You are on page 1of 1

A B C D E F G H

B7(300X250)

B6(600X250)

B5(500X250)
C1 C1 B5(500X250) C1 C1 B5(500X250) C1 C1 C1
1 B5(500X250) C1

B(150X250)
B(150X250)

ELEVATOR
PIT
C2 C2 C2 C2
B4(800X250) C2
2 SW1

B5(500X250)

B5(500X250)
B6(600X250)
4.9737 m

B6(600X250)

B6(600X250)

B6(600X250)
RIB SALB 300mm C3
7.0000 m

B5(500X250)
7.0000 m

SW2
3 C2
B4(800X250)
C2 C2 C2 C2 C2
B5(500X250)

C2
C1 C1 C2
4 C1 C1 B5(500X250) C1

B6(600X250)

B5(500X250)
B7(300X250)

GENERAL NOTES ABBREVIATIONS


1. ALL DIMENSIONS ARE IN MM & ALL
C: COLUMN
LEVELS ARE IN METERS
2. MINIMUM COMPRESSIVE STRENGTH B: BEAM

04-Second Floor Fcu 28 DAYS (N/mm) AS FOLLOWS:


A) SUBSTRUCTURE (PLAIN CONCRETE AND
FOUNDATION)
F: FOOTING

1 1 : 100
B) SUPERSTRUCTURE (COLUMNS, BEAMS,
SLABS, WALLS, STAIRS)
3. MINIMUM CONCRETE CLEAR COVER TO
PC: PLAIN CONCRETE

SW: SHEAR WALL


REINFORCMENT:
FOUNDATION 50mm PW: PLANTED WALL
COLUMN 40mm
BEAMS and GIRDERS 30mm
STAIRS 20mm
SLABS 30mm

No. Description Date


MANAGEMENT BUILDING 2ND FLOOR
LAYOUT
ASN UNIVERSITY
Date 11/22/2021 04-ASN-IFC-STR-2ND_R00
Drawn by Author
Checked by Checker Scale As indicated

You might also like