You are on page 1of 4

Integrated Valve Train

INSTALLATION INSTRUCTIONS
6. Make sure the gas flow is in the direction of the arrow
APPLICATION on the gas valve casting.

These Integrated Gas Valve Train component installation NOTE: Gas flow in the V4297S Normally Open Vent Valve
instructions are for small valves (3/4 in. to 2 in.) and large can be in either direction.
valves (2 in. to 3 in.) are identical except where noted. EXCESS DOPE CAN BLOCK
TWO CLEAN DISK FROM
THREADS VALVE
WITH SEAT
INSTALLATION MODERATE
AMOUNT
OF DOPE LOOSE

When Installing this product... CORRECT:


NORMAL
1
CHIPS INCORRECT:
TOO LONG,
1. Read these instructions carefully. Failure to follow them FULL DISTORTS
THREAD VALVE SEAT
could damage the product or cause a hazardous
PIPE REAM PIPE AND BLOW
condition. OUT CHIPS (TO AVOID
ADAPTER
2. Check ratings given in these instructions and on the LODGING ON SEAT) PIPE
product to make sure the product is suitable for your ADAPTER

application.
3. Make sure the installer is a trained, experienced service
technician.
4. Use these instructions to check out product operation
after installation.

WARNING
Fire or Explosion Hazard. CORRECT:
INCORRECT:
Can cause property damage, serious injury or TOO LONG,
death. DISTORTS
Perform the safety shutdown test any time work is VALVE SEAT
1 USE PIPE DOPE RESISTANT TO ACTION OF LP GAS.
done on a gas system. M16410

Make sure gas is turned off before starting installation. Fig. 1. Preparing pipes.

Bolt Torque Specifications


Torque specifications for the two bolt sizes are: Connecting Upstream or Downstream Pipe
• 3/8 in. 16 bolts: 13 lb-ft. Adapter to Valve (Fig. 2)
• 1/2 in.-13 bolts: 25 lb-ft.
1. Using the grease packet provided (or equivalent,
general purpose, lithium grease), grease the O-ring.
Valve Assembly Precautions (Fig. 1) Make sure the grease is applied evenly around the
1. Use new, properly reamed, pipe, free from chips. entire O-ring.
2. Do not thread pipe too far into pipe adapter. Valve 2. Insert the O-ring into the O-ring groove.
distortion or malfunction can result from excess pipe in 3. Assemble the pipe adapter to the valve using the three
the valve. bolts, nuts and lock washers as shown in Fig. 2.
3. Do not attach valve actuator until valve body installation
is complete.
4. Make sure O-ring sealing surfaces are clean.
5. Apply moderate amount of good quality pipe dope,
resistant to the action of liquid propane (LP) gas only
on the pipe threads.

® U.S. Registered Trademark


Copyright © 1999 Honeywell Inc. • All Rights Reserved 66-1099
INTEGRATED VALVE TRAIN

Connecting Normally Open Vent Valve


GREASE
PACKET
Adapter Between Two Valves (Fig. 4)
1. Using the grease packet provided (or equivalent,
general purpose, lithium grease), grease the O-ring of
the first valve. Make sure the grease is applied evenly
O-RING around the entire O-ring.
2. Insert the O-ring into the O-ring groove.
3. Assemble the NOVV adapter to the first valve using the
three bolts, nuts and lock washers as shown in Fig. 4.
4. Using the grease packet provided (or equivalent,
PIPE ADAPTER
general purpose lithium grease), grease the O-ring of
the second valve. Make sure the grease is applied
evenly around the entire O-ring.
M16407 5. Insert the O-ring into the greased O-ring groove.
6. Assemble the NOVV adapter to the second valve using
the three bolts, nuts and lock washers as shown in Fig.
Fig. 2 Connecting the pipe adapter to the valve. 4.

