedges 0.4
Some joints or many wedges 0.4
Some joints or many wedges 0.4
Some joints or many wedges 0.4
Some joints or many wedges 0.4
Some joints or many wedges 0.4
Some joints or many wedges 0.4
Some joints or many wedges 0.4
Some joints or many wedges 0.4
Planar or big wedges 0.6
Some joints or many wedges 0.4
Some joints or many wedges 0.4
Some joints or many wedges 0.4
Some joints or many wedges 0.4
Some joints or many wedges 0.4
Some joints or many wedges 0.4
Some joints or many wedges 0.4
Some joints or many wedges 0.4
Some joints or many wedges 0.4
Some joints or many wedges 0.4
Some joints or many wedges 0.4
Some joints or many wedges 0.4
Some joints or many wedges 0.4
Some joints or many wedges 0.4
Some joints or many wedges 0.4
Some joints or many wedges 0.4
Some joints or many wedges 0.4
Some joints or many wedges 0.4
Some joints or many wedges 0.4
Some joints or many wedges 0.4
Some joints or many wedges 0.4
Some joints or many wedges 0.4
Some joints or many wedges 0.4
Some joints or many wedges 0.4
Some joints or many wedges 0.4
Some joints or many wedges 0.4
Some joints or many wedges 0.4
Some joints or many wedges 0.4
Slope Mass Rating SMR2 Chainage K0+110

Parmeters Amount For Plane Failure


dip direction of Slope 296 F1=|αj-αs|
Dip amount of slope 68 F1 for each joints Rating
Dip direction of J1 34 J1 262 r1 0.15
Dip amount of J1 24 J2 163 r2 0.15
Dip direction of J2 133 J3 82 r3 0.15
Dip amount of J2 59 F2=βj
Dip direction of J3 214 F2 for each joints Rating
Dip amount of J3 48 J1 24 r1 0.40
Geological Strength Index (GSI) 47 J2 59 r2 1
RMRb 42 J3 48 r3 1
F3=βj- βs
F3 for each joints Rating
Trend J1 -44 r1 -60
J1*J2 57 J2 -9 r2 -50
J1*J3 123 J3 -20 r3 -60
J2*J3 186 F4 (excavation Method)
Plunge Presplitting 10 Blasting or mechanical
J1*J2 22 Smooth Blasting 8 Natural Slope
J1*J3 1
J2*J3 44

For Toppling Failure


F1=|αj-αs-180|
F1 for each joints Rating
J1 442 r1 0.15
J2 343 r2 0.15
J3 262 r3 0.15
F2=βj
F2 for each joints Rating
J1 24 r1 1
J2 59 r2 1
J3 48 r3 1
F3=βj+βs
F3 for each joints Rating
J1 92 r1 0
J2 127 r2 -25
J3 116 r3 -6
F4 (excavation Method)
Presplitting 10 Blasting or mechanical
Smooth Blasting 8 Natural Slope
K0+110

For Wedge Failure


SMR F1=|αj-αs|
Average Rating F1 for each joints Rating Average Rating
0.150 J1 239 r1 0.15 0.150
J2 173 r2 0.15
J3 110 r3 0.15
F2=βj
Average Rating F2 for each joints Rating Average Rating
0.8 J1 22 r1 0.40 0.466666666667
50.2 J2 1 r2 0.15
J3 44 r3 0.85
F3=βj- βs
Average Rating F3 for each joints Rating Average Rating
-56.67 J1 -46 r1 -60 -60.00
J2 -67 r2 -60
J3 -24 r3 -60
F4 (excavation Method)
Blasting or mechanical 0 Presplitting 10 Blasting or mechanical
Natural Slope 15 Smooth Blasting 8 Natural Slope

SMR
Average Rating
0.150

Average Rating
1.00
55.45

Average Rating
-10.33

Blasting or mechanical 0
Natural Slope 15
SMR

52.8

0
15
Slope Mass Rating SMR 3 Chainage K0+120

Parmeters Amount For Plane Failure


dip direction of Slope 314 F1=|αj-αs|
Dip amount of slope 70 F1 for each joints Rating
Dip direction of J1 7 J1 307 r1 0.15
Dip amount of J1 31 J2 14 r2 0.70
Dip direction of J2 300 J3 49 r3 0.15
Dip amount of J2 69 F2=βj
Dip direction of J3 265 F2 for each joints Rating
Dip amount of J3 64 J1 31 r1 0.70
Geological Strength Index (GSI) 43 J2 69 r2 1
RMRb 38 J3 64 r3 1
F3=βj- βs
F3 for each joints Rating
Trend J1 -39 r1 -60
J1*J2 17 J2 -1 r2 -50
J1*J3 339 J3 -6 r3 -50
J2*J3 261 F4 (excavation Method)
Plunge Presplitting 10 Blasting or mechanical
J1*J2 30 Smooth Blasting 8 Natural Slope
J1*J3 28
J2*J3 64

For Toppling Failure


F1=|αj-αs-180|
F1 for each joints Rating
J1 487 r1 0.15
J2 194 r2 0.15
J3 229 r3 0.15
F2=βj
F2 for each joints Rating
J1 31 r1 1
J2 69 r2 1
J3 64 r3 1
F3=βj+βs
F3 for each joints Rating
J1 101 r1 0
J2 139 r2 -25
J3 134 r3 -25
F4 (excavation Method)
Presplitting 10 Blasting or mechanical
Smooth Blasting 8 Natural Slope
For Wedge Failure
SMR F1=|αj-αs|
Average Rating F1 for each joints Rating Average Rating
0.333 J1 297 r1 0.15 0.233
J2 25 r2 0.40
J3 53 r3 0.15
F2=βj
Average Rating F2 for each joints Rating Average Rating
0.9 J1 30 r1 0.70 0.7
37 J2 28 r2 0.40
J3 64 r3 1
F3=βj- βs
Average Rating F3 for each joints Rating Average Rating
-53.33 J1 -40 r1 -60 -56.67
J2 -42 r2 -60
J3 -6 r3 -50
F4 (excavation Method)
ng or mechanical 0 Presplitting 10 Blasting or mechanical
al Slope 15 Smooth Blasting 8 Natural Slope

SMR
Average Rating
0.150

Average Rating
1.00
50.50

Average Rating
-16.67

ng or mechanical 0
al Slope 15
SMR

43.74444

0
15
Slope Mass Rating SMR 4 Chainage K0+130

Parmeters Amount For Plane Failure


dip direction of Slope 272 F1=|αj-αs|
Dip amount of slope 62 F1 for each joints Rating
Dip direction of J1 19 J1 253 r1 0.15
Dip amount of J1 38 J2 107 r2 0.15
Dip direction of J2 165 J3 0 r3 1
Dip amount of J2 57 F2=βj
Dip direction of J3 272 F2 for each joints Rating
Dip amount of J3 54 J1 38 r1 0.85
Geological Strength Index (GSI) 41 J2 57 r2 1
RMRb 36 J3 54 r3 1
F3=βj- βs
F3 for each joints Rating
Trend J1 -24 r1 -60
J1*J2 85 J2 -5 r2 -50
J1*J3 336 J3 -8 r3 -50
J2*J3 220 F4 (excavation Method)
Plunge Presplitting 10 Blasting or mechanical
J1*J2 16 Smooth Blasting 8 Natural Slope
J1*J3 30
J2*J3 40

For Toppling Failure


F1=|αj-αs-180|
F1 for each joints Rating
J1 433 r1 0.15
J2 287 r2 0.15
J3 180 r3 0.15
F2=βj
F2 for each joints Rating
J1 38 r1 1
J2 57 r2 1
J3 54 r3 1
F3=βj+βs
F3 for each joints Rating
J1 100 r1 0
J2 119 r2 -6
J3 116 r3 -6
F4 (excavation Method)
Presplitting 10 Blasting or mechanical
Smooth Blasting 8 Natural Slope
For Wedge Failure
SMR F1=|αj-αs|
Average Rating F1 for each joints Rating Average Rating
0.433 J1 187 r1 0.15 0.150
J2 64 r2 0.15
J3 52 r3 0.15
F2=βj
Average Rating F2 for each joints Rating Average Rating
0.95 J1 16 r1 0.15 0.566666666667
29.0444444 J2 30 r2 0.70
J3 40 r3 0.85
F3=βj- βs
Average Rating F3 for each joints Rating Average Rating
-53.33 J1 -46 r1 -60 -60.00
J2 -32 r2 -60
J3 -22 r3 -60
F4 (excavation Method)
ng or mechanical 0 Presplitting 10 Blasting or mechanical
al Slope 15 Smooth Blasting 8 Natural Slope

SMR
Average Rating
0.150

Average Rating
1.00
50.40

Average Rating
-4.00

ng or mechanical 0
al Slope 15
SMR

45.9

0
15
Slope Mass Rating SMR 5 Chainage K0+140

Parmeters Amount For Plane Failure


dip direction of Slope 275 F1=|αj-αs|
Dip amount of slope 72 F1 for each joints Rating
Dip direction of J1 14 J1 261 r1 0.15
Dip amount of J1 38 J2 53 r2 0.15
Dip direction of J2 328 J3 4 r3 1
Dip amount of J2 56 F2=βj
Dip direction of J3 271 F2 for each joints Rating
Dip amount of J3 70 J1 38 r1 0.85
Geological Strength Index (GSI) 42 J2 56 r2 1
RMRb 37 J3 70 r3 1
F3=βj- βs
F3 for each joints Rating
Trend J1 -34 r1 -60
J1*J2 26 J2 -16 r2 -60
J1*J3 346 J3 -2 r3 -50
J2*J3 327 F4 (excavation Method)
Plunge Presplitting 10 Blasting or mechanical
J1*J2 37 Smooth Blasting 8 Natural Slope
J1*J3 34
J2*J3 55

For Toppling Failure


F1=|αj-αs-180|
F1 for each joints Rating
J1 441 r1 0.15
J2 127 r2 0.15
J3 184 r3 0.15
F2=βj
F2 for each joints Rating
J1 38 r1 1
J2 56 r2 1
J3 70 r3 1
F3=βj+βs
F3 for each joints Rating
J1 110 r1 -50
J2 128 r2 -25
J3 142 r3 -25
F4 (excavation Method)
Presplitting 10 Blasting or mechanical
Smooth Blasting 8 Natural Slope
For Wedge Failure
SMR F1=|αj-αs|
Average Rating F1 for each joints Rating Average Rating
0.433 J1 249 r1 0.15 0.150
J2 71 r2 0.15
J3 52 r3 0.15
F2=βj
Average Rating F2 for each joints Rating Average Rating
0.95 J1 37 r1 0.85 0.85
28.6722222 J2 34 r2 0.70
J3 55 r3 1
F3=βj- βs
Average Rating F3 for each joints Rating Average Rating
-56.67 J1 -35 r1 -60 -60.00
J2 -38 r2 -60
J3 -17 r3 -60
F4 (excavation Method)
ng or mechanical 0 Presplitting 10 Blasting or mechanical
al Slope 15 Smooth Blasting 8 Natural Slope

SMR
Average Rating
0.150

Average Rating
1.00
47.00

Average Rating
-33.33

ng or mechanical 0
al Slope 15
SMR

44.35

0
15
Slope Mass Rating SMR 6 Chainage K0+150

Parmeters Amount For Plane Failure


dip direction of Slope 262 F1=|αj-αs|
Dip amount of slope 58 F1 for each joints Rating
Dip direction of J1 12 J1 250 r1 0.15
Dip amount of J1 31 J2 97 r2 0.15
Dip direction of J2 165 J3 7 r3 0.85
Dip amount of J2 58 F2=βj
Dip direction of J3 255 F2 for each joints Rating
Dip amount of J3 60 J1 31 r1 0.70
Geological Strength Index (GSI) 46 J2 58 r2 1
RMRb 41 J3 60 r3 1
F3=βj- βs
F3 for each joints Rating
Trend J1 -27 r1 -60
J1*J2 82 J2 0 r2 -25
J1*J3 329 J3 2 r3 -6
J2*J3 208 F4 (excavation Method)
Plunge Presplitting 10 Blasting or mechanical
J1*J2 11 Smooth Blasting 8 Natural Slope
J1*J3 24
J2*J3 50

For Toppling Failure


F1=|αj-αs-180|
F1 for each joints Rating
J1 430 r1 0.15
J2 277 r2 0.15
J3 187 r3 0.15
F2=βj
F2 for each joints Rating
J1 31 r1 1
J2 58 r2 1
J3 60 r3 1
F3=βj+βs
F3 for each joints Rating
J1 89 r1 0
J2 116 r2 -6
J3 118 r3 -6
F4 (excavation Method)
Presplitting 10 Blasting or mechanical
Smooth Blasting 8 Natural Slope
For Wedge Failure
SMR F1=|αj-αs|
Average Rating F1 for each joints Rating Average Rating
0.383 J1 180 r1 0.15 0.150
J2 67 r2 0.15
J3 54 r3 0.15
F2=βj
Average Rating F2 for each joints Rating Average Rating
0.9 J1 11 r1 0.15 0.516666666667
45.535 J2 24 r2 0.40
J3 50 r3 1
F3=βj- βs
Average Rating F3 for each joints Rating Average Rating
-30.33 J1 -47 r1 -60 -56.67
J2 -34 r2 -60
J3 -8 r3 -50
F4 (excavation Method)
ng or mechanical 0 Presplitting 10 Blasting or mechanical
al Slope 15 Smooth Blasting 8 Natural Slope

SMR
Average Rating
0.150

Average Rating
1.00
55.40

Average Rating
-4.00

ng or mechanical 0
al Slope 15
SMR

51.60833

0
15
Slope Mass Rating SMR 7 Chainage K0+160

Parmeters Amount For Plane Failure


dip direction of Slope 160 F1=|αj-αs|
Dip amount of slope 58 F1 for each joints Rating
Dip direction of J1 355 J1 195 r1 0.15
Dip amount of J1 32 J2 36 r2 0.15
Dip direction of J2 124 J3 94 r3 0.15
Dip amount of J2 74 F2=βj
Dip direction of J3 254 F2 for each joints Rating
Dip amount of J3 48 J1 32 r1 0.70
Geological Strength Index (GSI) 44 J2 74 r2 1
RMRb 39 J3 48 r3 1
F3=βj- βs
F3 for each joints Rating
Trend J1 -26 r1 -60
J1*J2 41 J2 16 r2 0
J1*J3 316 J3 -10 r3 FALSE
J2*J3 202 F4 (excavation Method)
Plunge Presplitting 10 Blasting or mechanical
J1*J2 23 Smooth Blasting 8 Natural Slope
J1*J3 26
J2*J3 34

For Toppling Failure


F1=|αj-αs-180|
F1 for each joints Rating
J1 15 r1 0.70
J2 216 r2 0.15
J3 86 r3 0.15
F2=βj
F2 for each joints Rating
J1 32 r1 1
J2 74 r2 1
J3 48 r3 1
F3=βj+βs
F3 for each joints Rating
J1 90 r1 0
J2 132 r2 -25
J3 106 r3 0
F4 (excavation Method)
Presplitting 10 Blasting or mechanical
Smooth Blasting 8 Natural Slope
For Wedge Failure
SMR F1=|αj-αs|
Average Rating F1 for each joints Rating Average Rating
0.150 J1 119 r1 0.15 0.150
J2 156 r2 0.15
J3 42 r3 0.15
F2=βj
Average Rating F2 for each joints Rating Average Rating
0.9 J1 23 r1 0.40 23.6
51.3 J2 26 r2 0.40
J3 34 r3 070
F3=βj- βs
Average Rating F3 for each joints Rating Average Rating
-20.00 J1 -35 r1 -60 -60.00
J2 -32 r2 -60
J3 -24 r3 -60
F4 (excavation Method)
ng or mechanical 0 Presplitting 10 Blasting or mechanical
al Slope 15 Smooth Blasting 8 Natural Slope

SMR
Average Rating
0.333

Average Rating
1.00
51.22

Average Rating
-8.33

ng or mechanical 0
al Slope 15
SMR

-158.4

0
15
Slope Mass Rating SMR 8 Chainage K0+170

Parmeters Amount For Plane Failure


dip direction of Slope 232 F1=|αj-αs|
Dip amount of slope 68 F1 for each joints Rating
Dip direction of J1 340 J1 108 r1 0.15
Dip amount of J1 25 J2 72 r2 0.15
Dip direction of J2 160 J3 11 r3 0.70
Dip amount of J2 54 F2=βj
Dip direction of J3 243 F2 for each joints Rating
Dip amount of J3 52 J1 25 r1 0.40
Geological Strength Index (GSI) 40 J2 54 r2 1
RMRb 35 J3 52 r3 1
F3=βj- βs
F3 for each joints Rating
Trend J1 -43 r1 -60
J1*J2 249 J2 -14 r2 -60
J1*J3 313 J3 -16 r3 -60
J2*J3 202 F4 (excavation Method)
Plunge Presplitting 10 Blasting or mechanical
J1*J2 1 Smooth Blasting 8 Natural Slope
J1*J3 23
J2*J3 44

For Toppling Failure


F1=|αj-αs-180|
F1 for each joints Rating
J1 72 r1 0.15
J2 252 r2 0.15
J3 169 r3 0.15
F2=βj
F2 for each joints Rating
J1 25 r1 1
J2 54 r2 1
J3 52 r3 1
F3=βj+βs
F3 for each joints Rating
J1 93 r1 0
J2 122 r2 -25
J3 120 r3 -6
F4 (excavation Method)
Presplitting 10 Blasting or mechanical
Smooth Blasting 8 Natural Slope
For Wedge Failure
SMR F1=|αj-αs|
Average Rating F1 for each joints Rating Average Rating
0.333 J1 17 r1 0.70 0.417
J2 81 r2 0.15
J3 30 r3 0.40
F2=βj
Average Rating F2 for each joints Rating Average Rating
0.8 J1 1 r1 0.15 0.466666666667
34 J2 23 r2 0.40
J3 44 r3 0.85
F3=βj- βs
Average Rating F3 for each joints Rating Average Rating
-60.00 J1 -67 r1 -60 -60.00
J2 -45 r2 -60
J3 -24 r3 -60
F4 (excavation Method)
ng or mechanical 0 Presplitting 10 Blasting or mechanical
al Slope 15 Smooth Blasting 8 Natural Slope

SMR
Average Rating
0.150

Average Rating
1.00
48.45

Average Rating
-10.33

ng or mechanical 0
al Slope 15
SMR

38.33333

0
15
Slope Mass Rating SMR 9 Chainage K0+180

Parmeters Amount For Plane Failure


dip direction of Slope 265 F1=|αj-αs|
Dip amount of slope 63 F1 for each joints Rating
Dip direction of J1 12 J1 253 r1 0.15
Dip amount of J1 39 J2 120 r2 0.15
Dip direction of J2 145 J3 23 r3 0.40
Dip amount of J2 47 F2=βj
Dip direction of J3 242 F2 for each joints Rating
Dip amount of J3 62 J1 39 r1 0.85
Geological Strength Index (GSI) 42 J2 47 r2 1
RMRb 37 J3 62 r3 1
F3=βj- βs
F3 for each joints Rating
Trend J1 -24 r1 -60
J1*J2 80 J2 -16 r2 -60
J1*J3 317 J3 -1 r3 -50
J2*J3 182 F4 (excavation Method)
Plunge Presplitting 10 Blasting or mechanical
J1*J2 16 Smooth Blasting 8 Natural Slope
J1*J3 25
J2*J3 42

For Toppling Failure


F1=|αj-αs-180|
F1 for each joints Rating
J1 433 r1 0.15
J2 300 r2 0.15
J3 203 r3 0.15
F2=βj
F2 for each joints Rating
J1 39 r1 1
J2 47 r2 1
J3 62 r3 1
F3=βj+βs
F3 for each joints Rating
J1 102 r1 0
J2 110 r2 -50
J3 125 r3 -25
F4 (excavation Method)
Presplitting 10 Blasting or mechanical
Smooth Blasting 8 Natural Slope
For Wedge Failure
SMR F1=|αj-αs|
Average Rating F1 for each joints Rating Average Rating
0.233 J1 185 r1 0.15 0.150
J2 52 r2 0.15
J3 83 r3 0.15
F2=βj
Average Rating F2 for each joints Rating Average Rating
0.95 J1 16 r1 0.15 0.466666666667
39.4388889 J2 25 r2 0.40
J3 42 r3 0.85
F3=βj- βs
Average Rating F3 for each joints Rating Average Rating
-56.67 J1 -47 r1 -60 -60.00
J2 -38 r2 -60
J3 -21 r3 -60
F4 (excavation Method)
ng or mechanical 0 Presplitting 10 Blasting or mechanical
al Slope 15 Smooth Blasting 8 Natural Slope

SMR
Average Rating
0.150

Average Rating
1.00
48.25

Average Rating
-25.00

ng or mechanical 0
al Slope 15
SMR

47.8

0
15
Slope Mass Rating SMR 10 Chainage K0+190

Parmeters Amount For Plane Failure


dip direction of Slope 230 F1=|αj-αs|
Dip amount of slope 63 F1 for each joints Rating
Dip direction of J1 16 J1 214 r1 0.15
Dip amount of J1 36 J2 85 r2 0.15
Dip direction of J2 145 J3 8 r3 0.85
Dip amount of J2 64 F2=βj
Dip direction of J3 238 F2 for each joints Rating
Dip amount of J3 74 J1 36 r1 0.85
Geological Strength Index (GSI) 41 J2 64 r2 1
RMRb 36 J3 74 r3 1
F3=βj- βs
F3 for each joints Rating
Trend J1 -27 r1 -60
J1*J2 68 J2 1 r2 -6
J1*J3 320 J3 11 r3 0
J2*J3 177 F4 (excavation Method)
Plunge Presplitting 10 Blasting or mechanical
J1*J2 24 Smooth Blasting 8 Natural Slope
J1*J3 22
J2*J3 59

For Toppling Failure


F1=|αj-αs-180|
F1 for each joints Rating
J1 394 r1 0.15
J2 265 r2 0.15
J3 172 r3 0.15
F2=βj
F2 for each joints Rating
J1 36 r1 1
J2 64 r2 1
J3 74 r3 1
F3=βj+βs
F3 for each joints Rating
J1 99 r1 0
J2 127 r2 -25
J3 137 r3 -25
F4 (excavation Method)
Presplitting 10 Blasting or mechanical
Smooth Blasting 8 Natural Slope
For Wedge Failure
SMR F1=|αj-αs|
Average Rating F1 for each joints Rating Average Rating
0.383 J1 162 r1 0.15 0.150
J2 90 r2 0.15
J3 53 r3 0.15
F2=βj
Average Rating F2 for each joints Rating Average Rating
0.95 J1 24 r1 0.40 0.6
42.9883333 J2 22 r2 0.40
J3 59 r3 1
F3=βj- βs
Average Rating F3 for each joints Rating Average Rating
-22.00 J1 -39 r1 -60 -56.67
J2 -41 r2 -60
J3 -4 r3 -50
F4 (excavation Method)
ng or mechanical 0 Presplitting 10 Blasting or mechanical
al Slope 15 Smooth Blasting 8 Natural Slope

SMR
Average Rating
0.150

Average Rating
1.00
48.50

Average Rating
-16.67

ng or mechanical 0
al Slope 15
SMR

45.9

0
15
Slope Mass Rating SMR 11 Chainage K0+200

Parmeters Amount For Plane Failure


dip direction of Slope 240 F1=|αj-αs|
Dip amount of slope 60 F1 for each joints Rating
Dip direction of J1 14 J1 226 r1 0.15
Dip amount of J1 26 J2 101 r2 0.15
Dip direction of J2 139 J3 7 r3 0.85
Dip amount of J2 58 F2=βj
Dip direction of J3 233 F2 for each joints Rating
Dip amount of J3 47 J1 26 r1 0.40
Geological Strength Index (GSI) 40 J2 58 r2 1
RMRb 35 J3 47 r3 1
F3=βj- βs
F3 for each joints Rating
Trend J1 -34 r1 -60
J1*J2 62 J2 -2 r2 -50
J1*J3 311 J3 -13 r3 -60
J2*J3 196 F4 (excavation Method)
Plunge Presplitting 10 Blasting or mechanical
J1*J2 18 Smooth Blasting 8 Natural Slope
J1*J3 12
J2*J3 40

For Toppling Failure


F1=|αj-αs-180|
F1 for each joints Rating
J1 406 r1 0.15
J2 281 r2 0.15
J3 187 r3 0.15
F2=βj
F2 for each joints Rating
J1 26 r1 1
J2 58 r2 1
J3 47 r3 1
F3=βj+βs
F3 for each joints Rating
J1 86 r1 0
J2 118 r2 -6
J3 107 r3 0
F4 (excavation Method)
Presplitting 10 Blasting or mechanical
Smooth Blasting 8 Natural Slope
For Wedge Failure
SMR F1=|αj-αs|
Average Rating F1 for each joints Rating Average Rating
0.383 J1 178 r1 0.15 0.150
J2 71 r2 0.15
J3 44 r3 0.15
F2=βj
Average Rating F2 for each joints Rating Average Rating
0.8 J1 18 r1 0.15 0.383333333333
32.6222222 J2 12 r2 0.15
J3 40 r3 0.85
F3=βj- βs
Average Rating F3 for each joints Rating Average Rating
-56.67 J1 -42 r1 -60 -60.00
J2 -48 r2 -60
J3 -20 r3 -60
F4 (excavation Method)
ng or mechanical 0 Presplitting 10 Blasting or mechanical
al Slope 15 Smooth Blasting 8 Natural Slope

SMR
Average Rating
0.150

Average Rating
1.00
49.70

Average Rating
-2.00

ng or mechanical 0
al Slope 15
SMR

46.55

0
15
Slope Mass Rating SMR 12 Chainage K0+220

Parmeters Amount For Plane Failure


dip direction of Slope 240 F1=|αj-αs|
Dip amount of slope 78 F1 for each joints Rating
Dip direction of J1 5 J1 235 r1 0.15
Dip amount of J1 32 J2 125 r2 0.15
Dip direction of J2 115 J3 24 r3 0.40
Dip amount of J2 50 F2=βj
Dip direction of J3 264 F2 for each joints Rating
Dip amount of J3 71 J1 32 r1 0.70
Geological Strength Index (GSI) 57 J2 50 r2 1
RMRb 52 J3 71 r3 1
F3=βj- βs
F3 for each joints Rating
Trend J1 -46 r1 -60
J1*J2 47 J2 -28 r2 -60
J1*J3 342 J3 -7 r3 -50
J2*J3 182 F4 (excavation Method)
Plunge Presplitting 10 Blasting or mechanical
J1*J2 24 Smooth Blasting 8 Natural Slope
J1*J3 30
J2*J3 24

For Toppling Failure


F1=|αj-αs-180|
F1 for each joints Rating
J1 415 r1 0.15
J2 305 r2 0.15
J3 156 r3 0.15
F2=βj
F2 for each joints Rating
J1 32 r1 1
J2 50 r2 1
J3 71 r3 1
F3=βj+βs
F3 for each joints Rating
J1 110 r1 -50
J2 128 r2 -25
J3 149 r3 -25
F4 (excavation Method)
Presplitting 10 Blasting or mechanical
Smooth Blasting 8 Natural Slope
For Wedge Failure
SMR F1=|αj-αs|
Average Rating F1 for each joints Rating Average Rating
0.233 J1 193 r1 0.15 0.150
J2 102 r2 0.15
J3 58 r3 0.15
F2=βj
Average Rating F2 for each joints Rating Average Rating
0.9 J1 24 r1 0.40 0.5
55.1 J2 30 r2 0.70
J3 24 r3 0.40
F3=βj- βs
Average Rating F3 for each joints Rating Average Rating
-56.67 J1 -54 r1 -60 -60.00
J2 -48 r2 -60
J3 -54 r3 -60
F4 (excavation Method)
ng or mechanical 0 Presplitting 10 Blasting or mechanical
al Slope 15 Smooth Blasting 8 Natural Slope

SMR
Average Rating
0.150

Average Rating
1.00
62.00

Average Rating
-33.33

ng or mechanical 0
al Slope 15
SMR

62.5

0
15
Slope Mass Rating SMR 14 Chainage K0+240

Parmeters Amount For Plane Failure


dip direction of Slope 235 F1=|αj-αs|
Dip amount of slope 64 F1 for each joints Rating
Dip direction of J1 5 J1 230 r1 0.15
Dip amount of J1 31 J2 120 r2 0.15
Dip direction of J2 115 J3 3 r3 1
Dip amount of J2 50 F2=βj
Dip direction of J3 238 F2 for each joints Rating
Dip amount of J3 78 J1 31 r1 0.70
Geological Strength Index (GSI) 48 J2 50 r2 1
RMRb 43 J3 78 r3 1
F3=βj- βs
F3 for each joints Rating
Trend J1 -33 r1 -60
J1*J2 47 J2 -14 r2 -60
J1*J3 322 J3 14 r3 0
J2*J3 158 F4 (excavation Method)
Plunge Presplitting 10 Blasting or mechanical
J1*J2 24 Smooth Blasting 8 Natural Slope
J1*J3 24
J2*J3 40

For Toppling Failure


F1=|αj-αs-180|
F1 for each joints Rating
J1 410 r1 0.15
J2 300 r2 0.15
J3 177 r3 0.15
F2=βj
F2 for each joints Rating
J1 31 r1 1
J2 50 r2 1
J3 78 r3 1
F3=βj+βs
F3 for each joints Rating
J1 95 r1 0
J2 114 r2 -6
J3 142 r3 -25
F4 (excavation Method)
Presplitting 10 Blasting or mechanical
Smooth Blasting 8 Natural Slope
For Wedge Failure
SMR F1=|αj-αs|
Average Rating F1 for each joints Rating Average Rating
0.433 J1 188 r1 0.15 0.150
J2 87 r2 0.15
J3 77 r3 0.15
F2=βj
Average Rating F2 for each joints Rating Average Rating
0.9 J1 24 r1 0.40 0.55
42.4 J2 24 r2 0.40
J3 40 r3 0.85
F3=βj- βs
Average Rating F3 for each joints Rating Average Rating
-40.00 J1 -40 r1 -60 -60.00
J2 -40 r2 -60
J3 -24 r3 -60
F4 (excavation Method)
ng or mechanical 0 Presplitting 10 Blasting or mechanical
al Slope 15 Smooth Blasting 8 Natural Slope

SMR
Average Rating
0.150

Average Rating
1.00
56.45

Average Rating
-10.33

ng or mechanical 0
al Slope 15
SMR

53.05

0
15
Slope Mass Rating SMR 15 Chainage K0+250

Parmeters Amount For Plane Failure


dip direction of Slope 225 F1=|αj-αs|
Dip amount of slope 62 F1 for each joints Rating
Dip direction of J1 5 J1 220 r1 0.15
Dip amount of J1 32 J2 85 r2 0.15
Dip direction of J2 140 J3 15 r3 0.70
Dip amount of J2 58 F2=βj
Dip direction of J3 240 F2 for each joints Rating
Dip amount of J3 60 J1 32 r1 0.70
Geological Strength Index (GSI) 53 J2 58 r2 1
RMRb 48 J3 60 r3 1
F3=βj- βs
F3 for each joints Rating
Trend J1 -30 r1 -60
J1*J2 62 J2 -4 r2 -50
J1*J3 322 J3 -2 r3 -50
J2*J3 192 F4 (excavation Method)
Plunge Presplitting 10 Blasting or mechanical
J1*J2 18 Smooth Blasting 8 Natural Slope
J1*J3 24
J2*J3 44

For Toppling Failure


F1=|αj-αs-180|
F1 for each joints Rating
J1 400 r1 0.15
J2 265 r2 0.15
J3 165 r3 0.15
F2=βj
F2 for each joints Rating
J1 32 r1 1
J2 58 r2 1
J3 60 r3 1
F3=βj+βs
F3 for each joints Rating
J1 94 r1 0
J2 120 r2 -6
J3 122 r3 -25
F4 (excavation Method)
Presplitting 10 Blasting or mechanical
Smooth Blasting 8 Natural Slope
For Wedge Failure
SMR F1=|αj-αs|
Average Rating F1 for each joints Rating Average Rating
0.333 J1 163 r1 0.15 0.150
J2 97 r2 0.15
J3 33 r3 0.15
F2=βj
Average Rating F2 for each joints Rating Average Rating
0.9 J1 18 r1 0.15 0.466666666667
47 J2 24 r2 0.40
J3 44 r3 0.85
F3=βj- βs
Average Rating F3 for each joints Rating Average Rating
-53.33 J1 -44 r1 -60 -60.00
J2 -38 r2 -60
J3 -18 r3 -60
F4 (excavation Method)
ng or mechanical 0 Presplitting 10 Blasting or mechanical
al Slope 15 Smooth Blasting 8 Natural Slope