NOTE: Use the three smaller bolts provided with the large
Connecting V4297S Normally Open Vent NOVV Adapter to connect the downstream side of
the NOVV adapter with the second valve.
Valve (NOVV) Between Two Valves (Fig. 3)
1. Using the grease packet provided (or equivalent, IMPORTANT
general purpose, lithium grease), grease the O-ring of Be sure that all bolts point out of the NOVV adapter.
the first valve. Make sure the grease is applied evenly
around the entire O-ring.
SECOND
2. Insert the O-ring into the O-ring groove. VALVE
3. Assemble the NOVV to the first valve using the three
bolts, nuts and lock washers as shown in Fig. 3. O-RING
4. Using the grease packet provided (or equivalent, OW
general purpose lithium grease), grease the O-ring of S FL
the second valve. Make sure the grease is applied GA
evenly around the entire O-ring.
5. Insert the O-ring into the O-ring groove.
6. Assemble the NOVV to the second valve using the
three bolts, nuts and lock washers as shown in Fig. 3. LOCKWASHER

3 BOLTS ON NUT
IMPORTANT O-RING
EACH SIDE
All bolts should be pointing out of the NOVV.
NOVV ADAPTER
GREASE
PACKET

V4297
M16403
FIRST
VALVE
SECOND
VALVE Fig. 4. Connecting the normally open vent valve adapter
GREASE
between two valves.
PACKET
O-RING

Connecting Two Valves in Series (Fig. 5)


1. Using the grease packet provided (or equivalent,
general purpose lithium grease), grease the O-ring of
O-RING
the first valve. Make sure the grease is applied evenly
around the entire O-ring.
3 BOLTS ON 2. Insert the first O-ring into the O-ring groove.
EACH SIDE 3. Using the grease packet provided (or equivalent,
general purpose lithium grease), grease the O-ring of
the second valve. Make sure the grease is applied
M16402
evenly around the entire O-ring.
4. Insert the second O-ring into the O-ring groove.
FIRST 5. Assemble the first valve to the second valve using the
VALVE
three bolts, nuts and lock washers as shown in Fig. 5.
Fig. 3. Connecting the normally open vent valve between
two valves.

66-1099 2
INTEGRATED VALVE TRAIN

IMPORTANT Completing the Assembly (Fig. 7):


Point the top two bolts upstream and the third bolt 1. Assemble the upstream and downstream pipes to the
downstream when connecting two valves in series. valve train.
2. Apply a parallel jaw wrench only to the pipe adapter flat
Connecting a C6097 Pressure Switch to a next to the pipe being inserted (Fig. 7). A wrench
applied to the valve body itself, or to the end farthest
Valve (Fig. 6) from the pipe being inserted, can distort the casting,
causing a malfunction. Do not use the valve as a lever.
1. Remove the 1/4 in. (6 mm) NPT plug from the side of 3. Make sure the gas flow is in the same direction as the
the valve. arrow on the valve body.
2. Remove the label holding the O-ring in place on the 4. Paint the pipe adapters and valve train components
C6097 and make sure the O-ring seal is in place. with a rich soap and water solution to check for bubbles
3. Remove the C6097 Cover by removing the cover that indicate a gas leak at the pipe adapter and valve
screws. mating surfaces.
4. Mount the C6097 Pressure Switch on the valve using 5. Make sure the power supply is disconnected from the
the two screws provided. powered components. Mount the actuators on the valve
5. Replace the C6097 Cover. bodies and complete the electrical and linkage
connections by following the instructions packed with
the actuators and solenoid valves.

SECOND
VALVE

OW
S FL CORRECT:
GA VISE GRIPS END
NEXT TO PIPE
BEING INSERTED

O-RINGS

FIRST
VALVE

CORRECT:
WRENCH
M16409
CORRECTLY
APPLIED NEXT
TO PIPE BEING
Fig. 5. Connecting two valves in series. INSERTED INCORRECT:
WRENCH APPLIED
HERE STRAINS
VALVE BODY

M11684

VALVE
Fig. 7. Completing the valve train.

REMOVE PLUG
(1/4 IN. SOCKET HEAD)

C6097
BODY

C6097
M16408
COVER

Fig. 6. Connecting C6097 Pressure Switch to Valve.

3 66-1099
INTEGRATED VALVE TRAIN

Home and Building Control Home and Building Control


Honeywell Inc. Honeywell Limited-Honeywell Limitée
Honeywell Plaza 155 Gordon Baker Road
P.O. Box 524 North York, Ontario
Minneapolis MN 55408-0524 M2H 3N7
Printed in U.S.A. on recycled
paper containing at least 10%
66-1099 G. R. 4-99 4 paper fibers.
post-consumer www.honeywell.com

You might also like