SMR
Average Rating
0.150

Average Rating
1.00
61.45

Average Rating
-10.33

ng or mechanical 0
al Slope 15
SMR

58.8

0
15
Slope Mass Rating SMR 16 Chainage K0+260

Parmeters Amount For Plane Failure


dip direction of Slope 235 F1=|αj-αs|
Dip amount of slope 54 F1 for each joints Rating
Dip direction of J1 12 J1 223 r1 0.15
Dip amount of J1 26 J2 120 r2 0.15
Dip direction of J2 115 J3 10 r3 0.70
Dip amount of J2 61 F2=βj
Dip direction of J3 225 F2 for each joints Rating
Dip amount of J3 69 J1 26 r1 0.40
Geological Strength Index (GSI) 54 J2 61 r2 1
RMRb 49 J3 69 r3 1
F3=βj- βs
F3 for each joints Rating
Trend J1 -28 r1 -60
J1*J2 3 J2 7 r2 -6
J1*J3 310 J3 15 r3 0
J2*J3 163 F4 (excavation Method)
Plunge Presplitting 10 Blasting or mechanical
J1*J2 23 Smooth Blasting 8 Natural Slope
J1*J3 13
J2*J3 50

For Toppling Failure


F1=|αj-αs-180|
F1 for each joints Rating
J1 403 r1 0.15
J2 300 r2 0.15
J3 190 r3 0.15
F2=βj
F2 for each joints Rating
J1 26 r1 1
J2 61 r2 1
J3 69 r3 1
F3=βj+βs
F3 for each joints Rating
J1 80 r1 0
J2 115 r2 -6
J3 123 r3 -25
F4 (excavation Method)
Presplitting 10 Blasting or mechanical
Smooth Blasting 8 Natural Slope
For Wedge Failure
SMR F1=|αj-αs|
Average Rating F1 for each joints Rating Average Rating
0.333 J1 232 r1 0.15 0.150
J2 75 r2 0.15
J3 72 r3 0.15
F2=βj
Average Rating F2 for each joints Rating Average Rating
0.8 J1 23 r1 0.40 0.516666666667
58.1333333 J2 13 r2 0.15
J3 50 r3 1
F3=βj- βs
Average Rating F3 for each joints Rating Average Rating
-22.00 J1 -31 r1 -60 -56.67
J2 -41 r2 -60
J3 -4 r3 -50
F4 (excavation Method)
ng or mechanical 0 Presplitting 10 Blasting or mechanical
al Slope 15 Smooth Blasting 8 Natural Slope

SMR
Average Rating
0.150

Average Rating
1.00
62.45

Average Rating
-10.33

ng or mechanical 0
al Slope 15
SMR

59.60833

0
15
Slope Mass Rating SMR 17 Chainage K0+270

Parmeters Amount For Plane Failure


dip direction of Slope 252 F1=|αj-αs|
Dip amount of slope 65 F1 for each joints Rating
Dip direction of J1 24 J1 228 r1 0.15
Dip amount of J1 30 J2 104 r2 0.15
Dip direction of J2 148 J3 8 r3 0.85
Dip amount of J2 84 F2=βj
Dip direction of J3 244 F2 for each joints Rating
Dip amount of J3 53 J1 30 r1 0.70
Geological Strength Index (GSI) 55 J2 84 r2 1
RMRb 50 J3 53 r3 1
F3=βj- βs
F3 for each joints Rating
Trend J1 -35 r1 -60
J1*J2 60 J2 19 r2 0
J1*J3 324 J3 -12 r3 -60
J2*J3 228 F4 (excavation Method)
Plunge Presplitting 10 Blasting or mechanical
J1*J2 25 Smooth Blasting 8 Natural Slope
J1*J3 15
J2*J3 57

For Toppling Failure


F1=|αj-αs-180|
F1 for each joints Rating
J1 408 r1 0.15
J2 284 r2 0.15
J3 188 r3 0.15
F2=βj
F2 for each joints Rating
J1 30 r1 1
J2 84 r2 1
J3 53 r3 1
F3=βj+βs
F3 for each joints Rating
J1 95 r1 0
J2 149 r2 -25
J3 118 r3 -6
F4 (excavation Method)
Presplitting 10 Blasting or mechanical
Smooth Blasting 8 Natural Slope
For Wedge Failure
SMR F1=|αj-αs|
Average Rating F1 for each joints Rating Average Rating
0.383 J1 192 r1 0.15 0.233
J2 72 r2 0.15
J3 24 r3 0.40
F2=βj
Average Rating F2 for each joints Rating Average Rating
0.9 J1 25 r1 0.40 0.516666666667
51.2 J2 15 r2 0.15
J3 57 r3 1
F3=βj- βs
Average Rating F3 for each joints Rating Average Rating
-40.00 J1 -40 r1 -60 -56.67
J2 -50 r2 -60
J3 -8 r3 -50
F4 (excavation Method)
ng or mechanical 0 Presplitting 10 Blasting or mechanical
al Slope 15 Smooth Blasting 8 Natural Slope

SMR
Average Rating
0.150

Average Rating
1.00
63.45

Average Rating
-10.33

ng or mechanical 0
al Slope 15
SMR

58.16852

0
15
Slope Mass Rating SMR 18 Chainage K0+280

Parmeters Amount For Plane Failure


dip direction of Slope 255 F1=|αj-αs|
Dip amount of slope 55 F1 for each joints Rating
Dip direction of J1 12 J1 243 r1 0.15
Dip amount of J1 32 J2 105 r2 0.15
Dip direction of J2 150 J3 20 r3 0.40
Dip amount of J2 82 F2=βj
Dip direction of J3 235 F2 for each joints Rating
Dip amount of J3 65 J1 32 r1 0.70
Geological Strength Index (GSI) 52 J2 82 r2 1
RMRb 47 J3 65 r3 1
F3=βj- βs
F3 for each joints Rating
Trend J1 -23 r1 -60
J1*J2 63 J2 27 r2 0
J1*J3 316 J3 10 r3 -6
J2*J3 223 F4 (excavation Method)
Plunge Presplitting 10 Blasting or mechanical
J1*J2 21 Smooth Blasting 8 Natural Slope
J1*J3 19
J2*J3 63

For Toppling Failure


F1=|αj-αs-180|
F1 for each joints Rating
J1 423 r1 0.15
J2 285 r2 0.15
J3 200 r3 0.15
F2=βj
F2 for each joints Rating
J1 32 r1 1
J2 82 r2 1
J3 65 r3 1
F3=βj+βs
F3 for each joints Rating
J1 87 r1 0
J2 137 r2 -25
J3 120 r3 -6
F4 (excavation Method)
Presplitting 10 Blasting or mechanical
Smooth Blasting 8 Natural Slope
For Wedge Failure
SMR F1=|αj-αs|
Average Rating F1 for each joints Rating Average Rating
0.233 J1 192 r1 0.15 0.150
J2 61 r2 0.15
J3 32 r3 0.15
F2=βj
Average Rating F2 for each joints Rating Average Rating
0.9 J1 21 r1 0.40 0.516666666667
57.38 J2 19 r2 0.15
J3 63 r3 1
F3=βj- βs
Average Rating F3 for each joints Rating Average Rating
-22.00 J1 -34 r1 -60 -42.00
J2 -36 r2 -60
J3 8 r3 -6
F4 (excavation Method)
ng or mechanical 0 Presplitting 10 Blasting or mechanical
al Slope 15 Smooth Blasting 8 Natural Slope

SMR
Average Rating
0.150

Average Rating
1.00
60.45

Average Rating
-10.33

ng or mechanical 0
al Slope 15
SMR

58.745

0
15
Slope Mass Rating SMR 19 Chainage K0+290

Parmeters Amount For Plane Failure


dip direction of Slope 260 F1=|αj-αs|
Dip amount of slope 62 F1 for each joints Rating
Dip direction of J1 15 J1 245 r1 0.15
Dip amount of J1 45 J2 110 r2 0.15
Dip direction of J2 150 J3 20 r3 0.40
Dip amount of J2 82 F2=βj
Dip direction of J3 240 F2 for each joints Rating
Dip amount of J3 68 J1 45 r1 0.85
Geological Strength Index (GSI) 53 J2 82 r2 1
RMRb 48 J3 68 r3 1
F3=βj- βs
F3 for each joints Rating
Trend J1 -17 r1 -60
J1*J2 62 J2 20 r2 0
J1*J3 323 J3 6 r3 -6
J2*J3 220 F4 (excavation Method)
Plunge Presplitting 10 Blasting or mechanical
J1*J2 18 Smooth Blasting 8 Natural Slope
J1*J3 15
J2*J3 66

For Toppling Failure


F1=|αj-αs-180|
F1 for each joints Rating
J1 425 r1 0.15
J2 290 r2 0.15
J3 200 r3 0.15
F2=βj
F2 for each joints Rating
J1 45 r1 1
J2 82 r2 1
J3 68 r3 1
F3=βj+βs
F3 for each joints Rating
J1 107 r1 0
J2 144 r2 -25
J3 130 r3 -25
F4 (excavation Method)
Presplitting 10 Blasting or mechanical
Smooth Blasting 8 Natural Slope
For Wedge Failure
SMR F1=|αj-αs|
Average Rating F1 for each joints Rating Average Rating
0.233 J1 198 r1 0.15 0.150
J2 63 r2 0.15
J3 40 r3 0.15
F2=βj
Average Rating F2 for each joints Rating Average Rating
0.95 J1 18 r1 0.15 0.433333333333
58.1233333 J2 15 r2 0.15
J3 66 r3 1
F3=βj- βs
Average Rating F3 for each joints Rating Average Rating
-22.00 J1 -44 r1 -60 -42.00
J2 -47 r2 -60
J3 4 r3 -6
F4 (excavation Method)
ng or mechanical 0 Presplitting 10 Blasting or mechanical
al Slope 15 Smooth Blasting 8 Natural Slope

SMR
Average Rating
0.150

Average Rating
1.00
60.50

Average Rating
-16.67

ng or mechanical 0
al Slope 15
SMR

60.27

0
15
Slope Mass Rating SMR 20 Chainage K0+300

Parmeters Amount For Plane Failure


dip direction of Slope 270 F1=|αj-αs|
Dip amount of slope 62 F1 for each joints Rating
Dip direction of J1 30 J1 240 r1 0.15
Dip amount of J1 29 J2 128 r2 0.15
Dip direction of J2 142 J3 37 r3 0.15
Dip amount of J2 77 F2=βj
Dip direction of J3 233 F2 for each joints Rating
Dip amount of J3 66 J1 29 r1 0.40
Geological Strength Index (GSI) 49 J2 77 r2 1
RMRb 44 J3 66 r3 1
F3=βj- βs
F3 for each joints Rating
Trend J1 -33 r1 -60
J1*J2 59 J2 15 r2 0
J1*J3 318 J3 4 r3 -6
J2*J3 203 F4 (excavation Method)
Plunge Presplitting 10 Blasting or mechanical
J1*J2 29 Smooth Blasting 8 Natural Slope
J1*J3 9
J2*J3 62

For Toppling Failure


F1=|αj-αs-180|
F1 for each joints Rating
J1 420 r1 0.15
J2 308 r2 0.15
J3 217 r3 0.15
F2=βj
F2 for each joints Rating
J1 29 r1 1
J2 77 r2 1
J3 66 r3 1
F3=βj+βs
F3 for each joints Rating
J1 91 r1 0
J2 139 r2 -25
J3 128 r3 -25
F4 (excavation Method)
Presplitting 10 Blasting or mechanical
Smooth Blasting 8 Natural Slope
For Wedge Failure
SMR F1=|αj-αs|
Average Rating F1 for each joints Rating Average Rating
0.150 J1 211 r1 0.15 0.150
J2 48 r2 0.15
J3 67 r3 0.15
F2=βj
Average Rating F2 for each joints Rating Average Rating
0.8 J1 29 r1 0.40 0.516666666667
56.36 J2 9 r2 0.15
J3 62 r3 1
F3=βj- βs
Average Rating F3 for each joints Rating Average Rating
-22.00 J1 -33 r1 -60 -48.33
J2 -53 r2 -60
J3 0 r3 -25
F4 (excavation Method)
ng or mechanical 0 Presplitting 10 Blasting or mechanical
al Slope 15 Smooth Blasting 8 Natural Slope

SMR
Average Rating
0.150

Average Rating
1.00
56.50

Average Rating
-16.67

ng or mechanical 0
al Slope 15
SMR

55.25417

0
15
Slope Mass Rating SMR 21 Chainage K0+310

Parmeters Amount For Plane Failure


dip direction of Slope 260 F1=|αj-αs|
Dip amount of slope 66 F1 for each joints Rating
Dip direction of J1 20 J1 240 r1 0.15
Dip amount of J1 32 J2 98 r2 0.15
Dip direction of J2 162 J3 8 r3 0.85
Dip amount of J2 73 F2=βj
Dip direction of J3 252 F2 for each joints Rating
Dip amount of J3 68 J1 32 r1 0.70
Geological Strength Index (GSI) 49 J2 73 r2 1
RMRb 44 J3 68 r3 1
F3=βj- βs
F3 for each joints Rating
Trend J1 -34 r1 -60
J1*J2 78 J2 7 r2 -6
J1*J3 333 J3 2 r3 -6
J2*J3 214 F4 (excavation Method)
Plunge Presplitting 10 Blasting or mechanical
J1*J2 18 Smooth Blasting 8 Natural Slope
J1*J3 23
J2*J3 62

For Toppling Failure


F1=|αj-αs-180|
F1 for each joints Rating
J1 420 r1 0.15
J2 278 r2 0.15
J3 188 r3 0.15
F2=βj
F2 for each joints Rating
J1 32 r1 1
J2 73 r2 1
J3 68 r3 1
F3=βj+βs
F3 for each joints Rating
J1 98 r1 0
J2 139 r2 -25
J3 134 r3 -25
F4 (excavation Method)
Presplitting 10 Blasting or mechanical
Smooth Blasting 8 Natural Slope
For Wedge Failure
SMR F1=|αj-αs|
Average Rating F1 for each joints Rating Average Rating
0.383 J1 182 r1 0.15 0.150
J2 73 r2 0.15
J3 46 r3 0.15
F2=βj
Average Rating F2 for each joints Rating Average Rating
0.9 J1 18 r1 0.15 0.516666666667
50.72 J2 23 r2 0.40
J3 62 r3 1
F3=βj- βs
Average Rating F3 for each joints Rating Average Rating
-24.00 J1 -48 r1 -60 -56.67
J2 -43 r2 -60
J3 -4 r3 -50
F4 (excavation Method)
ng or mechanical 0 Presplitting 10 Blasting or mechanical
al Slope 15 Smooth Blasting 8 Natural Slope

SMR
Average Rating
0.150

Average Rating
1.00
56.50

Average Rating
-16.67

ng or mechanical 0
al Slope 15
SMR

54.60833

0
15
Slope Mass Rating SMR 22 Chainage K0+320

Parmeters Amount For Plane Failure


dip direction of Slope 250 F1=|αj-αs|
Dip amount of slope 63 F1 for each joints Rating
Dip direction of J1 15 J1 235 r1 0.15
Dip amount of J1 36 J2 96 r2 0.15
Dip direction of J2 154 J3 19 r3 0.70
Dip amount of J2 79 F2=βj
Dip direction of J3 231 F2 for each joints Rating
Dip amount of J3 75 J1 36 r1 0.85
Geological Strength Index (GSI) 39 J2 79 r2 1
RMRb 34 J3 75 r3 1
F3=βj- βs
F3 for each joints Rating
Trend J1 -27 r1 -60
J1*J2 69 J2 16 r2 0
J1*J3 315 J3 12 r3 0
J2*J3 205 F4 (excavation Method)
Plunge Presplitting 10 Blasting or mechanical
J1*J2 22 Smooth Blasting 8 Natural Slope
J1*J3 20
J2*J3 72

For Toppling Failure


F1=|αj-αs-180|
F1 for each joints Rating
J1 415 r1 0.15
J2 276 r2 0.15
J3 199 r3 0.15
F2=βj
F2 for each joints Rating
J1 36 r1 1
J2 79 r2 1
J3 75 r3 1
F3=βj+βs
F3 for each joints Rating
J1 99 r1 0
J2 142 r2 -25
J3 138 r3 -25
F4 (excavation Method)
Presplitting 10 Blasting or mechanical
Smooth Blasting 8 Natural Slope
For Wedge Failure
SMR F1=|αj-αs|
Average Rating F1 for each joints Rating Average Rating
0.333 J1 181 r1 0.15 0.150
J2 65 r2 0.15
J3 45 r3 0.15
F2=βj
Average Rating F2 for each joints Rating Average Rating
0.95 J1 22 r1 0.40 0.6
42.6666667 J2 20 r2 0.40
J3 72 r3 1
F3=βj- βs
Average Rating F3 for each joints Rating Average Rating
-20.00 J1 -41 r1 -60 -42.00
J2 -43 r2 -60
J3 9 r3 -6
F4 (excavation Method)
ng or mechanical 0 Presplitting 10 Blasting or mechanical
al Slope 15 Smooth Blasting 8 Natural Slope

SMR
Average Rating
0.150

Average Rating
1.00
46.50

Average Rating
-16.67

ng or mechanical 0
al Slope 15
SMR

45.22

0
15
Slope Mass Rating SMR 23 Chainage K0+330

Parmeters Amount For Plane Failure


dip direction of Slope 242 F1=|αj-αs|
Dip amount of slope 62 F1 for each joints Rating
Dip direction of J1 14 J1 228 r1 0.15
Dip amount of J1 35 J2 92 r2 0.15
Dip direction of J2 150 J3 14 r3 0.70
Dip amount of J2 76 F2=βj
Dip direction of J3 228 F2 for each joints Rating
Dip amount of J3 72 J1 35 r1 0.85
Geological Strength Index (GSI) 50 J2 76 r2 1
RMRb 45 J3 72 r3 1
F3=βj- βs
F3 for each joints Rating
Trend J1 -27 r1 -60
J1*J2 66 J2 14 r2 0
J1*J3 311 J3 10 r3 -6
J2*J3 196 F4 (excavation Method)
Plunge Presplitting 10 Blasting or mechanical
J1*J2 24 Smooth Blasting 8 Natural Slope
J1*J3 18
J2*J3 69

For Toppling Failure


F1=|αj-αs-180|
F1 for each joints Rating
J1 408 r1 0.15
J2 272 r2 0.15
J3 194 r3 0.15
F2=βj
F2 for each joints Rating
J1 35 r1 1
J2 76 r2 1
J3 72 r3 1
F3=βj+βs
F3 for each joints Rating
J1 97 r1 0
J2 138 r2 -25
J3 134 r3 -25
F4 (excavation Method)
Presplitting 10 Blasting or mechanical
Smooth Blasting 8 Natural Slope
For Wedge Failure
SMR F1=|αj-αs|
Average Rating F1 for each joints Rating Average Rating
0.333 J1 176 r1 0.15 0.150
J2 69 r2 0.15
J3 46 r3 0.15
F2=βj
Average Rating F2 for each joints Rating Average Rating
0.95 J1 24 r1 0.40 0.516666666667
53.0333333 J2 18 r2 0.15
J3 69 r3 1
F3=βj- βs
Average Rating F3 for each joints Rating Average Rating
-22.00 J1 -38 r1 -60 -42.00
J2 -44 r2 -60
J3 7 r3 -6
F4 (excavation Method)
ng or mechanical 0 Presplitting 10 Blasting or mechanical
al Slope 15 Smooth Blasting 8 Natural Slope

SMR
Average Rating
0.150

Average Rating
1.00
57.50

Average Rating
-16.67

ng or mechanical 0
al Slope 15
SMR

56.745

0
15
Slope Mass Rating SMR 24 Chainage K0+340

Parmeters Amount For Plane Failure


dip direction of Slope 220 F1=|αj-αs|
Dip amount of slope 78 F1 for each joints Rating
Dip direction of J1 20 J1 200 r1 0.15
Dip amount of J1 32 J2 75 r2 0.15
Dip direction of J2 145 J3 0 r3 1
Dip amount of J2 82 F2=βj
Dip direction of J3 220 F2 for each joints Rating
Dip amount of J3 70 J1 32 r1 0.70
Geological Strength Index (GSI) 40 J2 82 r2 1
RMRb 35 J3 70 r3 1
F3=βj- βs
F3 for each joints Rating
Trend J1 -46 r1 -60
J1*J2 59 J2 4 r2 -6
J1*J3 306 J3 -8 r3 -50
J2*J3 212 F4 (excavation Method)
Plunge Presplitting 10 Blasting or mechanical
J1*J2 26 Smooth Blasting 8 Natural Slope
J1*J3 10
J2*J3 68

For Toppling Failure


F1=|αj-αs-180|
F1 for each joints Rating
J1 380 r1 0.15
J2 255 r2 0.15
J3 180 r3 0.15
F2=βj
F2 for each joints Rating
J1 32 r1 1
J2 82 r2 1
J3 70 r3 1
F3=βj+βs
F3 for each joints Rating
J1 110 r1 -50
J2 160 r2 -25
J3 148 r3 -25
F4 (excavation Method)
Presplitting 10 Blasting or mechanical
Smooth Blasting 8 Natural Slope
For Wedge Failure
SMR F1=|αj-αs|
Average Rating F1 for each joints Rating Average Rating
0.433 J1 161 r1 0.15 0.383
J2 86 r2 0.15
J3 8 r3 0.85
F2=βj
Average Rating F2 for each joints Rating Average Rating
0.9 J1 26 r1 0.40 0.516666666667
34.92 J2 10 r2 0.15
J3 68 r3 1
F3=βj- βs
Average Rating F3 for each joints Rating Average Rating
-38.67 J1 -52 r1 -60 -40.00
J2 -68 r2 -60
J3 -10 r3 FALSE
F4 (excavation Method)
ng or mechanical 0 Presplitting 10 Blasting or mechanical
al Slope 15 Smooth Blasting 8 Natural Slope

SMR
Average Rating
0.150

Average Rating
1.00
45.00

Average Rating
-33.33

ng or mechanical 0
al Slope 15
SMR

42.07778

0
15
Slope Mass Rating SMR 25 Chainage K0+350

Parmeters Amount For Plane Failure


dip direction of Slope 240 F1=|αj-αs|
Dip amount of slope 55 F1 for each joints Rating
Dip direction of J1 25 J1 215 r1 0.15
Dip amount of J1 40 J2 120 r2 0.15
Dip direction of J2 120 J3 5 r3 0.85
Dip amount of J2 72 F2=βj
Dip direction of J3 235 F2 for each joints Rating
Dip amount of J3 49 J1 40 r1 0.85
Geological Strength Index (GSI) 38 J2 72 r2 1
RMRb 33 J3 49 r3 1
F3=βj- βs
F3 for each joints Rating
Trend 45 J1 -15 r1 -60
J1*J2 311 J2 17 r2 0
J1*J3 193 J3 -6 r3 -50
J2*J3 F4 (excavation Method)
Plunge 38 Presplitting 10 Blasting or mechanical
J1*J2 14 Smooth Blasting 8 Natural Slope
J1*J3 42
J2*J3

For Toppling Failure


F1=|αj-αs-180|
F1 for each joints Rating
J1 395 r1 0.15
J2 300 r2 0.15
J3 185 r3 0.15
F2=βj
F2 for each joints Rating
J1 40 r1 1
J2 72 r2 1
J3 49 r3 1
F3=βj+βs
F3 for each joints Rating
J1 95 r1 0
J2 127 r2 -25
J3 104 r3 0
F4 (excavation Method)
Presplitting 10 Blasting or mechanical
Smooth Blasting 8 Natural Slope
For Wedge Failure
SMR F1=|αj-αs|
Average Rating F1 for each joints Rating Average Rating
0.383 J1 71 r1 0.15 0.150
J2 47 r2 0.15
J3 240 r3 0.15
F2=βj
Average Rating F2 for each joints Rating Average Rating
0.95 J1 14 r1 0.15 0.383333333333
34.6472222 J2 42 r2 0.85
J3 0 r3 0.15
F3=βj- βs
Average Rating F3 for each joints Rating Average Rating
-36.67 J1 -41 r1 -60 -60.00
J2 -13 r2 -60
J3 -55 r3 -60
F4 (excavation Method)
ng or mechanical 0 Presplitting 10 Blasting or mechanical
al Slope 15 Smooth Blasting 8 Natural Slope

SMR
Average Rating
0.150

Average Rating
1.00
46.75

Average Rating
-8.33

ng or mechanical 0
al Slope 15
SMR

44.55

0
15
Slope Mass Rating SMR 26 Chainage K0+360

Parmeters Amount For Plane Failure


dip direction of Slope 215 F1=|αj-αs|
Dip amount of slope 59 F1 for each joints Rating
Dip direction of J1 15 J1 200 r1 0.15
Dip amount of J1 36 J2 82 r2 0.15
Dip direction of J2 133 J3 1 r3 1
Dip amount of J2 67 F2=βj
Dip direction of J3 216 F2 for each joints Rating
Dip amount of J3 72 J1 36 r1 0.85
Geological Strength Index (GSI) 47 J2 67 r2 1
RMRb 42 J3 72 r3 1
F3=βj- βs
F3 for each joints Rating
Trend 55 J1 -23 r1 -60
J1*J2 301 J2 8 r2 -6
J1*J3 165 J3 13 r3 0
J2*J3 F4 (excavation Method)
Plunge 28 Presplitting 10 Blasting or mechanical
J1*J2 12 Smooth Blasting 8 Natural Slope
J1*J3 63
J2*J3

For Toppling Failure


F1=|αj-αs-180|
F1 for each joints Rating
J1 380 r1 0.15
J2 262 r2 0.15
J3 179 r3 0.15
F2=βj
F2 for each joints Rating
J1 36 r1 1
J2 67 r2 1
J3 72 r3 1
F3=βj+βs
F3 for each joints Rating
J1 95 r1 0
J2 126 r2 -25
J3 131 r3 -25
F4 (excavation Method)
Presplitting 10 Blasting or mechanical
Smooth Blasting 8 Natural Slope
For Wedge Failure
SMR F1=|αj-αs|
Average Rating F1 for each joints Rating Average Rating
0.433 J1 86 r1 0.15 0.150
J2 50 r2 0.15
J3 215 r3 0.15
F2=βj
Average Rating F2 for each joints Rating Average Rating
0.95 J1 12 r1 0.15 0.433333333333
47.9433333 J2 63 r2 1
J3 0 r3 0.15
F3=βj- βs
Average Rating F3 for each joints Rating Average Rating
-22.00 J1 -47 r1 -60 -42.00
J2 4 r2 -6
J3 -59 r3 -60
F4 (excavation Method)
ng or mechanical 0 Presplitting 10 Blasting or mechanical
al Slope 15 Smooth Blasting 8 Natural Slope

SMR
Average Rating
0.150

Average Rating
1.00
54.50

Average Rating
-16.67

ng or mechanical 0
al Slope 15
SMR

54.27

0
15
Slope Mass Rating SMR 27 Chainage K0+370

Parmeters Amount For Plane Failure


dip direction of Slope 218 F1=|αj-αs|
Dip amount of slope 68 F1 for each joints Rating
Dip direction of J1 17 J1 201 r1 0.15
Dip amount of J1 33 J2 75 r2 0.15
Dip direction of J2 143 J3 4 r3 1
Dip amount of J2 63 F2=βj
Dip direction of J3 214 F2 for each joints Rating
Dip amount of J3 67 J1 33 r1 0.70
Geological Strength Index (GSI) 47 J2 63 r2 1
RMRb 42 J3 67 r3 1
F3=βj- βs
F3 for each joints Rating
Trend J1 -35 r1 -60
J1*J2 66 J2 -5 r2 -50
J1*J3 300 J3 -1 r3 -50
J2*J3 170 F4 (excavation Method)
Plunge Presplitting 10 Blasting or mechanical
J1*J2 23 Smooth Blasting 8 Natural Slope
J1*J3 8
J2*J3 60

For Toppling Failure


F1=|αj-αs-180|
F1 for each joints Rating
J1 381 r1 0.15
J2 255 r2 0.15
J3 184 r3 0.15
F2=βj
F2 for each joints Rating
J1 33 r1 1
J2 63 r2 1
J3 67 r3 1
F3=βj+βs
F3 for each joints Rating
J1 101 r1 0
J2 131 r2 -25
J3 135 r3 -25
F4 (excavation Method)
Presplitting 10 Blasting or mechanical
Smooth Blasting 8 Natural Slope
For Wedge Failure
SMR F1=|αj-αs|
Average Rating F1 for each joints Rating Average Rating
0.433 J1 152 r1 0.15 0.150
J2 82 r2 0.15
J3 48 r3 0.15
F2=βj
Average Rating F2 for each joints Rating Average Rating
0.9 J1 23 r1 0.40 0.516666666667
36.2 J2 8 r2 0.15
J3 60 r3 1
F3=βj- βs
Average Rating F3 for each joints Rating Average Rating
-53.33 J1 -45 r1 -60 -56.67
J2 -60 r2 -60
J3 -8 r3 -50
F4 (excavation Method)
ng or mechanical 0 Presplitting 10 Blasting or mechanical
al Slope 15 Smooth Blasting 8 Natural Slope

SMR
Average Rating
0.150

Average Rating
1.00
54.50

Average Rating
-16.67

ng or mechanical 0
al Slope 15
SMR

52.60833

0
15
Slope Mass Rating SMR 28 Chainage K0+380

Parmeters Amount For Plane Failure


dip direction of Slope 212 F1=|αj-αs|
Dip amount of slope 50 F1 for each joints Rating
Dip direction of J1 6 J1 206 r1 0.15
Dip amount of J1 41 J2 73 r2 0.15
Dip direction of J2 139 J3 37 r3 0.15
Dip amount of J2 56 F2=βj
Dip direction of J3 249 F2 for each joints Rating
Dip amount of J3 70 J1 41 r1 0.85
Geological Strength Index (GSI) 39 J2 56 r2 1
RMRb 34 J3 70 r3 1
F3=βj- βs
F3 for each joints Rating
Trend J1 -9 r1 -50
J1*J2 66 J2 6 r2 -6
J1*J3 325 J3 20 r3 0
J2*J3 182 F4 (excavation Method)
Plunge Presplitting 10 Blasting or mechanical
J1*J2 23 Smooth Blasting 8 Natural Slope
J1*J3 34
J2*J3 46

For Toppling Failure


F1=|αj-αs-180|
F1 for each joints Rating
J1 386 r1 0.15
J2 253 r2 0.15
J3 143 r3 0.15
F2=βj
F2 for each joints Rating
J1 41 r1 1
J2 56 r2 1
J3 70 r3 1
F3=βj+βs
F3 for each joints Rating
J1 91 r1 0
J2 106 r2 0
J3 120 r3 -6
F4 (excavation Method)
Presplitting 10 Blasting or mechanical
Smooth Blasting 8 Natural Slope
For Wedge Failure
SMR F1=|αj-αs|
Average Rating F1 for each joints Rating Average Rating
0.150 J1 146 r1 0.15 0.233
J2 113 r2 0.15
J3 30 r3 0.40
F2=βj
Average Rating F2 for each joints Rating Average Rating
0.95 J1 23 r1 0.40 0.7
46.34 J2 34 r2 0.70
J3 46 r3 1
F3=βj- βs
Average Rating F3 for each joints Rating Average Rating
-18.67 J1 -27 r1 -60 -56.67
J2 -16 r2 -60
J3 -4 r3 -50
F4 (excavation Method)
ng or mechanical 0 Presplitting 10 Blasting or mechanical
al Slope 15 Smooth Blasting 8 Natural Slope

SMR
Average Rating
0.150

Average Rating
1.00
48.70

Average Rating
-2.00

ng or mechanical 0
al Slope 15
SMR

39.74444

0
15
Slope Mass Rating SMR 29 Chainage K0+390

Parmeters Amount For Plane Failure


dip direction of Slope 212 F1=|αj-αs|
Dip amount of slope 50 F1 for each joints Rating
Dip direction of J1 6 J1 206 r1 0.15
Dip amount of J1 36 J2 62 r2 0.15
Dip direction of J2 150 J3 14 r3 0.70
Dip amount of J2 70 F2=βj
Dip direction of J3 198 F2 for each joints Rating
Dip amount of J3 62 J1 36 r1 0.85
Geological Strength Index (GSI) 38 J2 70 r2 1
RMRb 33 J3 62 r3 1
F3=βj- βs
F3 for each joints Rating
Trend J1 -14 r1 -60
J1*J2 67 J2 20 r2 0
J1*J3 284 J3 12 r3 0
J2*J3 194 F4 (excavation Method)
Plunge Presplitting 10 Blasting or mechanical
J1*J2 19 Smooth Blasting 8 Natural Slope
J1*J3 6
J2*J3 62

For Toppling Failure


F1=|αj-αs-180|
F1 for each joints Rating
J1 386 r1 0.15
J2 242 r2 0.15
J3 194 r3 0.15
F2=βj
F2 for each joints Rating
J1 36 r1 1
J2 70 r2 1
J3 62 r3 1
F3=βj+βs
F3 for each joints Rating
J1 86 r1 0
J2 120 r2 -6
J3 112 r3 -6
F4 (excavation Method)
Presplitting 10 Blasting or mechanical
Smooth Blasting 8 Natural Slope
For Wedge Failure
SMR F1=|αj-αs|
Average Rating F1 for each joints Rating Average Rating
0.333 J1 145 r1 0.15 0.333
J2 72 r2 0.15
J3 18 r3 0.70
F2=βj
Average Rating F2 for each joints Rating Average Rating
0.95 J1 19 r1 0.15 0.433333333333
41.6666667 J2 6 r2 0.15
J3 62 r3 1
F3=βj- βs
Average Rating F3 for each joints Rating Average Rating
-20.00 J1 -31 r1 -60 -40.00
J2 -44 r2 -60
J3 12 r3 0
F4 (excavation Method)
ng or mechanical 0 Presplitting 10 Blasting or mechanical
al Slope 15 Smooth Blasting 8 Natural Slope

SMR
Average Rating
0.150

Average Rating
1.00
47.40

Average Rating
-4.00

ng or mechanical 0
al Slope 15
SMR

42.22222

0
15
Slope Mass Rating SMR 30 Chainage K0+400

Parmeters Amount For Plane Failure


dip direction of Slope 225 F1=|αj-αs|
Dip amount of slope 58 F1 for each joints Rating
Dip direction of J1 6 J1 219 r1 0.15
Dip amount of J1 36 J2 133 r2 0.15
Dip direction of J2 92 J3 5 r3 0.85
Dip amount of J2 77 F2=βj
Dip direction of J3 230 F2 for each joints Rating
Dip amount of J3 66 J1 36 r1 0.85
Geological Strength Index (GSI) 49 J2 77 r2 1
RMRb 44 J3 66 r3 1
F3=βj- βs
F3 for each joints Rating
Trend J1 -22 r1 -60
J1*J2 11 J2 19 r2 0
J1*J3 309 J3 8 r3 -6
J2*J3 168 F4 (excavation Method)
Plunge Presplitting 10 Blasting or mechanical
J1*J2 35 Smooth Blasting 8 Natural Slope
J1*J3 22
J2*J3 46

For Toppling Failure


F1=|αj-αs-180|
F1 for each joints Rating
J1 399 r1 0.15
J2 313 r2 0.15
J3 175 r3 0.15
F2=βj
F2 for each joints Rating
J1 36 r1 1
J2 77 r2 1
J3 66 r3 1
F3=βj+βs
F3 for each joints Rating
J1 94 r1 0
J2 135 r2 -25
J3 124 r3 -25
F4 (excavation Method)
Presplitting 10 Blasting or mechanical
Smooth Blasting 8 Natural Slope
For Wedge Failure
SMR F1=|αj-αs|
Average Rating F1 for each joints Rating Average Rating
0.383 J1 214 r1 0.15 0.150
J2 84 r2 0.15
J3 57 r3 0.15
F2=βj
Average Rating F2 for each joints Rating Average Rating
0.95 J1 35 r1 0.85 0.75
50.9883333 J2 22 r2 0.40
J3 46 r3 1
F3=βj- βs
Average Rating F3 for each joints Rating Average Rating
-22.00 J1 -23 r1 -60 -60.00
J2 -36 r2 -60
J3 -12 r3 -60
F4 (excavation Method)
ng or mechanical 0 Presplitting 10 Blasting or mechanical
al Slope 15 Smooth Blasting 8 Natural Slope

SMR
Average Rating
0.150

Average Rating
1.00
56.50

Average Rating
-16.67

ng or mechanical 0
al Slope 15
SMR

52.25

0
15
Slope Mass Rating SMR 31 Chainage K0+410

Parmeters Amount For Plane Failure


dip direction of Slope 205 F1=|αj-αs|
Dip amount of slope 59 F1 for each joints Rating
Dip direction of J1 25 J1 180 r1 0.15
Dip amount of J1 42 J2 62 r2 0.15
Dip direction of J2 143 J3 5 r3 0.85
Dip amount of J2 85 F2=βj
Dip direction of J3 210 F2 for each joints Rating
Dip amount of J3 63 J1 42 r1 0.85
Geological Strength Index (GSI) 50 J2 85 r2 1
RMRb 45 J3 63 r3 1
F3=βj- βs
F3 for each joints Rating
Trend J1 -17 r1 -60
J1*J2 56 J2 26 r2 0
J1*J3 298 J3 4 r3 -6
J2*J3 222 F4 (excavation Method)
Plunge Presplitting 10 Blasting or mechanical
J1*J2 37 Smooth Blasting 8 Natural Slope
J1*J3 3
J2*J3 61

For Toppling Failure


F1=|αj-αs-180|
F1 for each joints Rating
J1 360 r1 0.15
J2 242 r2 0.15
J3 175 r3 0.15
F2=βj
F2 for each joints Rating
J1 42 r1 1
J2 85 r2 1
J3 63 r3 1
F3=βj+βs
F3 for each joints Rating
J1 101 r1 0
J2 144 r2 -25
J3 122 r3 -25
F4 (excavation Method)
Presplitting 10 Blasting or mechanical
Smooth Blasting 8 Natural Slope
For Wedge Failure
SMR F1=|αj-αs|
Average Rating F1 for each joints Rating Average Rating
0.383 J1 149 r1 0.15 0.333
J2 93 r2 0.15
J3 17 r3 0.70
F2=βj
Average Rating F2 for each joints Rating Average Rating
0.95 J1 37 r1 0.85 0.666666666667
51.9883333 J2 3 r2 0.15
J3 61 r3 1
F3=βj- βs
Average Rating F3 for each joints Rating Average Rating
-22.00 J1 -22 r1 -60 -42.00
J2 -56 r2 -60
J3 2 r3 -6
F4 (excavation Method)
ng or mechanical 0 Presplitting 10 Blasting or mechanical
al Slope 15 Smooth Blasting 8 Natural Slope

SMR
Average Rating
0.150

Average Rating
1.00
57.50

Average Rating
-16.67

ng or mechanical 0
al Slope 15
SMR

50.66667

0
15
Slope Mass Rating SMR 32 Chainage K0+420

Parmeters Amount For Plane Failure


dip direction of Slope 205 F1=|αj-αs|
Dip amount of slope 59 F1 for each joints Rating
Dip direction of J1 24 J1 181 r1 0.15
Dip amount of J1 40 J2 62 r2 0.15
Dip direction of J2 143 J3 6 r3 0.85
Dip amount of J2 85 F2=βj
Dip direction of J3 211 F2 for each joints Rating
Dip amount of J3 59 J1 40 r1 0.85
Geological Strength Index (GSI) 55 J2 85 r2 1
RMRb 50 J3 59 r3 1
F3=βj- βs
F3 for each joints Rating
Trend J1 -19 r1 -60
J1*J2 56 J2 26 r2 0
J1*J3 298 J3 0 r3 -25
J2*J3 223 F4 (excavation Method)
Plunge Presplitting 10 Blasting or mechanical
J1*J2 35 Smooth Blasting 8 Natural Slope
J1*J3 4
J2*J3 58

For Toppling Failure


F1=|αj-αs-180|
F1 for each joints Rating
J1 361 r1 0.15
J2 242 r2 0.15
J3 174 r3 0.15
F2=βj
F2 for each joints Rating
J1 40 r1 1
J2 85 r2 1
J3 59 r3 1
F3=βj+βs
F3 for each joints Rating
J1 99 r1 0
J2 144 r2 -25
J3 118 r3 -6
F4 (excavation Method)
Presplitting 10 Blasting or mechanical
Smooth Blasting 8 Natural Slope
For Wedge Failure
SMR F1=|αj-αs|
Average Rating F1 for each joints Rating Average Rating
0.383 J1 149 r1 0.15 0.333
J2 93 r2 0.15
J3 18 r3 0.70
F2=βj
Average Rating F2 for each joints Rating Average Rating
0.95 J1 35 r1 0.85 0.666666666667
54.6819444 J2 4 r2 0.15
J3 58 r3 1
F3=βj- βs
Average Rating F3 for each joints Rating Average Rating
-28.33 J1 -24 r1 -60 -56.67
J2 -55 r2 -60
J3 -1 r3 -50
F4 (excavation Method)
ng or mechanical 0 Presplitting 10 Blasting or mechanical
al Slope 15 Smooth Blasting 8 Natural Slope

SMR
Average Rating
0.150

Average Rating
1.00
63.45

Average Rating
-10.33

ng or mechanical 0
al Slope 15
SMR

52.40741

0
15
Slope Mass Rating SMR 33 Chainage K0+430

Parmeters Amount For Plane Failure


dip direction of Slope 215 F1=|αj-αs|
Dip amount of slope 65 F1 for each joints Rating
Dip direction of J1 18 J1 197 r1 0.15
Dip amount of J1 38 J2 65 r2 0.15
Dip direction of J2 150 J3 3 r3 1
Dip amount of J2 72 F2=βj
Dip direction of J3 218 F2 for each joints Rating
Dip amount of J3 60 J1 38 r1 0.85
Geological Strength Index (GSI) 57 J2 72 r2 1
RMRb 52 J3 60 r3 1
F3=βj- βs
F3 for each joints Rating
Trend J1 -27 r1 -60
J1*J2 69 J2 7 r2 -6
J1*J3 302 J3 -5 r3 -50
J2*J3 203 F4 (excavation Method)
Plunge Presplitting 10 Blasting or mechanical
J1*J2 25 Smooth Blasting 8 Natural Slope
J1*J3 10
J2*J3 59

For Toppling Failure


F1=|αj-αs-180|
F1 for each joints Rating
J1 377 r1 0.15
J2 245 r2 0.15
J3 177 r3 0.15
F2=βj
F2 for each joints Rating
J1 38 r1 1
J2 72 r2 1
J3 60 r3 1
F3=βj+βs
F3 for each joints Rating
J1 103 r1 0
J2 137 r2 -25
J3 125 r3 -25
F4 (excavation Method)
Presplitting 10 Blasting or mechanical
Smooth Blasting 8 Natural Slope
For Wedge Failure
SMR F1=|αj-αs|
Average Rating F1 for each joints Rating Average Rating
0.433 J1 146 r1 0.15 0.333
J2 87 r2 0.15
J3 12 r3 0.70
F2=βj
Average Rating F2 for each joints Rating Average Rating
0.95 J1 25 r1 0.40 0.516666666667
51.0822222 J2 10 r2 0.15
J3 59 r3 1
F3=βj- βs
Average Rating F3 for each joints Rating Average Rating
-38.67 J1 -40 r1 -60 -56.67
J2 -55 r2 -60
J3 -6 r3 -50
F4 (excavation Method)
ng or mechanical 0 Presplitting 10 Blasting or mechanical
al Slope 15 Smooth Blasting 8 Natural Slope

SMR
Average Rating
0.150

Average Rating
1.00
64.50

Average Rating
-16.67

ng or mechanical 0
al Slope 15
SMR

57.24074

0
15
Slope Mass Rating SMR 34 Chainage K0+440

Parmeters Amount For Plane Failure


dip direction of Slope 215 F1=|αj-αs|
Dip amount of slope 65 F1 for each joints Rating
Dip direction of J1 18 J1 197 r1 0.15
Dip amount of J1 38 J2 60 r2 0.15
Dip direction of J2 155 J3 17 r3 0.70
Dip amount of J2 77 F2=βj
Dip direction of J3 198 F2 for each joints Rating
Dip amount of J3 58 J1 38 r1 0.85
Geological Strength Index (GSI) 52 J2 77 r2 1
RMRb 47 J3 58 r3 1
F3=βj- βs
F3 for each joints Rating
Trend J1 -27 r1 -60
J1*J2 71 J2 12 r2 0
J1*J3 288 J3 -7 r3 -50
J2*J3 226 F4 (excavation Method)
Plunge Presplitting 10 Blasting or mechanical
J1*J2 25 Smooth Blasting 8 Natural Slope
J1*J3 1
J2*J3 54

For Toppling Failure


F1=|αj-αs-180|
F1 for each joints Rating
J1 377 r1 0.15
J2 240 r2 0.15
J3 197 r3 0.15
F2=βj
F2 for each joints Rating
J1 38 r1 1
J2 77 r2 1
J3 58 r3 1
F3=βj+βs
F3 for each joints Rating
J1 103 r1 0
J2 142 r2 -25
J3 123 r3 -25
F4 (excavation Method)
Presplitting 10 Blasting or mechanical
Smooth Blasting 8 Natural Slope
For Wedge Failure
SMR F1=|αj-αs|
Average Rating F1 for each joints Rating Average Rating
0.333 J1 144 r1 0.15 0.333
J2 73 r2 0.15
J3 11 r3 0.70
F2=βj
Average Rating F2 for each joints Rating Average Rating
0.95 J1 25 r1 0.40 0.516666666667
50.3888889 J2 1 r2 0.15
J3 54 r3 1
F3=βj- βs
Average Rating F3 for each joints Rating Average Rating
-36.67 J1 -40 r1 -60 -60.00
J2 -64 r2 -60
J3 -11 r3 -60
F4 (excavation Method)
ng or mechanical 0 Presplitting 10 Blasting or mechanical
al Slope 15 Smooth Blasting 8 Natural Slope

SMR
Average Rating
0.150

Average Rating
1.00
59.50

Average Rating
-16.67

ng or mechanical 0
al Slope 15
SMR

51.66667

0
15
Slope Mass Rating SMR 35 Chainage K0+450

Parmeters Amount For Plane Failure


dip direction of Slope 255 F1=|αj-αs|
Dip amount of slope 64 F1 for each joints Rating
Dip direction of J1 10 J1 245 r1 0.15
Dip amount of J1 34 J2 103 r2 0.15
Dip direction of J2 152 J3 25 r3 0.40
Dip amount of J2 83 F2=βj
Dip direction of J3 230 F2 for each joints Rating
Dip amount of J3 54 J1 34 r1 0.70
Geological Strength Index (GSI) 51 J2 83 r2 1
RMRb 46 J3 54 r3 1
F3=βj- βs
F3 for each joints Rating
Trend J1 -30 r1 -60
J1*J2 65 J2 19 r2 0
J1*J3 306 J3 -10 r3 FALSE
J2*J3 232 F4 (excavation Method)
Plunge Presplitting 10 Blasting or mechanical
J1*J2 21 Smooth Blasting 8 Natural Slope
J1*J3 17
J2*J3 54

For Toppling Failure


F1=|αj-αs-180|
F1 for each joints Rating
J1 425 r1 0.15
J2 283 r2 0.15
J3 205 r3 0.15
F2=βj
F2 for each joints Rating
J1 34 r1 1
J2 83 r2 1
J3 54 r3 1
F3=βj+βs
F3 for each joints Rating
J1 98 r1 0
J2 147 r2 -25
J3 118 r3 -6
F4 (excavation Method)
Presplitting 10 Blasting or mechanical
Smooth Blasting 8 Natural Slope
For Wedge Failure
SMR F1=|αj-αs|
Average Rating F1 for each joints Rating Average Rating
0.233 J1 190 r1 0.15 0.233
J2 51 r2 0.15
J3 23 r3 0.40
F2=βj
Average Rating F2 for each joints Rating Average Rating
0.9 J1 21 r1 0.40 0.516666666667
56.8 J2 17 r2 0.15
J3 54 r3 1
F3=βj- βs
Average Rating F3 for each joints Rating Average Rating
-20.00 J1 -43 r1 -60 -40.00
J2 -47 r2 -60
J3 -10 r3 FALSE
F4 (excavation Method)
ng or mechanical 0 Presplitting 10 Blasting or mechanical
al Slope 15 Smooth Blasting 8 Natural Slope

SMR
Average Rating
0.150

Average Rating
1.00
59.45

Average Rating
-10.33

ng or mechanical 0
al Slope 15
SMR

56.17778

0
15
Slope Mass Rating SMR 36 Chainage K0+460

Parmeters Amount For Plane Failure


dip direction of Slope 240 F1=|αj-αs|
Dip amount of slope 67 F1 for each joints Rating
Dip direction of J1 19 J1 221 r1 0.15
Dip amount of J1 42 J2 110 r2 0.15
Dip direction of J2 130 J3 35 r3 0.15
Dip amount of J2 66 F2=βj
Dip direction of J3 205 F2 for each joints Rating
Dip amount of J3 72 J1 42 r1 0.85
Geological Strength Index (GSI) 50 J2 66 r2 1
RMRb 45 J3 72 r3 1
F3=βj- βs
F3 for each joints Rating
Trend J1 -25 r1 -60
J1*J2 58 J2 -1 r2 -50
J1*J3 293 J3 5 r3 -6
J2*J3 155 F4 (excavation Method)
Plunge Presplitting 10 Blasting or mechanical
J1*J2 35 Smooth Blasting 8 Natural Slope
J1*J3 4
J2*J3 63

For Toppling Failure


F1=|αj-αs-180|
F1 for each joints Rating
J1 401 r1 0.15
J2 290 r2 0.15
J3 215 r3 0.15
F2=βj
F2 for each joints Rating
J1 42 r1 1
J2 66 r2 1
J3 72 r3 1
F3=βj+βs
F3 for each joints Rating
J1 109 r1 0
J2 133 r2 -25
J3 139 r3 -25
F4 (excavation Method)
Presplitting 10 Blasting or mechanical
Smooth Blasting 8 Natural Slope
For Wedge Failure
SMR F1=|αj-αs|
Average Rating F1 for each joints Rating Average Rating
0.150 J1 182 r1 0.15 0.150
J2 53 r2 0.15
J3 85 r3 0.15
F2=βj
Average Rating F2 for each joints Rating Average Rating
0.95 J1 35 r1 0.85 0.666666666667
54.49 J2 4 r2 0.15
J3 63 r3 1
F3=βj- βs
Average Rating F3 for each joints Rating Average Rating
-38.67 J1 -32 r1 -60 -56.67
J2 -63 r2 -60
J3 -4 r3 -50
F4 (excavation Method)
ng or mechanical 0 Presplitting 10 Blasting or mechanical
al Slope 15 Smooth Blasting 8 Natural Slope

SMR
Average Rating
0.150

Average Rating
1.00
57.50

Average Rating
-16.67

ng or mechanical 0
al Slope 15
SMR

54.33333

0
15
Slope Mass Rating SMR 37 Chainage K0+470

Parmeters Amount For Plane Failure


dip direction of Slope 217 F1=|αj-αs|
Dip amount of slope 64 F1 for each joints Rating
Dip direction of J1 18 J1 199 r1 0.15
Dip amount of J1 38 J2 72 r2 0.15
Dip direction of J2 145 J3 16 r3 0.70
Dip amount of J2 69 F2=βj
Dip direction of J3 233 F2 for each joints Rating
Dip amount of J3 55 J1 38 r1 0.85
Geological Strength Index (GSI) 49 J2 69 r2 1
RMRb 44 J3 55 r3 1
F3=βj- βs
F3 for each joints Rating
Trend 65 J1 -26 r1 -60
J1*J2 310 J2 5 r2 -6
J1*J3 206 J3 -9 r3 -50
J2*J3 F4 (excavation Method)
Plunge 27 Presplitting 10 Blasting or mechanical
J1*J2 17 Smooth Blasting 8 Natural Slope
J1*J3 50
J2*J3

For Toppling Failure


F1=|αj-αs-180|
F1 for each joints Rating
J1 379 r1 0.15
J2 252 r2 0.15
J3 164 r3 0.15
F2=βj
F2 for each joints Rating
J1 38 r1 1
J2 69 r2 1
J3 55 r3 1
F3=βj+βs
F3 for each joints Rating
J1 102 r1 0
J2 133 r2 -25
J3 119 r3 -6
F4 (excavation Method)
Presplitting 10 Blasting or mechanical
Smooth Blasting 8 Natural Slope
For Wedge Failure
SMR F1=|αj-αs|
Average Rating F1 for each joints Rating Average Rating
0.333 J1 93 r1 0.15 0.333
J2 11 r2 0.70
J3 217 r3 0.15
F2=βj
Average Rating F2 for each joints Rating Average Rating
0.95 J1 17 r1 0.15 0.433333333333
46.7555556 J2 50 r2 1
J3 0 r3 0.15
F3=βj- βs
Average Rating F3 for each joints Rating Average Rating
-38.67 J1 -47 r1 -60 -60.00
J2 -14 r2 -60
J3 -64 r3 -60
F4 (excavation Method)
ng or mechanical 0 Presplitting 10 Blasting or mechanical
al Slope 15 Smooth Blasting 8 Natural Slope

SMR
Average Rating
0.150

Average Rating
1.00
57.45

Average Rating
-10.33

ng or mechanical 0
al Slope 15
SMR

50.33333

0
15
Slope Mass Rating SMR 20 Chainage K0+480

Parmeters Amount For Plane Failure


dip direction of Slope 230 F1=|αj-αs|
Dip amount of slope 70 F1 for each joints Rating
Dip direction of J1 10 J1 220 r1 0.15
Dip amount of J1 35 J2 95 r2 0.15
Dip direction of J2 135 J3 10 r3 0.70
Dip amount of J2 81 F2=βj
Dip direction of J3 220 F2 for each joints Rating
Dip amount of J3 50 J1 35 r1 0.85
Geological Strength Index (GSI) 51 J2 81 r2 1
RMRb 46 J3 50 r3 1
F3=βj- βs
F3 for each joints Rating
Trend J1 -35 r1 -60
J1*J2 50 J2 11 r2 0
J1*J3 298 J3 -20 r3 -60
J2*J3 214 F4 (excavation Method)
Plunge Presplitting 10 Blasting or mechanical
J1*J2 28 Smooth Blasting 8 Natural Slope
J1*J3 12
J2*J3 49

For Toppling Failure


F1=|αj-αs-180|
F1 for each joints Rating
J1 400 r1 0.15
J2 275 r2 0.15
J3 190 r3 0.15
F2=βj
F2 for each joints Rating
J1 35 r1 1
J2 81 r2 1
J3 50 r3 1
F3=βj+βs
F3 for each joints Rating
J1 105 r1 0
J2 151 r2 -25
J3 120 r3 -6
F4 (excavation Method)
Presplitting 10 Blasting or mechanical
Smooth Blasting 8 Natural Slope
For Wedge Failure
SMR F1=|αj-αs|
Average Rating F1 for each joints Rating Average Rating
0.333 J1 180 r1 0.15 0.333
J2 68 r2 0.15
J3 16 r3 0.70
F2=βj
Average Rating F2 for each joints Rating Average Rating
0.95 J1 28 r1 0.40 0.516666666667
48.3333333 J2 12 r2 0.15
J3 49 r3 1
F3=βj- βs
Average Rating F3 for each joints Rating Average Rating
-40.00 J1 -42 r1 -60 -60.00
J2 -58 r2 -60
J3 -21 r3 -60
F4 (excavation Method)
ng or mechanical 0 Presplitting 10 Blasting or mechanical
al Slope 15 Smooth Blasting 8 Natural Slope

SMR
Average Rating
0.150

Average Rating
1.00
59.45

Average Rating
-10.33

ng or mechanical 0
al Slope 15
SMR

50.66667

0
15
Slope Mass Rating SMR 20 Chainage K0+300

Parmeters Amount For Plane Failure


dip direction of Slope 200 F1=|αj-αs|
Dip amount of slope 66 F1 for each joints Rating
Dip direction of J1 4 J1 196 r1 0.15
Dip amount of J1 40 J2 60 r2 0.15
Dip direction of J2 140 J3 23 r3 0.40
Dip amount of J2 70 F2=βj
Dip direction of J3 223 F2 for each joints Rating
Dip amount of J3 55 J1 40 r1 0.85
Geological Strength Index (GSI) 52 J2 70 r2 1
RMRb 47 J3 55 r3 1
F3=βj- βs
F3 for each joints Rating
Trend 60 J1 -26 r1 -60
J1*J2 299 J2 4 r2 -6
J1*J3 200 J3 -11 r3 -60
J2*J3 F4 (excavation Method)
Plunge 24 Presplitting 10 Blasting or mechanical
J1*J2 19 Smooth Blasting 8 Natural Slope
J1*J3 52
J2*J3

For Toppling Failure


F1=|αj-αs-180|
F1 for each joints Rating
J1 376 r1 0.15
J2 240 r2 0.15
J3 157 r3 0.15
F2=βj
F2 for each joints Rating
J1 40 r1 1
J2 70 r2 1
J3 55 r3 1
F3=βj+βs
F3 for each joints Rating
J1 106 r1 0
J2 136 r2 -25
J3 121 r3 -25
F4 (excavation Method)
Presplitting 10 Blasting or mechanical
Smooth Blasting 8 Natural Slope
For Wedge Failure
SMR F1=|αj-αs|
Average Rating F1 for each joints Rating Average Rating
0.233 J1 99 r1 0.15 0.433
J2 0 r2 1
J3 200 r3 0.15
F2=βj
Average Rating F2 for each joints Rating Average Rating
0.95 J1 19 r1 0.15 0.433333333333
52.69 J2 52 r2 1
J3 0 r3 0.15
F3=βj- βs
Average Rating F3 for each joints Rating Average Rating
-42.00 J1 -47 r1 -60 -60.00
J2 -14 r2 -60
J3 -66 r3 -60
F4 (excavation Method)
ng or mechanical 0 Presplitting 10 Blasting or mechanical
al Slope 15 Smooth Blasting 8 Natural Slope

SMR
Average Rating
0.150

Average Rating
1.00
59.50

Average Rating
-16.67

ng or mechanical 0
al Slope 15
SMR

50.73333

0
15
Slope Mass Rating SMR 20 Chainage K0+300

Parmeters Amount For Plane Failure


dip direction of Slope 202 F1=|αj-αs|
Dip amount of slope 64 F1 for each joints Rating
Dip direction of J1 14 J1 188 r1 0.15
Dip amount of J1 40 J2 60 r2 0.15
Dip direction of J2 142 J3 11 r3 0.70
Dip amount of J2 85 F2=βj
Dip direction of J3 213 F2 for each joints Rating
Dip amount of J3 69 J1 40 r1 0.85
Geological Strength Index (GSI) 41 J2 85 r2 1
RMRb 36 J3 69 r3 1
F3=βj- βs
F3 for each joints Rating
Trend J1 -24 r1 -60
J1*J2 55 J2 21 r2 0
J1*J3 298 J3 5 r3 -6
J2*J3 217 F4 (excavation Method)
Plunge Presplitting 10 Blasting or mechanical
J1*J2 32 Smooth Blasting 8 Natural Slope
J1*J3 11
J2*J3 69

For Toppling Failure


F1=|αj-αs-180|
F1 for each joints Rating
J1 368 r1 0.15
J2 240 r2 0.15
J3 169 r3 0.15
F2=βj
F2 for each joints Rating
J1 40 r1 1
J2 85 r2 1
J3 69 r3 1
F3=βj+βs
F3 for each joints Rating
J1 104 r1 0
J2 149 r2 -25
J3 133 r3 -25
F4 (excavation Method)
Presplitting 10 Blasting or mechanical
Smooth Blasting 8 Natural Slope
For Wedge Failure
SMR F1=|αj-αs|
Average Rating F1 for each joints Rating Average Rating
0.333 J1 147 r1 0.15 0.333
J2 96 r2 0.15
J3 15 r3 0.70
F2=βj
Average Rating F2 for each joints Rating Average Rating
0.95 J1 32 r1 0.70 0.616666666667
44.0333333 J2 11 r2 0.15
J3 69 r3 1
F3=βj- βs
Average Rating F3 for each joints Rating Average Rating
-22.00 J1 -32 r1 -60 -42.00
J2 -53 r2 -60
J3 5 r3 -6
F4 (excavation Method)
ng or mechanical 0 Presplitting 10 Blasting or mechanical
al Slope 15 Smooth Blasting 8 Natural Slope

SMR
Average Rating
0.150

Average Rating
1.00
48.50

Average Rating
-16.67

ng or mechanical 0
al Slope 15
SMR

42.36667

0
15
Slope Mass Rating SMR 20 Chainage K0+590

Parmeters Amount For Plane Failure


dip direction of Slope 221 F1=|αj-αs|
Dip amount of slope 54 F1 for each joints Rating
Dip direction of J1 12 J1 209 r1 0.15
Dip amount of J1 40 J2 129 r2 0.15
Dip direction of J2 92 J3 13 r3 0.70
Dip amount of J2 81 F2=βj
Dip direction of J3 234 F2 for each joints Rating
Dip amount of J3 63 J1 40 r1 0.85
Geological Strength Index (GSI) 53 J2 81 r2 1
RMRb 48 J3 63 r3 1
F3=βj- βs
F3 for each joints Rating
Trend J1 -14 r1 -60
J1*J2 10 J2 27 r2 0
J1*J3 311 J3 9 r3 -6
J2*J3 173 F4 (excavation Method)
Plunge Presplitting 10 Blasting or mechanical
J1*J2 39 Smooth Blasting 8 Natural Slope
J1*J3 22
J2*J3 43

For Toppling Failure


F1=|αj-αs-180|
F1 for each joints Rating
J1 389 r1 0.15
J2 309 r2 0.15
J3 167 r3 0.15
F2=βj
F2 for each joints Rating
J1 40 r1 1
J2 81 r2 1
J3 63 r3 1
F3=βj+βs
F3 for each joints Rating
J1 94 r1 0
J2 135 r2 -25
J3 117 r3 -6
F4 (excavation Method)
Presplitting 10 Blasting or mechanical
Smooth Blasting 8 Natural Slope
For Wedge Failure
SMR F1=|αj-αs|
Average Rating F1 for each joints Rating Average Rating
0.333 J1 211 r1 0.15 0.150
J2 90 r2 0.15
J3 48 r3 0.15
F2=βj
Average Rating F2 for each joints Rating Average Rating
0.95 J1 39 r1 0.85 0.7
56.0333333 J2 22 r2 0.40
J3 43 r3 0.85
F3=βj- βs
Average Rating F3 for each joints Rating Average Rating
-22.00 J1 -15 r1 -60 -60.00
J2 -32 r2 -60
J3 -11 r3 -60
F4 (excavation Method)
ng or mechanical 0 Presplitting 10 Blasting or mechanical
al Slope 15 Smooth Blasting 8 Natural Slope

SMR
Average Rating
0.150

Average Rating
1.00
61.45

Average Rating
-10.33

ng or mechanical 0
al Slope 15
SMR

56.7

0
15
Slope Mass Rating SMR 20 Chainage K0+600

Parmeters Amount For Plane Failure


dip direction of Slope 240 F1=|αj-αs|
Dip amount of slope 66 F1 for each joints Rating
Dip direction of J1 6 J1 234 r1 0.15
Dip amount of J1 42 J2 97 r2 0.15
Dip direction of J2 143 J3 2 r3 1
Dip amount of J2 66 F2=βj
Dip direction of J3 242 F2 for each joints Rating
Dip amount of J3 78 J1 42 r1 0.85
Geological Strength Index (GSI) 53 J2 66 r2 1
RMRb 48 J3 78 r3 1
F3=βj- βs
Trend F3 for each joints Rating
J1*J2 65 J1 -24 r1 -60
J1*J3 324 J2 0 r2 -25
J2*J3 175 J3 12 r3 0
Plunge F4 (excavation Method)
J1*J2 24 Presplitting 10 Blasting or mechanical
J1*J3 33 Smooth Blasting 8 Natural Slope
J2*J3 63

For Toppling Failure


F1=|αj-αs-180|
F1 for each joints Rating
J1 414 r1 0.15
J2 277 r2 0.15
J3 178 r3 0.15
F2=βj
F2 for each joints Rating
J1 42 r1 1
J2 66 r2 1
J3 78 r3 1
F3=βj+βs
F3 for each joints Rating
J1 108 r1 0
J2 132 r2 -25
J3 144 r3 -25
F4 (excavation Method)
Presplitting 10 Blasting or mechanical
Smooth Blasting 8 Natural Slope
For Wedge Failure
SMR F1=|αj-αs|
Average Rating F1 for each joints Rating Average Rating
0.433 J1 84 r1 0.15 0.150
J2 65 r2 0.15
J3 240 r3 0.15
F2=βj
Average Rating F2 for each joints Rating Average Rating
0.95 J1 33 r1 0.70 0.7
51.3361111 J2 63 r2 1
J3 24 r3 0.40
F3=βj- βs
Average Rating F3 for each joints Rating Average Rating
-28.33 J1 -33 r1 -60 -56.67
J2 -3 r2 -50
J3 -66 r3 -60
F4 (excavation Method)
ng or mechanical 0 Presplitting 10 Blasting or mechanical
al Slope 15 Smooth Blasting 8 Natural Slope

SMR
Average Rating
0.150

Average Rating
1.00
60.50

Average Rating
-16.67

ng or mechanical 0
al Slope 15
SMR

57.05

0
15
Slope Mass Rating SMR 20 Chainage K0+650

Parmeters Amount For Plane Failure


dip direction of Slope 209 F1=|αj-αs|
Dip amount of slope 62 F1 for each joints Rating
Dip direction of J1 9 J1 200 r1 0.15
Dip amount of J1 44 J2 34 r2 0.15
Dip direction of J2 243 J3 43 r3 0.15
Dip amount of J2 68 F2=βj
Dip direction of J3 166 F2 for each joints Rating
Dip amount of J3 72 J1 44 r1 0.85
Geological Strength Index (GSI) 47 J2 68 r2 1
RMRb 42 J3 72 r3 1
F3=βj- βs
F3 for each joints Rating
Trend J1 -18 r1 -60
J1*J2 81 J2 6 r2 -6
J1*J3 318 J3 10 r3 -6
J2*J3 211 F4 (excavation Method)
Plunge Presplitting 10 Blasting or mechanical
J1*J2 15 Smooth Blasting 8 Natural Slope
J1*J3 30
J2*J3 64

For Toppling Failure


F1=|αj-αs-180|
F1 for each joints Rating
J1 380 r1 0.15
J2 146 r2 0.15
J3 223 r3 0.15
F2=βj
F2 for each joints Rating
J1 44 r1 1
J2 68 r2 1
J3 72 r3 1
F3=βj+βs
F3 for each joints Rating
J1 106 r1 0
J2 130 r2 -25
J3 134 r3 -25
F4 (excavation Method)
Presplitting 10 Blasting or mechanical
Smooth Blasting 8 Natural Slope
For Wedge Failure
SMR F1=|αj-αs|
Average Rating F1 for each joints Rating Average Rating
0.150 J1 128 r1 0.15 0.433
J2 109 r2 0.15
J3 2 r3 1
F2=βj
Average Rating F2 for each joints Rating Average Rating
0.95 J1 15 r1 0.15 0.616666666667
53.58 J2 30 r2 0.70
J3 64 r3 1
F3=βj- βs
Average Rating F3 for each joints Rating Average Rating
-24.00 J1 -47 r1 -60 -42.00
J2 -32 r2 -60
J3 2 r3 -6
F4 (excavation Method)
ng or mechanical 0 Presplitting 10 Blasting or mechanical
al Slope 15 Smooth Blasting 8 Natural Slope

SMR
Average Rating
0.150

Average Rating
1.00
54.50

Average Rating
-16.67

ng or mechanical 0
al Slope 15
SMR

45.77667

0
15
Slope Mass Rating SMR 20 Chainage K0+690

Parmeters Amount For Plane Failure


dip direction of Slope 227 F1=|αj-αs|
Dip amount of slope 60 F1 for each joints Rating
Dip direction of J1 16 J1 211 r1 0.15
Dip amount of J1 50 J2 57 r2 0.15
Dip direction of J2 170 J3 4 r3 1
Dip amount of J2 60 F2=βj
Dip direction of J3 231 F2 for each joints Rating
Dip amount of J3 54 J1 50 r1 1
Geological Strength Index (GSI) 54 J2 60 r2 1
RMRb 49 J3 54 r3 1
F3=βj- βs
F3 for each joints Rating
Trend J1 -10 r1 0
J1*J2 89 J2 0 r2 -25
J1*J3 304 J3 -6 r3 -50
J2*J3 211 F4 (excavation Method)
Plunge Presplitting 10 Blasting or mechanical
J1*J2 17 Smooth Blasting 8 Natural Slope
J1*J3 20
J2*J3 52

For Toppling Failure


F1=|αj-αs-180|
F1 for each joints Rating
J1 391 r1 0.15
J2 237 r2 0.15
J3 176 r3 0.15
F2=βj
F2 for each joints Rating
J1 50 r1 1
J2 60 r2 1
J3 54 r3 1
F3=βj+βs
F3 for each joints Rating
J1 110 r1 -50
J2 120 r2 -6
J3 114 r3 -6
F4 (excavation Method)
Presplitting 10 Blasting or mechanical
Smooth Blasting 8 Natural Slope
For Wedge Failure
SMR F1=|αj-αs|
Average Rating F1 for each joints Rating Average Rating
0.433 J1 138 r1 0.15 0.333
J2 77 r2 0.15
J3 16 r3 0.70
F2=βj
Average Rating F2 for each joints Rating Average Rating
1 J1 17 r1 0.15 0.516666666667
53.1666667 J2 20 r2 0.40
J3 52 r3 1
F3=βj- βs
Average Rating F3 for each joints Rating Average Rating
-25.00 J1 -43 r1 -60 -56.67
J2 -40 r2 -60
J3 -8 r3 -50
F4 (excavation Method)
ng or mechanical 0 Presplitting 10 Blasting or mechanical
al Slope 15 Smooth Blasting 8 Natural Slope

SMR
Average Rating
0.150

Average Rating
1.00
60.90

Average Rating
-20.67

ng or mechanical 0
al Slope 15
SMR

54.24074

0
15
Slope Mass Rating SMR 20 Chainage K0+700

Parmeters Amount For Plane Failure


dip direction of Slope 232 F1=|αj-αs|
Dip amount of slope 70 F1 for each joints Rating
Dip direction of J1 4 J1 228 r1 0.15
Dip amount of J1 41 J2 79 r2 0.15
Dip direction of J2 153 J3 16 r3 0.70
Dip amount of J2 58 F2=βj
Dip direction of J3 248 F2 for each joints Rating
Dip amount of J3 46 J1 41 r1 0.85
Geological Strength Index (GSI) 53 J2 58 r2 1
RMRb 48 J3 46 r3 1
F3=βj- βs
F3 for each joints Rating
Trend J1 -29 r1 -60
J1*J2 72 J2 -12 r2 -60
J1*J3 310 J3 -24 r3 -60
J2*J3 211 F4 (excavation Method)
Plunge Presplitting 10 Blasting or mechanical
J1*J2 14 Smooth Blasting 8 Natural Slope
J1*J3 25
J2*J3 39

For Toppling Failure


F1=|αj-αs-180|
F1 for each joints Rating
J1 408 r1 0.15
J2 259 r2 0.15
J3 164 r3 0.15
F2=βj
F2 for each joints Rating
J1 41 r1 1
J2 58 r2 1
J3 46 r3 1
F3=βj+βs
F3 for each joints Rating
J1 111 r1 -6
J2 128 r2 -25
J3 116 r3 -6
F4 (excavation Method)
Presplitting 10 Blasting or mechanical
Smooth Blasting 8 Natural Slope
For Wedge Failure
SMR F1=|αj-αs|
Average Rating F1 for each joints Rating Average Rating
0.333 J1 160 r1 0.15 0.233
J2 78 r2 0.15
J3 21 r3 0.40
F2=βj
Average Rating F2 for each joints Rating Average Rating
0.95 J1 14 r1 0.15 0.466666666667
44 J2 25 r2 0.40
J3 39 r3 0.85
F3=βj- βs
Average Rating F3 for each joints Rating Average Rating
-60.00 J1 -56 r1 -60 -60.00
J2 -45 r2 -60
J3 -31 r3 -60
F4 (excavation Method)
ng or mechanical 0 Presplitting 10 Blasting or mechanical
al Slope 15 Smooth Blasting 8 Natural Slope

SMR
Average Rating
0.150

Average Rating
1.00
61.15

Average Rating
-12.33

ng or mechanical 0
al Slope 15
SMR

56.46667

0
15
Slope Mass Rating SMR 20 Chainage K0+730

Parmeters Amount For Plane Failure


dip direction of Slope 246 F1=|αj-αs|
Dip amount of slope 73 F1 for each joints Rating
Dip direction of J1 18 J1 228 r1 0.15
Dip amount of J1 43 J2 98 r2 0.15
Dip direction of J2 148 J3 4 r3 1
Dip amount of J2 66 F2=βj
Dip direction of J3 250 F2 for each joints Rating
Dip amount of J3 44 J1 43 r1 0.85
Geological Strength Index (GSI) 42 J2 66 r2 1
RMRb 37 J3 44 r3 0.85
F3=βj- βs
F3 for each joints Rating
Trend J1 -30 r1 -60
J1*J2 72 J2 -7 r2 -50
J1*J3 314 J3 -29 r3 -60
J2*J3 217 F4 (excavation Method)
Plunge Presplitting 10 Blasting or mechanical
J1*J2 28 Smooth Blasting 8 Natural Slope
J1*J3 22
J2*J3 39

For Toppling Failure


F1=|αj-αs-180|
F1 for each joints Rating
J1 408 r1 0.15
J2 278 r2 0.15
J3 176 r3 0.15
F2=βj
F2 for each joints Rating
J1 43 r1 1
J2 66 r2 1
J3 44 r3 0.85
F3=βj+βs
F3 for each joints Rating
J1 116 r1 -6
J2 139 r2 -25
J3 117 r3 -6
F4 (excavation Method)
Presplitting 10 Blasting or mechanical
Smooth Blasting 8 Natural Slope
For Wedge Failure
SMR F1=|αj-αs|
Average Rating F1 for each joints Rating Average Rating
0.433 J1 174 r1 0.15 0.233
J2 68 r2 0.15
J3 29 r3 0.40
F2=βj
Average Rating F2 for each joints Rating Average Rating
0.9 J1 28 r1 0.40 0.55
29.9 J2 22 r2 0.40
J3 39 r3 0.85
F3=βj- βs
Average Rating F3 for each joints Rating Average Rating
-56.67 J1 -45 r1 -60 -60.00
J2 -51 r2 -60
J3 -34 r3 -60
F4 (excavation Method)
ng or mechanical 0 Presplitting 10 Blasting or mechanical
al Slope 15 Smooth Blasting 8 Natural Slope

SMR
Average Rating
0.150

Average Rating
0.95
50.24

Average Rating
-12.33

ng or mechanical 0
al Slope 15
SMR

44.3

0
15
Slope Mass Rating SMR 37 Chainage K0+740

Parmeters Amount For Plane Failure


dip direction of Slope 265 F1=|αj-αs|
Dip amount of slope 70 F1 for each joints Rating
Dip direction of J1 354 J1 89 r1 0.15
Dip amount of J1 43 J2 122 r2 0.15
Dip direction of J2 143 J3 15 r3 0.70
Dip amount of J2 43 F2=βj
Dip direction of J3 280 F2 for each joints Rating
Dip amount of J3 71 J1 43 r1 0.85
Geological Strength Index (GSI) 38 J2 43 r2 0.85
RMRb 33 J3 71 r3 1
F3=βj- βs
F3 for each joints Rating
Trend J1 -27 r1 -60
J1*J2 68 J2 -27 r2 -60
J1*J3 351 J3 1 r3 -6
J2*J3 200 F4 (excavation Method)
Plunge Presplitting 10 Blasting or mechanical
J1*J2 13 Smooth Blasting 8 Natural Slope
J1*J3 43
J2*J3 26

For Toppling Failure


F1=|αj-αs-180|
F1 for each joints Rating
J1 91 r1 0.15
J2 302 r2 0.15
J3 165 r3 0.15
F2=βj
F2 for each joints Rating
J1 43 r1 1
J2 43 r2 0.85
J3 71 r3 1
F3=βj+βs
F3 for each joints Rating
J1 113 r1 -6
J2 113 r2 -6
J3 141 r3 -25
F4 (excavation Method)
Presplitting 10 Blasting or mechanical
Smooth Blasting 8 Natural Slope
For Wedge Failure
SMR F1=|αj-αs|
Average Rating F1 for each joints Rating Average Rating
0.333 J1 197 r1 0.15 0.150
J2 86 r2 0.15
J3 65 r3 0.15
F2=βj
Average Rating F2 for each joints Rating Average Rating
0.9 J1 13 r1 0.15 0.466666666667
35.4 J2 43 r2 0.85
J3 26 r3 0.40
F3=βj- βs
Average Rating F3 for each joints Rating Average Rating
-42.00 J1 -57 r1 -60 -60.00
J2 -27 r2 -60
J3 -44 r3 -60
F4 (excavation Method)
ng or mechanical 0 Presplitting 10 Blasting or mechanical
al Slope 15 Smooth Blasting 8 Natural Slope

SMR
Average Rating
0.150

Average Rating
0.95
46.24

Average Rating
-12.33

ng or mechanical 0
al Slope 15
SMR

43.8

0
15
Slope Mass Rating SMR 37 Chainage K0+760

Parmeters Amount For Plane Failure


dip direction of Slope F1=|αj-αs|
Dip amount of slope F1 for each joints Rating
Dip direction of J1 J1 0 r1 1
Dip amount of J1 J2 0 r2 1
Dip direction of J2 J3 0 r3 1
Dip amount of J2 F2=βj
Dip direction of J3 F2 for each joints Rating
Dip amount of J3 J1 0 r1 0.15
Geological Strength Index (GSI) 40 J2 0 r2 0.15
RMRb 35 J3 0 r3 0.15
F3=βj- βs
Trend F3 for each joints Rating
J1*J2 J1 0 r1 -25
J1*J3 J2 0 r2 -25
J2*J3 J3 0 r3 -25
Plunge F4 (excavation Method)
J1*J2 Presplitting 10 Blasting or mechanical
J1*J3 Smooth Blasting 8 Natural Slope
J2*J3

For Toppling Failure


F1=|αj-αs-180|
F1 for each joints Rating
J1 180 r1 0.15
J2 180 r2 0.15
J3 180 r3 0.15
F2=βj
F2 for each joints Rating
J1 0 r1 1
J2 0 r2 1
J3 0 r3 1
F3=βj+βs
F3 for each joints Rating
J1 0 r1 0
J2 0 r2 0
J3 0 r3 0
F4 (excavation Method)
Presplitting 10 Blasting or mechanical
Smooth Blasting 8 Natural Slope
For Wedge Failure
SMR F1=|αj-αs|
Average Rating F1 for each joints Rating Average Rating
1.000 J1 0 r1 1 1.000
J2 0 r2 1
J3 0 r3 1
F2=βj
Average Rating F2 for each joints Rating Average Rating
0.15 J1 0 r1 0.15 0.15
46.25 J2 0 r2 0.15
J3 0 r3 0.15
F3=βj- βs
Average Rating F3 for each joints Rating Average Rating
-25.00 J1 0 r1 -25 -25.00
J2 0 r2 -25
J3 0 r3 -25
F4 (excavation Method)
ng or mechanical 0 Presplitting 10 Blasting or mechanical
al Slope 15 Smooth Blasting 8 Natural Slope

SMR
Average Rating
0.150

Average Rating
1.00
50.00

Average Rating
0.00

ng or mechanical 0
al Slope 15
SMR

46.25

0
15
Slope Mass Rating SMR 37 Chainage K0+770

Parmeters Amount For Plane Failure


dip direction of Slope F1=|αj-αs|
Dip amount of slope F1 for each joints Rating
Dip direction of J1 J1 0 r1 1
Dip amount of J1 J2 0 r2 1
Dip direction of J2 J3 0 r3 1
Dip amount of J2 F2=βj
Dip direction of J3 F2 for each joints Rating
Dip amount of J3 J1 0 r1 0.15
Geological Strength Index (GSI) 35 J2 0 r2 0.15
RMRb 30 J3 0 r3 0.15
F3=βj- βs
Trend F3 for each joints Rating
J1*J2 J1 0 r1 -25
J1*J3 J2 0 r2 -25
J2*J3 J3 0 r3 -25
Plunge F4 (excavation Method)
J1*J2 Presplitting 10 Blasting or mechanical
J1*J3 Smooth Blasting 8 Natural Slope
J2*J3

For Toppling Failure


F1=|αj-αs-180|
F1 for each joints Rating
J1 180 r1 0.15
J2 180 r2 0.15
J3 180 r3 0.15
F2=βj
F2 for each joints Rating
J1 0 r1 1
J2 0 r2 1
J3 0 r3 1
F3=βj+βs
F3 for each joints Rating
J1 0 r1 0
J2 0 r2 0
J3 0 r3 0
F4 (excavation Method)
Presplitting 10 Blasting or mechanical
Smooth Blasting 8 Natural Slope
For Wedge Failure
SMR F1=|αj-αs|
Average Rating F1 for each joints Rating Average Rating
1.000 J1 0 r1 1 1.000
J2 0 r2 1
J3 0 r3 1
F2=βj
Average Rating F2 for each joints Rating Average Rating
0.15 J1 0 r1 0.15 0.15
41.25 J2 0 r2 0.15
J3 0 r3 0.15
F3=βj- βs
Average Rating F3 for each joints Rating Average Rating
-25.00 J1 0 r1 -25 -25.00
J2 0 r2 -25
J3 0 r3 -25
F4 (excavation Method)
ng or mechanical 0 Presplitting 10 Blasting or mechanical
al Slope 15 Smooth Blasting 8 Natural Slope

SMR
Average Rating
0.150

Average Rating
1.00
45.00

Average Rating
0.00

ng or mechanical 0
al Slope 15
SMR

41.25

0
15
Slope Mass Rating SMR 37 Chainage K0+780

Parmeters Amount For Plane Failure


dip direction of Slope 250 F1=|αj-αs|
Dip amount of slope 58 F1 for each joints Rating
Dip direction of J1 9 J1 241 r1 0.15
Dip amount of J1 43 J2 95 r2 0.15
Dip direction of J2 155 J3 17 r3 0.70
Dip amount of J2 75 F2=βj
Dip direction of J3 267 F2 for each joints Rating
Dip amount of J3 49 J1 43 r1 0.85
Geological Strength Index (GSI) 42 J2 75 r2 1
RMRb 37 J3 49 r3 1
F3=βj- βs
F3 for each joints Rating
Trend J1 -15 r1 -60
J1*J2 64 J2 17 r2 0
J1*J3 296 J3 -9 r3 -50
J2*J3 217 F4 (excavation Method)
Plunge Presplitting 10 Blasting or mechanical
J1*J2 23 Smooth Blasting 8 Natural Slope
J1*J3 8
J2*J3 52

For Toppling Failure


F1=|αj-αs-180|
F1 for each joints Rating
J1 421 r1 0.15
J2 275 r2 0.15
J3 163 r3 0.15
F2=βj
F2 for each joints Rating
J1 43 r1 1
J2 75 r2 1
J3 49 r3 1
F3=βj+βs
F3 for each joints Rating
J1 101 r1 0
J2 133 r2 -25
J3 107 r3 0
F4 (excavation Method)
Presplitting 10 Blasting or mechanical
Smooth Blasting 8 Natural Slope
For Wedge Failure
SMR F1=|αj-αs|
Average Rating F1 for each joints Rating Average Rating
0.333 J1 186 r1 0.15 0.150
J2 46 r2 0.15
J3 33 r3 0.15
F2=βj
Average Rating F2 for each joints Rating Average Rating
0.95 J1 23 r1 0.40 0.516666666667
40.3888889 J2 8 r2 0.15
J3 52 r3 1
F3=βj- βs
Average Rating F3 for each joints Rating Average Rating
-36.67 J1 -35 r1 -60 -56.67
J2 -50 r2 -60
J3 -6 r3 -50
F4 (excavation Method)
ng or mechanical 0 Presplitting 10 Blasting or mechanical
al Slope 15 Smooth Blasting 8 Natural Slope

SMR
Average Rating
0.150

Average Rating
1.00
50.75

Average Rating
-8.33

ng or mechanical 0
al Slope 15
SMR

47.60833

0
15
Slope Mass Rating SMR 37 Chainage K0+820

Parmeters Amount For Plane Failure


dip direction of Slope 242 F1=|αj-αs|
Dip amount of slope 51 F1 for each joints Rating
Dip direction of J1 349 J1 107 r1 0.15
Dip amount of J1 38 J2 148 r2 0.15
Dip direction of J2 94 J3 104 r3 0.15
Dip amount of J2 84 F2=βj
Dip direction of J3 346 F2 for each joints Rating
Dip amount of J3 56 J1 38 r1 0.85
Geological Strength Index (GSI) 47 J2 84 r2 1
RMRb 42 J3 56 r3 1
F3=βj- βs
F3 for each joints Rating
Trend J1 -13 r1 -60
J1*J2 8 J2 33 r2 0
J1*J3 72 J3 5 r3 -6
J2*J3 12 F4 (excavation Method)
Plunge Presplitting 10 Blasting or mechanical
J1*J2 35 Smooth Blasting 8 Natural Slope
J1*J3 5
J2*J3 53

For Toppling Failure


F1=|αj-αs-180|
F1 for each joints Rating
J1 73 r1 0.15
J2 328 r2 0.15
J3 76 r3 0.15
F2=βj
F2 for each joints Rating
J1 38 r1 1
J2 84 r2 1
J3 56 r3 1
F3=βj+βs
F3 for each joints Rating
J1 89 r1 0
J2 135 r2 -25
J3 107 r3 0
F4 (excavation Method)
Presplitting 10 Blasting or mechanical
Smooth Blasting 8 Natural Slope
For Wedge Failure
SMR F1=|αj-αs|
Average Rating F1 for each joints Rating Average Rating
0.150 J1 234 r1 0.15 0.150
J2 170 r2 0.15
J3 230 r3 0.15
F2=βj
Average Rating F2 for each joints Rating Average Rating
0.95 J1 35 r1 0.85 0.666666666667
53.865 J2 5 r2 0.15
J3 53 r3 1
F3=βj- βs
Average Rating F3 for each joints Rating Average Rating
-22.00 J1 -16 r1 -60 -42.00
J2 -46 r2 -60
J3 2 r3 -6
F4 (excavation Method)
ng or mechanical 0 Presplitting 10 Blasting or mechanical
al Slope 15 Smooth Blasting 8 Natural Slope

SMR
Average Rating
0.150

Average Rating
1.00
55.75

Average Rating
-8.33

ng or mechanical 0
al Slope 15
SMR

52.8

0
15
Slope Mass Rating SMR 37 Chainage K0+840

Parmeters Amount For Plane Failure


dip direction of Slope 223 F1=|αj-αs|
Dip amount of slope 53 F1 for each joints Rating
Dip direction of J1 356 J1 133 r1 0.15
Dip amount of J1 37 J2 121 r2 0.15
Dip direction of J2 102 J3 28 r3 0.40
Dip amount of J2 80 F2=βj
Dip direction of J3 251 F2 for each joints Rating
Dip amount of J3 67 J1 37 r1 0.85
Geological Strength Index (GSI) 45 J2 80 r2 1
RMRb 40 J3 67 r3 1
F3=βj- βs
F3 for each joints Rating
Trend J1 -16 r1 -60
J1*J2 19 J2 27 r2 0
J1*J3 324 J3 14 r3 0
J2*J3 183 F4 (excavation Method)
Plunge Presplitting 10 Blasting or mechanical
J1*J2 34 Smooth Blasting 8 Natural Slope
J1*J3 33
J2*J3 41

For Toppling Failure


F1=|αj-αs-180|
F1 for each joints Rating
J1 47 r1 0.15
J2 301 r2 0.15
J3 152 r3 0.15
F2=βj
F2 for each joints Rating
J1 37 r1 1
J2 80 r2 1
J3 67 r3 1
F3=βj+βs
F3 for each joints Rating
J1 90 r1 0
J2 133 r2 -25
J3 120 r3 -6
F4 (excavation Method)
Presplitting 10 Blasting or mechanical
Smooth Blasting 8 Natural Slope
For Wedge Failure
SMR F1=|αj-αs|
Average Rating F1 for each joints Rating Average Rating
0.233 J1 204 r1 0.15 0.150
J2 101 r2 0.15
J3 40 r3 0.15
F2=βj
Average Rating F2 for each joints Rating Average Rating
0.95 J1 34 r1 0.70 0.75
50.5666667 J2 33 r2 0.70
J3 41 r3 0.85
F3=βj- βs
Average Rating F3 for each joints Rating Average Rating
-20.00 J1 -19 r1 -60 -60.00
J2 -20 r2 -60
J3 -12 r3 -60
F4 (excavation Method)
ng or mechanical 0 Presplitting 10 Blasting or mechanical
al Slope 15 Smooth Blasting 8 Natural Slope

SMR
Average Rating
0.150

Average Rating
1.00
53.45

Average Rating
-10.33

ng or mechanical 0
al Slope 15
SMR

48.25

0
15
Slope Mass Rating SMR 37 Chainage K0+860

Parmeters Amount For Plane Failure


dip direction of Slope 240 F1=|αj-αs|
Dip amount of slope 57 F1 for each joints Rating
Dip direction of J1 4 J1 236 r1 0.15
Dip amount of J1 42 J2 121 r2 0.15
Dip direction of J2 119 J3 4 r3 1
Dip amount of J2 58 F2=βj
Dip direction of J3 236 F2 for each joints Rating
Dip amount of J3 77 J1 42 r1 0.85
Geological Strength Index (GSI) 50 J2 58 r2 1
RMRb 45 J3 77 r3 1
F3=βj- βs
F3 for each joints Rating
Trend J1 -15 r1 -60
J1*J2 52 J2 1 r2 -6
J1*J3 327 J3 20 r3 0
J2*J3 180 F4 (excavation Method)
Plunge Presplitting 10 Blasting or mechanical
J1*J2 31 Smooth Blasting 8 Natural Slope
J1*J3 36
J2*J3 37

For Toppling Failure


F1=|αj-αs-180|
F1 for each joints Rating
J1 416 r1 0.15
J2 301 r2 0.15
J3 184 r3 0.15
F2=βj
F2 for each joints Rating
J1 42 r1 1
J2 58 r2 1
J3 77 r3 1
F3=βj+βs
F3 for each joints Rating
J1 99 r1 0
J2 115 r2 -6
J3 134 r3 -25
F4 (excavation Method)
Presplitting 10 Blasting or mechanical
Smooth Blasting 8 Natural Slope
For Wedge Failure
SMR F1=|αj-αs|
Average Rating F1 for each joints Rating Average Rating
0.433 J1 188 r1 0.15 0.150
J2 87 r2 0.15
J3 60 r3 0.15
F2=βj
Average Rating F2 for each joints Rating Average Rating
0.95 J1 31 r1 0.70 0.8
50.9433333 J2 36 r2 0.85
J3 37 r3 0.85
F3=βj- βs
Average Rating F3 for each joints Rating Average Rating
-22.00 J1 -26 r1 -60 -60.00
J2 -21 r2 -60
J3 -20 r3 -60
F4 (excavation Method)
ng or mechanical 0 Presplitting 10 Blasting or mechanical
al Slope 15 Smooth Blasting 8 Natural Slope

SMR
Average Rating
0.150

Average Rating
1.00
58.45

Average Rating
-10.33

ng or mechanical 0
al Slope 15
SMR

52.8

0
15
Slope Mass Rating SMR 37 Chainage K0+870

Parmeters Amount For Plane Failure


dip direction of Slope 234 F1=|αj-αs|
Dip amount of slope 68 F1 for each joints Rating
Dip direction of J1 9 J1 225 r1 0.15
Dip amount of J1 41 J2 89 r2 0.15
Dip direction of J2 145 J3 10 r3 0.70
Dip amount of J2 63 F2=βj
Dip direction of J3 244 F2 for each joints Rating
Dip amount of J3 72 J1 41 r1 0.85
Geological Strength Index (GSI) 52 J2 63 r2 1
RMRb 47 J3 72 r3 1
F3=βj- βs
F3 for each joints Rating
Trend J1 -27 r1 -60
J1*J2 74 J2 -5 r2 -50
J1*J3 310 J3 4 r3 -6
J2*J3 200 F4 (excavation Method)
Plunge Presplitting 10 Blasting or mechanical
J1*J2 19 Smooth Blasting 8 Natural Slope
J1*J3 24
J2*J3 41

For Toppling Failure


F1=|αj-αs-180|
F1 for each joints Rating
J1 405 r1 0.15
J2 269 r2 0.15
J3 170 r3 0.15
F2=βj
F2 for each joints Rating
J1 41 r1 1
J2 63 r2 1
J3 72 r3 1
F3=βj+βs
F3 for each joints Rating
J1 109 r1 0
J2 131 r2 -25
J3 140 r3 -25
F4 (excavation Method)
Presplitting 10 Blasting or mechanical
Smooth Blasting 8 Natural Slope
For Wedge Failure
SMR F1=|αj-αs|
Average Rating F1 for each joints Rating Average Rating
0.333 J1 160 r1 0.15 0.150
J2 76 r2 0.15
J3 34 r3 0.15
F2=βj
Average Rating F2 for each joints Rating Average Rating
0.95 J1 19 r1 0.15 0.466666666667
49.7555556 J2 24 r2 0.40
J3 41 r3 0.85
F3=βj- βs
Average Rating F3 for each joints Rating Average Rating
-38.67 J1 -49 r1 -60 -60.00
J2 -44 r2 -60
J3 -27 r3 -60
F4 (excavation Method)
ng or mechanical 0 Presplitting 10 Blasting or mechanical
al Slope 15 Smooth Blasting 8 Natural Slope

SMR
Average Rating
0.150

Average Rating
1.00
59.50

Average Rating
-16.67

ng or mechanical 0
al Slope 15
SMR

57.8

0
15
Slope Mass Rating SMR 37 Chainage K0+890

Parmeters Amount For Plane Failure


dip direction of Slope 265 F1=|αj-αs|
Dip amount of slope 73 F1 for each joints Rating
Dip direction of J1 14 J1 251 r1 0.15
Dip amount of J1 54 J2 171 r2 0.15
Dip direction of J2 94 J3 15 r3 0.70
Dip amount of J2 50 F2=βj
Dip direction of J3 250 F2 for each joints Rating
Dip amount of J3 72 J1 54 r1 1
Geological Strength Index (GSI) 53 J2 50 r2 1
RMRb 48 J3 72 r3 1
F3=βj- βs
F3 for each joints Rating
Trend J1 -19 r1 -60
J1*J2 59 J2 -23 r2 -60
J1*J3 322 J3 -1 r3 -50
J2*J3 166 F4 (excavation Method)
Plunge Presplitting 10 Blasting or mechanical
J1*J2 44 Smooth Blasting 8 Natural Slope
J1*J3 41
J2*J3 19

For Toppling Failure


F1=|αj-αs-180|
F1 for each joints Rating
J1 431 r1 0.15
J2 351 r2 0.15
J3 195 r3 0.15
F2=βj
F2 for each joints Rating
J1 54 r1 1
J2 50 r2 1
J3 72 r3 1
F3=βj+βs
F3 for each joints Rating
J1 127 r1 -25
J2 123 r2 -25
J3 145 r3 -25
F4 (excavation Method)
Presplitting 10 Blasting or mechanical
Smooth Blasting 8 Natural Slope
For Wedge Failure
SMR F1=|αj-αs|
Average Rating F1 for each joints Rating Average Rating
0.333 J1 206 r1 0.15 0.150
J2 57 r2 0.15
J3 99 r3 0.15
F2=βj
Average Rating F2 for each joints Rating Average Rating
1 J1 44 r1 0.85 0.616666666667
44.1111111 J2 41 r2 0.85
J3 19 r3 0.15
F3=βj- βs
Average Rating F3 for each joints Rating Average Rating
-56.67 J1 -29 r1 -60 -60.00
J2 -32 r2 -60
J3 -54 r3 -60
F4 (excavation Method)
ng or mechanical 0 Presplitting 10 Blasting or mechanical
al Slope 15 Smooth Blasting 8 Natural Slope

SMR
Average Rating
0.150

Average Rating
1.00
59.25

Average Rating
-25.00

ng or mechanical 0
al Slope 15
SMR

57.45

0
15
Slope Mass Rating SMR 37 Chainage K0+900

Parmeters Amount For Plane Failure


dip direction of Slope 259 F1=|αj-αs|
Dip amount of slope 73 F1 for each joints Rating
Dip direction of J1 20 J1 239 r1 0.15
Dip amount of J1 53 J2 112 r2 0.15
Dip direction of J2 147 J3 18 r3 0.70
Dip amount of J2 33 F2=βj
Dip direction of J3 241 F2 for each joints Rating
Dip amount of J3 69 J1 53 r1 1
Geological Strength Index (GSI) 48 J2 33 r2 070
RMRb 43 J3 69 r3 1
F3=βj- βs
F3 for each joints Rating
Trend J1 -20 r1 -60
J1*J2 93 J2 -40 r2 -60
J1*J3 317 J3 -4 r3 -50
J2*J3 165 F4 (excavation Method)
Plunge Presplitting 10 Blasting or mechanical
J1*J2 21 Smooth Blasting 8 Natural Slope
J1*J3 31
J2*J3 31

For Toppling Failure


F1=|αj-αs-180|
F1 for each joints Rating
J1 419 r1 0.15
J2 292 r2 0.15
J3 198 r3 0.15
F2=βj
F2 for each joints Rating
J1 53 r1 1
J2 33 r2 070
J3 69 r3 1
F3=βj+βs
F3 for each joints Rating
J1 126 r1 -25
J2 106 r2 0
J3 142 r3 -25
F4 (excavation Method)
Presplitting 10 Blasting or mechanical
Smooth Blasting 8 Natural Slope
For Wedge Failure
SMR F1=|αj-αs|
Average Rating F1 for each joints Rating Average Rating
0.333 J1 166 r1 0.15 0.150
J2 58 r2 0.15
J3 94 r3 0.15
F2=βj
Average Rating F2 for each joints Rating Average Rating
24 J1 21 r1 0.40 0.6
-395.33333 J2 31 r2 0.70
J3 31 r3 0.70
F3=βj- βs
Average Rating F3 for each joints Rating Average Rating
-56.67 J1 -52 r1 -60 -60.00
J2 -42 r2 -60
J3 -42 r3 -60
F4 (excavation Method)
ng or mechanical 0 Presplitting 10 Blasting or mechanical
al Slope 15 Smooth Blasting 8 Natural Slope

SMR
Average Rating
0.150

Average Rating
24.00
-2.00

Average Rating
-16.67

ng or mechanical 0
al Slope 15
SMR

52.6

0
15